Loading...
HomeMy WebLinkAboutSW8971223_HISTORICAL FILE_20071109STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 rjl 1223 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS 11 HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2 0 0-1 1100, YYYYMMDD ATF9 �Qr t 1 Y November 9, 2007 M. Kent Mitchell, Managing Member Bald Head Island Limited, LLC P.O. Box 3069 Bald Head Island, NC 28461 9- --aa3 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality Subject: Stormwater Permit No. SW8 971223 Modification - Correction Harbour Village Eastern Basin High Density Subdivision Project Brunswick County Dear Mr. Mitchell: The Wilmington Regional Office issued Stormwater Management Permit No. SW8 971223 Modification dated November 6, 2007, for the Harbour Village Eastern Basin, The stream index number was reported incorrectly on page 3 of the permit. Please replace Page 3 of the permit with the attached, corrected page. The corrections listed above do not impact the approved plans or permitted stormwater control system. If you have questions, please call Mary Jean Naugle or me at (910) 796-7215. Sincerely Edward Beck Regional Supervisor Surface Water Protection Section ENB\ml S:\WOS\STORMWATER\PERMIT\971223 mod correction nov07 cc: Bruce Marek, P.E. Wilmington Regional Office Central Fill- es-M.J. Naugle o gh,Carolina North Carolina Division of Water Quality 127 Cardinal Drive E.etensian Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet, w _nce�a�uilitvnrp Fax (910) 350-2004 1-877-623-6748 An Equal Opponunily/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper State Stormwater Management Systems Permit No. SW8 971223 Modification 6. The following design elements have been permitted for this wet detention pond stormwater facility, and must be provided in the system at all times. Pond Low Density Drainage Area Drainage Area a. Drainage Area, acres: 6.97 3.07 Onsite, ft2: 303,614 133,745 Offsite, ft2: 0 0 b. Total Impervious Surfaces, ft2: 203,485 29,230 Lots ft2: 120,274 29,230 Streets, ft2: 53,143 0 Parking, ft2: 17,000 0 Sidewalks, ft2: 13,068 0 Offsite, ft2: 0 0 C. Design Pond Depth, feet: 7.5 max. (installed prior to 2006) d. TSS removal efficiency: 90% - e. Design Storm: 1 inch - f. Permanent Pool Elevation, FMSL: 3.9 - g. Permitted Surface Area @PP ft2: 6640 - h. Permitted Storage Volume, ftj: 17,136 - i. Storage Elevation, FMSL: 6.08 - j. Controlling Orifice: 1.61 " ID 0 pipe - k. Permanent Pool Volume, ft3: 30,525 - I. Forebay Volume, ft3: 6,100 - m. Maximum Fountain Horsepower: 1/8 HP - n. Receiving Stream / River Basin: Bald Head Marina Bald Head Creek o. Stream Index Number: 18-88-8-5 18-88-8-4 p. Classification of Water Body: "SC" "SA;HQW" 11. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot does not exceed the maximum allowed by this permit. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 3. If an Architectural Review Board or Committee is required to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built -upon area. Any approvals given by the Board do not relieve the homeowner of the responsibility to maintain compliance with the permitted. BUA limit. 4. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 5. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. pant I of A A TF9O Michael E. Easley, Governor G William G. Ross Jr., Secretary r North Carolina Department of Environment and Natural Resources Colleen 11. Sullins, Director Division of Water Quality November 6, 2007 M. Kent Mitchell, Managing Member Bald Head Island Limited, LLC P.O. Box 3069 Bald Head Island. NC 28461 Subject: Stormwater Permit No. SW8 971223 Modification Harbour Village Eastern Basin Lots High Density Subdivision Project Brunswick County Dear Mr. Mitchell: The Wilmington Regional Office received a Stormwater Management Permit Application for Harbour Village Eastern Basin on August 15, 2007 with additional information received on September 26, October 24, and November 6, 2007. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 971223 Modification, dated November 6, 2007, for the modification of the project, Harbour Village Eastern Basin. This permit shall be effective from the date of issuance until November 6, 2017, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. Please note that Bald Head Island Limited, LLC is responsible for ensuring built -upon areas are within the permitted allotment and for conveying this information to the lot buyer prior to the sale of any lot. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to'request an adjudicatory hearing upon written request within sixty (60) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact M.J. Naugle, or me at (910) 796-7215. Sincerely, Edward Beck Regional Supervisor Surface Water Protection Section ENB/mjn: S:\WQS\STORMWATER\PERMIT\971223mod nov07 cc: Stephen O. Robertson, Chief Operating Officer, BHI Limited, LLC Jim Henry, Bald Head Island Limited, LLC Bruce Marek, P.E. Brunswick County Inspections Jeff Phillips, Brunswick County Engineering Division of Coastal Management Wilmington Regional Office, Central Files, M.J. Naugle ,�hCarolina N atura!!y North Carolina Division of Wager Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet=w_ngvge�unliy,nig Fan (910)350-2004 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer- 5l1 . Recycled/10% Post Consumer Paper State Stormwater Management Systems Permit No. SW8 971223 Modification STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO M. Kent Mitchell, Managing Member and Bald Head Island Limited, LLC Harbour Village Eastern Basin East side of Bald Head Island, Brunswick County FOR THE construction, operation and maintenance of one wet detention pond for the high density area and a 25 % low density area, in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until November 6, 2017 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The low density portion is permitted for 28 single family lots, each allowed a maximum built upon area equivalent to the building envelope (see Summary of Built -Upon Area - Attachment A, dated August 14, 2007). Runoff from the high density area will be treated in a detention pond, sized to handle 203,485 square feet of built -upon area. The built -upon area for lots in the high density area is listed in Attachment A - dated August 14, 2007 and Exhibit A — dated October 24, 2007. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 5. Development within CAMA's Area of Environmental Concern may be subject to a reduction in the allowable built -upon area due to CAMA regulations. At a minimum, maintain a 30 foot vegetated filter between High Water Line and BUA. Page 2 of 8 State Stormwater Management Systems Permit No. SW8 971223 Modification 6. The following design elements have been permitted for this wet detention pond stormwater facility, and must be provided in the system at all times. Pond Low Density Drainage Area Drainage Area a. Drainage Area, acres: 6.97 3.07 Onsite, ftz: 303,614 133,745 Offsite, ftz: 0 0 b. Total Impervious Surfaces, ftz: 203,485 29,230 Lots ftz: Streets , ftz: 12020,27274 29,230 0 Parking, ftz: 17,000 0 Sidewalks, ftz: 13,068 0 Offsite, ft : 0 0 C. Design Pond Depth, feet: 7.5 max. (installed prior to 2006) d. TSS removal efficiency: 90% - e. Design Storm: 1 inch - f. Permanent Pool Elevation, FMSL: 3.9 - g. Permitted Surface Area @PP ftz: 6640 - h. Permitted Storage Volume, ftl: 17,136 - i. Storage Elevation, FMSL: 6.08 - j. Controlling Orifice: 1.61 " ID 0 pipe - k. Permanent Pool Volume, ft3: 30,525 - I. Forebay Volume, ft3: 6,100 - m. Maximum Fountain Horsepower: 1/8 HP - n. Receiving Stream / River Basin: Bald Head Marina ICWW o. Stream Index Number: 15-25 15-25 p. Classification of Water Body: "SC" "SA" It. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot does not exceed the maximum allowed by this permit. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 3. If an Architectural Review Board or Committee is required to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built -upon area. Any approvals given by the Board do not relieve the homeowner of the responsibility to maintain compliance with the permitted BUA limit. 4. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 5. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. Page 3 of 8 State Stormwater Management Systems Permit No. SW8 971223 Modification 6. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 7. The Director may determine that other revisions to the project should require a modification to the permit. 8. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 9. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 10. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 11. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 12. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 13. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. Page 4 of 8 State Stormwater Management Systems Permit No. SW8 971223 Modification 14. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 15. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 16. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 971223 Modification, as issued by the Division of Water Quality under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. c. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. f. Twenty -eighty (28) of the 33 lots contribute built -upon area to the low density area. Total lot BUA contributing to low density is 29,230 square feet. See Attachment A and Exhibit A for BUA per lot limits. The total BUA contributing to the high density pond is 203,485 square feet. This allotted amount includes any built -upon area is taken as the building envelope constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. The building envelope for the allowable built -upon area is based on current Bald Head Island lot setback lines. Bald Head Island Limited, LLC is responsible for conveying this information to the lot buyer prior to the sale of any lot. h. Lots within CAMA's Area of Environmental Concern may be subject to a reduction in their allowable built -upon area due to CAMA regulations. i. All runoff on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters, which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. j. Built -upon area in excess of the permitted amount will require a permit modification. 17. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 18. Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. Page 5 of 8 State Stormwater Management Systems Permit No. SW8 971223 Modification 19. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2 foot below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. C. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for the fountain pump is based on the permanent pool volume. The maximum pump power for a fountain in this pond is 1/8 HP. III. GENERAL CONDITIONS 1. This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a completed "Name/Ownership Change Form" must be submitted to the Division of Water Quality, signed by the parties involved, along with the applicable documents as listed on page 2 of the form. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal), which have jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 7. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 8. The permittee shall notify the Division in writing of any name, ownership or mailing address changes within 30 days. 9. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Permit issued this tla sixth day of November 2007. NORT CAROLINA-,NVIRONMENTAL MANAGEMENT COMMISSION Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 971223 Modification Page 6 of 8 State Stormwater Management Systems Permit No. SW8 971223 Modification Harbour Village Eastern Basin Page 1 of 2 Stormwater Permit No. SW8 971223 Modification Brunswick County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 7 of 8 State Stormwater Management Systems Permit No. SW8 971223 Modification Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. cc: NCDENR-DWQ Regional Office Brunswick County Building Inspections Page 8 of 8 w Print Form OFFICE USE ONLY Dale Receiv Fee Paid I Permit Number t o oo o 05y ►s t 2-z5/_t 7 State of North Carolina Harbour Village Eastern Basin Lots SW8-971223 Mod Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Bald Head Island Limited, LLC 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Stephen O. Robertson, Chief Operating Officer Foe n - VL--rsf m t i c NEL L , p(� qtv a c 1 N�, I�em6ER 3, Mailing Address for person listed in item 2 above: P.O. Box 3069 City:Bald Head Island State:NC Zip: 28461910-457- Telephone Number: 10-457-735$ 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Harbour Village Eastern Basin Lots SW8-971223 Mod 5. Location of Project (street address): East side of Bald Head Island Marina: Along Keelson Row, Tanbark Ct., Windward Ct. & Leeward Ct. -3i1Ci1:EFT.111i:1i:1T:l Coumy:Brunswick 6. Directions to project (from nearest major intersection): Take Ferry to Island from Indigo or Deep Point Marinas in Southport, Get off Ferry, Project is across (to east) of the marina. 7. Latitude: 33 deg 52' N Longitude: 78 Deg 00.0' W of project 8. Contact person who can answer questions about the project: Name: Bruce Marek, P.E. Telephone Number: ( G%/U Il. PERMIT INFORMATION: 1. Specify whether project is (check one): New Renewal x Modification E R CE I V ED Form SWU-101 Version 3.99 Page I of4 AUK 1. 5 2007 DWQ (S PROJ # 1 Harbour Village East Basin Lots SW8-971223 Mod 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number SW8-971223 and its issue date (if known) 6-2-98 3. Specify the type of project (check one) Low Density X High Density _Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): CAMA Major —Sedimentation/Erosion Control 404/401 Permit NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. There is an existing pond at the tent site. Overflow is piped to the marina (SC Waters) 2. Stormwater runoff from this project drains to the Cape Fear River basin. 3. Total Project Area: 10'04 acres 4. Project Built Upon Area: 3' 0 % 5. How many drainage areas does the project have? 2 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. V1014 Q LV Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name BHI Marina 18-88-8-5 Bald Head Creek 18-88-8-4 Receiving Stream Class SC SA Drainage Area 6.97 ac 3.07 ac Existing Impervious* Area 3.15 ac 0.39 ac Proposed Impervious`Area Total4.67 ac 2o3 qpocj Total 0.67'ac Zq 23o5 % Impervious* Area (total) 67.0% 21.8 Impervious' Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings 120274 sf 2.76 ac 29230 sf 0.67 ac; On -site Streets 53143 sf 1.22 ac On -site Parking 17000 sf 0.39 ac On -site Sidewalks 13068 sf 0.30 ac Other on -site Off -site Total: 203485 sf 4.67 ac Total: 29230 sf 0.67 ac 2�a,-7ls Impervious area is defined as the built upon area Including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. R E C E B V ED Form SWU-101 Version 3.99 Page 2 of 4 AUG 15 2007 DWO PROJ 4 . r � .. �. ". - .. � �. _. _ _ .. .. Harbour Village Eastern Basin Lots SW8-971223 Mod 7. How was the off -site impervious area listed above derived? non, per Engineer IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than see attachments square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area In excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control System. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 nE C E 9 V ED Unp( AUG 1 5 2007 DWQ PROJ # .. I' � 1 - i '... � � '.. � .� .. 1 ' 1 SW8-971223 Mod VI. SUBMITTAL REQUIREMENTS BHI— Harbour Village Eastern Basin Lots Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. Please indicate that you have provided the following required information by initialing in the space provided next to each item. ni 'a • Original and one copy of the Stormwater Management Permit Application Form _ • One copy of the applicable Supplement Form(s) for each BMP0 • Permit application processing fee of $420'(payable to NCDENR)SVJSA90� • Detailed narrative description of stormwater treatment/management _ • ftm copies of plans and specifications, including: �J -Development/Project name rtakSir SfJtMpAPlllof PL - Engineer and firm pN A6(. rg4*r Sw 1 -Legend C ! -North arrow 4,00AVoVV COPY Iron. C4064J Scale Revision number & date Mean high water line Dimensioned property/project boundary Location map with named streets or NCSR numbers Original contours, proposed contours, spot elevations, finished floor elevations Details of roads, drainage features, collection systems, and stormwater control measures Wetlands delineated, or a note on plans that none exist Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations Drainage areas delineated Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): Bruce Marek, P.E. Mailing Address: P.O. Box 3069 City: Bald Head Island State: NC Zip: 28461 Phone: ( 910 ) 457-7517 Fax: ( 910 ) 457-7463 VIIL APPLICANT'S CERTIFICATION I,(print ortypenameofpersonlistedinGeneral Information, item 2) Stephen O Robertson certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000. Form SWU-101 Version 3.99 Page 4 of 4 Date: c�/�Ic 7 (�E G E I V ED AUG 1 5 2007 DWQ PROJ # 11/06/2007 12:07 9104577463 BALD HEAD ISLAND PLA PAGE 01 PLANNING DEPARTMENT Telephone: (910) 457-7515 Fax Number: (910) 457-7463 IDENTIFICATION FOR FACSIMILE TRANSMISSION 7b: Mary Jean Naugle From: Bruce Marek Par. 350-2004 Pages: 2 Phsna: Onte: November6, 2007 Res SW8 971223 HV Eastern Basin Lots CC: Message: bNP Caw t-e7m c A�--) C� "IF TRANSMISSION IS INCOMPLETE OR ILLEGIBLE. PLEASE TELEPHONE IMMEDIATELY — Post Office Box 30W Said Head Island, North Carolina 2WI -.. RECF.'VFD L 1 6I'll -®J rA Re: SW8 971223 Mod Harbour Village Eastern Basin Lots Subject: Re: SW8 971223 Mod Harbour Village Eastern Basin Lots From: Mary Jean Naugle <Mary.Naugle@ncmail.net> Date: Tue, 06 Nov 2007 09:50:18 -0500, To: Bruce Marek <bmarek@bhisland.com> Bruce; I just read your memo again. Please be sure that you use the same elevation datum reference for the stormwater permit. Your depth of 7.88 feet on Pond 41 supplement is not possible when you had a Permanent Pool of 3.9 ft and a bottom of - 3.6 ft. The difference between those numbers, and thus the depth is only 7.5 ft. Please check your plans, calculations, and all references to elevation. Stay in the same datum reference for elevation. thank you, Mary Jean Bruce Marek wrote: I I'll fax it within 15 minutes Mary Jean Naugle <Mary.Naugle@ncmail.net> 11/6/2007 8:41 AM >>> Can you correct page 3 of each supplement and fax or e-mail it to me? fax: 910-350-2004. thank you, Mary Jean Bruce Marek wrote: Hi Mary Jean, My measurements were from the top of the forebay divider wall wood cap, which is at elev 6.15 FMSL NGVD 29. I agree with your assessment if we were measuring from permanent pool elevation. Since water depth is not always at permanent pool depth, especially this drought year, measuring down from the top of the forebay wall (not the cut -down), gives us an easy way to walk along the wall and "stick" the depth. I have a note that the measurement is from the divider cap. Do I need to change my sheet? Bruce IMary Jean Naugle <Mary.Naugle@ncmail.net> 11/5/2007 7:10 PM >>> Bruce; Please verify the pond 41 supplement on page 3, section 4. It appears the sediment clean out should be: "when the PP depth reads 5.63 ft [not 7.88] in the main pond... and the PP depth reads _t_ 5.06 f[not 7.31] in the forebay . The elevations on the diagram are correct, but please verify the values in the text lines. It means how deep down from the PP if one "sticks" the depth. Please verify and fax or e-mail me a corrected sheet. I am trying to draft the permit modification now. thank you Mary Jean 1 of 2 11/6/2007 9:50 AM BH1 SW8-971223 Quartermasr Row Covenant Sheet Subject: BHI SW8-971223 Quartermasr Row Covenant Sheet From: 'Bruce Marek" <marekyd@ec.rr.com> Date: Wed, 24 Oct 2007 14:09:32 -0400 To: <mary.naug1e@ncmai1.net> M.'Bruce Marek-Island" <bmarek@bhisland.com>, "Marek Yacht & Design" <marekyd@ec.rr.com> Hi Mary Jean, Attached is the changes to the covenant sheet for the Quartemaster Row Lots. Hope that is all that is needed for you to wrap up our review for Harbor Village East Basin Lots SW8-971223. Bruce Marek, P.E. for Bald Head Island Limited, LLC Planning Dept. Content -Type: application/msword 11 QuarMastExA.07.doc Content -Encoding: base64 � FIVFD OCT 2 4 7007 i BY: ---_ _ - 1 of 1 10/24/2007 2:12 PM SWS-971223 Mod Modification to June 2, 1998 NCDENR Stom order Permit Bruce Marek, P.E. Project: Harbor Village Eastern Basin Lots P.O. Box 3069 Client: Bad Head Island Limftec, LLC Bab Head Island, NC 28403 Location: Bald Head island, BrunsWck County, NC W12007 Rev 10.18-07 Corrected acreage celwlalion Project Narrative " Summary of Project Area: Aug2007 Permit ModiflcatioNU date 303613 of 6.97 acres 133745 sf 3.07 acres 437358 of 10.04 acres Summary of Streets (CAD Area includes Curbs, bump owls, end of street turnarounds, etc.) Length Width Curb A - LxW Cad Arse Max L xW or CAD Asses Keelson ROW Sta 9+10 to 23+53 1443 ft 16 It 23088 of 25828 at 25828 of 0.75 acres Tanbark Ct Sla 0+00 to 1+97 197 It 20 If 3940 sf 4210 at 4210 at 0.12 acres VVadaard Coat Sta 0+00 to 3+20 320 It 19 fl 6080 of Shon Alley Sla 0+00 to 0+70 70 It 8 If 560 at Leeward Court Sta 0+00 to 2-61 261 ft 1911 4959 of Brinkman Ali Sta 0+00 b 1+60 160 8 a ft 1280 of Sum 12879 at 1 SOM of 1503061 0.43 acres Tweeds Low Sta 0+00 to 3+53 353 It 14 It 4942 sf 7173 at 7173 of 0.21 acres Totals 52241 sf 1.51 acres Proposed 53143 of 1.54 acres Summary of Parking: Starting from South to North Keelson Row West (Marina) Side Keelson Raw Wert (Manna) Side Length Nominal Width A-LxVV Length Nominal Wdth A=LxW 54 It 10 it 540 of 78fl 12 It 897 at 40 If 6 It 220 sf 72 It 12 It 828 of 40 It oft 220 at so ft 12 It 690 5f 48 It 6 ft 264 Sf 66 ft 12 ft 759 of 48 ft 6 ft 264 at 42 It 6 ft 231 of 30ft 6ft 165 of 12 If 6ft 66 sf 12ft oft 66 Sf 12A 6ft 66 of 54 It 12 It 621 of 36 It 6 ft 198 at 20 ft 12 ft 230 at 40 It oft 220 of 20 ft 12 It 230 M 40 ft 6 ft 220 at 30 It 14 It 405 at 36 ft 6 ft 198 of loft 12 ft 184 sf 28ft 6ft 154at 36 ft 12 It 414 sf 60It 611 330 SI 30 It 14 ft 405 of 54 fl oft 297 at 30 It 12 It 345 of 80 It 6 It 440 sf 48 ft 24 It 1152 Sf 48 It 24 ft 1152 of Tad Site loft 12 If 207 at 74It 11.5 ft 851 st 30 It 14 It 405 sf 74 It 11.5It 851 sf 30 It 12 ft 345 of 102 ft oft 561 at 60 It 6 It 330 at 8726 sf 7296 at Spaces use curbs of curb for rrominal xitlth, Total Existi 16022 ft which Was calculated in streets. Widths in Cale is .5' less. Pro sed: 17000 fl 0.39 acre. 1 trsilli (H CAQ SEA L 4r"0 i 15684 REC IV OCT 17 2007 BY: W East Basin SOeasParldng SWS-971223 Mod Modification to Juns 2, 1998 NCDENR Stormater Permit Bruce Marek, P.E. Project: Harbor Village Eastern Basin Lots P.O. Box 3069 Client: Bald Head Island Limited, LLC Bald Head Island, NC 28403 Location: Bald Head Island, Brunswick County, NC 8/7/2007 Rev 10.16-07 Coffeow acreage calcination Project Narrative Summary of Project Area: Aug2007 Permit Modification/Update 303613 sf 6.97 scram 133745 sf 3.07 acres 437358 sf 10.04 acres Summary of Streets (CAD Area Includes Curbs, bump outs, end of street tumarounds, etc.) Length Width w Curb A = LxW Cad Area Max LxW or CAD Acres Keelson Row Star 9+10 to 23+53 1443 it 16 fl 23088 sf 25828 sf 25328 st 0.75 acres Tanbark Ct Sta 0+00 to 1+97 197 It 20 8 3940 sf 4210 sf 4210 sf 0.12 acres Windward Coal Sta 0+0010 3+20 320 it left 6080 sf Short Alley Sta 0-00 to 0+70 70 It 8 It 560 sf Leeward Coat Sta 0+00 to 2-61 261 it loft 4959 sf Militiamen Alley But 0+00 to 1+60 1so fl 8 If 1280 sf Sum 12879 cl 15030 of 15030 sf 0.43 acres Teniate Loop Star 0+00 to 3+53 353 It 14 it 4942 sf 7173 sf 7173 st 0.21 acres Totals 52241 sf 1.51 acme Proposed 53143 sf 1.54 acres Summary of Parking: Starting from South to North Keelson Row West (Marina) Side Keelson Raw West (Marina) Side Length Nominal Wirth A = LxW Length Nominal Width A = LxW 54 fl loft 540 at 78 it 12 If 897 sf 40 it 6 It 220 in 72 it 12 it 828 sf 40 It 6 It 220 sf so ff 12 It 690 sf 48 it 6 If 264 at 66 fl 12 it 759 sf 48 fi 6 fl 264 sf 42 a 6 fl 231 sf 30 It 6 If 185 sf 12 If 6 It 66 sf 12 it 6fl 66 sf 12 If 6fl 66 sf 54 It 12 It 621 sf 36 If 6 It 198 sf 20 If 12 it 230 sf 40 It 6 it 220 sf 20 it 12 it 230 sf 40 fl 6 it 220 sf WIf 14 If 405 sf 36 it 6fl 198 sf 16 it 12 it 184 sf 28 it 6 0 154 sf 36 R 12 It 414 sf 60If 6 It 330 sf 30 If 14 It 405 sf 54 it 6 it 297 sf 30 If 12 6 345 sf 80 fl 6 It 440 sf 48 it 24 It 1152 sf 48 fl 24 It 1152 sf Tern Site 18 If 12 If 207 sf 74It i t5It 851 at 30 If 14 It 405 sf 74 it 11.5 It 851 sf 30 fl 12 fl 345 sf 102 fl 611 561 sf 60 It 6 It 330 sf 8728 sf 7296 sf Spaces use some of arD (or nominal width, Total Existi 16022 fl which was calculated in streets. Widths in Cale Is .5less. Pro sad: 17000 fl 0.39 acres 7OCT 1 7 2007 BY: =- -J '\\\I `war9rrr \.#Q�WIH 4\ CARO, , aaaaaaa V` a �FESS%. s�9 = ° �F�4L ''r-= �7 t �668a `/o 7 ............ W East Basin Streets -Parking 9 r -1 October 15, 2007 Stephen O. Robertson, Chief Operating Officer Bald Head Island Limited, LLC P.O. Box 3069 Bald Head Island, NC 28461 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Subject: Request for Additional Information Stormwater Project No. SW8 971223 Modification Harbour Village Eastern Basin Lots at Bald Head Island Brunswick County Dear Mr. Robertson: Coleen H. Sullins Director DivislQn of Water Quality 01�✓ The Wilmington Regional Office received a State Stormwater Management Permit Application for Harbour Village Eastern Basin Lots at Bald Head Island on August 15, 2007, with additional information submitted on September 26, 2007. A preliminary review of that information has determined that the following information is needed to continue the stormwater review: Provide deed restrictions for all 33 lots proposed and label the lot numbers and corresponding built -upon areas assigned. Deed restrictions were submitted but provided BUA different than the proposed plans. Lot # DR Plan SW1 (BUA submitted) (BUA submitted) 33,000 sf with lot 3 not labeled 1A 3242 sf not labeled 1B 2881 sf not labeled 2 11,760 sf not included in plan or supplement 0M3 with lot tat 33,000 sf not labeled 3A not included 3584 sf 313 not included 4650 sf 86 not included 3000 sf 87 not included 3000 sf 2. Provide consistent lot numbering on plans, supplements, and deed restrictions. For . example, some of the discrepancies identified were: There is no lot number assigned to the new lot labeled as "New Area # 1 " on plan # (��� SW1. There is already a a lot labeled QM1. phi,_ ✓l cannot identify the location of lot 1A and 1 B on plan SW#1. •/"New area #2" labeled on plan SW#1 as 11,507 sf BUA on the plan, but is reported L G as 4456 sf BUA on the table at top left, yet reported as 11,760 sf in the deed restrictions. T, h�rJeed restrictions also mention a note at the bottom that the streets a ts, and parking iiv6re not included in the BUA. All-BUA-must-be includedlThere is,, a(I Q�2 already a lot labeled QM2 and HV2 and this conflicts with new area 2. ✓The total impervious in the top right had of plan SW1 box labeled: "2007 &Qot&,5 Mod/update" reports impervious for drainage area #1 as 186,701 sf, whereas the A-cz& supplement documents report 203,485 sf. II� The total impervious in the top right had of plan SW1 box labeled: "2007 tl,110 01 Mod/update" reports impervious for total project as 233,917 sf; whereas the supplement documents report 232,715 sf. Correct the calculations also. • 1 cannot identify lots labeled as QM1 and HV1AHV1B, or QM2 against HV2. NoncCarolina Naturallil North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet: www.newaterguality.org Fax (910) 350-2004 1-877-623-6748 An Equal Opportunity/Affrmabve Action Employer - 50 % Recycled/10% Post Consumer Paper ly Lo is proposed in the deed restrictions but not on the plans or supplement or BUA documents. The low -density supplement reports 28 lots whereas the table on plan SW1 reports MPDrovide _33lots. ��i a table on the plans for each lot that corresponds to the plan view and the deed restrictions and the supplements. In the table, provide the following columns: Lot #, BUA total, lot area total, BUA draining to pond, BUA draining to low density. 3. A note included under the table of BUA requests permeable pavement allocation. If permeable pavement allocation is requested, then provided the allocation to the BUA and itemize the amounts with each lot for sidewalks, parking, or streets; provide the operation and maintenance agreement and the calculations to demonstrate the BUA allotment, and include the locations on the plans. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to October 30, 2007, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at mary.Naugle@ncmail.net. Sincerely, Mary Jean Naugle ENB/mjn: S:\WQS\STORMWATER\ADDINFO\2007\971223Mod oct07 CC: Bruce Marek, P.E. 910-228-2484, fax 910-457-7463 M. Kent Mitchell, Managing Member Mary Jean Naugle X FOR: NCDENR SEND DATE START RECEIVER P. 01 TRANSACTION REPORT OCT-15-2007 MON 02:57 PM 9103502004 TX TIME PAGES TYPE M# DP OCT-15 02:57 PM 94577463 501, 2 FAX TX r OK) 873 W WT V m TOTAL 50S PAGES: 2 • Lot *4 is proposed In the dead restdctions but not on the plans or supplement or BUA documents. rts • The IOW-denshy supplement repo29 lots whereas the table On plan SW1 roportS 33lots.ew Provide a table on the plans for each lot that ce esponovide the fot vA la columns: Lot #, restrictions and the supplements. In the table, BUA draining f lO low density. BUA total, lot area total, BUA draining to pond, 9 ent able 3. A note include allocatioit under ns requested, thetable of EIUA n provided the allocationermeable to thelSUA andlitemaze the amounts with each lot for sidewalks, parking, or streets: provide the operation and maintenance agreement and the calculations to demonstrate the BUA allotment, and Include the locations on the plans. Please note that this request for addigonal information is In response to a preliminary review. The or to October the application requested trned as incomplete. The return of alp ojedn this �cen dceu� re ub3mWil of all required wig bereturned ems, including the application fee. other than a construction entrance under an The construction of any impervious surfaces,is approved Sil�aciion pursuant to NC Sn143 215.SA. a violation o} NCGS 143-215.1 end is subject to enf Please reference the State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (910) 795-1215 or email me at mary.Naugle@nomail.net. Sincerely, 46f_tQQ4 Mary Jean Naugle ENB/mjn: S:\WOS\STORMWATERWDDINFO\2007\971223MOd oct07 CC: M tm Mhchell Managing Member Mary Mary Jean Naugle Bruce Marek, P.E. P.O. Box 3069 Bald Head Island, NC 28461 Cell:910-228-2482 Fax:910-457-7463 September 26, 2007 ,SFP 2 6 2007 Ms Mary Jean Naugle' S NC DENR — Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Stormwater Express Review S W8-971223 request for additional information Dear Ms Naugle, Per your September 19, 2007 letter, I submit the following: 1. Letter signed by Mr. M. Kent Mitchell, President & Managing Member of Bald Head Island Limited, LLC dated 9-25-07 stating the Mr. Stephen O. Robertson, Senior Vice President & Chief Operationg Office, has signing authority for the company for stormwater permits. With this is a 1 page Consent of Action from the Managing Members of the LLC dated 5-19-06 electing Stephen O. Robertson as Senior Vice President. 2. Three copies of the updated pond drawing SW2 dated & sealed 9-25-07 are included. With plan approval, we will install a new orifice on the existing discharge structure, designed similar to the one in chapter 10 of the 2007 State BMP Manual. Detail is included on drawing. Seasonal High Water Table in the Harbor Area has been permitted in the past at 2 FMSL or lower. The Permanent Pool elevation is +3.90', thus meeting requirements of design permanent pool above SHWT. Please note that this pond was built in 1997. The 10' vegetated shelf requirement at that time was only 6'. For item 26, the pond is already vegetated. In 1997, 1 don't believe there was a restriction on the use of weeping love grass at that time. I also understand that as the state was beginning to establish its stormwater program, researchers from NC State University came out to Bald Head Island in 1983 & 1984 to experiment with native plantings. Bald Head Island features some of the first, if not the first, infiltration basins in the state. Blends of weeping love grass and wildflowers such as marsh marigolds and native gaillardia have been successfully used on the island for over 20 years. These are very drought resistant, and grow well in the very sandy soil of the island. That is what is growing at the pond. Included is a letter from Landscape Architect, Donna Clemmons. 3. Corrected Calculation Sheet °HV Eastern Basin Lots -Summary" is included with a 9-25-07 rev date. I unknowingly set the auto -sum function to sum the 29230 sf of bua 3 times by grabbing the cells above the bottom box. 4. I have replotted sheet SW1 in color, and added a legend to help delineate the Low Density and High Density areas. Three copies are included, sealed and dated 9-25-07. `t Bald Head Island Limited, LLC- SW8-971223 Mod Page 2 5. Deed restrictions are included for the Quartermaster Row part of the project. The existing deed restrictions list the impervious coverages, but didn't have all of the language you now require. 1 have a draft addendum which includes the new verbage plus the updated impervious coverage. Lot 4 does not currently exist. Harbour Village lots pre-existed the 1987 stormwater rules, and there are no binding covenants in regards to stormwater. I understand from permit research that the original SW8-971223 permit, was a reconciliation of a 1994 and/or 1996 permit, and in 1997 there was an agreement on the Low & High Density Areas shown on the plans. The pond is in a recorded "Common Area", and there are exiting access easements. In the proposed Quartermaster Row amendment, we are intending to give a blanket easement not only for pond access, but also for utilities, etc. The existing easements to the pond follow the perimeter of the site, and don't acknowledge that there is now a paved loop road on Lot 2 (the Tent Site), which is what you would use to access the pond with any equipment. The band along the marina front was listed as a series of approximate 20'x20' "postage stamp" lots, with 100% impervious coverage. There has been correspondence between Linda Lewis, myself, and CAMA in 2006 whereby Bald Head Island Limited, LLC can track the amount of impervious and give periodic updates. SW1 is intended to be the most recent update, and we have dropped the numbers from a potential of 15337 sf of impervious to only 12,200 sf of impervious, with 7433 sf +/- already being in existence. 6. Check #1273 for $500.00 is included. I have included 3 sets of both drawing sheets rather than 2 so that I can give CAMA a set with your stamped approval for their permitting needs. We have found that if each sheet has the DWQ approval, then there is no question which is the latest approved drawing. And I think that the color plotting make nicer drawing sets (at least for this project) than for us to black & white copy after the fact. Please do not hesitate to call me at 457-7517 ( at BHI Tuesdays & Thursdays) or cell 228-2484 or 799-9245 (my Wilmington office) if you have any questions and/or comments concerning the project. Sincerely, Bruce Marek, P.E. For: Bald Head Island Limited, LLC Planning Department CC: Jim Henry — Director of Planning & Development Steve Robertson — COO 0 September 25, 2007 NCDENR — Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Bald Head Island Limited, LLC Signatory Authority To Whom It May Concern: As President and Managing Member of Bald Head Island Limited. LLC, I have delegated Mr. Stephen O. Robertson, Sr. Vice President and Chief Operating Officer, the authority to sign for stormwater permits for the numerous company projects. Although Mr. Robertson is not himself a Manager of Bald Head Island Limited, LLC, he has full legal authority to bind the company by reason of unanimous action of the Managing Members, as evidenced by the enclosed consent resolution. Should you have any questions or need further information, please don't hesitate to contact me. SEP 2 6 2007 Bald Head Island Post Office Box 3069 • Bald Hcad Island, North Carolina 28461 1-800-888-3707 • ww sv. b n l dh ea dis l a n d. c om CONSENT TO ACTION WITHOUT MEETING BY THE MANAGING MEMBERS OF BALD HEAD ISLAND LIMITED, LLC We, the undersigned, constituting a majority of the Managing Members of BALD HEAD ISLAND LIMITED, LLC, a Texas limited liability company, acting by consent and without meeting, hereby elect and/or confirm the election of the persons named below to the offices set out beside their names, to hold said offices until their successors are designated, hereby delegating to the persons named below full authority to perform the duties and exercise the powers of their respective offices, pursuant to and as set forth in Article VIII of the Regulations of Bald Head Island Limited, LLC, to wit: M. Kent Mitchell - President; Mark D. Mitchell - Executive Vice President; Stephen O. Robertson - Senior Vice President; Shirley A. Mayfield - Secretary / Treasurer. This action is effective as of May 19, 2006. a Michael K Managing Aa—� (SEAL) Mark D. Mitchell Managing Member 2c'�, (SEAL) C. Grant Mitchell Managing Member �t (SEAL) Spi N. V ilakis Man ember SEP L 6 nn/ SW8-971223 Mod Modification to June 2, 1998 NCDENR Stormater Permit Bruce Marek, P.E. Project: Harbor Village Eastern Basin Lots P.O. Box 3069 Client: Bald Head Island Limited, LLC Bald Head Island, NC 2&403 Location: Bald Head Island, Brunswick County, NC 8,712007 rev 9-25-07 Summary of Impervious Area: 1998 Permit Conditions Area Draining To Pond = DA#1: SC Waters- Bald Head Island Marina 18-88-8-5 289834 sf 6.65 acres Area Draining To Low Density = DA#2: SA Waters - Bald Head Creek 18-88-8-4 133745 sf 3.07 acres Total Project Area 423579 of 9.72 acres Summary of Built Upon Areas: 1998 Permft Areas Draining to Pond Areas Draining to Low Density Totals Drainage Area #1 (SC) Drainage Area #2 (SA) Impervious Area of acres Area of acres Area sf acres Lots 55557 of 1.28 acres 29230 sf 0.67 acres 84787 at 1.95 acres Bldgs (Marina Frond) 15337 at 0.35 acres 0 at 0.00 acres 15337 sf 0.35 acres Sidewalks 10679 of 0.25 acres 0 of 0.00 acres 10679 at 0.25 acres Pavement 57128 at 1.31 acres 0 sf 0.00 acres 57128 sf 1.31 acres Future 48000 of 1.10 acres 0 of 0.00 acres 48" of 1.10 acres 186701 at 4.29 acres 29230 sf 0.67 acres 215931 of 4.96 acres 64.4% 21.9% 51.0% Summary of Impervious Area: Aug 2007 Permit Modification/Update Area Draining To Pond = DA#1: SC Waters- Bald Head Island Marna 18-88-8-5 303613 at 6.97 acres Area Draining To Low Density= DA#2: SA Waters - Bald Head Creek 18-88-8 4 133745 of 3.07 acres Total Project Area 437368 of 10.04 acres Areas Draining to Pond Areas Draining to Low Density Totals Drainage Area #1 SC Drainage Area #2 SA IMPERVIOUS Area sf acres Area of acres Area sf acres Lots (HV1J1) �44134o11wgq 57757 of 1.33 acres 29230 sf 0.67 acres 86987 sf 2.00 acres Bldge (Marina Frond) 12200 of 0.28 acres 0 of 0.00 acres 12200 of 0.28 acres Tent Site OM2 BUA' 11760 sf 0.27 acres 0 sf 0.00 acres 11760 at 0.27 acres Future: QM1, OM3 33000 at 0.76 acres 0 sf 0.00 acres 33000 sf 0.76 acres Future: OM 4A,413 5567 5557 of 0.13 acres 0 of 0.00 acres 5557 sf 0.13 acres Subtotal BUA 120274 of 2.76 acres 29230 sf 0,67 acres 149604 of 3.43 acres BUA 120274 of 2.76 acres 29230 sf 0.67 acres 149504 at 3.43 acres Streets: Pavement 53143 of 1.22 acres 0 sf 0.00 acres 53143 sf 1.22 acres Parking: Pavement '• 4592 of 0.11 acres 0 of 0.00 acres 4592 of 0.11 acres Parking: Brick " 12408 at 0.28 acres 0 sf 0.00 acres 12408 sf 0.28 acres Sidewalks 13068 sf 0.30 acres 0 at 0.00 acres 13068 at 0.30 acres Impervious Totals 203485 of 4.67 acres 29230 of 0.67 acres 232715 at 5.34 acres 67.0% 21.9% 53.2% 'Tent Site BUA does not include the loop mad 7175 of or its two 84'04' cart parking = 2352 of areas. They are now in streets & parking- -Developer may at a future date redo existing parking as pervious avers/turfstone per Chapter 18 of SNIP Manual for area credit. rUY/Iq,i a o S1'l;l 151584 q,( P aF7'�1wEER,rr � �: AMES RECEZVE� HV Eastern Basin lots -Summary S E P 2 6 2007 BY: I I Sw8-971223MOd. 'Modifieatlon:to Jurie,2,.1998NCDENR Stormater Permit ', =-Bruce'Marek P.E.' Project: Harbor Village Eastern Basin Lots P.O. Box 3069 Client Bald Head Island Limited, LLC Bald Head Island, NC 28403 Location: Bald Head Island, Brunswick County, NC 817I2007 rev 9-25-07 Summary of Impervious Area` 1998"Permit Conditions. Area Draining To Pond = DA#1: SC Waters- Bald Head Island Marina 18-88-8-5 289834 sf 6.65 acres Area Draining To Low Density= DA#2: SA Waters - Bald Head Creek 18-88-8-4 133745 at 3.07 acres Total Project Area ' .- .. - ' ., • - , 623578sf -. - 9.72 acres - .:.. ;. .. . Summary of Built Upon Areas: 1998 Permit Areas Dminfng to Pond Areas Draining to Low Density Totals Drainage Area #1 (SC) Drainage Area #2 (SA) Impervious Am of acres Area sf acres Area at acres Lob 55557 sf 1.28 acres 29230 sf 0.67 acres 84787 of 1.95 acres Bidgs (Marina From) 15337 sf 0.35 acres 0 sf 0.00 acres 15337 sf 0.35 acres Sidewalks 10679 sf 0.25 acres 0 at 0.00 acres 10579 sf 0.25 acres Pavement 57128 sf 1.31 acres 0 sf 0.00 acres 57128 sf 1.31 acres Future 48000 sf 1.10 acres 0 sf 0.00 acres 48000 at 1.10 acres 186701 sfo - -4.29 acres' - 29230 sf 0.67 acres .' . 215931 sf '- 4.96'acres Summary of Impervious, Area: Aug 2007,Permit Modification/Update Area Draining To Pond = DA#1: SC Waters Bald Head [stand Marina 18-08-&5 303613 sf 6.97 acres Area Draining To Low Density= DA#2: SA Waters - Bald Head Creek 18-88-8-4 133745 sf 3.07 acres TotaLPmject Areas-:- _, .. , _ _. 437368 sf 10.114 acres " Areas Draining to Pond Areas Draining to Low Density Totals Drainage Area #1 (SC) Drains a Area #2 (SA) IMPERVIOUS` - ,Area, sf- -acres.. Area:.sf --:acres` -Area sf :acres - Lob (HV1J7) 5T757 sf 1.33 acres 29230 sf 0.67 acres 86987 sf 2.00 acres Sidgs (Karim Frond) 12200 sf 0.28 acres 0 sf 0.00 acres 12200 sf 0.28 acres Tent Site OW BUA' 11760 sf 0.27 acres 0 sf 0.00 acres 11760 at 027 acres Future: OMt, OM3 33000 at 0.76 acres 0 sf 0.00 acres 33000 sf 0.76 acres Future: ON 4A,4B 5557 5557 sf 0.13 acres 0 sf 0.00 acres 5557 sf 0.13 acres Subtotal BUA ' . - - - ` 120274 elf - 2.76 acres' ; `: 29230 sf 0.67 acres - 149504 sf- - 3.43 acres BUA 120274 sf 2.76 acres 29230 sf 0.67 acres 149504 sf 3.43 acres Streets: Pavement 53143 at 1.22 acres 0 at 0.00 acres 53143 sf 1.22 acres Parking: Pavement" 4592 sf 0.11 acres 0 sf 0.00 acres 4592 sf 0.11 acres Parking: Brick " 12408 of 0.28 acres 0 sf 0.00 acres 12408 sf 0.28 apes Sidewalks 13068 sf 0.30 apes 0 sf 0.00 apes 13068_sf 0.30 acres - Impervious Totals , ' > " :" (203485 sf} 4.67 acres " 67.0%'21.8% - 29230 sf •� 0.67 acres `232715 sf ,J - . .. 5.34 acme:-. 53.2% 'Tent Site BUA does not include the loop road 7175 sf or its two 84Y14' cart parking = 2352 sf areas. They are now in streets & parking. Developer may at a future date re -do existing parking as pervious paversnurfstone per Chapter 18 of BMP Manual for area credit. 1A CARO,�.,,ws '. SFi L 15681 q� /9� Y 1h1ES HV Eastern Basin Lots -summary I SEP 2 6 2007 SW8-971223Mod ModlBeatlontoJune 2,1998NCDENRSIormaterPermit '', BruceMarek,:P.E. " Project: Harbor Village Eastern Basin Lots P.O. Box 3069 Crmnt: Bald Head Island Limited, LLC Bald Head Island, NC 20403 Location: Bald Head Island, Brunswick County, NC 8f712007 rev 9-25-07 Summary of Impervious Area:1998 Permit Conditions ' Area Draining To Pond = DA#1: SC Waters- Bald Head Island Marina 1"841-5 289834 at 6.65 acres Area Draining To Low Dens = DAtt2: SA Waters - Bald Head Creek 18-88-8-4 133745 at 3.07 acres Total Project Area .423578s .'9.72 acres - Summary of Buft Upon Areas: 19S8 Permit Arms Draining to Pond Areas Draining to Low Density Totals Drainage Area #1 (SC) Drainage Area #2 (SA) Impervious Area of acres Area of acres Area sf acres Lots 55557 sf 1.28 apes 29230 sf 0.67 acres 84787 sf 1.95 acres Burgs (Marina From) 15337 sf 0.35 acres 0 sf 0.00 apes 15337 at 0.35 acres Sidewalks 10679 at 0.25 apes 0 at 0.00 acres 10679 at 0.25 apes Pavement 57128 sf 1.31 acres 0 sf 0.00 acres 57128 sf 1.31 acres Future 48DOO sf 1.10 apes 0 at 0.00 apes 48" sf 1.10 apes 186701 of - 4.29 acres -" 29230 sf 0.67 acres 216931 of 4.96 acres - 64.4% 21.9% 51.0% Summary of Impervious Area: Aug 2007'Permit Modification/Update Area Draining To Ports - DA#1: SC Waters- Bald Head Island Marina 18-8885 303613 sf 6.97 acres Area Draining To Low Density = DA#2: SA Waters - Bald Head Creek 18-88-84 133745 sf 3.07 acres Total Project Area - - 437368 sf 10.04 acres Areas Draining to Pond Areas Draining to Low Density Totals Drainage Area #1 (SC) Drainage Area #2 SA IMPERVIOUS Area at acres Area sf ;tree Area sf acres Lots (HV131) 57757 sf 1.33 apes 29230 sf 0.67 acres 86987 sf 2.00 acres BMgs (Marina From) 1220D sf 0.28 apes 0 of O.DO apes 12200 sf 0.28 apes Tent Slte O111112 BUA' 11760 sf 0.27 apes 0 sf 0.00 apes 11760 sf 0.27 apes Future: CA". OM3 33000 sf 0.76 apes 0 at 0.00 apes 33000 sf 0.76 apes Future: QM 4A,48 SW 5557 sf 0.13 apes 0 sf 0.00 acres 5557 sf 0.13 acres Subtotal BUA - 120274 sit 2:76 acres 29230 of 0.67 acres 149604 sf 3.43 acres BUA 120274 sf 2.76 acres 29230 sf 0.67 acres 149504 sf 3.43 apes Streets: Pavement 53143 sf 1.22 apes 0 at 0.00 acres 53143 at 1.22 acres Parking: Pavement" 4592 sf 0.11 apes 0 sf 0.00 acres 4592 sf 0.11 apes Parking: Brick » 12408 sf 028 acres 0 at 0.00 acres 12408 sf 028 acres Sidewalks 13068 sf 0.30 apes 0 at 0.00 apes 13068 sf 0.30 apes Impervious Totals 203486 sf 4.67 acres 29230 sf 0.67 acres 232715 sf 5.34 acres - 67.0% 21.9%" 53.2% 'Tern Site BUA does not include the loop mad 7175 sf or its two 84704' cart parking = 2352 sf areas. They are now in streets 6 parking. -Developer may at a fuhae date redo e4sting parking as perhous paverstturfstone per Chapter 18 of BMP Manual for area credit. �.nrrrlrt. " CARO4 15G8d RECEIVED HV Eastern Basin Lots -Summary SEP 2 6 2007 LBY:---- AMENDMENT TO PROTECTIVE COVENANTS QUARTERMASTER ROW BALD HEAD ISLAND, NORTH CAROLINA THIS AMENDMENT TO PROTECTIVE COVENANTS, QUARTERMASTER ROW, BALD HEAD ISLAND, is made as of the day of 2007, as follows: WHEREAS, Bald Head Island Limited, LLC, a Texas limited liability company, is the developer of that certain real property on Bald Head Island known as Quartermaster Row, a nonresidential subdivision located in the Village of Bald Head Island, Brunswick County, NC; and, WHEREAS, Bald Head Island Limited, as Declarant, has heretofore caused to be recorded in the records of the Brunswick County Registry at Book 1353, Page 404, certain Protective Covenants which regulate the ownership and use of the Quartermaster Row real property; and, WHEREAS, Bald Head Island Limited, as Declarant, has recorded as part of the aforesaid Protective Covenants certain provisions required by the Stormwater Management Permit issued by the State of North Carolina pertaining to impervious coverage and related limitations for said Quartermaster Row property; and, WHEREAS, Bald Head Island Limited is the sole owner of all of the real property constituting the Quartermaster Row subdivision and has full right and authority, pursuant to Article I I of the aforesaid Protective Covenants, to amend said Covenants in the manner hereinafter set forth, without the consent orjoinder of any other party; NOW, THEREFORE, Declarant, Bald Head Island Limited, LLC, hereby declares that the Protective Covenants for Quartermaster Row, Bald Head Island, North Carolina, set forth in Deed Book 1353, Page 404 of the Brunswick County Registry, shall be amended to include the following covenant provisions applicable to all of the Lots and property therein, to wit: Each Lot in Quartermaster Row shall contain a maximum allowable built upon area (BUA) which may be covered by impervious surfaces (as defined by the Department of Environmental Management), as set forth on the attached Exhibit A. These allotted amounts include any BUA constructed within the Lot property boundaries, and that portion of the right-of- way between the front lot line and the edge of the pavement. BUA includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, and coquina, but does not include raised, Sp 2 6 2007 open wood decking, or the water surface of swimming pools Filling in or piping of any vegetative conveyances (ditches, swales, etc.) associated with the development of the property, except for average driveway crossings, is strictly prohibited. All Lots shall provide a minimum thirty (30') feet of vegetated buffer area between impervious areas and surface waters, and all roof drains shall terminate at least thirty (30') feet from the mean high water mark. Lots within CAMA's Area of Environmental Concern (AEC) may have their permitted maximum built -upon area reduced, due to CAMA jurisdiction within the AEC. The covenants pertaining to stormwater regulations may not be changed or deleted without concurrence of the Division of Water Quality, Department of Environment and Natural Resources, State of North Carolina. Construction of additional impervious areas such that low density requirements are no longer met will require a permit modification to be issued prior to construction. An engineered system will be required to collect and treat the runoff from all built -upon areas associated with the development, including that area permitted under the low density option. The provisions of the Protective Covenants pertaining to stormwater may be enforced by the State of North Carolina, as well as any other party entitled to enforce said Covenants. To the extent that the State of North Carolina should revise its existing stormwater permit to allow different imperious surface amount(s) on any one of more of the Lots, upon filing by Declarant or the Association of a notice of said change in permit, the impervious surface limitation as to said Lot or Lots shall be automatically deemed amended to comply with the changed impervious surface limitation allowed by the State of North Carolina by permit. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality, and alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Water Quality. There are hereby reserved for the benefit of the Owners of the Lots, the Declarant, the Association, all public and private utilities, and the Village of Bald Head Island, those certain easements for vehicular access over and across the property and Lots in Quartermaster Row as may be reasonably necessary for the installation and maintenance of all utilities, public and private, and for the maintenance of an existing stormwater detention pond, as heretofore described in the Protective Covenants for Quartermaster Row. This Amendment is made as a result of the modification of the Stormwater Management Permit Number SW8-971223MOD, issued to Declarant for Harbour Village Eastern Basin, and is intended to insure continued ongoing compliance with said permit and with rules adopted by the State of North Carolina. The covenants contained herein are to run with the land, and shall be binding on all parties and persons claiming under them. IN WITNESS WHEREOF, the undersigned Declarant has caused this instrument to be executed by its duly authorized attorney in fact, under seal, this the _ day of , 2007. BALD HEAD ISLAND LIMITED, LLC (SEAL) a Texas limited liability company STATE OF NORTH CAROLINA BRUNSWICK COUNTY 1, , a Notary Public for said County and State, do hereby certify that for Bald Head Island Limited, LLC, personally appeared before me this day, and being by me duly sworn, says that he executed the foregoing instrument for and on behalf of the said Bald Head Island Limited, LLC. WITNESS my hand and official seal, this the day of 2007. Notary Public My commission expires: 1SM!11:1YII_\ IMPERVIOUS COVERAGE Qmi Qw� LOT 1 AND LOT 3 -- 33,000 square feet, combined LOT 11,760 square feet* aryl PROPOSED LOT 4 -- 5,557 square feet *NOTE: The impervious coverage figure for Lot�2 does not include an additional 9,527 square feet for streets (7,175 sq. ft.) and parking (2,352 sq. ft.) on the Lot. }2F.GDrwD _D 01112-I20011 000/1-13� 3 , PROTECTIVE COVENANTS QUARTERMASTER ROW These Protective Covenants for Quartermaster Row, a non-residential subdivision located in the Village of Bald Head Island, Brunswick County, North Carolina, are made, published and declared by Bald Head Island Limited, a Texas Limited Partnership ("Declarant") as of this j Of day of January, 2000. RECITALS - Declarant has subdivided property owned by it, and more fully described on that plat of survey for Quartermaster Row recorded in Map Cabinet ; Z, Instrument 2-11 , Brunswick County Registry ("the Plat") into three (3) lots ("the Lots"), and a Common Area. In order to provide for the effective administration of the Lots, and to ensure compliance with various permitting requirements imposed by the State of North Carolina and the Village of Bald Head Island, Declarant has chartered a North Carolina, non-profit corporation named Quartermaster Row Commercial Association, Inc. ("the Association"), to administer and manage the Lots as more ( fully set out herein. These Protective Covenants are executed and recorded by and on behalf of Declarant, and the owners from time -to -time of the Lots and the Common Area. Declarant hereby subjects the property described on the Plat to the terms and provisions of these Protective Covenants for the use and benefit of all present and future owners of the Lots and the Common Area, for the mutual benefit of Declarant, the owners of the Lots, and the owners of the Common Area. I. Description. These Protective Covenants shall run with the land and shall bind and enure to the benefit of the owner of each Lot and the owner of the Common Area as shown on the Plat, and the property made subject to these Protective Covenants is all of the surveyed property shown on the Plat, as the Plat may be amended from time -to -time. 2. Common Area. The Common Area as shown on the Plat contains a stormwater retention pond constructed in accordance with a stormwater permit issued by the State of North Carolina. Said retention pond provides required stormwater management control for the Lots, as well as properties located within Bald Head Island Harbour, as those lots are more fully described in the Amended and Restated Declaration of Covenants, Conditions and Restrictions for Bald Head -. Island Harbour, recorded in Book 985, Page 384 et. seq., Brunswick County RECF.TV'r':- ; 1 SEP `Z 6 ' 007 ' SY: 5�------ Registry, as the same may have been, or may in the future, be amended ("Harbour Covenants"). The Common Area shall be conveyed by Declarant to the Association, no later than the end of the calendar year following conveyance of any one of the Lots to a third party, other than a third party owned or controlled by Declarant. It is expressly acknowledged that the Common Area provides the required stormwater collection and retention for certain lots subject to the Harbour Covenants, and that, for the lots so benefitted, a non-profit corporation, the Harbour Association of Bald Head Island (the "Harbour Association"), is charged with administration of the Harbour Covenants. It is expressly understood and agreed that the Association shall maintain the Common Area in good condition, and in compliance with all applicable permit conditions imposed by the State of North Carolina in regard to the stormwater collection and retention system, as long as the Harbour Association agrees to contribute two-thirds of the cost of such maintenance and upkeep. The Board of Directors of the Association is expressly authorized to enter into joint maintenance and upkeep agreements with the Harbour Association allocating maintenance responsibilities and contributions as set out within these Protective Covenants. Until such time as a joint maintenance agreement is entered into by the Association and the Harbour Association, Declarant shall maintain the stormwater retention pond and its appertenant facilities. It is expressly agreed that the bulkhead and dam within the Common Area, and any system of conveyance located within the Common Area, is to be maintained as part of the permitted stormwater management system benefitting the Association and the Harbour Association, with expenses of such repair and maintenance to be allocated as set out hereinbefore. Any portion of the collection and distribution system for the permitted stormwater system not located in the Common Area shall be the full maintenance responsibility of the association benefitted thereby. To the extent there are portions of the conveyance or discharge system, such as overflow piping allowing discharge to the Marina, which piping is not directly the conveyance of collected stormwater benefitting only one association, such conveyance or discharge system shall be maintained as though a part of the Common Area. 3. Other Bulkhead Maintenance. There exists a bulkhead along the perimeter boundaries of most of Lots 1, 2'and 3. Such bulkhead shall be maintained in a good and usable condition by the Association. 4. Retaining �Wall. There exists a retaining wall on Lot 2. The owner of Lot 2 from time -to -time shall be fully responsible for the maintenance of said retaining wall, without contribution from the Association or from the owners of Lots 1 or 3. 4 5. Driveway Easements. There exists a driveway easement (depicted on the Plat) between Lot .1 and Lot 2, and between Lot 2 and Lot 3. Such driveway easements shall be maintained in good and passable condition at all times by the Association, notwithry standing the paror parties utilizing said driveway easements, it being the intent of the parties that such driveway easements be available for utilization to provide secondary access to structures to be constructed on the Lots. Declarant, as long as it owns all of the Lots, shall have full authority to improve the driveway easements as it deems appropriate; at such time as any of the Lots have been conveyed to a third party, no improvement shall be made in the driveway easements without the approval of the Association. It is the intent of Declarant that, to the maximum extent feasible, easements be granted from time -to -time by the owners of each of the Lots to allow joint service vehicle access to improvements to be constructed on each of the Lots. In order to further this objective, as long as Declarant owns at least one Lot, no improvements may be constructed on any Lot without the approval of Declarant, which approval shall not be unreasonably withheld, but which approval may be withheld unless reasonable accommodation and grant of easement is made to benefit the adjoining Lot owners as to reasonable service and access needs, to minimize interference with appropriate, functional and aesthetic use of the Lots when improved. 6. Easements. There are depicted on the Plat various maintenance and access easements. These easements may be utilized, to the extent necessary, for access to the Common Area by Declarant, the Harbour Association and the Association. Such maintenance and access easements may further be utilized by the Declarant and the Association, and their agents, for purposes of maintenance of the bulkheads. No improvement shall be constructed within said maintenance and access easements without the approval of the Association and the Village of Bald Head; however, Declarant reserves the right to construct improvements within the Common Area, either before or after conveyance of the Common Area to the Association, for purposes of beautification or related landscaping. 7. Binding Effect. All covenants, restrictions, reservations, easements and privileges contained herein shall run with the land and the grantee, by accepting any deed to any portion of such land as described herein, accepts the same subject to these Protective Covenants and its terms and conditions and agrees for himself, his heirs, successors and assigns, to be fully bound by each and all of the terms and conditions of these Protective Covenants, jointly, separately and severally. 8. Utility Easements. Subject to approval of Declarant as long as Declarant owns all of the Lots, and subject to the approval of the Association at such time as Declarant does not own all of said Lots, any maintenance and access easement shown on the Plat may be utilized as a utility easement, without necessity of 3 joinder of the owner of the Lot across which said maintenance and access easement crosses. There is also reserved a ten (10) foot utility and drainage easement across the Lots, immediately adjacent to Keelson Row. Assignment. As used herein, Declarant shall mean and include Bald Head Island Limited and any of its successors and assigns specifically assigned rights of Declarant herein. 10. Bylaws and Rules. The Association shall adopt bylaws, and, in accordance with said bylaws, the Association may adopt rules and regulations for utilization of the Lots. Any such rules and regulations adopted in accordance with the provisions of the Bylaws shall be fully applicable and shall be binding upon the owners of each Lot, and their guests and invitees. 11. Amendment. These Protective Covenants may be amended at any time upon the joinder of the owner of any two of the three Lots shown on the Plat. Any such amendment shall become effective upon recordation in the office of the Register of Deeds of Brunswick County. No amendment shall be made which alters the obligation of the Association to contribute to the maintenance of the Common Area without the approval of Declarant, as long as it owns any Lot, and without the approval of the State of North Carolina. 12. pervious Surface. The maximum impervious surface allowed on any Lot is set out on Exhibit A attached hereto. Impervious surfaces include any hardened surfaces joining the pavement on Keelson Row to a Lot, and further include pavement, structures, asphalt, concrete, gravel, walkways or patios of brick, stone or slate, but do not include open wood decking. No amendment altering the impervious surface limitation on any Lot may be made effective without approval of the State of North Carolina. WITNESS our hands and seals as of the day and year first above written. BALD HEAD ISLAND LIMITED By: rfrieth M. Kirkman STATE OF NORTH CAROLINA COUNTY OF BRUNSWICK I, Lorraine Thompson, a Notary Public, do hereby certify that Kenneth M. Kirkman personally appeared before me this day of January,'2000 and acknowledged the due execution of the foregoing instrument. Notary Public My Commission expires: Omy IALSEALNotary Public - North CarolinaBRUNSWICK COUNTY LORRAINE THOMPSON � i Co�nu1sa-Ezp�eA1 _ \ EXHIBIT A IMPERVIOUS COVERA E LOT 1 — 9,400 square feet LOT 2 -- 13,240 square feet LOT 3 — 25,360 square feet FAHOA_POA\QUARO W \CO VENANT. W PD(I/ 10/2000) 0 �PI� r'(trY .°AHD DmIARIBN HART COMMON AREA 1 ._.._. 1 L aeaT¢ RARER RETAINER tt[EMBER 1905 L i 10a1—&M—T`ABOMEN[` EAsE.c dNRBR LOT 1 .. Hnw[AD 9 / I /MNCENIT &N H. DRisswA. E..IHI / SHARON HANKAERD ws+w Y =m 1 PBxL .AH A01 \ (B) ITAIIO lxJNlDisi 1. ACRSSN[ASINABI 1e'vR,xFw.Y i.ssYEN1 N82 LOT 3 t 011 AC 5. )x �QZA9'W 1`11_ I W xux. Naaroy'zs'AN 1 _ NJIS N89 10 70", e NJO 41 f[ ^inwmr I., I NJY3 '9] 795B 4'S0E �'..--AY A. A.A, CMA•e,.V -NA, Y�1er . I_ -A2--A. CBFA1 _P'P430C �� { rIC31w I_ 1;'10'S�'w aw.am... rtyNL'\vpy, ws K" a 12r. TI 1 �f�I 3 Errii0.or� BE - I.y AN HH 11 NEWBEARTHAN uE3 N. wARP --__ .. Mrtu0EA IT.xq.MAar LW. —HI. P01! v III HHOPERTY LINE f Ii LAI INVANATTHE —HI THIN9gDIIHA I. u. A Hrrgr NA tA3 HANT. LAI RFG. aIILI 00 "k 2 YZ P/9. Z1ITNILIBIAO ML _ BALD r4A0 PiAb uwl[0 BALD HEAD PLAT OF wB.E• Fa ISLANDD UNITED �1�'. QUARTERMASTER R W ' , E , x n^, A o I 111V IAo. o�EI ze. RH NElPI I Tl Rrnr.MY wxu INHIBIT, I.." `J �Ew',A'.rI 1.1 KEELSON ROW Aa.1 DFw m:nTle.a mo J. m L9mngm. Evw.Dvmlr BRUNSWICK r � _—__—__—__—__—_ ______—__—__—___RM SURVEYING. INC .. Thom9. A. u9rg9n .- - Pw..ra Lon FPPq?J4LGiIFHIi^ IIIH, 1 u )6I w 1 .W RU1MP9Cv,ED l '• - .. .T1E SREER K.A.A. HERE. Al'PERIAIE' x[P[Or AUNDw.EovF MAi M - 10 APL NOT M wLLI O1 D[ EENATIN r .. BYRN M ERB 0.AI " WTw IK EUBqu9M E✓'f.•`AY 1ED ..... SiuSAIgI FM pfl IO 1L4RAMM AM9r. LPM a n2 xLLA6 " O'N" HEAD •........ .••, II . A[I Rr ME M .." BE BAIU MAO 9NO. Dx.xH I N Em Yr m[E YDPCAY. N MCUAS w o. 5 GV i DERDFr BEAT in 'IS EiTH sx.LE NDi c AHD DIE O, HDw SCAN: - . rA1F 0 H/Yi/'r) Fq AT ANY RUE FEAR —NIE. AiN DE Y RUE ME NiWE. FM uOTHER x[F 21n IIA BUITEA g1IEfALAND 'EREXNBERIN V AEAAU MATICPOR ML xLL'A iAUN TEAS HEPP[er I AN THE AR ry AVux V fP urlxiCc ♦ MA H s Ax MgWMR AH I BlJ7Y PA .EYEHI. U yANY s1RC[i, aA 1Nh q1 OM[P DMrExR LOLARD x1Mw MC RIRAHT-R-w1V H,E, N. TMBAuO�EAp 1' rill i.. I + iuAi HAI A . Fp c0.gND MAi REOAARC PANT ES ERE LAND. _ 6 Ah SII¢CT. 5 9dANPC II�.I " THEY VFI¢ OT ME Al-BT R C OQM Fp gWSNPr _ 1 111ANI., 1.11 rm l ---- [ n. .. Ib . I.- 1...� —�— , �,./ri. September 25, 2007 !Mary Jean Naugle Division of Water Quality Wilmington Regional Office SUBJECT: REQUEST FOR ADDITIONAL INFORMATION FOR A STORMWATER PERMPC Bald Head Island has a twenty-year history of using a weeping lovegrass/ wildflower seeding mix, it works and it is pretty. When Stormwater regulations came into existence in 1987, Bald Head Island created one of the first infiltration swale/basins in the State of N.C. , which was overseedcd with BHI native lovegrass and wildflower mix. Since then this has been our preferred seeding schedule. The topography of Bald Head Island is flat, basically a beach, we do not incur typical erosion problems and runoff that would otherwise require a landscape contractor seeding blend. Such a blend would also require watering, mowing and soil amendments which would change our native plant and soil composition. Our pond is existing and the vegetation has worked perfectly with our environment for twelve years. With the existing North Carolina drought conditions it further shows us that native plantings arc the best way to go especially for these types of ponds ,slopes and more importantly sand. We welcome you to visit our island and see how well our seeding schedule works. 1 'spec�� t gully, 4WM V 0/ nna Clemmons Landscape Architect, Asla Bald Head Island , N.C. do TRANSACTION REPORT FOR: NCDENR 9103502004 SEND DATE START RECEIVER SEP-20 12:08 PM 94577483 P. 01 SEP-20-2007 THU 12:11 PM TX TIME PAGES TYPE NOTE 31011, 9 FAX TX OK TOTAL 3M 1S .PAGES: 9 State of North Carolina Department of Environment and Natural Resources Wilmington Regional office Michael F. Easley, Governor William G. Ross Jr., Secretary FAX COVER SHEET Date: 9/20/07 No. Of Pages: (excluding cover) 8 To: Bruce Marek From: Miriam Hughes CO: CO: Express Permitting FAX #: 910-457-7463 FAX#: 910-350-2004 REMARKS: Harbour ViUaLre Eastern Basin Lots — Additional Information Request. 127 Cardinal Drive Eatenalan, Wilmington, N.C. 284os-3a45 Telephone (910) 796-7215 Fax (91o) 350-2004 An Equal Opportunity Afthmative Action Employer t M# DP 654 Michael F. Fasley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality September 19, 2007 Stephen O. Robertson, Chief Operating Officer V Bald Head Island Limited, LLC P.O. Box 3069 Bald Head Island, NC 28461 Subject: Request for Additional Information Stormwater Project No. SW8 971223 Modification Harbour Village Eastern Basin Lots, Brunswick County Dear Mr. Robertson: The Wilmington Regional Office received a Stormwater Management Permit Application for Harbour Village Eastern Basin Lots on August 15, 2007. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Lly Provide an applicant and signing official who is registered on the North Carolina etary of State a who is a managr of the LLC. Mr. Robertson is not lis 4 1a(_p as arma ages of the nLdLC. Alternativeyeprrovide signed and sealed signatureted authority from a manager of the LLC, who is listed on the secretary of state website, to Mr. Robertson. 15A NCAC 2H.1003 (e). The secretary of state listing is attached for your reference. 2. Provide plans of the updated pond to reflect the changes reported in the narrative. Although the supplement and calculations were provided for the proposed changes, no pond details were updated. All information updated must be submitted on the plans. Attached for your reference is a checklist of required information. It appears from the narrative that the following has been changed: permanent pool elevation, top of overflow discharge structure is raised; orifice elevation and size are changed. If there are other items that are changed, please // list. ✓3q� Please correct the Impervious total for drainage area #2. It appears it should report 29,230 square feet, whereas 87,690 sf is reported. (See attached) 4. Please clearly delineate the drainage areas. Although plan #SW1 labels the two drainage areas, there is no line delineation separating the areas. �5/jk-W Please provide deed restrictions to reflect the proposed changes in built -upon areas on the lots. R�-iu Submit $500 fee to cover additional reviews in the express process. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to October 2, 2007, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. If you have any questions please call me at (910) 796-7303 or email me at mary.naugle(a)ncmail.net. In�c1erely Ma`an augle� No" Carolina ✓ura!!y North Carolina Division of Water Quality 127 Cardinal Drive Emension Wilmingma, NC 28405 Phone (910) 796-0215 Cusmmer Service Wilmington Regional Office Internet: wcv.r novale"'nalin_n,, Fax (910)350-2004. 1-877-623-6748 An Equal OpporlunitylAtfrmative Action Employer - 50 % Recycledl10 % Post Consumer Paper ENB/mjn: S:\WQS\STORMWATER\ADDINF_O\2007-\97_1223MOD sep07 cc: Bruce Nlarek—P-E., 9 00-228-2484,_fax 91.0=457-7463 Mary'J'ean Naugle SW8-971223 Mod Modification to June 2, 1998 NCDENR Stonnater Permit Bruce Marek, P.E. Project: Harbor Village Eastern Basin Lots P.O. Box 3069 Client: Bald Head Island Limited, LLC Bald Head Island, NC 28403 Location: Bald Head Island, Brunswick County, NC 8/7/2007 Summary of Impervious Area: 1998 Permit Conditions Area Draining To Pond = DA#1: SC Waters- Bald Head Island Marina 18-88-8-5 289834 sf 6.65 acres Area Draining To Low Density = DA#2: SA Waters - Bald Head Creek 18-88-84 133745 sf 3.07 acres Total Project Area 423579 at 9.72 acres Summary of Built Upon Areas: 1998 Permit Areas Draining to Pond Areas Draining to Low Density Totals Drainage Area #1 (SC) Drainage Area #2 (SA) Impervious Area sf acres Area sf acres Area sf acres Loft 55557 at 1.28 acres 29230 at 0.67 acres 84787 st 1.95 acres Bldge (Marina Front) 15337 sf 0.35 acres 0 sf 0.00 acres 15337 sf 0.35 acres Sidewalks 10679 sf 0.25 acres 0 at 0.00 acres 10679 sf 0.25 acres Pavement 57128 at 1.31 acres 0 sf 0.00 acres 57128 sf 1.31 acres Future 48000 sf 1.10 acres 0 sf 0.00 acres 48000 sf 1.10 acres 186701 sf 4.29 acres - 29230 sf 0.67 acres 216931 sf 4.96 acres 1 64.4% - 21-9% 51.0% Summary of Impervious Area: Aug 2007- Permit • Modification/Update Area Draining To Pond = DA#1: SC Waters- Bald Head Island Marina 18-88-8-5 303613 sf 6.97 acres Area Draining To Low Density= DA#2: SA Waters -Bald Head Creek 18-88-84 133745 sf 3.07 acres Total Project Area 437358 sf 10.04 acres Areas Draining to Pond Areas Draining to Low Density Totals Drainage Area 01 (SC) Drainage Area #2 SA) IMPERVIOUS Areasfacres Area sf acres - Area sf acres Lots (HV7-31) 57757 sf 1.33 acres 29230 sf 0.67 acres 86957 sf 2.00 acres Bldgs (Marina Front) 12200 sf 0.28 acres 0 sf 0.00 acres 12200 sf 0.28 acres Tent Site QM2 BUA' 11760 at 0.27 acres 0 at 0.00 acres 11760 sf 0.27 acres Future: 0111111, QM3 33000 sf 0.76 acres 0 sf 0.00 acres 33000 sf 0.76 acres Future: QM 4A,48 5557 sf) 5557 at 0.13 acres _ 0 sf 0.00 acres 5557 sf 0.13 acres Subtotal BUA 120274 sf 2.76 acres 29230 sf 0.67 acres 149504 sf 3.43 acres BUA 120274 of 2.76 acres 29230 sf - 0.67 acres 149504 sf 3.43 acres Streets: Pavement 53143 sf 1.22 acres 0 sf 0.00 acres 53143 at 1.22 acres Parking: Pavement" 4592 sf 0.11 acres 0 sf 0.00 acres 4592 sf 0.11 acres Parking: Brick " 12408 at 0.28 acres 0 sf 0.00 acres 12408 sf 0.28 acres Sidewalks 13068 at 0.30 acres __0 sf,_. 0.00 acres 13068 sf 0.30 acres Impervious Totals 203485 sf 4.67 acres / 87690 at 0.67 acres 232715 sf 5.34 acres 67.0% 21.9% . 53.2% 'Tent Site BUA does not include the loop road 7175 sf or its two 84'x14' cart parking = 2352 sf areas. They am now in streets & parking. -Developer may at a future date re -do existing parking as pervious aversfturfstone r Chapter 18 of BMP Manual for area cretlit. 6'peAS' •r>are y �rp Y HV Eastern Basin Lots -Summary -Vr- tlf 'S+t•r-'1I2(Y APPLICATION FOR CERTIFICATE OF AUTHORITY Page 2 8. The names, titles, and usual business addresses of the current managers of the limited liability company are: (use attachment ifnecessary) Name Business Address Mark D. Mitchell P.O. Box 595, Wrightsville Beach, NC 28480 Michael K. Mitchell P.O. Box 3069, Bald Head Island, NC 28461 C. Grant Mitchell 10077 Grogan's Mill Road, Ste. 475, Woodlands, TX 77380 Spiros N. Vassilakis 10077 Grogan's Mill Road, Ste. 475, Woodlands, TX 77380 9. Attached is a certificate of existence (or document of similar import), duly authenticated by the secretary of state or other official having custody of limited liability company records in the state or country of formation. The Certificate of Existence must be Icss than six months old A photocopy of the certification cannot be accept 10. If the limited liability company is required to use a fictitious name in order to transact business in this State, a copy of the resolution of its managers adopting the fictitious name is attached. 11. This application will be effective upon filing, unless a delayed date and/or time is Specified: This the 0day of June, 2006 CBALD HEAD ISLAND LIMITED LLC Name of Limited Liability Company (&Wa M. Kent Mitchell) Type or Print Name Notes: 1. Mling fee is $250. This document must be filed with the Secretary of State. CORPORATIONS DIVISION P. O. BOX 29622 RALEIGH, NC 27626-0622 (Revised January 2002) (Form L-09) TOTAL P.05 Corporations Section TE p 'P.O.Box 13697 Austin, Texas 78711-3697 r Office of the Secretary of State Roger Williams Secretary of State The undersigned, as Secretary of State of Texas, does hereby certify that the document, Certificate of Conversion for Bald Head Island Limited LLC (filing number: 800658158), a Domestic Limited Liability Company (LLC), was filed in this office on May 19, 2006. It is further certified that the entity status in Texas is in existence. In testimony whereof, I have hereunto signed my name officially and caused to be impressed hereon the Sea] of State at my office in Austin, Texas on June 09, 2006. Come visit us on the internet at http://ivww.sos.state.tx.us/ Phone:(512) 463-5555 Fax: (512) 463-5709 TrY: 7-1-1 Prepared by: SOS -WEB . Document 132409370003 STORMWATER SUBMITTAL REQUIREMENTS WET DETENTION POND I. Objective A. Collect all runoff from all BUA (proposed and/or existing and/or offsite) as the case maybe, by any means including piping or swales, and direct it to the pond. B. Check the proposed pond design to make sure it meets or exceeds the minimum design criteria for surface area, volume and drawdown. II. What makes up a complete wet detention pond application package? A. Two sets of sealed, signed & dated layout & grading plans with appropriate details. B. Completed application with supplement(s), SWU-101, SWU-102, SWU-104. C. Deed restriction document, if applicable (for subdivisions & projects with out parcels) D. Sealed, signed & dated calculations. E. Estimated seasonal high water table elevation at all pond locations. F. Chlorides test results if the project is within ''/z mile of SA waters and a wet pond is proposed. Chlorides testing must be accomplished by averaging the chloride concentration of five (5) water samples taken '% mile downstream from the project site, that are taken on separate days, within one hour of high tide, and not within 48 hours following a rain event. The samples must be analyzed by a State certified laboratory. Ill. BIMS entry (for DWQ use only) Enter & track application acknowledged date, review date, add info requested/received dates, permit issue dates, and drainage area info. Best done after the add info letter is written and before sending permit up for signature. IV. Shell documents (for DWQ use only) Permit shells: s:\wqs\stormwater\shells\highcompond s:\wqs\stormwater\shells\highsubpond s:\wqs\stormwater\shells\H Dhybrid Spreadsheet: s:\wqs\stormwater\excel spreadsheets\pond VI. Review Procedure A. APPLICATION 1. An original signature is required. Photocopied signatures cannot be accepted. 2. A completed signed, dated and notarized wet detention pond supplement (SWU-102) with an original signature. 3. The numbers on the supplement match up to the numbers used in the calculations and shown on the plan details. 4. Built -upon areas are reported in square feet in Section 111.6. 5. Receiving stream name and classification. This is important because in the non -Phase 11 counties, a wet pond cannot be used on a project that is within %mile of and draining to SA waters. For Phase 11, a wet pond is allowed within '/2 mile of SA waters. 6. Section 111.6 is filled in -cannot be left blank. One column must be filled in for each proposed wet pond. 7. If the applicant is a corporation, partnership or LLC, look it up on the Secretary of State Corporations Database. Make sure corporation is spelled correctly (capitalization and punctuation matter) and that the person signing the application is at least a vice- president in the corporation, a General Partner in the partnership, a member in a member -managed LLC, or the manager of a manager -managed LLC. Need documentation to support if the Articles of Incorporation do not list the members or managers of the LLC. If an agent signs, then a letter of authorization is needed from the president, vice president, general partner, member or manager. 8. For subdivided projects, a signed and notarized deed restriction statement must be provided. , Wet Detention Pond, cont. B. CALCULATIONS The orifice is sized based on drawing down the calculated minimum volume in 2-5 t days. The average head to use in the orifice equation is approximately one-third of the distance between the permanent pool elevation (PPE) and the elevation of the next available outlet above the Dermanent c5o6l-The elevation of the next available itner the -elevation where the minimum volume is provided, or it can e`mporary'-pool`elevation T( PEl to report on the supplnt rary pooemewill tie_ ___ the next available outlet above the PPE. The tempol volume 3-n—the supplemerif'is the volume between the specified PPE and the 2. For Phase II projects that are within %, mile of and draining to SA waters, the discharge rate leaving the pond can be no more than the pre -development discharge rate for the 1 year 24 hour storm. 3. For Phase II projects, no discharge to surface waters may occur from wet ponds. The discharge leaving the orifice must be effectively infiltrated prior to reaching surface waters. 4. The average pond depth is the permanent pool volume divided by the permanent pool surface area. The result must be between 3 ft. and 7.5 ft. Parts of the pond can be deeper than 7.5 ft., but in no case can any part of the pond be less than 3 ft deep. 5. If the 85% TSS chart is used a 30' vegetated filter must be provided at the outlet of the pond. If the 90% TSS chart is used, no filter is required. 6. Use the correct SA/DA TSS chart from the BMP Manual noting that there are different charts for different areas of the State. 7. Required surface area at permanent pool. 8. Provided surface area at permanent pool (Based on pond dimensions) 9. Required volume calculation based on 1.5" storm for Phase II projects and 1" storm for all others. 10. Table of elevations, areas, incremental volumes and accumulated volumes for overall pond and for forebay, to verify volumes provided. 11. Forebay designed to hold 20% of the permanent pool volume. (Range of 18%-22% OK.) 12. Non -erosive flow for 10 yr. storm in the vegetated filter, if using 85% TSS. 13. The seasonal high water table must be at or below the proposed permanent pool elevation to assure that the necessary volume will be available above the permanent pool. 14. Rounding numbers off during the calculation process can result in deficiencies. Do not round the numbers until you get to the final result. 15. An additional one foot must be excavated below the bottom elevation of the pond. The 1 foot sediment accumulation depth is not included in the average depth calculation. Wet Detention Pond, cont. C. PLANS- Due to storage space constraints, plan sheets should be kept to a minimum. For small commercial single wet pond projects, the plan set could consist of only 2 or 3 sheets, layout, grading and details. For larger projects, show as much information as possible on as few sheets as possible, without cluttering them up. 1. Development/Project Name 2. Engineer name and firm. 3. Legend 4. North Arrow 5. Location Map with nearest intersection of two major roads shown. Major road is any 1, 2, or 3 digit NC, US or interstate highway. 6. Scale- standard engineering scale, no off-the-wall stuff. 7. Date 8. Revision number and date, if applicable. 9. Original contours, proposed contours, spot elevations, finished floor elevations, pipe inverts, swale inverts, etc. 10. Existing drainage (piping, swales, ditches, ponds, etc.), including off -site. Include a map delineating the offsite drainage areas. 11. Property/Project boundary lines, bearing & distances. 1.2.o(Mean High Water Line or Normal High Water Line, if applicable. C3. The permanent pool elevation must be above the SHWT and above the lowest elevation of adjacent wetlands. Evaluate the need for a liner and/or berm/slurry wall to prevent dewatering the wetland. 14.. Drainage easement widths, pipe sizes and swale inverts are provided. 11 Wetlands delineated, or a note on the tans that none exist. Get a copy of the wetlands delineation map signed by�fEEngineer�' s, or fiave the applicant include a copy of the unsigned delineation map submitted to the Corps. Wet ponds may not be located in wetlands unless a permit to fill those wetlands has been obtained. 16. Details for the roads, parking, cul-de-sacs, including sidewalk width, radii, dimensions & slopes. 17. Apartment / Condo development- Provide a typical building footprint with dimensions and note all concrete and wood deck areas. 18. The drainage area for each wet pond isslearly delineated and numbered to match up to the calculations and supplement. Drainage area delineation is best done as a separate plan sheet. 19. A pond section detail to include the forebay, a 10 foot wide vegetated shelf, pertinent elevations for the bottom, permanent pool, temporary pool, and SHWT, 3:1 slopes above the permanent pool, and the weir elevation between the main pond and the forebay. ..�The 10 vegetated shelf extends 6" below and 6" above the permanent pool elevation. 21.E An outlet structure detail showing a trash rack with 4i" square openings, the necessary orifice invert elevation (i.e., the permanent pool), orifice size and temporary pool elevation. 22. Dimensions for each line and arc formed by the permanent pool contour. 23. Where the 85% TSS chart was used, a 30 ft. vegetated filter strip is required to be shown on the plans & detailed (elevations, inverts, slopes, and flow spreader mechanism). Please note that the filter strip is not a ditch. 24. A forebay is provided for each inlet and located so as to prevent short-circuiting. 25. The pond must have a minimum 1.5:1 length to width ratio and a minimum 3:1 flow path length. Artificial "baffles" of timber, vinyl, or earth can be used to create a longer flow path. The top elevation of the baffle should be set at the temporary pool elevation or higher. ' A Vegetation plan is specified for the pond, including slopes. Wetlands species are listed for planting on the 6:1 shelf. Weeping Love Grass is not suitable as a permanent vegetated cover for pond slopes. 27. All roof drainage must be directed to the pond. Show the roof drain collection lines on the plan. This is necessary for projects where the buildings back up the property lines where roof drainage may leave the site prior to going through the pond. SW8-971223 Mod Modification to June 2, 1998 NCDENR Stormater Permit Bruce Marek, P.E. Project: Harbor Village Eastern Basin Lots P.O. Box 3069 Client: Bald Head Island Limited, LLC Bald Head Island, NC 28403 Location: Bald Head Island, Brunswick County, NC 8/7/2007 Summary of Impervious Area: Aug 2007 Permit Modification/Update for Wet Detention Basin (Pond) Design Area Draining To Pond = DA#1: SC Waters- Bald Head Island Manna 18-88-8-5 303613 sf 6.97 acres IMPERVIOUS Area sf acres Lots(HV1-31) 57757sf 1.33 acres Burgs (Marina From) 12200 sf 0.28 acres Tent Site QM2 BUA* 11760 sf 0.27 acres Future: QM1, OM3 33000 sf 0.76 acres Future: OM 4A,4B (6657 sf) 5557 sf 0.13 acres Subtotal BUA 120274 sf 2.76 acres BUA 120774 sf 2.76 acres Streets: Pavement 53143 sf 1.22 acres Parking: Pavement "" 4592 sf 0.11 acres Parking: Brick " 12408 sf 0.28 acres Sidewalks 13068 sf 0.30 acres Impervious Totals 203485 sf 4.67 acres 67.0% -rent Site BUA does not include the loop road 7175 sf or its two 84'xl4' can parking = 2352 sf areas. They are now in streets a parking. "Developer may at a future dale redo emstrng parking as pervious pavwsftfttDne per Chapter 18 of BMP Manual for area credit C A CA Site Impervious 0.95 4.67 acres 4.44 Sandy Soil, < 2% slope 0A0 2.30 aces 0.23 Drainage Area Total 6.97 acres 4.67 Composite C - Sum CAIDA = 0.67 C A Design Rain Volumes Site Impervious 0.95 4.67 acres 43560 sf/ac i"/(12"/ft) = 16104 cu It Sandy Soil, < 2% slope 0.10 2.30 acres 43560 si/ac 1 "I(12711) = 835 cu It Drainage Area Total 6.97 acres Required Temporary Storage Volume = 16939 cu ft Wet Detention Basin (Pond) Data Pond Built in 1998 In Common Area near Tent Site 1.0" Design Rainfall Note: Wet Pond (In Common Area by Tentsite) was built in 1998 to Vertical Datum NVGD 29. Because of FEMA Zone changes, Vertical Datum now being used by surveyors on Bald Head Island is NAVD 88. To keep consilem wile original 1998 permit numbers NGVD 29 is used on SWU-102. Pernartent Pool elevation has beeen raised .30' to account for the larger required surface area because of the addition of area to the drainage area (by "annexing" south end of Keelson Row for the "Bald Head Island Landing" CAMA/SW Project) Pond Areas/volumes have been adjusted for the new in permanent pond elevation, and verified by recent survey data translated from NAVD 88). Top of overflow discharge structure is being raised 1 1/2" (.13') to account for higher temporary pool, and onface is being reset to elev +3.90'. Seasonal High Water Table for the Bald Hoed Harbor Area has traditionally been indicated as betweert 1.5 FMSL and 2.0 FMSL, with 2.0 FMSL being conservative. Pond temporary pool is above this elevation. Pond overflow is piped to Bald Head Island Marine, SC Waters Benchmark for pond sediment removal is at 6.151ms1 NGVD 29 on wood capping of forebay divider top. Required Permanent Pool Surface Area SAIDA from 90%TSS Table 10-3 NCDENR 2007 BMP Manual 7.5 H Pond Depth 60% Impervious = 1.9 SAIDA - 70% Impervious = 2.3 SAIDA By Linear Interpolation 67.0% = 2.18 SAIDA 2.1811006.97 acres 43560 sflac - 6619 sf Provided Surface Area at 3.90 FMSL NGVD 29 - 6640 sf Stage -Storage Volume Calculation per Table 3-7 NCDENR 2007 BMP Manual Increment Incremental Cumulative Elevation Surface Area It Volume Volume Pond Bottom: -3.6 1500 sf Less than 2.82 NAVD 88 Operational Volume 0 0 2.82 FMSL NAVD 86 390 FMSL NGVD 29 6640 sf 0 0 3.00 FMSL NAVD 68 4.08 FMSL NGVD 29 6810 sf 0.18 1211 cu It 1211 cu It 4.00 FMSL NAVD 88 6.08 FMSL NGVD 29 7830 sf 1.00 7320 cu it 8531 w it 5.00 FMSL NAVD 88 GAS FMSL 14DVD 29 9380 sf 1.00 8605 cu ft 17136 a If 5.50 FMSL NAVD a8 6.58 FMSL NGVD 29 9780 sf 0.50 4790 cu ft 9192iq ft 6.00 FMSL NAVD 88 1t1 7.08 FMSL NGVD 29 9780 at 0.50 4890 Atli t�e�'tfi fl j 4' a Required storage volume of Temporary Pool Volume Permanent Pool Volume Foreb I e 16939 cu ft occurs at approximate elevation 6.06 FMSL NG 29',p',� 17136 cu it occurs at approximate elevation 6.08 FMSL NG1/D 29 ° Q,�t)' 30525 cu combined volume of main basin a tomboy 1100 app, 20% of volume Forebay Bottom -2.85 (top = 1 +0 sf,".bottom -0. in u '+ AUG 1 5 2007 DWQ PROJ # HV Eastern Basin Lots -Ports. SW8-971223 Mod Modification to June 2, 1998 NCDENR Stormater Permit Bruce Marek, P.E. Project: Harbor Village Eastern Basin Lots P.O. Box 3069 Client Bald Head Island Limited, LLC Bald Head Island, NC 28403 Location: Bald Head Island, Brunswick Ccumty, NC 8/72007 Design Discharge Oriface so that pond drains in between two (2) days and five (5) days 0 = C'A'(2gh)^.5 Rearranged, A = 0/(C' (2gh)^.5) where C = onface coefficient = 0.60 = Onface Diameter (sf) g = gravity (ftfsee2) 32.2 It = pressure head (ft) Stage -Storage Volume Calculation per Table 3-7 NCDENR 2007 BMP Manual Increment Incremental Cumulative Elevation Surface Area ft Volume Volume Pond Bottom: -3.6 1500 sf Less than 2.82 NAVD 88 Operational Volume 0 0 2.82 FMSL NAVD 88 3.90 FMSL NGVD 29 6640 sf Pond Penn Pool 0 0 3.00 FMSL NAVD 88 4.08 FMSL NGVD 29 6810 sf 0.18 1211 cu It 1211 cu ft 4.00 FMSL NAVD 88 5.08 FMSL NGVD 29 7830 sf 1.00 7320 cu It 8531 cu It 5.D0 FMSL NAVD 88 6.08 FMSL NGVD 29 9380 sf Outlet Overflow 1.00 8605 cu ft 17136 cu ft 5.50 FMSL NAVE) 88 6.58 FMSL NGVD 29 9780 sf 0.50 4790 cu ft 21926 cu ft 6.00 FMSL NAVD 88 7.08 FMSL NGVD 29 9780 sf 0.50 4890 cu ft 26816 cu It Required storage volume of 16939 cu It occurs at appmArnate elevation 6.06 FMSL NGVD 29 Temporary Pool Volume 17136 cu It occurs at approximate elevation 6.08 FMSL NGVD 29 Temporary Pool Volume 17136 cu It 17136 cu ft Time to drain: 2 days 5 172800 seconds 432000 Flow Rate 0 = 0.0992 cis 0.0397 cfs ' Max storage level = 6.08 FMSL NGVD 29 6.08 FMSL NGVD 29 Pond Penn Pool = Onface Ht 3.90 FMSL NGVD 29 3.90 FMSL NGVD 29 Height Difference 2.18 ft 2.18 It Ave Pressure Head It =diff2 1.09 ft 1.09 ft A read = 0/(C' (2gh)At5) = 0.0197 sf 0.0079 at A sf' 144 sq in/sf = 2.84 aq in 1.14 sq in Reqd Onface Diameter = 1.90" inside diam 1.20" inside diam Use 1 1/2" Schedule 40 Pipe 1.61" inside diam A sq in 2.04 sq in A sf 0.0141 sf Draw Down Rate 0 = 0.0711 cis Draw Down Time Seconds = 241107 seconds Draw Down Time Hours = 67.0 his Draw Down Time Days = \ 2.79 days nE C E B V ED AUG 15 2007 DWQ PROJ # HV Eastern Basin Lots-0nface 0 SW8-971223 Mod Modification to June 2, 1998 NCDENR Stormater Permit Bruce Marek, P.E. Project: Harbor Village Eastern Basin Lots P.O. Box 3069 Client: Bald Head Island Limited, LLC Bald Head Island, NC 28403 Location: Bald Head Island, Brunswick County, NC 8f/2007 Project Narrative Summary of Project Area:•Aug 2007 Permit ModificationNpdate Area Draining To Pond = DA#1: SC Waters- Bald Head Island Marina 18-88-8-5 303613 sf 6.97 acres Am Draining To Lax Density = DA#2: SA Waters- Bald Head Creek 1""A 133745 sf 3.07 acres ' Total Project Area 437358 sf 10.04 acres Summary of Project Area: 1998 Permit Conditions Area Draining To Pond = DA#1: SC Waters- Bald Head Island Manna 18-88-8-5 289834 at 6.65 acres Draining To Low Density = DA#2: SA Waters - Bald Head Creek 18-88-" 133745 at 3.07 acres Total Project Area 423579 sf 9.72 acres Said Heed Island Limited, LLC Stormwater Permit SW8-97-1223 is being modified/updated to allow the approximate 10 awes of Land south of the Bald Head Island Marina that predated stornwater regulations (mostly developed prior to 1987) to be brought under new or existing CAMA and Stormwi ter Permits. This area, to be known as "Bald Head Island Landing", is bounded on the east by Bald Head Creek (SA Waters), the north by Bald Head Island Marina (SC Waters), and the west by the Atlantic OceaNCape Fear River Mouth (SB Waters). The generally flat topography of the site (and mostly at elevation 6 FMSL to 8 FMSL) meant that the best method of handling the northeast corner of Ball Head Island Landing was to include approximately 0:25 acres by the Eb 8 Flo Manna From Restaurant in the Harbor Village Eaten Basin Lots Permit SW8-971223. There is an existing catch basin at the old southern boundary of SW8-97-1223 in the center of Keelson Row which, with a little bit of grading change during the next paving poject, will handle the somhwater from what will be the intersection of Keelson Row, Marina Wynd, and the start of the new (proposed) cart bridge. Thera is also an additional .06 acres added to tot OM1, ("Quartermasters Row" Commercial Development around the Tent Site), which is land previously not included in the stomwater project boundary. The total project increase is 0.32 acres. In 1998 the project was permitted with 6.65 acres draining to the wet detention basin (pond) near the tent site, whose overflow is piped into the marina (SC Waters). An additional 3.07 acres was permitted as low density, without any engineered treatment system. It was taken as the back half of the Harbor Village Lots, which in theory, but not in practice drain to the creek. The highly Conductive sand soils on the island make it doubfful that rain makes it over the bulkhead. That however, was an agreed on solution because several of the lots were sold prior to the existence of.slont water regulations, and it would have been difficult to impose strict measures on owners that did not originally have deed restrictions. The Low Densely (DA#2) portion of this project has not been charged. It remains with the same areas and impervious coverage form the prior permit. The High Density portion of the project has the .32 acre increas in area, as well as a 0.38 acre increase in impervious area. See project summary for proposed impervious areas. Numbers were also reworked to better follow the current SWU-101 format of reporting numbers. The Tent Site 13UA does riot include the loop road 7175 of or its two 84'x14' cart parking = 2352 sf areas. They are now, in streets 8 parking. There are short areas along the manna wall where < 10 pit of roof at the gazeebo, bath house and swilling cub infiltrates directly off the roof along the land side of the marina wall in vegetaed planters. Tin roof style is such that gutters were not feasible, and impact is minimal. The Developer may at a future date redo existing or future parking as perviouspavers/turfstone per Chapter 18 of BMP Manual for area mod. Please write into the permit an allow2nce for such area credits if the state guidelines are followed. The Wet Pond (In Common Area by Tentsite) was built in 1998 to Vertical Datum NVGD 29. Because of FEMA Zone changes, Vertical Datum now being used by surveyors on Bald Head Island is NAVD 88. To keep consitent with original 1998 permit numbers NGVD 29 is used on SWU-102. Permanent Pod elevation has beeert raLsed..W-toaccount for.the larger required surface area because otthe addition of area to the drainage area (by "annexing" south end of Keelson Row for the "Bald Head Island Landing' CAMNSW Project) Pod Areastvdumes have bear adjusted for the raise in permanent pond elevation, and verified by recent survey data translated from NAVO 88). Top of overflow discharge structure is being misnd l 12" (.13') to account for higher temporary pod, and onface is being rs-set to elev +3.90:� Seasonal High Water Table for the BaW Head Harbor Area has traditionally been indicated as between 1 S FMSL and 2.0 FMSL, with 2.0 FMSL being conservative. Pond temporary pool is above this elevation. Pod overflow is piped to Bald Head Island Marina, SC Waters r bHrr4: (H CgRO •>. gAtL 15684 �E C E I V ED �uu^(pp AUG 15 23107 PROJ If DWO HV EaBtem Basin Lots Narrative SW8-971223 Mod Modification to June 2, 1998 NCDENR Stormater Permit Bruce Marek, P.E. Project: Harbor Village Eastern Basin Lots P.O. Box 3069 Client: Bald Head Island Limited, LLC Bald Head Island, NC 28403 Location: Bald Head Island, Brunswick County, NC 8/142007 Attachment to SWU-104 Low Density Supplement SA Site Area = 133746 sf = DA#2 DF Density Factor = 0.25 (=1998 Unchanged SA Low Density Permit DF) RA Road Area = 0 sf OA Other Area = 0 sf No. Lots 28 that drain to DA#2 (includes 1 lot each for lot 3A & 38) Calculation: For irregular st alifthaped loft: Drainage Area Allowable BUA - (SA'DF) - RA-OA = 33436 at TABLE OF LOT BUA FOR HARBOUR VILLAGE LOW DENSITY LOT BUILT UPON FORM SWU-104 IMPERVIOUS IMPERVIOUS HV LOT # TO LOW HV LOT # TO LOW DENSITY DENSITY DA#2 DA#2 1 A 0 sf 18 922 at 111 0 sf 19 963 sf 2 0 sf 21 666 sf 3A 430 sf 22 0 sf 3B 3300 sf 23 1613 sf 5 1610 sf 24 962 sf 6 0 sf 25 962 at 7 1237 sf 26 990 sf 8 1875 sf 27 1239 sf 9 903 sf 28 1138 at 10 910 sf 29 788 sf 11 628 sf 30 1138 sf 12 690 sf 31 813 sf 13 690 sf 86 495 sf 14 690 sf 87 594 sf 15 1435 sf 16 936 sf 17 613 sf SUBTOTALS: 15947 sf 13283 sf TOTAL LOT BUILT UPON AREA DRAINING TO LOW DENSITY AREA = DA#2 = 29230 sf 0.67 acres Area Draining To Low Density = DA#2: SA Waters - Bald Head Creek 18-88-8-4 133745 sf 3.07 acres Per Cent Impervious 21.86% Changes from 1998 Permit. Note: Low Density Area DA#2 Impervious did not change except for Lot 3A, 3B Split Lot 1 Harbor Village was split into lots 1A & 1B for construction of a Duplex. Lot was/is 100% impervious, None in DA#2. Lot 3 Harbor Village was split into lots 3A & 38 for construction of a Duplex. DA#2 impervious has been split to numbers shown.. Lot 86 Harbor Village was was enlarged after addition of new bulkhead along Coastal Wetland Line. No change in DA#2 Impervious. ( 1200 sf impervious area was added to the high density (pond) portion of the lot.) Lot 86 Harbor Village was was enlarged after addition of new bulkhead along Coastal Weiland Line. No change in DA#2 Impervious. (1000 at impervious area was added to the high dens' (pond) portion of the lot.) f1E C E I V ED IunU� AUS 15.2007 DWQ PROJ # HV East Basin Lots for SWU-104 •erNII III del L.:9r '"a is A' b 1 %084 g; JAMES 0 SW8-971223 Mod Modification to June 2, 1998 NCDENR Stormater Permit Bruce Marek, P.E. Project: Harbor Village Eastern Basin Lots P.O. Box 3069 Client: Bald Head Island Limited, LLC Bald Head Island, NC 28403 Location: Bald Head Island, Brunswick County, NC 8f7/2007 Summary of Impervious Area: 1998 Permit Conditions Area Draining To Pond = DA#1: SC Waters- Bald Head Island Marina 18-88-8-5 289834 sf 6.65 acres Area Draining To Low Density = DA#2: SA Waters - Bald Head Creek 18-88Ad 133745 sf 3.07 acres Total Project Area 423579 sf 9.72 acres Summary of Bulk Upon Areas: 1998 Permit Areas Draining to Pond Areas Draining to Low Density Totals Drainage Area #1 (SC) Drainage Area #2 (SA) Impervious Arm of acres Area sf acres Area sf acres Lots 55557 sf 1.28 acres 29230 sf 0.67 acres 84787 sf 1.95 acres Bldgs (Marina Front) 15337 sf 0.35 acres 0 sf 0.00 acres 15337 sf 0.35 acres Sidewalks 10679 sf 0.25 acres 0 sf 0.00 acres 10679 sf 0.25 acres Pavement 57128 sf 1.31 acres 0 sf 0.00 acres 57128 sf 1.31 acres Future 48000 sf 1.10 acres 0 sf 0.00 acres 48000 sf 1.10 acres 186701 sf 4.29 acres 29230 sf 0.67 acres 216931 at 4.96 acres 64.4% 21.9% 51.0% Summary of Impervious Area: Aug 2007 Permit Modification/Update Area Draining To Pond = DA#1: SC Waters- Bald Head Island Marina 18-88-8-5 303613 sf 6.97 acres Area Draining To Low Dens' = DA#2: SA Waters - Bald Head Creek 18-88-8-4 133745 sf 3.07 acres Total Project Area 437368 sf 10.04 acres Areas Draining to Pond Areas Draining to Low Density Totals Drainage Area #1 SC Drainage Area #2 SA IMPERVIOUS Area all acres Area sf acres Area sf acres Lots (HVI41) 57757 sf 1.33 acres 29230 sf 0.67 acres 86987 at 2.00 acres Bldgs (Marina Front 12200 sf 0.28 acres 0 sf 0.00 acres 12200 sf 0.28 acres Tent Site OM2 BUA* 11760 sf 0.27 acres 0 sf 0.00 acres 11760 sf 0.27 acres Future: OM1, OM3 33000 at 0.76 acres 0 sf 0.00 acres 33000 sf 0.76 acres Future: OM 4A,413 (5657 5557 sf 0.13 acres 0 sf 0.00 apes 5557 sf 0.13 acres Subtotal BUA 120274 sf 2.76 acres 29230 sf 0.67 acres 149504 sf 3.43 acres BUA 120274 sf 2.76 apes 29230 sf 0.67 acres 149504 sf 3.43 acres Streets: Pavement 53143 sf 1.22 acres 0 sf 0.00 apes 53143 sf 1.22 acres Parking: Pavement" 4592 sf 0.11 apes 0 sf 0.00 apes 4592 sf 0.11 acres Parking: Brick ^ 12408 sf 0.28 apes 0 sf 0.00 acres 12408 sf 0.28 acres Sidewalks 13068 sf 0.30 acres 0 sf 0.00 apes - 13068 sf 0.30 acres Impervious Totals 203485 sf 4.67 acres 87590 sf 0.67 acres 232715 sf 5.34 acres 67.1 21.9% 53.2% 'Tent Site BUA does not include the loop road 7175 sf or its two 84'x14' cart parking = 2352 sf areas. They are now in streets & parking. -Developer may at a future date re -do existing parking as pervious paverafturfstone per Chapter 18 of BMP Manual for area credit. rer1��p999 rnsl►yr, At nE C E 9 V ED Iu�Su AUG 15 2007 HV Eastern Basin Lots -Summary ow0 PROJ # SW8-971223 Mod Modification to June 2, 1998 NCDENR Stormater Permit Bruce Marek, P.E. Project: Harbor Village Eastern Basin Lots P.O. Box 3069 Client: Bald Head Island Limited, LLC Bald Head Island, NC 28403 Location: Bald Head Island, Brunswick County, NC 8/7/2007 SUMMARY OF HARBOR VILLAGE LOT BUILT UPON ASSESSMENTS HV LOT # LOT TO TO LOW HV LOT # LOT TO TO LOW IMPERVIOUS POND DENSITY IMPERVIOUS POND DENSITY 1 A 3242 sf 3242 sf 0 sf 18 2060 sf 1138 sf 922 sf 1 B 2881 sf 2881 sf 0 sf 19 2165 sf 1202 sf 963 sf 2 4150 sf 4150 sf 0 sf 21 4315 sf 3649 sf 666 sf 3A 3584 sf 3164 sf 430 sf 22 2745 sf 2745 sf 0 sf 3B 4650 sf 1350 sf 3300 sf 23 3130 sf 1517 sf 1613 sf 5 3030 sf 1420 sf 1610 sf 24 2165 sf 1203 sf 962 sf 6 2885 sf 2885 sf 0 sf 25 2165 sf 1203 sf 962 sf 7 2715 sf 1478 sf 1237 sf 26 1835 sf 845 sf 990 sf 8 4005 sf 2130 sf 1875 sf 27 2620 sf 1381 sf 1239 sf 9 2120 sf 1217 sf 903 sf 28 2515 sf 1377 sf 1138 sf 10 3290 sf 2380 sf 910 sf 29 1815 sf 1027 sf 788 sf 11 1520 sf 892 sf 628 sf 30 2515 sf 1377 sf 1138 sf 12 1615 sf 925 sf 690 sf 31 1865 sf 1052 sf 813 sf 13 1615 sf 925 sf 690 sf 86 3000 sf 2505 sf 495 sf 14 1615 sf 925 sf 690 sf 87 3000 sf 2406 sf 594 sf 15 2985 sf 1550 sf 1435 sf 16 1710 sf 774 sf 936 sf 17 1465 sf 852 sf 613 sf , SUBTOTALS: 49077 sf 33130 sf 15947 sf 37910 sf 24627 sf 13283 sf TOTAL LOT BUILT UPON AREAS DRAINING TO POND = DA#1 = 57757 sf 1.33 acres TOTAL LOT BUILT UPON AREA DRAINING TO LOW DENSITY AREA = DA#2 = 29230 sf 0.67 acres TOTAL LOT BUILT UPON AREA = 86987 sf 2.00 acres 1998 Permit Original Numbers that have changed above. Changes shown above in bold. HV1 6123 sf 6123 sf 0 sf - HV3 8235 sf 4504 sf 3730 sf HV86 1800 sf 1305 sf 495 sf HV87 2000 sf 1406 sf 594 sf Note: this is an increase of 2200 sf impervious in DA#1 (draining to the pond) Notes: Lot 1 Harbor Village was split into lots 1A & 1 B for construction of a Duplex. Lot was/is 100% impervious. Lot 3 Harbor Village was split into lots 3A & 3B for construction of a Duplex. 100% Lot impervious has been split. Lot 86 Harbor Village was was enlarged after addition of new bulkhead along Coastal Wetland Line and 1200 sf impervious area added to the high density (pond) portion of the lot. Lot 86 Harbor Village was was enlarged after addition of new bulkhead along Coastal Wetland Line and 1000 sf impervious area added to the high density (pond) portion of the lot. aD E C E ' " ED AUG 15 2007 DWO PROJ #-- — — —"��— HV East Basin Lots - Lots BHI Sheds Subject: BHI Sheds From: "Bruce Marek" <marekyd@ec.rr.com> Date: Wed, 11 Jul 2007 12:35:02 -0400 To: "Heather Coats" <heather.coats@ncmail.net>, "Linda Lewis" <Iinda.lewis@ncmail.net> CC: "Jim Henry" <jhenry@bhisland.com>, "Bruce Marek-Island" <bmarek@bhisland.com>, "Marek Yacht & Design" <marekyd@ec.rr.com> Good talking to both of you this morning. Quick summaty since Linda said that she doesn't care about "temporary" sheds built within allowable bua. 7 The 4 Shoals Club sheds, the 2 tent site sheds, and the 1 shed at the ferry depot fall into this category. All are 12'02' or less. Two of the Shoals club sheds fall in the footprint of the 3000 sf future Pavilion Expansion in basin 3 of sheet Rec 3A SW8-980920 Mod. The other 2 Shoals club sheds are in the foortprint for a 20'x20' future storage building in basin 4. , The Ferry depot shed, also temporary, is in the permitted footprint of the future Transpo World/Baggage Claim building. SW8-940918 The two tent site sheds (Harbor Village East Basin Lots SW8-971223) are also temporary, and will be replaced when we build our major retail building and/or replace the tent with a real building. We already have designs for both big buildings, but they are not in this year's budget. The 2 sailing club sheds are more of a permanent item, but still 12'x12' in size, plus say 312 sf of pavers = 600 sf total area. These are also in Harbor Village East Basin Lots, (SW8-971223) on the strip of 20'x20'+/- "postage stamp" lots that are permitted at 100% impervious. See attached pdf where CAMA last year referenced Linda saying we could self track our impervious. There should be an April 19, 2006 Linda Lewis e-mail that allowed this, but mine has long since been purged from my computers. Hopefully the CAMA letter is enough for us to move ahead on the Sailing Club Sheds, and we will later in the year update what has been built. This is in lieu of submitting a plan revision, as we are still 30%+/- under our permitted bua for the area. I will submit a letter of continuance to Heather this week for my MOV for my 410+/- sf impervious inside the marina AEC asking to wait until Stormwater Permit gets issued with our July 30,2007 Bald Head Island Landing Submittal. Thus no response from Linda will be needed at this time. Thanks again for taking time to talk to me today. Bruce Marek, P.E. Content -Type: application/pdf SW8-971223 - CAMA 191-86 5-2-06 Letter re Keelson Row Impervious.pdf Content -Encoding: base64 1 of 1 7/11/2007 1:27 PM Pagel of 3 Bruce Marek From: "Bruce Marek" <marekyd@ec.rr.com> To: "Linda Lewis" <linda.lewis@ncmail.net> Cc: "Jim Henry" <jhenry@bhisland.com>; "Marek Yacht & Design" <marekyd@ec.rr.com>; "Bruce Marek-Island" <bmarek@bhisland. com> r.nlffC EIVE' D Sent: Tuesday, July 03, 2007 7:37 AM Subject: BHI Projects 1 0 3 2007 Good Morning Linda, Here is the summary of the BHI Stormwater Projects/Issues as I see them. They are not necessarily in order of importance. 1. Sheds: I now have 4 CAMA letter of refinement requests in for a total of nine 12'x12' roofed area sheds. Two of the CAMA requests also include 312 sf of pavers/pavement as lead in to the sheds. All are covered by existing permits, and are located either in the footprint of permitted future building pads, or are in areas that have allowable impervious still available. For CAMA purposes I also call the sheds 10'x11' building footprint, as this Qyields the 12'x12' size with front & back 1' overhangs, and 6" end overhangs. q6/15/07 CAMA 199-87 Letter of Refinement request for 4 sheds at the Shoals Club, Cape Fear Station SW8- 920Mod. This is from sheet Rec3A of the 3/16/06 approved Stormwater set. When CAMA did their acceptance of the Stormwater plans, they specifically wrote in the letter of refinement that details had to be provided for any new buildings at the Shoals Club site, since we had stormwater permitted 3 building addtions/expansions, a (lookout) tower, and a 20'x20' storage shed. These were in areas of small and large structure setbacks from the Ocean Hazard AEC. What really is needed is two of the sheds at the end of the driveway in the future 3000 sf (50'x60') building building pad in Basin B3. These are needed to store tables, chairs, etc. 288 sf for two sheds seems a reasonable request for where we are permitted for 3000 sf of impervious. In basin B4, we already have impervious permitted for a 20'x20' shed. We are finding that the 12'x12' sheds are easier to build on the island. Here again, 288 sf is less than the 400 sf permitted. It is possible that we will decide to only build the two at the top of the driveway in basin 3, and then if/when we build the 3000 sf expansion of the Shoals Club Pavillion, we relocate the sheds to the Basin 4 location. Preferably you will concur that the 4 sheds are on permitted impervious, and then this becomes a CAMA L.O.R. issue. If plan revision is required, which probably wouldn't be scheduled until after the end of the summer season or first hurricane, then we would accept it if we could only do one shed in basin 3, and one shed in basin 4 now. P1b Two Sailing Club Sheds on Keelson Row SWS-971223 CAMA 191-86 L.O.R. request date July 2, 2007. ast April 19 (2006) you responded tome by e-mail that for the Harbour Village East Basin Lots we could self track our impervious for the postage stamp lots along the marina. This was referenced into our May 2, 2006 CAMA L.O.R for "Harbour Side at Keelson Row" . Only 9609 sf of the permitted 15337 sf have been committed. With the 2 sheds plus 312 sf of pavers, we are looking at 600 sf of impervious, still leaving over 5000 sf unused/undesignated. Perhaps you can reiterate to CAMA that everything doesn't need to be run by you. We are well capable of watching/tracking our impervious amounts. e 1c Two Tent Site Sheds on Keelson Row SW8-971223. CAMA 191-86 L.O.R. request date July 2, 2007. Same quest as 1 b, but on the other side of the street, and outside of the 75' AEC. Not sure if CAMA will question these, but the area is in Permit 191-86. These sheds plus 312 sf of pavers/pavement = 600. sf. The general tentsite area had an original allowable from the 1997 Klein drawing/permit of 48000 sf impervious. We are much, much lower than that at this time. I don't have that drawing at home to do an accurate accounting, but we haven't yer built the big retail building that we considered in the original permit. 1 One shed at the Ferry Landing Depot. CAMA 172-87 L.O.R. Request. SW8-940918 Mod. We already have _Vxl� CAMA permitted sheds in the footprint of the future 1792 sf (24'x56') Transpo World/Baggage Claim building 7/3/2007 Page 2 of 3 near the marina entrance. These are used for UPS, lost bags, generator storage, etc. We need an additional one for the increased storage needs this season. Hopefully you can provide one answer for all of the shed issues, so that it doesn't bog down the system. These sheds are small enough that the building department doesn't even require building permits. . 2. CAMA Notice of Violation #0748D for Development inside of the AEC along Marina Wynd. I will have a copy of my response to CAMA/Heather Coats dropped off at your office today, as I am required to contact you per the NOV. When we couldn't achieve a timely impervious swap solution for the 1500 sf to 2000 sf of widening that we proposed for a CAMA Letter of Refinement to #172-87, after discussions with Jim Gregson we approached the project from a standpoint of staying outside of the 75' AEC. We felt that we could do this without much modification to what we originally proposed as our paving limits. Outside of the AEC, they no longer would ask for stormwater concurranoe. Without a need for a CAMA Permit, and at approximately 2000 sf of new pavement, we weren't into requiring sediment and erosion or stormwater permits either. Unfortunately, we ended up placing gravel/pavement inside of the 75' AEC in two small areas, one of 230 sf, the other 180 sf. The 230 sf area is where I didn't use the southeastern comer of the barge landing ramp as my measurement point, which is where Heather & Ed Brooks measured from. In my mind and on my drawing that I used to confirm being outside of the 75' AEC, the hydraulic barge ramp wasn't the marina comer. I don't think it fits the "float a canoe" designation for navigable waters, but I don't have any reason to contest either the point that the CAMA reps used. That leaves me with 180 sf of "development" at the corner/ intersection of Keelson Row with Marina Wynd. The shift to staying outside of the AEC meant that we were better off the closer we wnt to the marsh, rather than closer to the marina. Marks that I had on the ground from when I was still hoping for an impervious surface swap were used for the clearing. This was mostly fine, except where we faired back into the curbline at Keelson Row. I thought that CAMA would set flags, I would draw a corner radius prior to paving, remove any nonconforming base material, and we were done with a "clean project'. CAMA however, considered the grading and placement of gravel as new "development", so correction at paving time was already too late. I guess first question is, if it was only 410 sf of impervious, and I did it was all directly behind Eb & Flo's, would there have been a way to work out an "impervious swap" deal, knowing that we have an upcoming July 30 stormwater review date to actually permit this area? Second, which CAMA wants to know, is this area permitable for StormwateR I assume the answer is yes, and we have already taken steps to submit it. Once permitted, then they will/may issue my L.O.R. rather than requiring me to tear out such minor asphalt amount. Third, if not, we stand ready to tear out asphalt, remove rock, and to restore area to prior sand condition I believe CAMA needs some sort of official answer on this. 3. SW8-970625 North Bulkhead Lots. BHI Planning just got a renewal notice for this stormwater permit, for a $420 fee, and prior to 180 days prior to permit expiration date of August 2007. Hard to do an 180 day prior renewal when notice arrives at end of June. Do we need to do anything to rush this? I don't remember getting renewal notices on our 19 other permits, is this something new? 4.SW8-010215 Mod Service Village Low Density. This had an express plan revision December of 2006. Permit came back with a wrong owner name, i.e. not the correct wording for BHI Limited, LLC (with BHI spelled out). We asked for this to be corrected, and at the same time I wanted to revise two impervious numbers, since our architects drew bigger builings than I originally thought. I gave three revised drawings to Cameron Weaver, and he wasn't sure if we would be charged another full $2000 express fee, an express $1000 revision fee, or just the $400 std fee. I have not heard anything back, and we may start construction this fall. Can you tell us what we have to do? 5. Pervious Pavers. I still have a request in for Express Review if possible to get a one page letter or less that we can add into all of our covenents that use of pervious pavers/pavement per state guidelines will be�@Iowed the 7/3/2007 i. no I q 71 , . —1 I a 0ou ps OAXI AV w.", no let; wo 07007 Y w op a no, w A, 0, 4., r n&On V41 E�91l` lQ1." 407W Of: -1 %'P. :.I"" ;? 001"! %, 0-1. 1 7-Av T"Ah MITMb -j.R j 05wg 01 v v in MIA amv) n eym 1 Awn x wroavi SO) VNM n It 4M 4yVI-1 I: 1. 4 at 0an Aw AV, Q! Al IN 1% "m to nuum.no e:.jln 11 Aloymys a UVA YWFS; eA ww&z min n, F, on 0 11 3 :J A,M: b AQ t its, C LoW C mono M: m "Xww � 10 Q�- JC; rr K "Y"we 1" wwL n Uas rn ovl�; 3RA 1K act 1% -A a w"s nky,�.v of T t ILly3p Wn? w: sn' w- :i:, , ll ?, 'I`!. l, .. i'l so ro :101 t. VL ol !4 140 N V. 01. ow a in ryqq ael -ot ync a-Itu, �_,l 12-1 C-,;' Ila: na Lye 0:4 1�vaowv ry 0 "Mu? 0- V: C w- Ann.: 3 05"vl 's'; ',n:1 ; �l 4, ON d,n I 0"K Yns WK 1200 0"417* %a vy 01 WO: to unh vort, )"m q1 0; ZYN Y; qa y1i Ow a US; v cc I abn to! onn­. ale'! f;T. to u? ev, T; Page 3 of 3 area credit as laid out in the state stormwater BMP manual. Is this possible yet? Enough for this morning. I will need express plan revision dates for Cape Fear Statiopn SW8-980920 Mod for three or four sheets of the 40 sheet set sometime in August, as well as another plan revision to SW8-971223 Harbour Village East Basin Lots (unless that happens in conjunction with the BHI Landing review that was putting most of the area into SW8-940918 Ferry Landing Depot, but a corner by my Keelson Row/Maritime Way corner into 971223. Fo I need to involve Cameron Weaver, or for Express Stormwater do I go directly to you now? Thanks, and have a great day! Bruce Marek, P.E. for BHI Planning No virus found in this incoming message. Checked by AVG Free Edition. Version: 7.5.476 / Virus Database: 269.9.14/883 - Release Date: 7/l/2007 12:19 PM 7/3/2007 � 0 1, t I - - * I Bruce Marek, P.E. P. O. Box 3069 Bald Head Island, NC 28461 910-457-7517 July 2, 2007 Ms. Heather Coats NCDENR Division of Coastal Management 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Letter of Refinement for CAMA Permit # 172-87 Bald Head Island "Marina Development" Request for Permission to build/add Storage Shed at BHI Ferry Depot Dear Ms. Coats: Enclosed are 5 copies of 8.5"xil" drawing dated & sealed 7-2-2007 in support of this Letter of Refinement request for Bald Head Island Limited, LLC CAMA Permit 172-87. The desire is to add one approximate 12'xl2' storage shed at the BHI Ferry Depot. The location for this shed is near the marina channel entrance, adjacent to the three existing Baggage Claim, UPS and Depot Maintenance storage sheds. This is in the already permitted 24'x56' footprint of the 1792 sf future Tram Handler/ Baggage Claim Building. The L.O.R. request is also for the addition of wood boardwalk/ramp to allow easy access to the new shed from the existing concrete sidewalk, to match what was done at the other three sheds. If this does not require a Letter of Refinement, please let me know so that construction can commence on a timely basis. This area is covered by State High Density Stormwater Permit #SW8-940918 Ferry Landing Depot. Last year, in conjunction with a stormwater plan update/revision to Harbor Village East Basin' Lots SW8- 971223, Linda Lewis of DWQ Stormwater agreed per e-mail dated 4/19/06 that Bald Head Island Limited could/should self track itself on its stormwater impervious amounts. I believe this e-mail was then referenced into the CAMA Letter of Refinement for Keelson Row Harbour Side Lots submitted last April 20 (2006). Since this project falls under a different stormwater permit, I don't know if she will give us the some liberty, but I also can't see where she wouldn't allow a total of approximately 576 sf of bua where 1792 sf is already permitted. If you have any'questions and/or comments, please call me at 910-799-9245 or cell 910-228-2484. Please have a copy of the Letter of Refinement faxed to 910-457-7463. Thanking you in advance for kind attention to this matter. Respectfully, A o Bruce Marek, P.E. k ✓` Tr'' :a °`\P�`�'y For Bald Head Island Limited Enclosures cc: Jim Henry, Director, BHI Planning & Development; M. Kent Mitchell, CEO a (' �` 1. . .'.J f'•1i ... .'�'�bf . �..t .... � ... 4"..r ., .. r«..1 i. ' ., t � c �.jr r BALD HEAD ISLAND LIMITED, LLC CAMA PERMIT LETTER OF REFINEMENT REQUEST 7-2-2007 NEW (4TH) 12'x12' STORAGE SHED PLUS WOOD RAMP (TO MATCH EXISTING) BRUCE MAREK, P.E. P.O. BOX 3069 BALD HEAD ISLAND, NC 28461 W U z Q W Lo W z� z� Z ULo Z z m 0 C #172-87 0 0 0 v� U) ^.'.: rno '�Lo 0' `` a 50' N BASIN 4. I►\�� =\ 75' AEC BALD HEAD ISLAND MARINA SC WATERS 4 Secondary Landing- - MINOR MOO 6-14-2004 BASIN 5: EXISTING RETAINING WALL ALONG SWALE ; «&11 i CARO��..,�e w SEAL fit! 1DOP 1563a h•" -� - � i �' _ _ ,. -• .'� � � 1 . � � , , ` � � _ � � . _ � _ + + �` �. n • � � '` � i i � i � d �' � i t n ,i � Bruce Marek, P.E. P. O. Box 3069 Bald Head Island, NC 28461 910-457-7517 July 2, 2007 Ms. Heather Coats NCDENR Division of Coastal Management 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Letter of Refinement for CAMA Permit #191-86 Bald Head Island "Harbour Village Development" Request for Permission to build Two Storage Sheds at Tent Site , Dear Ms. Coats: Enclosed are 5 copies of 8.5"xl1" drawing dated & sealed 7-2-2007 in support of this Letter of Refinement request for Bald Head Island Limited, LLC CAMA Permit 191-86. The desire is to build two small I Vx10' storage sheds (I2'x12' roofline) at the Keelson Row Tentsite. The locations for these two sheds are outside of the 75' BHI Marina Estuarine AEC. If they do not require a Letter of Refinement, please let me know so that construction can commence on a timely basis. This area is covered by State Stormwater Permit #SW8-971223 Harbour Village East Basin Lots. tent,, site area is part of the 1997 permit 48,000 sf "Future" impervious surface. See attached sheet 3 of DWQ Project Data Sheet. Last year, in conjunction with other construction along both sides of Keelson Row, Linda Lewis of DWQ Stormwater completed a stormwater plan update orl April 12, 2006. Ms. Lewis agreed per e-mail dated 4/19/06 that Bald Head Island Limited could/should self track itself on its stormwater impervious amounts. This e-mail was then referenced into the CAMA Letter of Refinement Keelson Row Harbour Side Lots dated May 2, 2006 with the wording "applicant need not obtain additional (stormwoter) authorization for the units provided that they were consistent with their allotted built upon area". Much of the 48,000 sf still remains available, as the grassed area south of the tent has not yet been built upon. The two sheds at 144 sf each, plus say 312 sf of impervious pavers or concrete for walkways to the sheds, total just 600 sf of new development. Please note that we may use some sort of pervious paver system, which is allowed a credit on how stormwater area is calculated. However, being many square feet shy of what is permitted, I won't go into a detailed analysis unless/until necessary. If you have any questions and/or comments, please call me at 910-799-9245 or cell 910-228-2484. Please have a copy -of the Letter of Refinement faxed to 910-457-7463, Thanking you in advance for kind attention to this matter. Respectfully, �a Bruce Marek, P.E. For Bald Head Island Limit ecf� ;, ? S '` j .�"'� Enclosures cc: Jim Henry, Director, BHI Planning & Development: M. Kent Mitchell, CEO RECEivi_ DCM WILMIINGT0N, ,\1C JUL 0 2 2007 BRUCE MAREK, P.E. P.O.BOX 3069 BALD HEAD ISLAND, NC 28461 • v a v v kc.i_pppp�—� 15'+/— to marina �(= outside of AEC �<de `-T3 TIOm) > 7' tre 71 TENT SITE KEELSON ROW _ CAMA 191.86 HARBOUR VILLAGE DEVELOPMENT STORMWATER SWS-971223 HARBOUR VILLAGE EAST BASIN LOTS a n t'.9 ......., (/ FEES/py.$9: r7 SEAL 9�i YQ 1 15684 g�7'." ti we) 1'71 a z3 Bruce Marek, P.E. P. O. Box 3069 Bald Head Island, NC 28461 910.457-7517 July 2, 2007 Ms. Heather Coats NCDENR Division of Coastal Management 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Letter of Refinement Request for CAMA Permit #191-86 Bold Head Island "Harbour Village Development" Request for Permission to build Two 12'x12' Storage Sheds at Sailing Club Site Dear Ms. Coats: Enclosed are 5 copies of 8.5"xlI" drawing dated & sealed 7-2-2007 in support of this Letter of Refinement request for Bald Head Island Limited, LLC CAMA Permit 191-86. The desire is to build two small I I'x10' storage sheds (I2'xl2' roofline) with a courtyard of brick pavers in between, on the previously permitted (in 1997) impervious areas adjacent to the east side of the Bald Head Island Marina Basin along Keelson Row. The locations for these two sheds are between the Sailing Club Clubhouse approved by Letter of Refinement dated April 5, 2006, and the Marina Bath House approved by Letter of Refinement dated December 27, 2000. On my April 20, 2006 "Keelson Row Harbour Side Lots" CAMA Letter of Refinement Drawing Cl, the new shed positions are between roofed areas A (Sailing Club) and B (Gazeebo). This area is covered by State Stormwater Permit #SW8_971223 Harbour Village East Basin Lots. The sheds are part of the 26,016 sf Building & Sidewalk permitted area. See attached sheet 3 of DWQ Project Data Sheet. Last year, in conjunction with other construction along both sides of Keelson Row, Linda Lewis of DWQ Stormwater completed a stormwater plan revision on April 12, 2006. Ms. Lewis agreed per e-mail dated 4/19/06 that Bald Head Island Limited could/should self track itself on its Stormwater impervious amounts. This e-mail was then referenced into the CAMA Letter of Refinement Keelson Row Harbour Side Lots dated May 2, 2006 with the wording "applicant need not obtain additional authorization for the units provided that they were consistent with their allotted built upon area". As previously determined last year, sidewalks equaled approximately 10,679 sf, leaving 15,337 sf available built upon area between the marina wall and the sidewalk. From the accounting on the Keelson Row Harbour Side Lots CAMA drawing, 9,609 sf of bua was proposed/ approved in this area, leaving over 5700 sf still available. The two sheds at 144 sf each, plus say 312 sf of impervious pavers in between, total 600 sf of new development. Please note that we may use some sort of pervious paver system, which is allowed a credit on how stormwater area is calculated. However, still having 5000 sf of what is permitted available, I won't go into a detailed analysis unless/until necessary. Note also that items B,C,D, & M from the April 20, 2006 Cl drawing have not yet been constructed. If you have any questions and/or comments, please call me at 910-799-9245 or cell 910-228-2484. Please have a copy of the Letter of Refinement faxed to 910-457-7463. Thanking you in advance for kind attention to this matter. < �f14 \HnCA�C' Respectfully, Bruce Marek, P.E. SEtI� For Bald Head Island Limited 15634 Enclosures r '°• ° aQQa' 'ZI cc: Jim Henry, Director, BHI Planning & Develcpment:UM_Kerif M1t&e11, CEO ic- BRUCE MAREK, P.E. P.O.BOX 3069 BALD HEAD ISLAND, NC 28461 . • n a s 15 +/— to morinc �(= outside of AEC LT3 T1 HT6 S M9 GH QE SHEOE 12'212' Ro W > 7�' to Bald ea Cre outside o A ti - -TENT SITE KEELSON ROW _ CAMA 191�86 HARBOUR VILLAGE DEVELOPMENT STORMWATER SWS-971223 HARBOUR VILLAGE EAST BASIN LOTS 1.1 , t 14 �CE MAREK -� P.O.BOX 306� HEAD ISL NC 28461 if--ai-la J MARI OF REFINEMENT :8� Room r AL V61\vvlJwlI axvvv v--.�w.. • V v s s Z .• ® CAMA191.86HARBOUR VILLAGE DEVELOPMENT -� ® K ON ROW STORMWATER SWS-971223 HARBOUR VILLAGE EAST BASIN LOTS Bruce Marek, P.E. 5489 Eastwind Rd Wilmington, NC 28403 910-99-9245 July 2, 2007 Ms. Heather Coats NCDENR Division of Coastal Management 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Notice of Violation #07-48D for Development (Road Widening Work) inside of 75' AEC Buffer along Marina Wynd near SE Corner of Marina, Bald Head Island, NC Dear Ms. Coats: Enclosed are 5 copies of an 8.5"xl1" drawing/supporting documentation in reply to the above referenced incident. The road widening was along a 350 linear ft section of roadway that existed pre 1985 near the marina barge landing/barge staging area/Eb & Flo's Restaurant. The roadway widening was intended to be in full compliance with CAMA requirements. The semi-annual paving week on Bald Head Island arrived without my being able to negotiate an impervious area swap from the Stormwater Division for the 1500 sf to 2000 if of desired road widening. I had been trying since March 6, 2007 to include this work as a Minor Mod or Letter of Refinement to BHI Marina Development CAMA Permit 172-87. We rescheduled the widening to be the lost of the island paving projects in order to find a suitable solution. After phone conversations with Jim Gregson on June 41h & June 61h, our approach shifted to doing the widening totally outside of the 75' Area of Environmental Concern (AEC) contiguous with Bald Head Island Marina. This solution would not require a CAMA permit, permit modification or letter of refinement. Without the CAMA permit requirement, then Stormwater concurrence for this pre- existing area was not required, since less than 1 acre was being disturbed. In fact, with the 1500+/- sq ft of impervious gravel "development" we had already removed from the truck parking lot in anticipation of an impervious swap; 250+/- sq ft of asphalt "development" removed near Eb & Flo's within the AEC, and another approximate 350 sq it of asphalt planned to be removed for planters/swales, we were looking at a net no change in impervious "development". Subsequent to the phone conversation with Mr. Gregson on June 6th , we firmed up the scheduled for paving outside of the AEC for Friday, June 8rh. Jim indicated that you and Ed Brooks were on the island, and he called to have you do an official measurement. As you and Mr. Ed Brooks found on your site visit on June 71h, two areas of what was supposed to outside of the 75' AEC, had marl (gravel) that was inside of the 75' AEC. Visually, your June 7rh inspection/measurements of the prior day's grading/installation of marl base may have missed that existing pavement that had been damaged during the installation of tiebacks and allowed backfill of the creekside bulkhead under Bulkhead General Permit #40454 had already been "peeled". This was to allow the full 8' width usage of the asphalt paving machine on the shoulder widening. At the southwest end of the paving where it ties into the existing pavement, the new asphalt is totally an overlay of the original road. From surveyor data points taken pre and post asphalt paving, these areas totaled approximately 230 sq It and 180 sq It of impervious pavement addition inside of the 75' AEC. Please see the drawing showing the 2827 sq ft of asphalt pavement, of which 2060 sq ft was actual road widening, Area 1 (230 sf) and Area 2 (180 sf). The Area 1 infringement occurred when I took my 75' AEC radius (on a drawing), from the southeast corner of the open water portion of the barge landing, rather than from the southeast comer of the steel barge ramp that you measured from. In my mind, that portion of existing road edge was already beyond the 75' AEC, and I didn't think otherwise about it. From the CAMA Website talking about Public Trust Waters and Estuarine Shorelines, it defines navigable waters as those able to float a canoe. �. •YI .. � � `'� .. . ...r. .. :li 'u .. �.Y.J �.. ..'7ti :. iii :lf; r.:. . t�i r ..� �'� � .1 . ' r'l r ^ r I, 1 . .. .�... r 1 .r• �l �.J' �'�-. .l - .. .. . r � . .. . . .. '. . .. � r .r . .. i... 1' .. .., i ' 1 !.. .. 1 . r. .. r .. � ru .. 1'.. r i 1' .. .. r r r ... i. r . . . .. r 1 ... �' . .. ,. .. .. .. ,. r.i. .. .r'.I. .. ... .. ,. . .. � �,a .... r - �.r r � _.. 1 � .. .. � ri!� r ,. r. err .. r. .. .. .. '� .. !'_ � '1 .. r � ...r .. .. .. ir. r. .. _ U-..r ... .. . r . , -i � .. ..� .r .. � .. -•]).` is i .. r ._. rr n � .. r. r t: `I' r.IL ., .rl r .. r 11 .. 'Ir •..CL �i .. � r: ... r Since you couldn't get a canoe in the barge ramp area without getting it crushed, I thought I had reasonably established Area 1 as outside of the marina AEC. The somewhat trapezoidal shape using your measurement point yielded impervious surface that is 58' long by 5' max width in the AEC. This can be trimmed out if required. Express Stormwater, CAMA and Sediment & Erosion Permit dates have already been requested for "Bald Head Island Landing" which encompasses 10 acres from the marina extending out to the Village owned right of ways of North Bald Head Wynd and West Bald Head Wynd. Stormwoter review is scheduled for July 30, 2007, at which point I anticipate gaining approvals for all of the planned impervious in the 10+ acre area. Area 2 is at the tie in of Marina Wynd to Keelson Row. The original existing pavement had a 40' outside radius. An approximate 75' outside tangent -tangent radius can tie the existing Keelson Row curb line into the outside of 75' AEC pavement widening with no infringement into the AEC zone. I already had some marks on the ground from when 1 was more worried about getting to close to the marsh, rather than keeping outside of the 75' radius from the Keelson Row corner of the marina. I thought that you and Mr. Brooks would place some CAMA flags, and then on the Friday morning I would strike a curve that kept pavement outside of the 75', but nicely "fairing in" to the existing Keelson Row curbline. In my phone conversations with both you and Ed Brooks that Friday, I was informed that the placing of the gravel (impervious), not the final placement of asphalt, was considered new development which triggered this NOV. By that point I couldn't undo the gravel placement, although I did, and still offer to cut back this corner curve to the 75' tangent -tangent radius and remove the offending impervious surface. As a side note, 40 sq ft of the 180 sf of pavement is actually covered by stormwater permit #SW8-971223 for Harbor Village East Basin Lots, for which a considerable amount of impervious surface allocation is still available. The developer, Mr. Kent Mitchell, is one of the, if not the most environmentally sensitive developer in the state. He will dictate changing a road or relocating a house on a site plan in order to save a tree. He has promoted the golf cart only image of the island, which allows for a lot narrower roads on the island. The standard for a two lane primary road is only 14' of paved width, which is only 2' wider than one lane of traffic on the mainland. He allowed the creation/purchase by the state to preserve 200 prime acres of Maritime Forest. Bald Head Island could have been a totally different place if the Mitchell Family had gone for a Myrtle Beach Style Development rather than what you see today. For a bit of history, On March 6, 2007 1 had first submitted a Letter of Refinement Request which included the proposed roadway widening and the bulkhead boardwalk under CAMA Permit # 177-87. Permit #177-87 includes the marina development, slip layouts, and the development in the Area of Environmental Concern (AEC) along the South and West sides of the Marina. The Eb & Flo's restaurant and surrounding area is part of this permit, but had its beginnings as a 1986 Letter of Refinement to Permit #22-74, which was the original marina development permit. In 1991, #22-74 was merged into Permit # 177-87 by CAMA request. The Mitchell's had purchased "the island" in 1983 Your office asked us to get Stormwater concurrence allowing the additional pavement, originally figured at approximately 2000 sf, and to change our application to a minor modification. I proposed an impervious area swap to Paul Bartlett and Linda Lewis for a like amount of gravel parking lot to be removed for a net no change in impervious area. Impervious area swaps had been granted in the past for minor additions/renovations of the restaurant. Linda Lewis replied to my e-mail request on April 9, 2007 saying that we would need to do a Stormwater Plan Revision. April 9 was 4 days after my quadruple bypass surgery. When I finally got back to reading my e-mails, (with blurry vision from all of my medications) I glanced at her response but forgot that I had gotten a response. I also got a new computer, with a larger monitor, and when I changed over, my old e-mails were left behind on my laptop. I continued to e-mail to follow up on my swap request, and on May 30 Linda re -sent her April 9t^ e-mail. I also discovered that the State e-mail system will sometimes cause a -mails with the Bald Head Island name in the heading bar to not get delivered. I had lost valuable time in my search for a solution. May 30 did not allow me time to do a plan revision, especially since there wasn't a stormwater permit for this end of the marina in existence. If I had come upon the approach of widening the road outside of the AEC sooner, and if I had time to �� ... 'i'. .. Yi' .. � .. r. .. '. 1 .,r ..., � n _ _ ... digest that 410 sq ft might be inside of the AEC, perhaps I could have more readily done a stormwater "swap" for 410 sq ft of existing impervious surface directly behind Eb & Flo's. When you are only 25' away, that is more direct than the truck parking area 400' away As mentioned in prior paragraphs, if it is, deemed necessary, considering the upcoming stormwater permit submittal which would allow concurrence for impervious "development", we could/would remove and restore the 230 sq ft and the 180 sq it intrusions into the AEC. Reading further from the CAMA Website, our intrusion probably lessened the chance for siltation by correcting awkward road alignment forced by the constraints of the marina and the marsh. The Keelson Row curve had been often overrun by trucks (including the Village Fire Truck & Waste Industries Garbage Truck) while negotiating the original road width. Taking out the 410 sq ft of impervious, even if restored to natural sand/love grass, might be no better for the environment than the actual paving. Keeping Public Safety in mind, the widened road is more user friendly for the citizens of the state, whether tourists, vacationers, or year round residents. I submit this reply with regrets that I was unable to stay out of the marina AEC with new "development" or to timely to have been able to properly permit what did end up in the AEC. With completion of this letter, I will be following up with Linda Lewis of DWQ, and also making the required mail notification to the adjacent property owners, who I have already verbally communicated with. If you have any questions and/or comments, please call me at 910-799-9245, 910-457-7517 or cell 910-228-2484. Thanking you in advance for kind attentiot%jo this matter. Respectfully, Bruce Marek, P.E. For Bald Head Island Limited Enclosures cc: ti L'/i�?L7,�yi neo°°ece- 15684 Jim Henry, Director, BHI Planning & Development; M. Kent Mitchell, CEO Linda Lewis, DWQ N , NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr., Secretary May 2, 2006 Bald Head Island Limited li� ��� C/o Jim Henry 0/ Post Office Box 3069 Bald Head Island, North Carolina 28461 Dear Mr. Henry: This is with reference to your request to modify State Permit /f 191-86, which was renewed on 9/2/05 and expires on 8/31/07. The action proposed in your submittal is the construction of "Harbour Side at Keelson Row", adjacent to the east side of the Bald Head Island Marina Basin. The proposed project area was included as impervious area in the existing stormwater plan (#SW8 971223) that was approved by the NC Division of Water Quality. The submitted drawing depicts the final dimensions and detail of the proposed construction for the remaining units (A-M) located adjacent to the east side of the Bald Head Island marina basin, off the Cape Fear River, in Brunswick County. Upon reviewing the submittal and conferring with Doug Huggett, Major Permits Section, I have determined that the proposed action is consistent with existing State rules and regulations and is in keeping with the original purpose and intent of the permit. I hereby submit this Letter of Refinement authorizing the modification of State Permit X 191-86, as described in your letter and plans dated 4/20/06, and received in our office on 4/20/06. On 4/12/06, the NC Division of Water Quality, Stormwater Section approved a Plan Revision (SW8 971223) for two of the above referenced units and stated that the applicant need not obtain additional authorization for the remaining units provided that they were consistent with their allotted built - upon area. By copy of this letter we are also notifying the U. S. Army Corps of Engineers of our action. If you have any questions concerning the above or if I can be of any other assistance, please advise. Sincerely, f James . Gregson District Manager cc: Doug Huggett, DCM O'Brien/McCall, LPO Henry Wicker, COE Linda Lewis, DWQ, AE 90VW L2E 127 CardinalDrive Extension, Wilmington, North Carolina 28405-3845 Phone: 910-796-7215\Fax: 910-350-2004 \ nccoastalmanage ment.net An Equal Opportunity \Affirmative Action Employer - 50% Recycled \10% Post Consumer Paper Bruce Marek, P.E. P. O. Box 3069 Bald Head Island, NC 28461 Ph:910-457-7517 Fax:910-457-7463 April 20, 2006 Mr. Ed Brooks NCDENR Division of Coastal Management 127 Cardinal Drive Extension Wilmington, NC 28405 Re: CAMA Permit#191-86 Letter of Refinement Request for "Harbourside at Keelson Row" a comprehensive site plan for the previously Permitted Marina Basin "Postage Stamp Lots" adjacent to East Side of the Bald Head Island Marina Basin Dear Mr. Brooks: Enclosed, please find five copies of drawing C1 dated 4-20-06 for "Harbourside at Keelson Row" on the previously permitted impervious areas adjacent to the east side of the Bald Head Island Marina Basin along Keelson Row. This project is similar to the one approved by Letter of Refinement to Permit 191-86 dated December 27, 2000 for the Marina Bath House and Letters of Refinement dated April 5, 2006 for the Star -Moon Unit and the Sailing Club Complex. In light of these recent LOR's, Bald head Island Limited's Planning Department had a design meeting to finalize the entire 20'+/- strip. Site drainage is to Keelson Row, and through catch basins/storm piping to the pond at the Tent Site. Linda Lewis of DWQ Stormwater completed a stormwater plan update on April 12, 2006. The update included the above mentioned units, whose impervious surfaces were subtracted from the bua allotment of 15,337 st as approved/permitted based on the original 1997 SW8-971223 Klein Engineering drawings. Ms. Lewis has agreed per e-mail dated 4/19/06 that Bald Head Island Limited (with the helpful assistance of the Village of Bald Head Island Building Department) will keep an accounting of the impervious area. A tally is included on the Letter of Refinement drawing. If you agree that this drawing is consistent with Permit 191-86, a timely Letter of Refinement will help us meet Village of Bald Head Island Building Permit Deadlines prior to upcoming FEMA changes. A faxed copy when complete would also be helpful. We always appreciate your kind assistance on our projects. If you have any questions and/or comments, please call me at 910-457-7517 or Jim Henry at 457-7268/279-0019. Thanking you in advance for attention to this matter. Respectfully, ; ,' 0A CA,��' %�j �tiOPoF cs srp� � �1ry; ; SEAL Bruce Marek, P.E. = 15684/-o�'� For Bald Head Island Limited e Enclosures f'�E^ Q�: cc: Jim Henry, Director, BHI, tannin�ko�velopment M. Kent Mitchell, CEO, Bak/ head Island, Limited RECEIVED DCn4 VVILMINGTCf•1 NC APR 2 0 ZuuG APR 2 0 2001; --- �� BARGE LANDING o 0 HYDRAULICo A fi BARGE RAMP 1 Z CAMA Cootal Wetland Line d Bulkhead Boardwalk Ln EBB & c AREA #1 — 230 SQ.FT. ELF S GREEN HATCH �Cu-, WP RESURFACED AREA — 2827 SQ.FT. PURPLE HATCH NEW PAVEMENT ADDED — 2060 SQ.FT. ; m YELLOW HATCH o AREA #2 — 180 SQ.FT. GREEN HATCH 1 2\fit' 0 20' 40' 60' 80'' NN ® KEELSON BALD HEAD ISLAND LIMITED _._._. CAMA N.O.V. 07-48D q Response Drawing viZ 7-2-07 Q a w O ai .. .. ,._.. O 4Q �� 7 v ... i MIN I 99 n x 0 c '+► £ lo'i enjo slows bd gin —90 "a 000 MNVC] �1n3W Q� �O%st��a a .m 1!� ^i nV s i 40 d d l ?]r, -T FOR WALKAROUND AND CONNECTIONS TO BOARDWALK PREP/STORAGE BLDO-.-/ j 20'X20' TO 20'x25' FUTURESTORAGE SHED IN SMALL STRUCTURE AREA OF B4 2,0 FUTURE 4 3' TOWER IN SMALL STRUCTURE AREA OF B8 WALKAROUND 3500 sf to basin 81 00 SF FUTU 50.0 IN 3MA STRUCTURE RE/ OF B3 MAIN POOL IMPERNAOUS DECK 10,000 SF to Basin B3 .23 AC