Loading...
HomeMy WebLinkAboutGW1-2022-07616_Well Construction - GW1_20220817 WELL CONSTRUCTION RECORD For Internal Use ONLY: This form can be used for single or multiple wells 1.Well Cnntractor Information: GARRETT CLYDE BANKS 1aR.zi ..<5 �. : 6: r , 4 FROM TO DESCRIPTION Well Contractor Name ft. ft. 4519-A ft. ft. j NC Well Contractor Certification Number f5 XJl11,LR4 Ittfx.lor'inulttc'a§eiliv[Is-l)R LiT� ,ilia lii Atli "' FROM TO DIAMETER THICKNESS MATERIAL CLYDE SAWYERS & SON WELL & PUMP INC +1 ft. 70 ft- 161/8 #21 PVC Company Name lull{YER<C11V(,OI2T3t371yCN, 'eoth¢imAllctose �„ " 2021-00179 FROM 10 DIAMETER THICKNESS MATERIAL 2,Well Construction Permit#: ft. rt. ' in. List till applicable w t!ll permits(i,e.County,State,Variance,Injection,etc. in. 3.Well Use(check well use): Water Supply Well: FROM TO DIAMETER, SWTSIZE THICKNESS MATERIAL ❑Agricultural ❑Municipal/Public ft. ft. in. ❑Geothermal(Heating/Cooling Supply) E'lResidential Water Supply(single) ft. ft' in.' ❑lndustrial/Commercial ❑Residential Water Supply(shared) Nit R',0T?MMMI FROM I TO MATERIAL EMPLACEMENT METHOD&.4MOUNT ElTi-rigation 0 t[ Non-Water Supply Well: 20 ft' Bentonite Pumped ft. tt. ❑Monitoring ❑Recovery injection Well: ❑Aquifer Recharge ❑Groundwater Remediation 29;SA'NDIGRA�?kL1' CKs d'a '°P;,hie , x " N ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL EMPLACEMENT METHOD ft. ft. ❑Aquifer Test ❑Stormwater Drainage ft. ft. ❑Experimental Technology ❑Subsidence Control ❑Geothermal(Closed Loop) ❑Tracer FROM TO DESCRIPTION color,hardness,soillrmk type. ram size,etc.) ❑Geothermal Heating/CooGn Return ❑Other(explain under#21 Remarks) 0 ft• 70 fr• OVER BURDEN 06-20-2022 70 fr• 285 fr• GRANITE 4.Date Well(s)Completed: Well ID# ft. ft. 5a.Well Location: rt. rt. JOSEPH MELTON/SCHUMACHER Facility/Owner Name Facility ID#(ifapplicable) f STARRY NIGHT COVE LEICESTER, NC ft. ft AUG G Physical Address,City,and Zip yy�� ii[[ r tl.".lit lYlao�gam,� .,v,. ..k BUNCOMBE 87804272790000 Flr^+.r'1�_z` r g UPS County Pat-eel Identification No.(PIN) 5b.Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22•Certification: (if well field,one lat/long is sufficient)N `,l, 06-28-2022 Signature of Cerh Well Contractor Date 6.is(are)the well(s): OPermanent or ❑Temporary By signing Neic(n•m,!Trerehr rrrttj}�that the Nell(s)was/were)constructed in actnrdanre with 15A NCAC 02C.0100 or 1 SA NCAC 02C.0200 Well Construction Standards and that a 7.Is this a repair to an existing well: ❑Yes or ElNo copy ofihis record has been provided to the well owner. ff this is u repair,fill uut knuwn well construction informatiun and ex7daiu the nature of the repair under#21 remark section or on the hack r'1his li,rm. 23.Site diagram or additional well details: You may use the back of this page'to provide additional well site details or well 8.Number of wells constructed: construction details. You may also attach additional pages if necessary. For multiple injection or non-water supply wells ONLY with the same construction,you can submit one form. SUBMITTAL INSTUCTIONS 9.Total well depth below land surface: 285 (ft.) 24a. For All Wells: Submit this form within 30 days of completion of well For multiple wells list all hTths ifdi/fi rent(example-3(V00'and 2(a.-100') construction to the following: 10.Static water level below top of casing: 20 (ft) Division of Water Resources,Information Processing Unit, uter level is above casing.use"+^ 1617 Mail Service Center, If w Raleigh,NC 27699-1617 11.Borehole diameter: 6.25 (in.) 24b.For Injection Wells ONLY: �In addition to sending the form to the address in ROTARY 24a above, also submit a copy of,this form within 30 days of completion of well 12.Well construction method: construction to the following: (i.c.auger,rotary,cable,direct push,etc.) Division of Water Resources,lUnderground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 13a.Yield(gpm) 30 Method of test: RIG 24c.For Water Supply&Injection Wells: Also submit one copy of this form within 30 days of completion of 13b.Disinfection type: PILLS Amount: 16 well construction to the county he lth department of the county where constructed. i Fort%G W-I North Carolina Department of Environment and Natural Resources—Division of Water Resources Revised August 2013