Loading...
HomeMy WebLinkAboutGW1-2022-07625_Well Construction - GW1_20220817 WELL CONSTRUCTION RECORD For Internal Use ONLY: This firm can be used for single or multiple wells I.Well Contractor Information: 14.WATER ZONES Kolby Mitchell Sawyers FROM TO DESCRIPTION \Nell Contractor Name ft. rt. 4471-A ft. ft. NC Well Contractor Certification Number 15.OUTER CASING for multi-eased wells)OR LINER if a Mable FROM TO DIAMETER THICKNESS MATERIAL CLYDE SAWYERS & SON WELL & PUMP INC +1 ft- 21 ft- 6 1/8 j in. 1 #188 1 Steel Company Name 16.INNER CASING OR TUBING(geothermal closed-loop) 2021-00210 FROM TO DIAMETER THICKNESS MATERIAL 2.Well Construction Permit#: ft. ft. in. Ow all applicable aril permits(i.e.County,State, Variance,Injection.etc.) ft. ft. in. 3.Well Use(check well use): 17.SCREEN i Water Supply Well: FROM 7.0 DIAMETER SLOTSIZF. 'THICKNESS MATERIAL ft. ft. in•' ❑Agricultural ❑Municipal/Public ft. f. in. ❑Geothermal(Heating/Cooling Supply) EIResidential Water SuPPIY(single) ❑Industrial/Commercial ❑Residential Water Supply(shared) 18.GROUT FROM I TO MATERIAL EMPLACEMENT METHOD&AMOUNT ❑Irr; ation 0 ft. 20 ft- Bentonite Pumped Non-Water Supply Well: ft. ft. ❑N1on itori ng ❑Recovery Injection Well: ❑AquilerRecharge ❑GroundwaterRemediation 19.SAND/GRAVEL PAC K ifa licable FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquiter Storage and Recovery ❑Salinity Barrier ft. ft. ❑Aquiter Test ❑Stonmwater Drainage ft. ft. ❑Experimental Technology ❑Subsidence Control 20.DRILLING LOG(attach additional Sheets if necessa ❑Geothermal(Closed Loop) ❑Tracer FROM TO DESCRIPTION color,hardness,soiltrock type,grain size,etc. ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) 0 fc' 21 fc• OVER BURDEN 6-22-2022 21 fc• 145 fc• GRANITE 4.Date Well(s)Completed: WeII ID# ft. ft. 5a.Well Location: Jeffrey Dodd facility/0"tier Name Facility ID#(if applicable) ft. ft. 2537 Lower Flat Creek Road Hendersonville, NC 28711 e u Phy>ical Address,City,and Zip 21.REMARKS Buncombe 062522601300000 C•OIInIV Parcel Identification No.(PIN) 51).Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22•Certification: nfwell field•one lat/long is sufficient) N M 7-21-2022 Signature ofCertifi Well Contractor X 6.Is(are)the well(s): 2Permanent or ❑Temporary Br signing this Jorin,I herebv certq[ that the well(s)was(were)constructed in accordance with 15A NCAC 02C.0I00 or 15A NCAC 02C.0200 Well Cqy Fyltrcti!.4tpnll rd that a 7.Is this a repair to an existing well: ❑Yes or ElNo copygf1his record has been provided to the well owner. hh''��JJ ({ l/ihis is a repair.Jill oul known well construc(ion in/brntalion and evtlain the nature of the repair under#2l remarks section or on the hack of,this firm. 23.Site diagram or additional well details: Ift iamif&ic-n Pr �ue'1h51Rg Ur1;t You may use the back of this page to provide additionabb� ails or well 8.Number of wells constructed: 1 construction details. You may also!attach additional pages ifnecessary. Fur tnuhildc injection or non-voter sllpphr wells ONLY with the scone construction,you can cuhmil one form. SUBMITTAL INSTUCTIONS 9.Total well depth below land surface: 145 (ft.) 24a. For All Wells: Submit this form within 30 days of completion of well For multiple welly list a/1 depths tfdihterent(example-3@200'and 2@100') construction to the following: 10.Static water level below top of casing: 40 Division of Water Resources,Information Processing Unit, U„ater level is above easing,use + 1617 Mail Service Center,Raleigh,NC 27699-1617 I I.Borehole diameter: 6.25 (in.) 24b. For Infection Wells ONLY:;! In addition to sending the form to the address in ROTARY 24a above, also submit a copy of this form within 30 days of completion of well 12.Well construction method: construction to the following: (i.e.auger,rotary,cable,direct push,etc.) Division of Water Resources;Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 m 13a.Yield (gP ) 12 Method of test: RIG 24c.For Water Supply&Injection Wells: i Also submit one copy of this form within 30 days of completion of 131).Disinfection type: PILLS Amount: 20 well construction to the county hi alth department of the county where constructed. Pori G W-I North Carolina Department of Environment and Natural Resources-Division of Water Resources Revised August 2013