Loading...
HomeMy WebLinkAboutSW8070726_HISTORICAL FILE_20170203STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO SW8 CO 0-7 Z 1 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS KI HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD Energy, Mineral& Land Resources ENVIRONMENTAL QUALITY February 3, 2017 Harry C Brown, Managing Member The Harry C Brown Family, LLC 2223 North Marine Blvd Jacksonville, NC 28546 Subject Approved Plan Revision State Stormwater Management Permit No SW8 070721 National Automotive Building Addition Onslow County Dear Mr Brown ROY COOPER Governor MICHAEL S REGAN Secretary TRACY DAVIS Dmecror Effective August 1, 2013, the State Stormwater program was transferred from the Division of Water Quality (DWQ) to the Division of Energy, Mineral and Land Resources (DEMLR) All previous references to DWQ will remain in older stormwater permits issued prior to August 1, 2013 until they are modified Please note that this permit references DEMLR as the Division responsible for issuance of the permit On August 5, 2009, the Governor signed Session Law 2009-406 This law impacted any development approval issued by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which was current and valid at any point between January 1, 2008, and December 31, 2010 The law extended the effective period of any stormwater permit that was set to expire during this time frame to three (3) years from its current expiration date On August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for a total of four (4) years extension Accordingly, this permit shall now be effective from the date of issuance until August 10, 2021, which includes all available extensions The terms and conditions of this extended permit, issued on February 3, 2017, shall remain in full force and effect On December 2, 2016, the Wilmington Regional Office received a complete request to revise the approved plans for Stormwater Management Permit Number SW8 070721 The revisions include the addition of another building and additional sidewalks totaling 8,560 square feet These changes result in a total current built -upon area (BUA) of 159,262 square feet, which reduces the future allocation of BUA to 185,583 square feet The overall BUA for the project remains the same at 344,845 square feet It has been determined that a formal permit modification is not required for the proposed changes We are forwarding you an approved copy of the revised plans for your files Please add the attached plans to the previously approved plan set Furthermore, please replace the previously issued permit with the revised permit, attached Please understand that the approval of this revision to the approved plans or to the permit for the subject State Stormwater project is done on a case -by -case basis Any other changes to this project must be approved through this Office prior to construction The issuance of this plan revision does not preclude the permittee from complying with all other applicable statutes, rules, regulations or ordinances which may have jurisdiction over the proposed activity, and obtaining a permit or approval prior to construction Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, certification of the BMP's, procedures for changing ownership, transferring the permit, and renewing the permit Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to certify the BMP's, to transfer the permit, or to renew the permit, will result in future compliance problems State of North Carolina I Environmental Quality I Energi Mineral and Land Resources Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington. NC 28405 910 796 7215 State Stormwater Permit No SW8 070721 Page 2 of 2 If any parts requirements or limitations contained in this permit are unacceptable you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH) The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www NCOAH com Unless such demands are made this permit shall be final and binding If you have any questions, or need additional information, please contact Steve Pusey in the Wilmington Regional Office, at (910) 796-7215 Sincerely 7, Tracy Davis P E Director Division of Energy, Mineral and Land Resources GDS/ sgp %Stormwater\Permus & Prolects\2007\070721 HD\2017 02 petmit_ir 070721 cc Timothy M Stewart, PE — Parker & Associates, Inc Onslow County Building Inspections Onslow County Engineering Wilmington Regional Office Stormwater File Stateof Nosh Catohna I Envnonmental QuaL4 i Energi Mi=i l and Land Resowces Wilmington Regionaloffcc 1127 Cardinal Drivt Exit ision I Miming tun NC 28405 910196,215 State Stormwater Management Systems Permit No SW8 070721 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL & LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws Rules, and Regulations :»:�►A6Y.9[�7►�E.9CI�:i�:l'><e1:7_Vl>r���[�7 The Harry C Brown Family, LLC National Automotive US Hwy 17 N, Onslow County Ize]:ird:l construction, operation and maintenance of one (1) wet detention pond in compliance with the provisions of 15A NCAC 2H 1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral & Land Resources (hereafter referred to as the Division or DEMLR) and considered a part of this permit This permit shall be effective from the date of issuance until August 10, 2021, and shall be subject to the following specified conditions and limitations I DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data 2 This stormwater system has been approved for the management of stormwater runoff as described in Section 1 5 of this permit and per the approved plans The stormwater control has been designed to handle the runoff from a maximum built -upon area of 344,845 square feet of impervious area The built -upon area reserved for future development is limited to 185,583 square feet 3 All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans 4 The runoff from all built -upon area within the permitted drainage area(s) of this project must be directed into the permitted stormwater control system Page 1 of 6 State Stormwater Management Systems Permit No SW8 070721 The following design criteria have been provided in the wet detention pond and must be maintained at design condition a Drainage Area, acres 93 Onsite, ft2 351,567 Offsite, ft2 52,622 b Total Impervious Surfaces, ft2 344,845 c Design Storm, inches 1 5" d Average Pond Design Depth, feet 6 e TSS removal efficiency 90% f Permanent Pool Elevation, FMSL 89 g Permanent Pool Surface Area, ft2 21,655 h Permitted Storage Volume, ft3 42,426 at temporary pool elev i Temporary Storage Elevation, FMSL 908 t Controlling Orifice 2 5" 0 pipe k Permitted Forebay Volume, ft3 15,074 1 Fountain Horsepower, HP 1/4 m Receiving Stream/River Basin UT to Northeast Creek / White Oak n Stream Index Number 19-16-(4 5) o Classification of Water Body SC,NSW II SCHEDULE OF COMPLIANCE 1 The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface 2 During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately 3 The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to a Semiannual scheduled inspections (every 6 months) b Sediment removal c Mowing and re -vegetation of slopes and the vegetated filter d Immediate repair of eroded areas e Maintenance of all slopes in accordance with approved plans and specifications f Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping g Access to the outlet structure must be available at all times 4 Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR The records will indicate the date, activity, name of person performing the work and what actions were taken 5 Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria a The fountain must draw its water from less than 2' below the permanent pool surface b Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond c The falling water from the fountain must be centered in the pond, away from the shoreline d The maximum horsepower for a fountain in this pond is 1/4 horsepower 6 The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division Page 2 of 6 State Stormwater Management Systems Permit No SW8 070721 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification A modification may be required for those deviations 8 If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility 9 Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times 10 The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below a Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc b Project name change c Transfer of ownership d Redesign or addition to the approved amount of built -upon area or to the drainage area e Further subdivision, acquisition, lease or sale of all or part of the project area The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought f Filling in, altering, or piping of any vegetative conveyance shown on the approved plan g The construction of permeable pavement for BUA credit 11 Prior to the construction of any permitted future areas shown on the approved plans, the permittee shall submit final layout and grading plans to the Division for approval 12 A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times At the time the permit is transferred to a new owner, the permittee shall forward the approved plans to the new owner 13 The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made 14 If the use of permeable pavement for BUA credit within the lot is desired, the permittee shall direct the lot owner to submit an application with all supporting documentation and the application fee to the Division and receive a permit prior to construction of the permeable pavement III GENERAL CONDITIONS The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request Neither the sale of the project, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit Any individual or entity found to be in noncompliance with the provisions of this stormwater management permit or the requirements of the Stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21 Page 3 of 6 State Stormwater Management Systems Permit No SW8 070721 The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction This permit is not transferable to any person or entity except after notice to and approval by the Director The permittee shall submit a completed and signed Name/Ownership Change Form, accompanied by the supportm documentation as listed on the form, to the Division of Energy, Mineral and Land f esources at least 60 days prior to any one or more of the following events a An ownership change including the sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions, b The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of Session Law 2011-256, c Bankruptcy, d Foreclosure, subject to the requirements of Session Law 2013-121, e Dissolution of the partnership or corporate entity, subject to NCGS 57D-2-01(e) and NCGS 57D-6-07, f A name change of the current permittee, g A name change of the protect, h A mailing address change of the permittee, 5 In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems 6 The permittee grants DEMLR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility 7 The permit remains in force and effect until modified, revoked, terminated or renewed The permit may be modified, revoked and reissued or terminated for cause The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition 8 Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual 9 Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit 10 The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes 11 The permittee shall submit a permit renewal request at least 180 days prior to the expiration date of this permit The renewal request must include the appropriate documentation and the processing fee Permit updated and reissued this the 3rd day of February, 2017 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Energy Mineral and Land Resources By Authority of the Environmental Management Commission Page 4 of 6 DEMLR USE ONLY - Date e//cerved Fee Pad (express only)/ Permit�N5uum7berr-t State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT PLAN REVISION APPLICATION FORM This form may be pliotocopied for use as an original I GENERAL INFORMATION 1 Stormwater Management Permit Number SW8 070721 2 Project Name National Automotive Building Addition 3 Permit Holder's name (specify the name of the corporation, individual, etc) The Harry C Brown Family, LLC 4 Prmt Owner/Signmg Official's name and title (person legally responsible for permit) Harry C Brown, Managing Member 5 Mailing Address for person listed in item 2 above 2223 North Marine Blvd City Jacksonville State NC Zip 28546 Phone (910 ) 347-3777 Fax Email harrvbrown@bizec rr com if PLAN REVISION INFORMATION RZ DEC 0 2 2016 1 Summarize the plan revision proposed (attach additional pages if needed) including proposed and future, remains the same See stormwater narrative for more information III SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR) A complete package includes all of the items listed below The complete application package should be submitted to the DEMLR Office that issued the permit 1 Please indicate that you have provided the following required information by initialing in the space provided next to each item Initialss 4 • Original & 1 copy of the Plan Revision Application Form � • Two (2) copies of revised plans (must be revisions of onguial approved plan sheet(s)) If applying for Express review (onlilavailable in 20 coastal counties) • Application fee of $500 00 (inade payable to NCDENR) t* '64 i VI APPLICANT'S CERTIFICATION I, (print or hype name of person listed in General information, itein 3) Harnl C Brown certify that I have authorized these plan revisions and that the information included on this plan revision application is. to the be,fiknowledge, correct and complete Signature Date Z'7114Zi6 Plan Revision Form Rev Oct 31, 2013 1 National Automotive SW8 070721 ORIGINAL DATA PROJECT NAME National Automotive Receiving Stream UT to Northeast Creek Drainage Basin White Oak Site Area 8 10 acres Drainage Area F 404189 00 square feet Area in Acres DATE 03-Feb-17 Class SC,NSW Index No 19-16-(B98 14 5) mm IMPERVIOUS AREAS - OLD Rational C Buildings square feet Parking square feet Existing square feet Future 295845 00 square feet Off Site 4900000 square feet square feet square feet TOTAL 344845 00 square feet I:IW479L\/_1 Onsite Area 8 10 acres Offsite Area 1 20 acres Drainage Area 404189 00 square feet Area in Acres 930 IMPERVIOUS AREAS - NEW Buildings Parking & Drives Sidewalks Existing Future Offsite Driveway TOTAL Existinq Phase 1 Phase 2 Total Remaininq 1465900 96000 856000 2417900 6054000 6756600 128106 00 400300 35900 436200 261500 261500 7920200 1 7150000 856000 159262 00 185583 00 square feet square feet square feet square feet square feet square feet square feet square feet square feet Casmer, Jo From, Casmer, Jo Sent Friday, December 16, 2016 4 31 PM To. 'harrybrown@bizec rr com', Inc , Parker & Associates, Subject National Automotive, Stormwater Permit SW8 070721 The Wilmington Regional Office of the Division of Energy, Mineral, and Land Resources (Stormwater Section) received the Stormwater Permit Plan Revision Application on December 2, 2016 The project has been assigned to Steve Pusey and you will be notified if additional information is needed Jo Casmer Administrative Assistant for DEMLR/Stornwater Section North Carolina Department of Environmental Quality Department of Environmental Assistance & Customer Service 910 796-7336 office 910 350-2004 fax io casmerOncdenr nov 127 Cardinal Drive Extension Wilmington, NC 28405 W. �/ Nothfng Compares.-.., Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties C 'i0lu"I r)o 1< J'0 J r)', "flu' Jf 0 . ' fU)I.I! 115j f??Wf;1UC6 tr{ C,I-1WUJSl i:Gl,+I `4 '(fyll'u 11' 1 1 nC b%2r1P)'UI JUL OU P JI' , I , 14-LUf'i I11111100 li '1 2 'Q ;4;11�001,1 lry)PIYAO$I Cfdli it It L;ljt"It 1J_10113, J" Completeness Review Checklist Protect Name N�� i� �, fa �i� 6LJ�,— Received Date Protect Location ;cw Accepted Date Rule(s) 1:12008 Coastal 1995 Coastal Phase II (WiRO) Universal Type of Permit New or Mod orb Existing Permit # (Mod or PR) 1 a I Density HD or LD I Type Commercial or Residential I nNCG El1988 Coastal I% _u(% OK?) I Stream Class 0SA Map I OOffsite to SW8 Sunbdivided? Subdivision or Single Lot ORW Map MExempt Paperwork Emailed Engineer on �Supplement(s) (1 original per BMP) BMP Type(s) �O&M with correct/original signatures (1 original per BMP except LS/VFS and swoles) pplication with correct/original signatures Deed Corp or LLC Sig Auth per SoS or letter Email Address 0$505 (within 6mo)Email Address PE Cert on File? Design Engineer Owner ❑Soils Report with SHWT Za, rS q4z.� So „ Note to Reviewer �Calculations(signed/sealed) nNo obvious errors 4� ity includes common areas, etc Deed Restrictions, if subdivided uSigned & Notarized MCorrect Template (Comm/Res & HD/LD) or Dec Covenants & Rest Plans Ekls*ets Details (roads, cul-de-sacs, curbs, sidewalks, BMPs, Buildings, etc) Grading Wetlands Delineated or No Wetlands Vicinity Map Layout (proposed BUA dimensions) Legend �DA Maps Protect Boundaries Infiltration Wet Pond Offsrte Soils Report Soils Report �PE Cert for Master Lot # SHWT SHWT Deed Rest for Master Lot # Matches Master Bottom PP BUA Permitted (Master) sf Visited BUA Proposed (Offsite) sf Additional Information Permitted Proposed Proposed Proposed BUA (sf) DA (sf) PP (el) SHWT (el) Depth (ft) SA (sf) PARKER & ASSOCIATES, INC. Consulting Engineers - Land Surveyors - Land Planners Snap g 2°hs 306 New Bridge Street • PO Box 976 Jacksonville, NC 28541-0976 (910) 455-2414 • Fax (910) 455-3441 www parkerengmeenngandsurveymg com Firm License Number F-0108 VIA MAIL Ms Georgette Scott NC DEQ- Stormwater Section 127 Cardinal Drive Extension Wilmington, NC 28405 Dear Ms Scott, November 29, 2016 RE National Automotive Building Addition Stormwater Permit #SW8070721 Plan Revision Application Onslow County, NC Please find enclosed the following for the above referenced stormwater submittal application I One (1) original and one (1) copy of the Plan Revision Application 2 Two (2) copies of the plans (sheets 1 and 3 of 6) 3 One (1) copy of the Stormwater Narrative If you have any questions or need any additional information, please let me know Sincerely, PARKER & ASSO( A71)SS. INC Timothy ec Mr Robbie Yates (w/enclosures) ECEIVE Mr Tony Morton (w/enclosures) xc CF (P), LAM, JLM DEC U 1 2016 JAH/krp Secretary C I TMS Letter Scott NationalAuto PlanRevAppl 1129 16 BY: EMAILADDRESS TEXTMESSAGESTO uaitext@bizec rreom MAPS and PLANS TO oatdraft@bizecrrcom + ENVIRONMENTAL ENGINEERING + STORMWATI R, WATER AND WASTEWATER SYSTEMS + FEASIBILITY AND DEVELOPMENT CONSULTING + GLOBAL POSITIONING SURVEYS + SUBDIVISION AND CONSTRUCTION PLANS National Automotive Building Addition Stormwater Narrative Permit No SW8070721 November 2016 On August 10, 2007 stormwater permit HSW8070721 was issued for National Automotive, an automotive sales lot on US Highway 17 in Jacksonville The stormwater project area is 9 3 acres (8 1 acres on site and 1 2 acres off site) The stormwater pond was designed to treat the runoff from 8 8 acres and 344,845 SF of future impervious There was no impervious proposed with the original permit It was only for the design of the pond to treat future proposed impervious On February 20, 2008, an approved plan revision was issued for a designed car sales parking area and a small building The plans were titled National Automotive Phase I and dated November 28 2007 The proposed impervious area was 71,500 SF In addition, 79,202 SF of existing impervious was permitted, for a total of 150,702 SF permitted to go to the pond Subtracting this total impervious from the original permitted future impervious 344,845 SF leaves 194,143 SF of future impervious that was allowed to go to the pond, at that time The drives and parking areas from the National Automotive Phase I plans, dated November 28, 2007 and permitted February 20, 2008 were constructed the building was not constructed With this submittal, the building is now proposed to be larger and additional sidewalks are proposed With these changes, a total of 8,560 SF additional impervious area is proposed to be permitted to flow to the pond This changes the amount of existing and proposed impervious going to the pond to 159,26ISF, which then changes the amount of allowable future impervious areas to be 185 85-3 SF This keeps the total SqP permitted impervious allowed to go to the pond the same as the original permit, 3 SF This plan is being submitted as a Plan Revision because the overall pond drainage area, impervious area and calculations do not change The additional proposed impervious areas are taken from the permitted future impervious areas EGEI V DEC 0 2 2016 BY• Secretary CI CMS Narratives Stormwater NationalAuto 11 28 16 CA201611701570 .°-fix LIMITED LIABILITY COMPANY ANNUAL RE NAME OF LIMITED LIABILITY COMPANY The Harry C Brown Family LLC SECRETARY OF STATE ID NUMBER 0707337 STATE OF FORMATION NC REPORT FOR THE YEAR 2016 SECTION A REGISTERED AGENT S INFORMATION 1 NAME OF REGISTERED AGENT Harry C Brown 2 SIGNATURE OF THE NEW REGISTERED AGENT 3 REGISTERED OFFICE STREET ADDRESS & COUNTY 2223 N Marine Blvd SOSID 0707337 Date Filed 4/26/201611 59 00 PM Flame F Marshall North Carolina Secretar} of State CA2016 117 01570 Rhly Office Use Oily Changes SIGNATURE CONSTITUTES CONSENT TO THE APPOINTMENT 4 REGISTERED OFFICE MAILING ADDRESS 2223 N Marine Blvd Jacksonville, NC 28546-6916 Onslow Jacksonville, NC 28546-6916 Onslow SECTION B PRINCIPAL OFFICE INFORMATION 1 DESCRIPTION OF NATURE OF BUSINESS Real Estate 2 PRINCIPAL OFFICE PHONE NUMBER (910) 347-3777 4 PRINCIPAL OFFICE STREET ADDRESS & COUNTY 2223 N Marine Blvd Jacksonville, NC 28546-6916 Onslow 3 PRINCIPAL OFFICE EMAIL Prnacy Redaction 5 PRINCIPAL OFFICE MAILING ADDRESS O � 2223 N Marine Blvd Jacksonville, NC 28546-6916 Onslow SECTION C COMPANY OFFICIALS (Enter additional Company Officials in Section E ) NAME Harry C Brown NAME TITLE Manager TITLE ADDRESS 2223 N Marine Blvd Jacksonville, NC 28546 Onslow ADDRESS NAME TITLE ADDRESS SECTION D CERTIFICATION OF ANNUAL REPORT Section D must be completed in its entirety by a person/business entity c -- � , y /6/ SIGNATURE DATE Form must be signed by a Company Offaal listed Under Section C of this form nt or Type Name of Company Official not or Type The Title of the Company Official pa SUBMIT THIS ANNUAL REPORT WITH THE REQUIRED FILING FEE OF $200 } .1 MAIL TO Secretary of Slate Corporations Division Post Office Box 29525 Raleigh NO 27626-0525 ❑ X PARKER & ASSOCIATES, INC. Consulting Engineers - Land Surveyors - Land Planners 306 New Bridge Street . P O Box 976 Jacksonville, NC 28541-0976 (910) 455-2414 + Fax (910) 455-3441 LETTER OF TRANSMITTAL TO- Ms Linda Lewis NCDENR —Division of Water Quality 127 Cardinal Dnve Extension Wilmington, NC 28405-3845 WE ARE SENDING YOU DATE: June 19, 2009 REF: National Automotive One (1) original Designer's Certification JUN 2 3 2009 DELIVERY VIA. ® Regular Mail ❑ Hand ❑ Federal Express ❑ UPS Overnight ❑ UPS Ground ❑ Other THESE ARE TRANSMITTED AS CHECKED BELOW ❑ For Approval ❑ As Requested ❑ For Your Use ❑ For Bids Due ® Other Stormwater Certification COMMENTS ❑ For Review and Cominent U/- Copies To Mr Robbie Yates (w/enclosure) MJK/avk CF (P), LAM (if enclosures are not as noted, kindly notify us at once) c I M1K LOT Lcwis NauonalAuto 6 19 09 EMAIL ADDRESS TEXT MESSAGES TO panextZbvec rr com MAPS AND PLANS TO paidraftnbizec rr com ♦ ENVIRONMENTAL ENGINEERING ♦ STORMWATER, WATER AND WASTEWATER SYSTEMS ♦ FEASIBILITY AND DEVELOPMENT CONSULTING ♦ GLOBAL POSITIONING SURVEYS ♦ SUBDIVISION AND CONSTRUCTION PLANS