Loading...
HomeMy WebLinkAboutSW8130113_CURRENT PERMIT_20211119STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO SW8 kl W 13 DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE Zo z l 1119 YYYYMMDD ROY COOPER Governor ELIZABETH S BISER secterory BRIAN WRENN Director November 19, 2021 Autumn Corporation Attn William I Weisberg, President 2700 Commerce Park Beachwood, OH 44122 NORTH CAROLINA Env4vnmentot QuaQty Subject Permit Renewal State Stormwater Management Permit No SW8 130113 Autumn Care Brunswick County Brunswick County Dear Mr Weisberg Effective August 1, 2013 the State Stormwater program has been transferred from the Division of Water Quality (DWQ) to the Division of Energy, Mineral and Land Resources (DEMLR) All previous references to DWQ will remain in older stormwater permits issued prior to August 1, 2013 until they are modified Please note that this permit will now reference DEMLR as the Division responsible for issuance of the permit The Wilmington Regional Office received a complete 8 year Stormwater Management Permit Renewal Application for the subject project on November 18, 2021 The Division is hereby notifying you that permit SW8 130113 has been renewed on November 19, 2021, and shall be effective until April 5, 2029 For your records, please find enclosed a renewed, updated, and re -issued permit and a copy of the renewal application As requested, a copy of the current operation and maintenance agreement is enclosed Please keep this permit on file at all times Please note that the renewed, updated, and re -issued permit does not impose new or different terms, it merely restates some of the previous terms to provide you with a better understanding of your obligations under the permit The renewal and reissuance of this stormwater permit does not imply that the site is currently m compliance with the terms and conditions of this state stormwater permit The plans originally approved on April 5, 2013, will remain in full force and effect in accordance with the regulations set forth in Title 15A NCAC 2H 1000 This permit is subject to the conditions and limitations as specified therein Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems If any parts, requirements, or limitations contained in this permit are unacceptable, you have the tight to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH) The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www NCOAH com Unless such demands are made this permit shall be final and binding If you have any questions, need additional copies of the permit or approved plans, please contact Ashley Smith in the Wilmington Regional Office, at (910) 796-7215 or ashleym smith@ncdenr gov Sincerely, Gk v"� H j 5;; Brian Wrenn, Director Division of Energy, Mineral and Land Resources D_E QZ� North Carohna Department of Environmental Quality I Dninon of Energy Kneral and Land Resources Wilmington Regional Office 1127 Cardmal Dyne Extension I wihmngton North Carohna 28405 w State Stormwater Permit No SW8 130113 Page 2 of 2 Enclosures DES/ams cc O & M Agreement Attachment C — Permitting History Renewal Application Documents \\\Stormwater\Permlts & Projects\2013\130113 HD\2021 11 permrt 130113 NCDEQ-DEMLR Wilmington Regional Office North Carolina Department of Environmental Quality I DWon of Energy Mineral and Land Resources E ryr Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington North Carolina 28405 ��\ / 9107967215 State Stormwater Management Systems Permit No SW8 130113 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Autumn Corporation Autumn Care Brunswick County 9646 No 5 School Rd, Shallotte, Brunswick County FOR THE construction, operation and maintenance of 1 (one) constructed wetland in compliance with Session Law 2008-211 and the provisions of 15A NCAC 2H 1000 (hereafter collectively referred to as the "stormwater rules') and as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR") The project shall be constructed, operated and maintained in accordance with these approved plans and specifications The approved plans and specifications are incorporated by reference and are enforceable part of this permit This permit shall be effective from the date of issuance until April 5, 2029 and shall be subject to the following specified conditions and limitations The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission, however, these actions do not stay any condition The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H 1000 and NCGS 143-215 1 et al I DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data 2 This stormwater system has been approved for the management of stormwater runoff as described in Section 17 of this permit 3 All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans 4 The project shall maintain a 50' wide vegetated buffer adjacent all surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures the top of bank of each side of rivers and streams and the mean high water line of tidal waters Page 1 of 5 State Stormwater Management Systems Permit No SW8 130113 5 All runoff being directed into wetlands shall flow into and through those wetlands at a non - erosive velocity of 2 fps or less 6 The following design elements have been approved for this constructed wetlands stormwater facility, and must be provided in the system at all times a Drainage Area, acres 830 Onsite, ft2 361,589 Offsite, ft2 0 b Total Impervious Surfaces, ft2 202,092 Onsite, ft2 202,092 Offsite, ft2 0 c Design Storm 1 5 d Permitted Storage Volume, ft3 25,600 e Planting/Ponding Depth, in 1200 f Temporary Storage Elevation, fmsl 2950 (top of shallow land) g Temporary Storage Surface Area, ft2 10,210 (shallow land surface area at top) h Permanent Pool Elevation, fmsl 2850 (top of shallow water) i Permanent Pool Surface Area, ft2 10,250 (shallow water surface area at top) j Deep Pool Bottom Elevation, Forebay, fmsl 265 k Deep Pool Surface Area, Forebay, fmsl 2,580 (Deep Pool Surface Area at Top, Forebay) I Deep Pool Bottom Elevation, Non-Forebay, fmsl 265 m Deep Pool Surface Area, Non-Forebay, fmsl 2,560 (Deep Pool Surface Area at Top, Non-Forebay) n Controlling Orifice 0 Pipe, in 200 o Pre -development 1 yr 24 hr peak flow, cfs 11 02 p Post -development 1 yr 24 hr peak flow, cfs 81 (onfirce flowrate) q Number Herbaceous Plants Provided 4,680 r Number Shrubs & Small Trees Provided 416 s Number 2 5" cal Trees Provided 0 t Seasonal High Water Table, FMSL N/A Liner is provided u Time to Draw Down Storage Volume, day 477 v Receiving Stream/River Basin Earnest Branch w Stream Index Number 15-(1) x Classification of Water Body C, Sw II SCHEDULE OF COMPLIANCE The permittee is responsible for verifying that the proposed built -upon area for the entire project does not exceed the allowable built -upon area Page 2 of 5 State Stormwater Management Systems Permit No SW8 130113 2 The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made 3 The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below For changes to the protect or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification a Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc b Redesign or addition to the approved amount of BUA or to the drainage area c Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications d Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan e The construction of any allocated future BUA f The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications g Other modifications as determined by the Director During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately Infiltration systems should not be used as erosion control devices, due to the potential clogging If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification A modification may be required for those deviations The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at the design condition The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to Semiannual scheduled inspections (every 6 months) Sediment removal Mowing and revegetation of side slopes Maintenance of the wetlands plants and replacement of dead plants Immediate repair of eroded areas Maintenance of side slopes in accordance with approved plans and specifications Trash and debris removal and unclogging of the wetlands, outlet structure, orifice, catch basins and piping Access to all components of the system must be available at all times Page 3 of 5 State Stormwater Management Systems Permit No SW8 130113 8 Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR The records will indicate the date, activity, name of person performing the work and what actions were taken 9 The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division 10 Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools 11 ANNUAL CERTIFICATION The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the protects conformance with permit conditions III GENERAL CONDITIONS CORRECTIVE ACTIONS REQUIRED If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems These additional or replacement measures shall receive a permit from the Division prior to construction PERMIT RENEWAL A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H 1045(3) CURRENT PERMITTEE NAME OR ADDRESS CHANGES The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one or more of the following changes A name change of the current permittee, A name change of the protect, A mailing address change of the permittee, TRANSFER This permit is not transferable to any person or entity except after notice to and approval by the Director Neither the sale of the protect and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit TRANSFER REQUEST The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H 1045(2) This request must be submitted within 90 days of the permit holder meeting one or more of the following i A natural person who is deceased, u A partnership, limited liability corporation, corporation, or any other business association that has been dissolved, ui A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding IV A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur, TRANSFER INSPECTION Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the protect and the on -site stormwater system complies with the permit conditions Records of maintenance activities performed to date may be requested Protects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met Page 4 of 5 State Stormwater Management Systems Permit No SW8 130113 COMPLIANCE The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request APPROVED PLANS AND SPECIFICATIONS A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times DIVISION ACCESS The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted protect c ENFORCEMENT Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21 d OBTAINING COMPLIANCE The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made e OTHER PERMITS The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215 1, and subject to enforcement procedures pursuant to NCGS 143-215 6 6 Unless specified elsewhere, permanent seeding requirements for the on -site stormwater system must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual Permit renewed, updated and reissued this the 19th day of November 2021 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION a '914 Brian ren Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 5 of 5 Attachment C - Permitting History Autumn Care Brunswick County Permit No SW8 130113 Approval Date permit Action BIMS Version Desc nphon of the Changes 4/5/2013 Original Approval 10 11/19/2021 Renewal 20 c Permit Number (nl 6 13 0113, (to be pnn ,dcd bl DWQ) Drainage Area Number Stormwater Wetland Operation and Maintenance Agreement 1 , I will keep a maintenance record on this BMP This maintenance record will be kept in a log in a known set location Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP Important maintenance procedures — Immediately following construction of the stormwater wetland, bi-weekly inspections will be conducted and wetland plants will be watered bi-weekly until vegetation becomes established (commonly six weeks) — No portion of the stormwater wetland will be fertilized after the first initial fertihzation that is required to establish the wetland plants — Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wetland — Once a year, a dam safety expert should inspect the embankment After the stormwater wetland is established, I will inspect it monthly and within 24 hours after every storm event greater than 10 inches (or 15 inches if in a Coastal County) Records of operation and maintenance will be kept in a known set location and will be available upon request Inspection activities shall be performed as follows Any problems that are found shall be repaired immediately ' I BMP element Potential problem. How I will remediate the problem Entire BMP Trash/debris is present Remove the trash/debris Perimeter of wetland Areas of bare sod and/or erosive Regrade the soil if necessary to remove the gullies have formed gully, and then plant a ground cover and water until it is established Provide lime i and a one-time fertilizer application Vegetation is too short or too long Maintain vegetation at an appropriate height Inlet device pipe or The pipe is clogged (if applicable) Unclog the pipe Dispose of the sediment swale offsite The pipe is cracked or otherwise Replace the pipe if applicable) -damaged Erosion is occurring in the swale (if Regrade the swale if necessary to smooth applicable) it over and provide erosion control f ' devices such as reinforced turf matting or riprap to avoid future problems with, erosion APR 0 5 2013 , Form SW401-Wetland O&M -Rev 4 BV Page 1 of 3 , ,, Ii, i Permit Number 1 (v, he provided by DWQ) BMP element Potential problem. How I will remediate the problem Forebay Sediment has accumulated in the Search for the source of the sediment and forebay to a depth that inhibits the remedy the problem if possible Remove forebay from functioning well the sediment and dispose of it in a location where it will not cause impacts toPstreams' or the BMP I P Erosion has occurred Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems 'I Weeds are present Remove the weeds, preferably by hand If a pesticide is used, wipe it on the plants rather than spraying Deep pool, shallow water Algal growth covers over 50% of the Consult a professional to remove and i and shallow land areas deep pool and shallow water areas control the algal growth Cattails, phragmites or other invasive Remove mvasives by physical removal or plants cover 50% of the deep pool and by wiping them with pesticide (do not shallow water areas spray) - consult a professional Shallow land remains flooded more Unclog the outlet device immediately than 5 days after a storm event ' device Receiving water Plants are dead, diseased or dying Determine the source of the problem soils, hydrology, disease, etc Remedy the problem and replace plants Provide a one-time fertilizer application to establish the ground cover if necessary Best professional practices show that Prune according to best professional pruning is needed to maintain ophmal practices Plant health Sediment has accumulated and Search for the source of the sediment and reduced the depth to 75% of the remedy the problem if possible Remove original design depth of the deep the sediment and dispose of it in a location pools where it will not cause impacts to streams or the BMP A tree has started to grow on the Consult a dam safety specialist to remove embankment the tree An annual inspection by appropriate Make all needed repairs professional shows that the embankment needs repair Evidence of muskrat or beaver activity Consult a professional to remove muskrats is present or beavers Sediment has accumulated and Search for the source of the sediment and reduced the depth to 75% of the remedy the problem if possible Remove original design depth the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP P Clogging has occurred Clean out the outlet device Dispose of the sediment off -site I The outlet device is damaged Repair or replace the outlet device " Erosion or other signs of damage have Contact the NC Division of Water Quality occurred at the outlet 401 Oversight Unit at 919-733-1786 Form SW401-Weiland O&M -Rev 4 I I i t c APR 0 3 2013' a e2'of3 1'' 01;ldo':A, iMh, t. lit l l t III i Permit Number ^ I acknowledge and agree by my signature below that I am responsible for the performance of the , maintenance procedures listed above 1 agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party Project name Autumn Care - Brunswick Co , NC BMP drainage area number 1 Print Title Vile V2e5 ttVA Address 451 N Winstead Ave Phone 252-443-6265 Signature r , Date 31!t / a� Note The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president f otary Public for the State of , rL,Countp of Q do hereby certify that Q personally appeared before me this day of and acknowledge the due execution of the forgoing stormwater'wetland maintenance requirements Witness my hand and official seal, SEAL DECEIVE My commission expires ate APR 0 5' 2013� I, Form SW401-Wetland O&M -Rev 4 Page'3 of 3 I � , ,i'! ,�� ,I I ;? ,I �I' i`: , I,, .I II I UI I l,Ili;,,, IEII, hJ„gel„i„b!II�,1J•4a��1', .I ,,I:.t� NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER. PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H 1045(3); the crment permit holder shaft renew their high density permit 180 days prcr to ds exp6ahon Renewed permits are veld for a period of 8 years per Session Law 2011-398 (SB 781) Section 60 (o) This application form Is for permit renewals only A PROJECT INFORMATION 1 State Stormwater Permit Number SW8130113 2 Pro)ect name Autumn Care of Brunswick County 3 Prgect street address 9600 No 5 School Read NW City Ash _ _ (;pub Brunswick ZIP 29420 4 What. If any, changes have been made to the project as pernntedo? None /f the nos cnangeo tram me ongrnal approved plans, please complete SAV- 101 for a Major or Minor Modlflcahon Application form avadabie at httoslldeo no eov/about/dwtisionsfe B PERMITTEE INFORMATION if changes to the permdtee or project name have been made, please complete either the Permit Update form or the Permit Transfer firm available at https //deg nc aovlabout/divisions/energy-mineral-land- resources/energy-mineral-land-rulesistormwater-program/post-construction State StormweterPermks do not automatically transfer with the sale of the property 1 Current Permit Holders Company Name/Organization Autumn Corporation 2 Signing Official's Name Witham I Weisberg 3 Signing Official's Title President 4 Mailing Address 23700 Commerce Park Cny —Beachwood - _ State OH ZIP 44122 5 Street Address 23700 Commerce Park City Beachwood _ - State OH ZIP-44122 6 Phone f 216 I 292_5706 Email _ peter.holmes@�saberhealth com EcovE NOV 19 2021 BY —� Stormwater Perrot Renewal Form Page 1 of 3 May 11 2018 C SUBMITTAL REQUIREMENTS Submrt the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW) Only applications packages that include all required items listed below will be accepted and reviewed Initial each Item below to indicate that the required information is provided In the application package X 1 A permit application processing fee of $505 00 payable to NCDEQ X 2 One original signed hard copy and one electronic copy of this completed form The signing official named on this application to represent the current permittee must meet one of the following a Corporation — a principle executive officer of at least the level of vice-president, b Limited Liability Company (LLC) — a manager or company official as those terms are defined in G S 57D'North Carolina Limited Liability Company Act; c Public Entity— a principal executive officer, ranking official or other duly authorized employee, d Partnership or limited partnership — the general partner, e Sole proprietor, or f Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity 3 One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including deed restrictions protective covenants, condominium/planned community declaration and easements If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date X 4 O&M Agreements, Please select one ❑ I have a copy of the current recorded O&M Agreement for all SCMs and I will continue to keep this on file with the permit, or ® I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent tome I agree to keep this on file with the permit X 5 Designer Certifications, Please select one ® A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division, or ❑ A copy of the certfication(s) confirming that the project was built in accordance with the approved plans are enclosed, or ❑ The project has not yet been built 6 [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit _ CX 7 [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC) Provide one hard copy and one electronic copy of documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Section C 2 per 15A NCAC 2H 1043(3)(b) NOV 12 2021 �) Br Stormwater Permit Renewal Application Form Page 2 of 3 May 11 2018 D PERMITTEE'S CERTIFICATION 1, William I Weisberg , the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership All information provided on this permit renewal application is, to the best of my knowledge, correct and cJ Signature Date 11 / 08/ Zc72( NOTARIZATION I, Stephanie Szymanski a Notary Public for the State of Ohio County of Cuyahoga , do hereby certify that William I Weisberg personally appeared before me this the !E�� day of November 20 21 , and acknowledge the due execution of the forgoing instrument Witness my hand and official seal, (Notary Seal) Notary Signature My commission innnnnh 2� a+ _ ey NOV 12 2021 ! Stormwater Permit Renewal Application Form Page 3 of 3 May 11 2018 ,)6 k3a�,,3 2{0�p�W�A�T\Pg�\O c NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WETLAND SUPPLEMENT This form must be filled out, printed and submitted The Required Items Checklist (Part 1/1) must be pnnted, filled out and submitted along with all the required information I' PR09ECTONFORMATIOW 33 3J Project name Autumn Care Brunswick Co , NC Contact name Mat Trowbridge, El Phone number 919 552 0849 Date March 15, 2013 Drainage area number 1 II DESIGNINF,ORMATIONk ,i7AP -11 ]7 a> ;;TM'- ",7�� », Site Characteristics Drainage area 361,895 00 fe Impervious area 202,092 00 fe Percent Impervious 55 8% % Design rainfall depth 150 Inch Peak Flow Calculations 1 yr 24 hr rainfall depth 370 In 1 yr 24 hr intensity 015 In/hr Pre -development 1 yr, 24 hr runoff 1102 ft'/sec Post -development 1 yr, 24 hr runoff 1912 ft3/sec PrelPost 1 yr, 24 hr peak control 810 ft3/sec Storage Volume Non SA Waters Minimum required volume 24,98800 ft' Volume provided (temporary pool volume) 25 600 00 ft' OK Storage Volume SA Waters Parameters 1 5" runoff volume 000 It, Pre development 1 yr, 24 hr runoff volume 000 ft3 Post development 1 yr, 24 hr runoff volume 000 ft3 Minimum volume required 000 fe Volume provided 000 fe OK Outlet Design Depth of temporary pool/ponding depth (DPI i,) 1200 In OK Drawdown time 4 77 days OK Diameter ofonfice 200in OK Coefficient of discharge (Co) used in onfice diameter calculation 060 (unlfiess) Driving head (Ho) used In the orifice diameter calculation 100 It OK BY - CEIVED Form SW401 Wetland Rev 6 11/16/09 Parts I and 11 Protect Design Summary Page 1 of 3 Surface Areas of Welland Zones Surface Area of Enbre Wetland 25 600 00 fe OK Shallow Land 10 210 00 ftz ✓ OK The shallow land percentage is 40% % Shallow Water 10,250 00 h2 V OK The shallow water percentage is 40% % Deep Pool Forebay portion of deep pool (pretreatment) 2,580 00 h2 OK The forebay surface area percentage is 10% % Non forebay portion of deep pool 2 560 00 It" OK The non forebay deep pool surface area percentage is 10% % Total of wetland zone areas 25,600 00 ft' OK Add or subtract the following area from the zones 000 ft2 Topographic Zone Elevations Temporary Pool Elevation (TPE) Shallow Land (top) 29 50 It amsl Permanent Pool Elevation (PPE) Shallow Water/Deep Pool (top) 28 50 It amsl Shallow Water bottom 28 00 It amsl Most shallow point of deep pool s bottom 26 50 It amsl Deepest point of deep pool's bottom 26 50 It amsl Design must meet one of the following two options This design meets Option #1 n (Y or N) Top of PPE is within 6" of SHWT If yes SHWT (Seasonally High Water Table) 0 00 It amsl OK This design meets Option #2, y (Y or N) Wetland has liner with permeability < 0 01 in/hr If yes Depth of topsoil above impermeable liner 4 00 in OK Topographic Zone Depths Temporary Pool Shallow Land 12 00 in OK Permanent Pool Shallow Water 6 00 in OK Deep Pool (shallowest) 2400 in OK Deep Pool (deepest) 24 00 in OK Planting Plan Are cattails included in the planting plan n (Y or N) OK Number of Plants recommended in Shallow Water Area Herbaceous (4'cubic inch container) 2,600 Number of Plants recommended in Shallow Land Area Herbaceous (4'cubic inch container) OR 2,600 Shrubs (1 gallon or larger), OR 416 Trees (3 gallon or larger) and Herbaceous (4+cubic inch) 52 and 2080 Number of Plants Provided in Shallow Water Area Herbaceous (4'cubic inch container) 2,600 OK Number of Plants Provided in Shallow Land Area Herbaceous (4'cubic inch container) 0 More required if not planting shrubs or trees Shrubs (1 gallon or larger) 416 OK Trees (3 gallon or larger) and 0 More required d not planting herb and/or shrubs Grass like Herbaceous (4+ cubic inch) 2,080 OK MAR 18 2013 Form SW401 Weiland Rev 6 f 1/16r09 Parts I and 11 Protect Design Summary Page 2 of 3 I Additional Information Can the design volume be contained? Does project drain to SA watersv If yes, What Is the length of the vegetated filter? Are calculations for supporting the design volume provided In the application? Is BMP sized to handle all runoff from ultimate build -out? Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? The length to width ratio is Approximate wetland length Approximate wetland width Approximate surface area using length and width provided y (Y or N) n (Y or N) 000 It y (Y or N) y (Y or N) y (Y or N) 200 1 230 00 It 115 00 ft 26 450 00 ft' Will the wetland be stabilized within 14 days of construction9 y (Y or N) OK Excess volume must pass through filter n OK OK OK This approx surface area Is within this number of square feet of the entire welland surface area reported above OK MAR 19 2013 Fomi SW401 Wetland Rev 6 11/16/09 Parts I and 11 Proieoi Design Summary Page 3 of 3 Autumn Care Brunswick County Stormwater Permit No SW8130113 Brunswick County Designer's Certification r1 S State Stormwater Management Systems i Permit No SW8 130113 Page 1 of 2 I, Donald L Curry Jr , PE, as a du registered Professional Engineer inthe State of North Carolina, having been authorized to observeQenodicall ekiylfuli time) the construction of the project, Autumn Care - Brunswick Co, NC (Protect) for Saber Healthcare Group (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications The checklist of items on page 2 of this form are a part of this Certification Noted deviations from approved plans and specifications Signatur Registratwn Number 026970 Date BY ��r�F.Airr�rrrr cry y� UZ6970 Y;,�4r'F�tHk9nt�y?� APR 2 7 2018 rrat r�rta,+•� Certification Requirements State Stormwater Management Systems Permit No SW8 130113 Page 2 of 2 1 The drainage area to the system contains approximately the permitted acreage *v/2 The drainage area to the system contains no more than the permitted amount of built -upon area V3 All the built upon area associated with the project is graded such that the runoff drains to the system �4 All roof drains are located such that the runoff is directed into the system %/5 The wetland zone elevations are per the approved plan %/6 The wetland is located per the approved plans V-7 A trash rack is provided on the outlet structure !t/8 All slopes are grassed with permanent vegetation !�/9 Vegetated slopes are no steeper than 31 % 10 The inlets are located per the approved plans and do not cause short-circwbng of the system �11 The permitted amounts of wetland zone surface area and volume have been provided !t/12 Required drawdown devices are correctly sized and located per the approved plans 3 All required design depths are provided �14 All required parts of the system are provided V15 The required number of wetlands plantings have been provided cc NCDENR DWQ Regional Office Inspector, Brunswick County Building Inspections EGEIV� APR, 1 7 20"3