Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20151065 Ver 2_Boom_PCN app_20220826
Strickland, Bev From: Carpenter,Kristi Sent: Friday, August 26, 2022 4:29 PM To: Conchilla, Ryan Cc: Chapman, Amy Subject: RE: once again need a question answered before I can process an app Attachments: DOT Initial Review _ Laserfiche Forms Piedmont Triad International Airport Manufacturing Site.pdf Ryan, It's not really a glitch. The ePCN was never meant to handle a buffer authorization application as a standalone request, only buffer authorizations being requested in conjunction with projects that also have impacts to streams, wetlands, and/or open water. There is a separate form if applicants are only seeking a Buffer Authorization found at the following link: https://edocs.deq.nc.gov/Forms/Buffer-Authorization. Do you know if there was a reason this form was not used? Also do we know if the ePCN covers all the same information about public funding and the like that gets captured on the Buffer Authorization Application? We don't see those a lot and never have I seen one come in on an ePCN so I'm trying to see if this is a case where we need to do a little training or put out guidance on what forms are available. I'm copying Amy on this one to make sure I am able to accept an application requesting an erroneous permit and if so, what documentation I need from the applicant that states they are only requesting a buffer authorization. I would assume we need something, so it doesn't appear though we are accepting an application that states a for the record NW14 is being allowed as I see nothing in the application stating the NW14 is not part of what is being requested. I have reattached the application for her viewing so we can have a conversation on this one. I was all set to put this on public notice and request a fee when one is not required. Glad I checked with you on it first because that would have been an even bigger mess. 0 klc Kristi Lynn Carpenter Administrative Assistant 401 & Buffer Transportation Permitting Branch Department of Environmental Quality Division of Water Resources 919.707.3872 office kristilynn.carpenter@ncdenr.gov 512 N Salisbury Street, 12th Floor 1617 Mail Service Center Raleigh, NC 27699-1617 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your i requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Conchilla, Ryan <ryan.conchilla@ncdenr.gov> Sent: Friday, August 26, 2022 4:08 PM To: Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov> Subject: Re: once again need a question answered before I can process an app NCDOT is not seeking a nationwide permit from the USACE. It's a glitch in the PCN submission system which requires a selection to move forward. It's just the buffer authorization. The US ACE has already issued a no permit required. Get Outlook for iOS From: Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov> Sent: Friday, August 26, 2022 3:47:05 PM To: Conchilla, Ryan <ryan.conchilla@ncdenr.gov> Subject: RE: once again need a question answered before I can process an app What about the NW14? Kristi Lynn Carpenter Administrative Assistant 401 & Buffer Transportation Permitting Branch Department of Environmental Quality Division of Water Resources 919.707.3872 office kristilynn.carpenter©ncdenr.gov 512 N Salisbury Street, 12th Floor 1617 Mail Service Center Raleigh, NC 27699-1617 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Conchilla, Ryan <ryan.conchilla@ncdenr.gov> Sent: Friday, August 26, 2022 3:45 PM To: Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov> Subject: Re: once again need a question answered before I can process an app This buffer auth would be 20151065-version 2- under TPB. Get Outlook for iOS From: Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov> Sent: Friday, August 26, 2022 2:54:36 PM 2 To: Conchilla, Ryan <ryan.conchilla@ncdenr.gov> Subject: once again need a question answered before I can process an app Ryan, Attached is a new application that I already know has some administrative issues that must be addressed, but I'm trying to determine if this is going to be a stand alone new project that references the current Boom Site project while maintaining its own project number in BIMS or a separate version of the Boom Site project 20151065 that would just be under Transportation Review. I have a fee request email ready to send as Nancy has marked this application as a for the record project and I cannot charge a WBS number without written acknowledgement to do so, but wanted to make sure I'm entering this project into BIMS correctly before sending that fee request correction. This needs a public notice, but I can't do that either until we determine how to enter it in BIMS. Fun times! Thanks, klc Kristi Lynn Carpenter Administrative Assistant 401 & Buffer Transportation Permitting Branch Department of Environmental Quality Division of Water Resources 919.707.3872 office kristilynn.carpenter©ncdenr.gov 512 N Salisbury Street, 12th Floor 1617 Mail Service Center Raleigh, NC 27699-1617 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. 3 DWR Division of Water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) April 13, 2022 Ver 4.3 Initial Review Has this project met the requirements for acceptance in to the review process?* (_) Yes Q No Is this project a public transportation project?* Yes 0 No Change only if needed. Pre -Filing Meeting Date Request was submitted on: 6/22/2022 Information for Initial Review la. Name of project: Piedmont Triad International Airport Manufacturing Site la. Who is the Primary Contact?* [Nancy Oberle 1 b. Primary Contact Email:* 1 c. Primary Contact Phone:* i nancy.oberle@threeoak Date Submitted 1(919)900-6535 8/25/2022 Nearest Body of Water Brush Creek Basin Cape Fear Water Classification WS-III; NSW Site Coordinates Latitude: Longitude: 36.119976 1-79.951711 A. Processing Information County (or Counties) where the project is located: Guilford Add another county Is this a NCDMS Project 0 Yes QQ No Is this project a public transportation project?* QQ Yes 0 No Is this a NCDOT Project?* ®i Yes 0 No (NCDOT only) T.I.P. or state project number: HE-0005 WBS # (7) 50338.3.1 la. Type(s) of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* 0 Yes QQ No 1 b. What type(s) of permit(s) do you wish to seek authorization? Q Nationwide Permit (NWP) ❑ Regional General Permit (RGP) ❑ Standard (IP) lc. Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit (NWP) Number: Add additional NWP NWP Numbers (for multiple NWPS): 14 - Linear transportation v 1d. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification 401 Water Quality Certification - Express Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: ci Yes O No For the record only for Corps Permit: ®i Yes 0 No 1f. Is this an after -the -fact permit application?* 0Yes QQ No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? 0Yes 0 No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1 h. Is the project located in any of NC's twenty coastal counties? Yes No 1 j. Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d. Who is applying for the permit? O Owner ❑ Applicant (other than owner) le. Is there an Agent/Consultant for this project?* QQ Yes 0 No 2. Owner Information 2a. Name(s) on recorded deed: North Carolina Department of Transportation 2b. Deed book and page no.: 2c. Contact Person: 2d. Address Street Address 1 1584 Yanceyville Street Address Line 2 City Greensboro Postal / Zip Code 27415 2e. Telephone Number: (336)256-2063 2g. Email Address: * (japarker3©ncdot.gov State / Province / Region INC Country (USA 2f. Fax Number: Add another owner 4. Agent/Consultant (if applicable) 4a. Name: Nancy Oberle 4b. Business Name: Three Oaks Engineering 4c. Address Street Address 324 Blackwell Street, Suite 1200 Address Line 2 City Durham Postal / Zip Code 27701 4d. Telephone Number: (919)900-6535 4f. Email Address: * State / Province / Region NC Country 1 USA 4e. Fax Number: inancy.oberle@threeoaksengineering.com J C. Project Information and Prior Project History 1. Project Information lb. Subdivision name: (if appropriate) lc. Nearest municipality / town: Greensboro 2. Project Identification 2a. Property Identification Number: 2b. Property size: 2c. Project Address Street Address Address Line 2 City Postal / Zip Code 3. Surface Waters State / Province / Region Country 3a. Name of the nearest body of water to proposed project: * Brush Creek 3b. Water Resources Classification of nearest receiving water: * WS-III; NSW 3c. What river basin(s) is your project located in?* 1 Cape Fear Add another river basin v 3d. Please provide the 12-digit HUC in which the project is located. L30300020102 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: * 'The proposed project is located adjacent to the Piedmont Triad International Airport. The project is bordered by Pleasant Ridge Road/I-73 to the north, North Regional Road to the west, Cornerstone Drive to the east, and the Mercy Hill Church Regional Campus to the south. The proposed project site is comprised of forested and clear cut areas. The land use in the vicinity of the project consists of suburban residential areas, commercial lots, industrial facilities, and airport property. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? * Yes OQ No 0 Unknown 4f. List the total estimated acreage of all existing wetlands on the property: 2.18 4g. List the total estimated linear feet of all existing streams on the property: 7035 4h. Explain the purpose of the proposed project: * The purpose of the project is to provide access and connectivity to PTI property to accommodate the employees and material delivery to the proposed aviation -related development on the airport property. Boom Supersonic selected Greensboro for the first supersonic airliner manufacturing facility. L 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * North Carolina Department of Transportation (NCDOT) Project No. HE-0005 proposes to construct two new roadways north of 1-73 between Pleasant Ridge Road and the 1-73 taxiway and south of 1-73 between Regional Road and the Old Oak Ridge Road/I-73 interchange to provide access and connectivity to the Piedmont Triad International (PTI) Airport in Greensboro. The project also includes constructing a bridge over 1-73 to provide connections between the new location roadways, north and south of 1-73. Boom Supersonic selected Greensboro for the first supersonic airliner manufacturing facility. Pleasant Ridge Road is generally a two-lane undivided roadway that widens to accommodate turn lanes at its signalized intersection with N.C. Highway 68. Regional Road is a four -lane 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes 0 No Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made? * Preliminary (_) Approved Not Verified Unknown N/A Corps AID Number: SAW-2022-00680 i 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Oth-~• Nathan Howell, MS, PWS Three Oaks Engineering 6. Future Project Plans 6a. Is this a phased project?* Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries Open Waters Pond Construction 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. ❑ Neuse ❑ Catawba ❑ Goose Creek ❑ Other ❑ Tar -Pamlico ❑ Randleman Q Jordan Lake Buffers 6b. Impact Type 6c. Per or Temp 6d. Stream name 1 6e. Buffer mitigation required? 6f. Zone 1 impact 6g. Zone 2 impact 1 Site 1 - Allowable (Road P N, 2,566 SA No 3,290 Add another impact 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 0.00 0.00 Zone 1 Zone 2 Total Permanent impacts: 2,566.00 3,290.00 Zone 1 Zone 2 Total combined buffer 2,566.00 3,290.00 impacts: 6i. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: This project has been designed with as few crossings of jurisdictional features as possible. The crossings have been designed to minimize jurisdictional impacts by avoiding features wherever possible. There will be impacts to the 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Erosion and sedimentation BMPs will be installed prior to construction. Construction has been sequenced and designed to avoid/minimize impacts by locating temporary pump arounds away from features. Water will be diverted 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Impacts to riparian buffers have been minimized as much as possible. What impacts are expected are small but unavoidable. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No What type of SCM are you providing? Level Spreader Vegetated Conveyance (lower SHWT) Wetland Swale (higher SHWT) Other SCM that removes minimum 30% nitrogen Proposed project will not create concentrated stormwater flow through the buffer 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* Yes No Comments: SMP is included in this permit application package. G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* Yes No 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? * Yes No Comments: * 'Minimum Criteria Determination Checklist is included in this permit application package. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* Yes i No 3b. If you answered "no," provide a short narrative description. 'The proposed project is a build -out of the project site. No additional development or expansion of the site is planned and no additional development outside of the project site is anticipated as a result of the proposed project. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* Yes CQ No 0 N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* Yes No 5e. Is this a DOT project located within Division's 1-8? Yes No Unknown 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? IPaC; site surveys/habitat assessments for bald eagle, small -whorled pogonia, - and Schweinitz's sunflower (area of buffer impact has been cleared for sunflower and the remaining portions of the study area will be surveyed 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes OQ No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? * NOAA Essential Fish Habitat Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? * HPOWEB 2.0 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? * Yes O No 8b. If yes, explain how project meets FEMA requirements: [The NCDOT Hydraulics Unit will coordinate with the N.C. Floodplain Mapping - Program � (FMP) to determine the status of the project with regard to applicability of 8c. What source(s) did you use to make the floodplain determination?* FEMA Flood Map Service Center Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document Upload BOOM DRAFT NRTR_June 2022.pdf 8.24MB X BOOM_Updated JD Package_05012022.pdf 17.88MB X HE-0005 Piedmont Triad International Airport - BOOM Project-Pre-Filin... 147.37KB X HE-0005_BOOM_RDY_PRE-65%_SET_FOR_PERMITTING.pdf 6.22MB X HE-0005_HYD_Buffer Impact_Drawings.pdf 2.76MB X HE-0005_HYD_Draft_SMPv3.01.pdf 295.14KB X HE-0005_MCDC.pdf 4MB X File must be PDF or KMZ Comments Signature * By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: W. R. Archer III, PE Signature Date 8/25/2022 Comments Accept Reject