Loading...
HomeMy WebLinkAboutSW8070138_HISTORICAL FILE_20070327STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 U1013� DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2 00 10321 YYYYMMDD F \NATF O�� ,q Michael F Easley, Governor 7 William Rosslr,Secretary North Carolina Department of Environment and Natural Resources -i O T Alan W Klimek, P E Director Division of Water Quality March 27, 2007 Rodney J Hyson, Sr Cape Fear Trading Group, IV, LLC 109 North Davis Street Southport, NC 28461 Subject Stormwater Permit No SW8 070138 Stevens Park- Phase I High Density Subdivision Project Brunswick County Dear Mr Hyson The Wilmington Regional Office received a complete Stormwater Management Permit Application for Stevens Park- Phase I on March 22, 2007 Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H 1000 We are forwarding Permit No SW8 070138, dated March 27, 2007, for the construction of the project, Stevens Park- Phase I This permit shall be effective from the date of issuance until March 27, 2017, and shall be subject to the conditions and limitations as specified therein Please pay special attention to the Operation and Maintenance requirements in this permit Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within sixty (60) days following receipt of this permit This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P O Drawer 27447, Raleigh, NC 27611-7447 Unless such demands are made this permit shall be final and binding If you have any questions, or need additional information concerning this matter, please contact Rhonda Hall, or me at (910) 796-7215 Since eiy, Edward Beck Regional Supervisor Surface Water Protection Section ENB/rbh S \WOS\STORMWATER\PERMIT\070138 mar07 cc Richard M Collier, PE, McKim & Creed Brunswick County Inspections Rhonda Hall Wilmington Regional Office Central Files Nor Carolina Naturally North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet oa" ncwa4.rou thty org Fax (910) 350 2004 1-877 623-6748 An Equal Opportunity/Af native Acton Employer- 50°% Recycled/l 0% Post Consumer Paper State Stormwater Management Systems Permit No SW8 070138 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Rodney J Hyson, Sr, Cape Fear Trading Group, IV, LLC Stevens Park- Phase I Brunswick County FOR THE construction, operation and maintenance of four wet detention pond in compliance with the provisions of 15A NCAC 2H 1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit This permit shall be effective from the date of issuance until March 27, 2017 and shall be subject to the following specified conditions and limitations I DESIGN STANDARDS 1 This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data 2 This stormwater system has been approved for the management of stormwater runoff as described in Section 1 6 on page 3 of this permit The subdivision is permitted for 154 lots, each allowed a maximum of 3,750 square feet of built - upon area 3 Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit 4 The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system 5 Each lot within the subdivision whose ownership is not retained by the permittee, must submit a separate Offsite Stormwater Management Permit application package to the Division of Water Quality and receive a permit prior to any construction on the lot Page 2 of 9 State Stormwater Management Systems Permit No SW8 070138 6 The following design elements have been permitted for this wet detention pond stormwater facility, and must be provided in the system at all times Pond 1 Pond 2 Pond 3 Pond 4 a Drainage Area, acres 5291 1992 1127 2083 Onsite, ft2 2,304,876 867,642 490,978 907,555 Offsrte, ftz None None None None b Total Impervious Surfaces, ftZ 777,927 288,310 146,480 376,444 Buildings/Lots, ftZ 322,500 86,250 52,500 116,250 Roads/Parking, ftZ 352,227 74,060 80,200 53,744 Sidewalks, ftZ 71,400 23,000 12,180 9,850 Pump Station, fh 1,600 0 1,600 1,600 Clubhouse, fiz 7,200 0 0 0 Indoor Pool, ftZ 23,000 0 0 0 Future Phase 1I, ftZ 0 105,000 0 195,000 c Pond Depth, feet 4 4 5 5 d TSS removal efficiency 90% 90% 90% 90 e Design Storm, inches 1 I 1 1 f Permanent Pool Elevation, FMSL 140 1800 1600 12 g Permitted Surface Area @ PP, ftz 91,349 25,726 10,949 22,936 h Permitted Storage Volume, ft' 232,217 70,468 24,836 72,467 1 Temporary Storage Elevation, FMSL 1638 205 180 1475 I Controlling Orifice 3"� 2"� 1 5"� 2"� k Permanent Pool Volume, ft3 284,868 73,013 25,938 67,107 1 Forebay Volume, ft3 55,834 14,833 5,243 13,119 in Maximum Fountain Horsepower 1 1/4 1/8 1/4 n Receiving Stream Cottage Creek o River Basin Cape Fear p Stream Index Number 18-88-9-4 q Classification of Water Body Sc, Sw II SCHEDULE OF COMPLIANCE 1 No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division 2 The permittee is responsible for verifying that the proposed built -upon area for the entire lot does not exceed the maximum allowed by this permit Once the lot transfer Is complete, the built -upon area may not be revised without approval Page 3 of 9 State Stormwater Management Systems Permit No SW8 070138 from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner 3 If an Architectural Review Board or Committee is required to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built -upon area Any approvals given by the Board do not relieve the homeowner of the responsibility to maintain compliance with the permitted BUA limit 4 The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below a Any revision to the approved plans, regardless of size b Project name change c Transfer of ownership d Redesign or addition to the approved amount of built -upon area e Further subdivision, acquisition, or sale of all or part of the protect area The protect area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought f Filling in, altering, or piping of any vegetative conveyance shown on the approved plan 5 The Director may determine that other revisions to the protect should require a modification to the permit 6 All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements The final plats for the protect will be recorded showing all such required easements, in accordance with the approved plans The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made 8 The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface 9 During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately 10 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification 11 If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility Page 4 of 9 State Stormwater Management Systems Permit No SW8 070138 12 Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual 13 The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to a Semiannual scheduled inspections (every 6 months) b Sediment removal c Mowing and re -vegetation of side slopes d Immediate repair of eroded areas e Maintenance of side slopes in accordance with approved plans and specifications f Debris removal and unclogging of structures, orifice, catch basins and piping g Access to all components of the system must be available at all times 14 Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ The records will indicate the date, activity, name of person performing the work and what actions were taken 15 This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data 16 Prior to the sale of any lot, the following deed restrictions must be recorded a The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 070138, as issued by the Division of Water Quality under NCAC 2H 1000 b The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit c These covenants are to run with the land and be binding on all persons and parties claiming under them d The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality e Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality f The maximum built -upon area per lot is 3,750 square feet This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools g Lots within CAMA's Area of Environmental Concern may be subject to a reduction in their allowable built -upon area due to CAMA regulations h All runoff on the lot must drain into the permitted system This may be accomplished through providing roof drain gutters, which drain to the street, grading the lot to dram toward the street, or grading perimeter swales and directing them into the pond or street Lots that will naturally drain into the system are not required to provide these measures Page 5 of 9 State Stormwater Management Systems Permit No SW8 070138 Built -upon area in excess of the permitted amount will require a permit modification Each lot within the subdivision whose ownership is not retained by the permittee, must submit a separate Offsite Stormwater Management Permit application package to the Division of Water Quality and receive a permit prior to any construction on the lot 17 A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds 18 Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ personnel The facility must be in compliance with all permit conditions Any items not in compliance must be repaired or replaced to design condition prior to the transfer Records of maintenance activities performed to date will be required 19 Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria a The fountain must draw its water from less than 2' below the permanent pool surface b Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond c The falling water from the fountain must be centered in the pond, away from the shoreline d The maximum horsepower for the fountain's pump is based on the permanent pool volume The maximum pump power for the four fountain associated with this project are as follows Decorative Spray Fountains Pond # Maximum Pump Horsepower Pond A 1 Pond B 1 /4 Pond C 1/8 Pond D 1/4 20 Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools III GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a "Name/Ownership Change Form" must be submitted to the Division of Water Quality accompanied by appropriate documentation from the parties involved This may include, but is not limited to, a deed of trust, recorded deed restrictions, Designer's Certification and a signed Operation and Maintenance plan The project must be in good standing with DWQ The approval of this request will be considered on its merits and may or may not be approved Page 6 of 9 State Stormwater Management Systems Permit No SW8 070138 2 The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request 3 Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215 6A to 143-215 6C 4 The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal), which have jurisdiction 5 In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems 6 The permit may be modified, revoked and reissued or terminated for cause The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition 7 Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours 8 The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days 9 A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction Permit issued this the 27`hday of March, 2007 NORTH-CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Water Quality ✓ vv V By Authority of the Environmental Management Commission Permit Number SW8 070138 Page 7 of 9 PAMMEW i1001. OOMOM�1101111�/�r7lfitRIMER %i7; State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM C�n'ty� 1 This form may be photocopied for use as an of iginal // I GENERAL INFORMATION 1 Applicant's name (specify the name of the corporation, individual, etc who owns the project) Fear IV, LLC 2 Print Owners/Signing Official's name and title (the person legally responsible for facility and compliance) Eric Lappala, Development Coordinator 3 Mailing Address for person listed in item 2 above 109 N Davis Street City Telephone Number 919-844-9025 State NC Zip 28461 4 Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc ) Stevens Park — Phase I 5 Location of Project (street address) 0 6 miles west along N C S R 1209 (West 9`h Street) from its intersection with U S Highway 211 City Southport County Brunswick 6 Directions to project (from nearest major intersection) From River Rd SE (133 South), turn left on Southport Supply Rd SE(U S Highway 211), which turns into N Howe St Turn right on West 9" Street (N C S R 1209) The project is located 0 6 miles west along N C S R 1209 (West 9s Street) from its intersection with U S Highway 211 7 Latitude 330 55' 44" N Longitude 78' 02' 09" W 8 Contact person who can answer questions about the project of project Name Richard M Collier, PE Telephone Number (910) 343-1048 H PERMIT INFORMATION 1 Specify whether project is (check one) X New Renewal Modification 2 if this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) Form SWU-101 Version 399 Page] of4 3 Specify the type of project (check one) ❑ Low Density ® High Density ❑ Redevelop ❑ General Pernut ❑ Other 4 Additional Project Requirements (check applicable blanks) ❑ CAMA Major ® Sediment/Erosion Control ® 404/401 Permit ❑ NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748 III PROJECT INFORMATION In the space provided below, summarize how stormwater will be treated Also attach a detailed narrative (one to two pages) describing stormwater management for the project Stormwater will be conveyed through catch basins and pipes into four (4) Stormwater Management Wet Detention Ponds with forebay and outlet control structures Each pond will treat the 1" storm runoff to 90% TSS, and control the City of Southport pre vs post development runoff requirements 2 Stormwater runoff from this project drams to the Cape Fear River basin 3 Total Project Area 93 70 acres 4 Project Built Upon Area 31 58 % 5 How many drainage areas does the project have9 6 Complete the following information for each drainage area If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below Basin Information Drainage Area - Total Drainage Area A - D Receiving Stream Name Cottage Creek See Attached Supplement Receiving Stream Class Sc, Sw Drainage Area 4,571,051 SF (104 94 AC) Existing Impervious* Area 0 Proposed Impervious* Area 1,589,161 SF (36 48 AC) % Impervious* Area (total) 36 48% Impervious* Surface Area Drainage Area - Total Drainage Area A - D On -site Buildings 577,500 SF See Attached Supplement On -site Street / Parking 560,231 SF On -site Sidewalks 116,430 SF Other on -site 35,000 SF Off site (Future Phase II) 300,000 SF Total 1,589,161 SF * Impervious ai ea its defined as the built upon area including, but not limited to, buildings, loads, parking areas, sidewalks, gravel areas, etc 7 How was the off -site impervious area listed derived? Sections of Phase 1 drainage areas outside of Phase 1 property was included with estimated lot built upon areas and roadways Form SWU-101 Version 3 99 Page 2 of 4 IV DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, out parcels and future development prior to sale of any lot If lot sizes vary significantly, a table listing each lot number, size and the allowable built upon area for each lot must be provided as an attachment I The following covenants are intended to ensm e ongoing compliance with state management pei mit number as issued by the Division of Water Quality These covenants my not be changed or deleted without the convent of the State 2 No more than 33,750 squat e feet of any lot shall be covet ed by structia es or impervious mates ials Impervious materials include asphalt, gravel, concrete, brick, stone, slate of similar mates ial but do not include wood decking or the water surface ofswimming pools 3 Swales shall not be filled in, piped, of alter ed except av neeessaiy to provide di iveway crossings 4 Built -upon at ea in ezcevs of the pet mitted amount requu es a state stormwater management pernut modification pt for to construction S All pet nutted i unofffrom out parcels of future development shall be do ected into the pernu tied stop mwater control system These connections to the stoi mwater contn of system shall be performed in a mannet that maintains the integrity and petfot manne of the system as pen milted By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable item required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot V SUPPLEMENT FORMS The applicable state stormwater management permit supplement form (s) listed below must be submitted for each BMP specified for this project Contact the Stonnwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3 99 Page 3 of 4 IV. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. Please indicate that you have provided the following required information by initialing in the space provided next to each item Initials • Original and one copy of the Stormwater Management Permit Application Form • One coov of the apnlicable Suoolement Form(s) for each BMP • Permit aoolication Drocessmg fee of 9424 (oavable to NCDENR) Jlfo= i�vo Air • Detailed narrative descnntion of stormwater treatment/manaeement tMr • Two copies of plans and specifications including - Development/Project name - Engineer and firm - Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VI. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section Designated agent (individual or firm) Richard M Collier, McKim & Creed PA Mailing Address 243 North Front Street City Wilmington State NC Zip 28401 Phone (910)343-1048 Fax (910)251-8282 VII APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) Eric G Lappala, P E certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be reco d, d that the proposed project complies with the requirements of 15A NCAC 2H 1000 Signature Date O Z' Z3. G 17. n QWI1-1 n1 VPr ', . 1 00 Papa d nfA I PROJECT INFORMATION (CONTU Basin Information ' Drainage Area A Drainage Area Receiving Stream Name Cottage Creek Cottage Creek Receiving Stream Class SC, Sw SC, Sw Drainage Area 2,304,876 SF 867,642 SF Existing Impervious* Area 0 SF 0 SF Proposed Impervious* Area 777,927 SF 288,310 SF % Impervious* Area (total) 33 8% 33 2% Irapernous*Surface Area Drainage'Ama A _ - = Drainage Area B On -site Buildings 322,500 SF 86,250 SF On -site Street / Parking 352,227 SF 74,060 SF On -site Driveway 0 SF 0 SF On -site Sidewalks 71,400 SF 23,000 SF Other (Pump Station) 1,600 SF 0 SF Other (Clubhouse) 7 200 SF 0 SF Other (Indoor Pool) 23,000 SF 0 SF Off site (Future Phase 11) 0 SF 105,000 SF Total 777,927 SF 288,310 SF 36 48197424 Basin Information : ' �Dmmage Area G Drainage Area Receiving Stream Name Cottage Creek Cottage Creek Receiving Stream Class SC, Sw SC, Sw Drainage Area 490,978 SF 907,555 SF Existing Impervious* Area 0 SF 0 SF Proposed Impervious* Area 146,480 SF 376,444 SF % Impervious* Area (total) 29 8% 41 5% Impervious* Surface Area Drainage Area C Drainage Area'D , On -site Buildings 52 500 SF 116,250 SF On -site Street / Parking 80,200 SF 53,744 SF On -cite Driveway 0 SF 0 SF On -cite Sidewalks 12,180 SF 9,850 SF Other (Pump Station) 1,600 SF 1,600 SF Off site (Future Phase 1I) 0 SF 195,000 SF Total 146,480 SF 376,444 SF Form SWU-101 Version 3 99 Page 2A of 4 Page 1 of 2 Ray Marconi From Paul Masten [PMasten@smeinc coml Sent Wednesday, February 28, 2007 9 09 AM To Noelle Lutheran, Ray Marconi Subject Stevens Park 401 application Noel le, I left you a voicemail about this as well, but I wanted to have Ray Marconi privy to this also, as they are trying to submit the stormwater application for Stevens Park Ian McMillan told me that the PCN for Stevens Park had been sent down to the Wilmington Regional office on Feb 20 Ray was told that they could not submit their stormwater application until the 401 permit had at least been applied for Have you received the PCN from the Raleigh Central Office? Thanks for your help Sincerely, Paul Masten Staff Professional S&ME - Wilmington Branch 6409 Amsterdam Way, Building B-3 Wilmington, NC 28405 (910) 799-9945 phone (910)799-9958 NOTICE OF CONFIDENTIALITY AND NONDISCLOSURE. This electronic message which includes any attachments and other documents referred to herein and in the attachments, contains information from S&ME, Inc that may be legally privileged and/or confidential The information is intended for the proper recipient(s) only If you are not the intended recipient, you are notified that any disclosure, copying, distribution, or use of the contents is strictly prohibited If you received this message in error or are not the intended recipient, please advise the sender by reply or by telephone at the number listed above and delete this electronic message and any attachments from your computer Receipt by anyone other than the intended recipient is not a waiver of any legal privilege INFORMATION ABOUT THIS ELECTRONIC MESSAGE- It is the policy of S&ME, Inc to provide clients with written reports signed by the author documenting the services performed by S&ME, Inc for our clients The information included in this electronic message is prepared solely for the recipient identified by S&ME, Inc based on the information provided to S&ME, Inc by the recipient The message may represent a summary with limitations, conditions and further explanations omitted in the interest of brevity and time constraints The contents of this electronic message and any attachments may be preliminary and incomplete, subject to review and revision Therefore, this electronic message is provided "for information only" and should not be relied upon for any purpose, pending receipt of signed reports from S&ME, Inc "For Information Only" means the electromc message provides the recipient with an indication of the general status and schedule of the services being performed for the recipient LIMITED DURATION This electronic message and any attachments can be used by the recipient in conformance with the permission and restrictions granted by S&ME, Inc for ninety days from the date of the electronic message at which time the electronic message should be deleted from the recipients system and any printed copies destroyed as the electronic message and any attachments will no longer be valid and can not be used or relied upon by the recipient for any purpose COPYRIGHT NOTICE Copyright 2007 by S&ME, Inc All Rights Reserved by S&ME, Inc This notice applies to 2/28/2007 STORMWATER DESIGN NARRATIVE STEVENS PARK - PHASE 1 RESIDENTIAL DEVELOPMENT Brunswick County, NC City of Southport McKim & Creed Project #04685-0003 February 2007 Prepared for Cape Fear Trading Group, LLC 109 N Davis St Southport, NC 28461 (910) 457-1702 Prepared by v �MCIQM&CREED 243 North Front Street Wilmington, NC 28401 (910) 343-1048 STEVENS PARK — PHASE 1 RESIDENTIAL DEVELOPMENT Brunswick County, NC City of Southport McKim & Creed Project #04685-0003 February, 2007 Table of Contents DESIGN NARRATIVE ➢ Existing Site ➢ Proposed Improvements ➢ Maintenance ATTACHMENT 1— EROSION CONTROL CALCULATIONS ➢ Watershed Classification ➢ Wetlands Map signed by USACE ➢ Brunswick County SCS Soils Map ➢ USGS Topographic Map ➢ Storm Water Calculations ATTACHMENT 2 — CONSTRUCTION PLANS Page i STEVENS PARK — PHASE 1 RESIDENTIAL DEVELOPMENT Brunswick County, NC City of Southport McKim & Creed Project#04685-0003 February, 2007 DESIGN NARRATIVE Existing Site The site is located approximately 0 6 miles west along N C S R 1209 (West 91h Street) from the intersection of US Highway 211 and West 91h Street, northwest of the town of Southport, with the majority of the site just outside of the City Limits of the City of Southport The development site is a 93 70-acre parcel of undeveloped land and an existing park area with baseball fields as identified within the Survey as prepared by McHenry Surveying The site is wooded with approximately three fourths the site covered in native hardwoods, and the remaining site covered with the existing park Land use in the area is generally residential or undeveloped The site borders West 9tt, Street and Indigo Plantation residential development to the south, undeveloped parcels of land to the west and north, West 111b Street and a few residences are located to the east and Southport Elementary School lies to the south east The only existing onsite improvements include two baseball fields, a tee -ball field and adjacent parking lots Several dirt trails have been graded through the site in order to access the property The existing onsite structures are the concession buildings, maintenance shed and dugouts that are associated with the baseball fields and a small home is located on the eastern portion of the property These structures will be removed from the site Please note the applicant owns the lands within the development from the 0 50 acre parcel which is land locked by the development along the western property line An access easement is proposed to Gables Run Further note the proposed alley along the south of the development traverses onto the adjacent property for future access from that land and to the best of our knowledge discussions with the applicant and adjacent property owner have allowed for this � I t t V '�. '4i" t'iW �a1� •r - i. 'j �)J •.. i,nau znoco�e�i Icl � �.. _ � GOQg���, - IYuirtYm33° '34'14:N iCOlb<i 99 `W olav ?'.,t. was performed for the project by Davenport Engineering & Mandala Services, Inc, dated May 2006 and was submitted to the City of Southport under previous cover 3 Stevens Park Phase 1 will include a total of one -hundred fifty three (154) single-family lots (dwelling units) located within two (2) residential 'cluster' communities as depicted within the Site Plan documents provided Please note as described within the contents of the Overall Site Plan, there are two (2) residential zones identified as R-10 Residential Cluster and R-20 Residential Cluster Each of the zones has their individual bulk requirements as shown and each contribute to the Open Space requirements as calculated within the Open Space Calculations within the note on the Overall Site Plan Eighteen (18) lots are proposed within the R-10 Residential Cluster and one hundred thirty-five (135) lots are proposed within the R-20 Cluster Please note that there is an additional Open Space which will be 'banked' for use during the future development of the remaining lands which to date have not been confirmed by the applicant Right-of-ways are shown in accordance with Southport UDO and of further importance to note the lots will be accessed with driveway connections to the alley and therefore, no access to the thoroughfares is proposed Please note one lot which will access site to the front along Oak Alley Run while all other will be rear access Further, the street names have been confirmed with Brunswick County Sidewalks and bike paths are shown within the Site Plan Documents as depicted within the Typical Roadway Sections in addition to Pedestrian Access Easements The applicant is proposing valley curb where applicable Further Site Amenities such as picnic areas and the club house are shown Please note the applicant intends to dedicate Tract I, the 'Ball Fields' and Tract II, the 'Swimming Pool' to the City of Southport and associated language within the Appendix for this Dedication is included Further development of this will need to occur between the applicant's attorney and the City of Southport Attorney to confirm the language Please note that Tract II, the'Access Easement' will be an easement only and not dedicated to the City It is important to note that on the project site there is an existing pocosin, or isolated wetlands feature that will remain as opposed to the two (2) small pockets which are to be removed in accordance with Wetlands Ecosystem Enhancement Program as included within the Appendix of this Report, that provides both scenic benefit and environmental enhancement for the project The development, as planned, proposes an elevated boardwalk along the pocosm perimeter, to be constructed with materials and workmanship that will not create wetland impacts (i e no heavy machinery, light -duty tools for wooden pile placement, etc), this will allow for enjoyment by the tenants of this natural area without impact or degradation to the pocosin area Additionally, the development also intends to protect this area within the project during and after construction, in order to enhance the recreational and scenic qualities of the development Please further note the applicant is proposing a 30' Conservation Easement to further protect this area as shown Please note that a Soil Erosion and Sediment Control Permit will need to be obtained from the Department of Environmental and Natural Resources in order to commence site work Stormwater The Stormwater Management System has been designed pursuant to the City of Southport Unified Development Ordinance Standards specifically the Stormwater Management Plan Technical Supplemental as shown Please note the site will adhere to the rational method peak runoff reductions as well as the SCS runoff volume analysis and storage for infiltration systems based on 25-year storm Please note the four (4) Stormwater Mitigation Basins are shown, all Wet Detention Basins and associated fore bays for each of the entry points to the basm A bypass line is proposed for the stormwater runoff in excess of the 100-year storm event that is proposed along proposed Steven's Path Way, north and parallel to 9th Street in an easterly direction beginning from Pond A, eventual discharging to Cottage Creek Basin A, B, C and D will tie into this by pass line, leading to a 50' level spreader with vegetative filter Supporting calculations and miscellaneous information are provided within the following pages of this report Maintenance The Contractor shall be responsible for periodic inspection and maintenance of all indicated stormwater devices In addition, inspection and any necessary maintenance will be required immediately following any significant storm event Any measure that fails to function as intended shall be repaired immediately Upon completion of construction and the establishment of stabilizing ground cover, the property owner shall be responsible for site maintenance ATTACHMENT 1— STORMWATER CALCULATIONS ➢ Watershed Classification ➢ Wetlands Map signed by USACE ➢ Brunswick County SCS Soils Map ➢ USGS Topographic Map ➢ Storm Water Calculations State of North Cat olma Permit No Depai tment of Euvu onment and Natural Resources Division of Water Quality WATER QUALITY CLASSIFICATION REQUEST FORM This form may be pholocopied for use as an w igowl I PROJECT INFORMATION In oidei to determine whether a State Stornwater Management Permit will be iequiied foi a project in a coastal county, the classification of the closest downslope surface wateis (the sui face waters that any sheet flow of oveiflow from the pioject would flow toward) must be determined Please complete Sections I and H below DQW Staff will determine the receiving stieam classification, complete Section III, and return the completed form to you 1 Project Name ��✓ County tLllM LLiIc-k- 2 Contact Person M R -E i }f"rla o Ply c+ 3 Madrng Addiess 7O A40 Alver- 5%rf-e /01 � LwtOS _ 4 City > /ia router cote State Zip 74 P Phone No 5 Name of closest downslope surface wateis 6 Signature of contact person 44 � �� Date kloG 7 Is a Sedimentation Erosion Control Plan of a CAMA Major Permit requued? YES NO II REQUIRED ITEMS An 8'/z" x 11" copy of the appropriate poitron of a USGS quad sheet showing the pioject's property boundaries, receiving stream, major roads or State Roads numbeis, and neatest town or city must be attached CLASSIFICATION REQUEST/(To be cooinplele//d by Regional Office personnl) e Name of suiface wateis r t l 'Zl0 l f LLK _ River Basin Cl !- r aIndex No 3 Classification (as established by the Environmental Management Commission) SC SGy 4 Proposed Classification, if applicable 5 State Stormwater Management Permit requiied7 YES NO 6 Signature of Regional Office personnel ��(lC�/G�� Date cc Linda Lewis Cngineei Building inspector _ Central Files I01111 SWU-111ve1Sion 10 99 Name of Stream Description Cur Class Date Prop pass Basin Stream Index q Dutchman C.z'eek That section of BA RON Shellfzob Ana Dutchmen Creek within a line beginning at a porn of amrnh at the 3unctro. of Dutchman Creak aM Rlrrabeth River and rvnbing due north to . point of onrah on the north bank of Dutchman Creak thence in a mrthventarly drrectron along the enot bank to the aonthazde of the LRrecoaotal Waterway thence is a ve.Cerly dzxectaw along the wthu.de of the Iuttacwatal Waters, to the vent bank of Dutchmen Creek thence an . southeaoterly demctron to the point of Legrnornq, rncludrng all tributarie. vlthin thin line Intracoastal Prop mouth of Cottage SC Waterway Creek to Cape F.. Rrver Cottage Creek Prom .wcce to SC 6v Intracoastal Waterway Doaher. Creek Prom Intracoastal SC Waterway to Cape Peer Rrver Snokrbouse Creek Prom .. to Cape DC HOW Pear River Death.. Creek Prom .Dorm to Cape SC Pear Biver Ca.well Be.. Raz1re Basin BC Atla.trt Ocean !rhe "tat. of the BB Atlantic Oman mntiguoua to that portion of the Cape Pear Pavar Dania that extend. ftsm the enatem edge of the Lumber River Be.. to the eaetetu and of oak I.land Figure 2 — Stream Classification 08/09/02 Cape Peer 18-88 9-3-(41 08/05/81 Cape Peer 18-88-9-0 5) 04/01/55 Cape Peer 16-88 9-4 00/09/81 Cape Pear 18-98 10 08/01/90 Cape Fear 16-88-11 08/09/81 CeDe Peer 1a-Fa-12 08/09/81 Cabe Pear 18-08-13 04/01/59 Cape Pear 99 (2) Page 6 of 15 I 1 —J FI tll y — I I I1I p�ag 1X 11 h y en 2�q ��is z F it(i" � [6y[6y @ sew 8 i W < Ilia, a51: III a 'Y„ XT€s cF i j Eps a .8 X Ep3 Md .iai 4'J lMi®IpG%Yw\ 3 Figure 3 — Brunswick County Soils Map PaA — Pactolus fine sand, 0 to 2 % slopes Permiability = 6 to 20 in/hr WaB — Wendo fine sand, 0 to 6 % slopes Permiability = 6 to 20 in/hr Ma — Mandarin fine sand Permiability = 0 6 to 20 in/hr Lo — Leon fine sand Permiability = 6 to 20 in/hr w — small dam KrB — Kureb fine sand, 1 to 8 % slopes Permiability = 6 to 20 in/hr Tm — Tomohawk loamy fine sand Permiability = 2 to 20 in/hr ST Figure 4 — USGS Topographic Map STEVENS PARK NCDENR CALCULATIONS (1" STORM EVENT) Basin A Wet Detention Pond Calculations NC DENR Retention Requirements Objective design a wet detention basin with the following characteristics a permanent water pool depth between 3- and 6-feet, a surface area that meets TSS removal requirements (values set by NC DENR and included here), a forebay that is approximately 20% of the total pond volume, a temporary water pool sized to detain the initial 1 inch of rainfall runoff, an outlet device that drains the temporary water pool within 2-5 days, and a length -to -width ratio of approximately 3 1 'Baffles will in be installed to achieve the length -to -width ratio Step 1 Determine the surface area required for 90% TSS removal Post -Development Conditions Total Drainage Area 5291 ACRE Value from CAD Impervious Drainage Area 1786 ACRE Value from CAD Impervious Cover -(Impervious Drainage Area)/(Total Impervious Cover 33 76% Drainage Area)'100% Elevation of Permanent Pool Surface 140 FT Value selected by designer Depth of Permanent Pool 40 FT Value selected by designer (Bottom Elevation)=(Permanent Pool Surface Elevation of Wet Detention Pond Bottom 100 FT Elevation) -(Depth of Permanent Poop Approximate Pond Length 301 FT Value from CAD (flow path through forebay weir) A roxtmate Pond Width 298 FT Value from CAD Len th Width Ratio (Baffles will be installed) 1 1 Ratio= Len th /Width 1 Required SAMA Ratio for 90% TSS Removal 2 950 Value from chart Reference "90% TSS Removal Required Permanent Pool Surface Area 67,990 SF Required Surface Area=(Required SAIDA Ratio)*(Total Drainage Area) Provided Permanent Pool Surface Area 91,349 SF Interpolated value from stage -storage calculations Step 2 Determine the 1-inch runoff elevation within the wet detentioUond Runoff Coefficient Rv 0 354 MIN Rv=0 05+0 009"(% Impervious) Required 1" Runoff Volume 67 960 CF 1"Runoff Volume=l inch'Rv'1 foot/12 inch'(Total Drainage Area) 1" Runoff Volume Elevation 1471 FT Value from stage -storage calculations [Temporary Pool Elevation 16 38 FT Elevation of the next -highest onfice (above the low - Treatment 232,217 CF Total volume controlled at the tempor elevation (from stage -storage charts) Step 3 Calculate the required forebay volume (18-22% the total pond volume below permanent pool) Total Pond Volume below permanent pool 284 868 CF Value from stage -storage calculations Reoumad Forebav Volume 56,974 CF Forebay Volume=(Total Pond Volume)'20% Provided Forebay Volume Total Pond Volume 20% (Provided Forebay Volume)'100/ Step 4 Verify that time required to drawdown the 1-inch runoff volume is within 2 to 5 days Diameter of Proposed Low -Flow Onfice 300 IN Value chosen by designer Weir Elevation of Outlet Structure 1400 FT Value chosen by designer (Total Elevation Head Above Center of Total Elevation Head Above Onfice 226 FT Onfice)=(Temp Pool Elevation) -(Perm Pool Elevation)-(12 Orifice Diameter) Average Elevation Head Above Orifice = 12 of Total Average Elevation Head Above Orifice 1 13 FT Elevation Head Above Orifice Cd, Coefficient of Discharge 060 Value chosen by designer Q=Cd'(Pp`((Diameter of Onfice)'(1 W12 Q Flowrate Through Low -flow Orifice 025 CFS ...Iln9/d*M•99 9`/d vcmc HmrV11M/l Drawdown Time for 1-inch Runoff 313 DAYS (Drawdown Time)=(1"Runoff Volume)/Q"(1 5 W665WW3t2UTechlSlorm✓ateMond A\ Wet Detention Pond A As D07 Post Basin Treatment Wet Detention Pond A Stage -Storage Calculations for Proposed Wet Detention Pond determine the storage capacity and characteristics of the proposed wet detention pond Pond side slope above Permanent Pool 31 Slope of Vegetated Shelf 61 Side Slope below planted shelf 3 1 incremental and cumulative storaoe of the wet detention pond per contour interval Stage/Storage Above Permanent Pool (Including Forebay) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 140 91,349 0 0 "Permanent Pool 160 98,989 95,169 95169 160 98,683 98,836 194,005 170 102,432 100,558 294,563 180 106,234 104 333 398,896 Stage/Storage Total Pond (Including Forebay) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 100 58,002 0 0 -Pond Bottom 110 63,525 60,764 60,764 120 69,263 66,394 127 158 130 77,404 73,334 200,491 140 91,349 84,377 284,868 Permanent Pool 150 98,989 95,169 380,037 160 98,683 98,836 478,873 170 102,432 100,558 579,430 180 106,234 104,333 683,763 Forebay 1 & 2 Only (20% of Total Pond) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 100 11,368 0 0 Pond Bottom 11 0 12,451 11,910 11,910 120 13 576 13,013 24,923 130 15 171 14,373 39,296 140 17,904 16,538 55,834 -Permanent Pool S A665\0003\20 TecMStormwater\Pond A\ Wet Detention Pond Axis Pond Stage Storage 2/26/2007 Wet Detention Pond A Stage -Storage Calculations for Proposed Wet Detention Pond DA of FES 1 2574 AC 49% 49% of total forebay volume DA of FES 31 13 51 AC 26% of total forebay volume DA of FES 52 1366 AC 26% 51% (DA of FES 31 & FES 52) TOTAL DA 5291 AC Forebay of FES 1 Only (20% of Total Pond & 49% of Total Forebay Volume) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 100 5 531 0 0 Pond Bottom 110 6,057 5,794 5,794 120 6,604 6,331 12,125 130 7,381 6,992 19,117 140 8,710 8,045 27,163 Permanent Pool Forebay of FES 31 & 52 Only (20% of Total Pond & 51% of Total Forebay Volume) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 100 5,838 0 0 Pond Bottom 11 0 6 394 6,116 6,116 120 6,971 6,682 12,798 130 7,791 7,381 20,179 140 9,194 8,492 28,672 Permanent Pool S A685\0003120-Tech\StomwateAPond A\ Wet Detenbon Pond A As Pond Stage Storage 2/2612007 Coastal Counties SAMA Ratio Reference- SA/DA Ratio for TSS Removal Surface Area/Drainage Area for 90% TSS Removal Permanent Pool Deoth (ft) Impervious % 30 35 40 45 50 55ENE 10% 1 30 1 00 080 070 060 050 20% 240 200 1 80 1 70 1 50 140 30% 350 300 270 250 2 20 1 90 40% 450 400 350 310 280 250 50% 560 500 430 390 350 310 60% 700 600 530 480 430 390 70% 810 1 700 1 6 00 550 500 450 390 80% 940 800 700 640 570 520 4 60 90% 1070 900 790 720 560 590 5 20 100% 1200 1000 880 810 730 660 5 80 S \4685\0003\20-Tech\Stormwater\Pond_A\ Wet Detention Pond A xls Reference - SA-DA Ratios 2/26/2007 Basin B Wet Detention Pond Calculations NC DENR Retention Requirements Objective design a wet detention basin with the following characteristics a permanent water pool depth between 3- and 6-feet, a surface area that meets TSS removal requirements (values set by NC DENR and Included here), a forebay that is approximately 20% of the total pond volume, a temporary water pool sized to detain the Initial 1 inch of rainfall runoff, an outlet device that drains the temporary water pool within 2-5 days, and a length -to -width ratio of approximately 3 1 "Baffles will m be installed to achieve the length -to -width ratio Step 1 Determine the surface area required for 90% TSS removal Post -Development Conditions Total Drainage Area 1992 ACRE Value from CAD Impervious Drainage Area 662 ACRE Value from CAD Impervious Cover 33 23% Impervious Cover -(Impervious Drainage Area)/(Total Drainage Area)'f00% Elevation of Permanent Pool Surface 180 FT Value selected by designer Depth of Permanent Pool 40 FT Value selected by designer (Bottom Elevation)=(Permanent Pool Surface Elevation of Wet Detention Pond Bottom 140 FT Elevation) -(Depth of Permanent Pool) Approximate Pond Length 209 FT Value from CAD (flow path through forebay weir) roximate Pond Width 127 FT Value from CAD Len th Width Ratw (Baffles will be installed) 2 1 Ratio= Len th / Idth 1 Required SAIDA Ratio for 90% TSS Removal 2 950 Value from chart Reference "90% TSS Removal Required Permanent Pool Surface Area 25,598 SF Required Surface Area=(Required SAIDA Raho)*(Total Drainage Area) Provided Permanent Pool Surface Area 25,726 SF Interpolated value from stage -storage calculations _ Step 2 Determine the 1-inch runoff elevation within the wet detention pond Runoff Coefficient Rv 0 349 INIIN Rv=O 05+0 009'(% Impervious) Required 1" Runoff Volume 25,241 CF 1"Runoff Volume=l inch'Rv`l foot/12 inch'(Total Drainage Area) ro a,,.,,.ff vni„nip Fiavannn 1895 FT Value from stage -storage calculations _ Temporary Pool Elevation 2050 FT Elevation of the next -highest onfice (above the low - /low onfice) Treatment Volume 70,468 CIF Total volume controlled at the temporary pool elevation (from stage -storage charts) Step 3 Calculate the required forebay volume (18-22% the total pond volume below permanent pool) Total Pond Volume below permanent pool 73 013 CIF Value from stage -storage calculations Reauired Forebav Volume 14,603 CIF Forebay Volume=(Total Pond Volume)*20% Provided Forebay Volume Total Pond Volume 20% (provided Forebay Volume)/(Total Pond Volume)'100% Steo 4 Venfv that time required to drawdown the 1-inch runoff volume is within 2 to 5 days Diameter of Proposed Low -Flow Orifice 200 IN Value chosen by designer Weir Elevation of Outlet Structure 1800 FT Value chosen by designer (Total Elevation Head Above Center of Total Elevation Head Above Orifice 242 FT Onfice)=(Temp Pool Elevation) -(Perm Pool Elevation)-(1/2 Orifice Diameter) Average Elevation Head Above Orifice = 1/2 of Total Average Elevation Head Above Orifice 1 21 FT Elevation Head Above Orifice Cd Coefficient of Discharge 060 Value chosen by designer O=Cd'(Pi)*j(Diameter of Onfice)'(I ft/12 0 Flowrate Through Low -Flow Onfice 9 0 12 CFS ,n11n91d.M.19 9•rd vamp HpadltM/7 Drewdown Time for 1-inch Runoff 253 DAYS (Drawdown Time)=(l"Runort Volume)/Q'(7 a=„rseaenn °prnnHoi S W68sOX) 2 Te stonmvateMMd B1 Wet Detention Pontl B xis =007 Post Basin Treatment Wet Detention Pond B Stage -Storage Calculations for Proposed Wet Detention Pond determine the storage capacity and characteristics of the proposed wet detention pond Pond side slope above Permanent Pool 3 1 Slope of Vegetated Shelf 61 Side Slope below planted shelf 3 1 remental and cumulative storage of the wet detention pond per contour inh age/Storage Above Permanent Pool (Including Forebay) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) 180 25,726 0 0 «Permanent Pool 0 190 27,593 26 660 26,660 200 29,517 28,555 55,215 21 0 31,497 30,507 85 722 220 32,516 32,007 117,728 Stage/Storage Total Pond (Including Forebay) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 140 13,297 0 0 Pond Bottom 150 15,218 14,258 14,258 160 17 485 16,352 30,609 170 20,798 19,142 49,751 180 25,726 23 262 73,013 -Permanent Pool 190 27,593 26,660 99,672 200 29,517 28 555 128,227 21 0 31,497 30507 158,734 220 32,516 32,007 190,741 Forebay Only (20% of Total Pond Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 140 2,103 0 0 Pond Bottom 150 2 836 2,470 2 470 160 3,651 3 243 5,713 170 4,541 4,096 9,809 180 5 507 5,024 14 833 Permanent Pool 5\4685\0003\20-Tech\Stormwater\Pond_B\ Wet Detention Pond B As 2 26l2007 Pond Stage Storege Coastal Counties SAIDA Ratio Reference SA/DA Ratio for TSS Removal Surface Area/Drainage Area for 90% TSS Removal Permanent Pool Depth ft Im ervious% 30 35 40 45 50 55 60 10% 1 30 1 00 080 070 060 050 040 20% 240 200 1 80 1 70 1 50 1 40 1 20 30% 350 300 270 250 220 1 90 1 60 40% 450 400 350 310 280 250 210 50% 560 500 430 390 350 310 270 60% 700 6 00 530 480 430 390 340 70% 8 7 00 6 00 550 500 450 390 80% 9 8 00 700 690% 10 ;40 9 00 790 720 560 590 520 100% 12 10 00 880 8 10 I7 30 6 60 5 80 S W6e5\0003\20-Tech\Stormwater\Pond_B\ Wet Detention Pond B AS Reference - SA-DA Ratios 2/26/2007 Basin C Wet Detention Pond Calculations NC DENR Retention Requirements Objective design a wet detention basin with the following characteristics a permanent water pool depth between 3- and 6-feet, a surface area that meets TSS removal requirements (values set by NC DENR and included here), a forebay that is approximately 20% of the total pond volume a temporary water pool sized to detain the initial 1 inch of rainfall runoff, an outlet device that drains the temporary water pool within 2-5 days, and a length -to -width ratio of approximately 3 1 Step 1 Determine the surface area required for 90% TSS removal Post -Development Conditions Total Drainage Area 11 27 ACRE Value from CAD Impervious Drainage Area 336 ACRE Value from CAD Impervious Cover 29 81 % Impervious Cover -(Impervious Drainage Area)/(Total Drainage Area)'100% Elevation of Permanent Pool Surface 160 FT Value selected by designer Depth of Permanent Pool 50 FT Value selected by designer (Bottom Elevation)=(Permanent Pool Surface Elevation of Wet Detention Pond Bottom 11 0 FT Elevation) -(Depth of Permanent Pool) Approximate Pond Length 189 FT Value from CAD (flow path through forebay weir) A.....,,,,-+. D—A \AhAth 84 FT Value from CAD Required SAIDA Ratio for 90% TSS Removal 220 Value from chart Reference "90% TSS Removal Required Permanent Pool Surface Area 10,800 SF Required Surface Area=(Required SA/DA Ratio)*(Total Drainage Area) Provided Permanent Pool Surface Area 10,949 SF Interpolated value from stage -storage calculations Steo 2 Determine the 1-inch runoff elevation within the wet detention pond Runoff Coefficient Rv 0 318 INIIN Rv=O 05+0 009'(% Impervious) 1 Runoff Volume=1 inch'Rv'1 foot/12 inch'(Total Required 1" Runoff Volume 13 021 CF Drainage Area) 1" Runoff Volume Elevation 1710 FT Value from stage -storage calculations Elevation of the next -highest onfice (above the low - Temporary Pool Elevation 18 00 FT Bow onfice Total volume controlled at the temporary pool Treatment Volume 24,836 CF elevation (from stage -storage charts) Step 3 Calculate the required forebay volume (18-22% the total pond volume below permanent pool) Total Pond Volume below permanent pool 25,938 CF Value from stage -storage calculations Reouired Forebav Volume 5,188 CF Forebay Volume=(Total Pond Volume)*20% Provided Forebay Volume Total Pond Volume 20 % (Provided Fore Volume)'100% Sten 4 Venfv that time required to drawdown the 1-inch runoff volume is within 2 to 5 days Diameter of Proposed Low -flow Orifice 1 50 IN Value chosen by designer Weir Elevation of Outlet Structure 1600 FT Value chosen by designer (Total Elevation Head Above Center of Total Elevation Head Above Orifice 1 94 FT Onfice)=(Temp Pool Elevation) -(Perm Pool Elevation)-(1/2 Onfice Diameter) Average Elevation Head Above Onfice = 1/2of Total Average Elevation Head Above Orifice 097 FT Elevation Head Above Orifice Cd Coefficient of Discharge 060 Value chosen by designer Q=Cd'(Pi)'j(Diameter of Orifice) *(I W12 Q Flowrate Through Low -flow Orifice 9 0 06 CFS in )A2/4'12'32 2'(Averoe Head)P12 Drawdown Time for 1-inch Runoff 259 DAYS (Drawdown Time)=(1"Runoff Volume)/Q'(1 a.., ✓ncwnn ..e..,.. 1 5 \4685\0 OM3 Tech\$tor atehPend_G Wet Detention Pon4 C As 726/2W7 Post Basin Trea nient Basin C Wet Detention Pond Calculations NC DENR Retention Requirements Objective design a wet detention basin with the following characteristics a permanent water pool depth between 3- and 6-feet a surface area that meets TSS removal requirements (values set by NC DENR and included here), a forebay that is approximately 20% of the total pond volume, a temporary water pool sized to detain the initial 1 inch of rainfall runoff, an outlet device that drains the temporary water pool within 2-5 days, and a length -to -width ratio of approximately 3 1 Step 1 Determine the surface area required for 90% TSS removal Post -Development Conditions Total Drainage Area 11 27 ACRE Value from CAD Impervious Drainage Area 336 ACRE Value from CAD Impervious Cover 29 81% Impervious Cover -(Impervious Drainage Area)/(Total Drainage Area)*100% Elevation of Permanent Pool Surface 160 FT Value selected by designer Depth of Permanent Pool 50 FT Value selected by designer (Bottom Elevation)=(Permanent Pool Surface Elevation of Wet Detention Pond Bottom 11 0 FT Elevation) -(Depth of Permanent Pool) Approximate Pond Length 181 FT Value from CAD (flow path through forebay weir) A roximate Pond Width 60 FT Value from CAD Len th Width Ratio 3 1 Ratio= Len tti/ idth 1 Required SAMA Ratio for 90% TSS Removal 220 Value from chart Reference "90% TSS Removal Required Permanent Pool Surface Area 10,800 SF Required Surface Area=(Required SA/DA Ratio)*(Total Drainage Area) Provided Permanent Pool Surface Area 10,949 SF Interpolated value from stage -storage calculations Step 2 Determine the 1-inch runoff elevation within the wet detention oond Runoff Coefficient, Rv 0 318 MIN Rv=0 05+0 009'(% Impervious) Required 1" Runoff Volume 13,021 CF 1"Runoff Volume=1 mch'Rv'i foot/12 inch'(Total Drainage Area) Temporary Pool Elevation 1800 FT Elevation of the next -highest onfice (above the low - flow onfice) Treatment Volume 24,836 CF Total volume controlled at the temporary pool elevation (from stage -storage charts) Step 3 Calculate the required forebay volume (18-22% the total pond volume below permanent pool) Total Pond Volume below permanent pool 25 938 CF Value from stage -storage calculations 0--...—A C.."nh— VM.. . -9 1RR CF Forebav Volume=(Total Pond Volume)*20% Provided Forebay Volume Total Pond Volume 20°k (Provided Forebay Volume)/(Total Pond Volume)'f00% Steo 4 Venfv that time required to drawdown the 1-inch runoff volume is within 2 to 5 days Diameter of Proposed Low -flow Orifice 1 50 IN Value chosen by designer Weir Elevation of Outlet Structure 1600 FT Value chosen by designer (Total Elevation Head Above Center of Total Elevation Head Above Orifice 1 94 FT Onfice)=(Temp Pool Elevation) -(Perm Pool Elevation)-(1/2 Orifice Diameter) Average Elevation Head Above Onfice = 12 of Total Average Elevation Head Above Orifice 097 FT Elevation Head Above Onfice Cd Coefficient of Discharge 060 Value chosen by designer Q=Cd'(PQ'((Diameter of Onfice)'(1 f 112 Q Flowrate Through Low -flow Orifice 9 0 O6 CFS rnlr^9/e*r'l•?9 94Avpma Headll^12 Drawdown Time for 1-inch Runoff 2 59 DAYS (Draw down----1(1"Runoff Volume)/Q'(1 s W6ast0003t20-Tech45tommatartPontl Ct Wet Detention Pond C As 726/2W7 Post Basin Treatment Wet Detention Pond C Stage -Storage Calculations for Proposed Wet Detention Pond determine the storage capacity and characteristics of the proposed wet detention pond Pond side slope above Permanent Pool 3 1 Slope of Vegetated Shelf Side Slope below planted shelf incremental and cumulative storage of the wet detention pond per contour interval Stage/Storage Above Permanent Pool (Including Forebay) Cumulative Contour Incremental Volume S Contour Area (SF) Volume (CF) 160 10,949 0 0 Permanent Pool 170 12,404 11,677 11 677 180 13,915 13,160 24,836 190 15,483 14,699 39,535 200 17,108 16 296 55,831 Stage/Storage Total Pond (Including Forebay) Cumulative Contour Incremental Volume S Contour Area (SF) Volume (CF) (CF) 11 0 1,836 0 0 -Pond Bottom 120 2,798 2 317 2,317 130 3,939 3 369 5,686 140 5,277 4 608 10,294 150 7,531 6 404 16,698 160 10,949 9,240 25,938 -Pennanent Pool 170 12 404 11 677 37,614 180 13 915 13 160 50,774 190 15 483 14 699 65,473 200 17 108 16 296 81,768 Forebay Only (20% of Total Pond) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 110 94 0 0 -Pond Bottom 120 313 203 203 130 646 480 683 140 1,151 899 1 581 150 1793 1,472 3,053 160 2,587 2,190 5 243 -Permanent Pool S \4685WM3120-TecnkStomw ner orM_C\ Wet Detention Pond C As 226R007 Pond Stege-Storage Coastal Counties SAMA Ratio Reference SA/DA Ratio for TSS Removal Surface Area/Drainage Area for 90% TSS Removal Permanent Pool Depth (ft) Impervious % 30 35 40 45 50 55 60 10% 1 30 1 00 080 070 060 050 040 20% 240 200 1 80 1 70 1 50 140 1 20 30% 350 300 270 250 220 1 90 1 60 40% 450 400 350 310 280 250 210 50% 560 500 430 390 350 310 270 60% 700 600 530 480 430 390 340 70% 810 700 1 600 5 50 500 450 390 80% 940 800 700 640 570 520 460 90% 1070 900 790 720 560 590 520 100% 1200 1000 880 810 730 660 580 S \4685\0003\20-Tech\Sto"water\Pond_C\ Wet Detention Pond C As Reference - SA-DA Ratios 2/26/2007 Basin D Wet Detention Pond Calculations NC DENR Retention Requirements Objective design a wet detention basin with the following characteristics a permanent water pool depth between 3- and 6-feet, a surface area that meets TSS removal requirements (values set by NC DENR and included here), a forebay that is approximately 20% of the total pond volume, a temporary water pool sized to detain the initial 1 inch of rainfall runoff, an outlet device that drains the temporary water pool within 2-5 days, and a length -to -width ratio of approximately 3 1 Step 1 Determine the surface area required for 90% TSS removal Post -Development Conditions Total Drainage Area 2083 ACRE Value from CAD Impervious Drainage Area 864 ACRE Value from CAD Impervious Cover 41 48% Impervious Cover -(Impervious Drainage Area)/(Total Drainage Area)'100% Elevation of Permanent Pool Surface 120 FT Value selected by designer Depth of Permanent Pool 50 FT Value selected by designer Elevation of Wet Detention Pond Bottom 70 FT (Bottom Elevation)=(Permanent Pool Surface Elevation) -(Depth of Permanent Pool) Approximate Pond Length 282 FT Value from CAD (flow path through forebay weir) Required SAIDA Ratio for 90% TSS Removal 245 Value from chart Reference "90% TSS Removal Required Permanent Pool Surface Area 22,230 SF Required Surface Area=(Required SA/DA Ratio)*(Total Drainage Area) Provided Permanent Pool Surface Area 22,936 SF Interpolated value from stage -storage calculations _ Step 2 Determine the 1-inch runoff elevation within the wet detention pond Runoff Coefficient Rv 0 423 INIIN Rv=O 05+0 009'(% Impervious) Required 1" Runoff Volume 32 008 CF 1"Runoff Volume=1 inch`Rv'1 foot/12 inch'(Total rlra,nana droal Temporary Pool Elevation 14 75 FT Elevation of the next -highest orifice (above the low - Flow orifice) Treatment Volume 72,467 CF Total volume controlled at the temporary pool elevation (from stage -storage charts) Step 3 Calculate the required forebay volume (18-22% the total pond volume below permanent pool) Total Pond Volume below permanent pool 67,107 CF Value from stage -storage calculations Required Forebav Volume 13,421 CF Forebay Volume=(Total Pond Volume)'20% Provided Forebay Volume Total Pond Volume 20% (Provided ForVo/ume)'100/^ebay Volume)/(Total Step 4 Venfv that time required to drawdown the 1-inch runoff volume is within 2 to 5 days Diameter of Proposed Low -flow Orifice 200 IN Value chosen by designer Weir Elevation of Outlet Structure 1200 FT Value chosen by designer (Total Elevation Head Above Center of Total Elevation Head Above Orifice 267 FT Onfice)=(Temp Pool Elevation) -(Perm Pool Elevation)-(1/2 Orifice Diameter) Average Elevation Head Above Onfice = 12 of Total Average Elevation Head Above Orifice 1 33 FT Elevation Head Above Orifice Cd, Coefficient of Discharge 060 Value chosen by designer Q=Cd'(PQ'((DiameterofOnfice)'(1 11112 0, Flowrate Through Low -Flow Orifice 012 CFS 2`rAvama HeaAll^12 Drawdown Time for 1-inch Runoff 305 DAYS (Drawdown Time)=(1"Runoff Volume)/0'(1 S \46850003UD Tech%Stomr t.nPontl_D% Wet Detentran Pond D xis Post Bean Treatment 1R62007 Wet Detention Pond D Stage -Storage Calculations for Proposed Wet Detention Pond determine the storage capacity and characteristics of the proposed wet detention pond Pond side slope above Permanent Pool 3 1 Slope of Vegetated Shelf 61 Side Slope below planted shelf 31 incremental and cumulative storage of the wet detention pond per contour interval Stage/Storage Above Permanent Pool (Including Forebay) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) 120 22,936 0 0 --Permanent Pool 130 25,331 24134 24,134 140 27,782 26 557 50,690 150 30,290 29 036 79 726 160 32,854 31 572 111,298 Stage/Storage Total Pond (Including Forebay) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 70 7 074 0 0 --Pond Bottom 80 9151 8,113 8,113 90 11,423 10,287 18,400 100 13 859 12,641 31,041 110 17 669 15,764 46 805 120 22,936 20,303 67 107 --Permanent Pool 130 25,331 24,134 91 241 140 27,782 26,557 117 797 150 30 290 29,036 146 833 160 32,854 31,572 178405 Forebay Only (20% of Total Pond) Cumulative Contour Incremental Volume S Contour Area (SF) Volume (CF) (CF) 70 1,315 0 0 -Pond Bottom 80 1 775 1 545 1,545 90 2 289 2,032 3,577 100 2,854 2,572 6 149 110 3472 3,163 9,312 120 4 143 3,807 13,119 -Permanent Pool S\4685\0003\2 Tech\Stonnwater\Pond D\ Wet Detention Pond D As Pond Stage Storage 2l26l2007 Beaver Creek Commons 02149-0003 JAR Coastal Counties SAMA Ratio Reference SA/DA Ratio for TSS Removal Surface Area/Drainage Area for 90% TSS Removal Permanent Pool Depth (ft) 30 35 40 45 50 55 60 1 30 1 00 080 070 060 050 040 240 200 1 80 1 70 1 50 1 40 1 20 N 350 300 270 250 220 1 90 1 60 450 400 350 310 280 250 2 10 560 500 430 390 350 310 270 600/c 700 600 1 530 1 480 430 1 390 1 340 70% 810 7 00 600 550 500 450 390 80% 940 800 700 640 570 520 460 90% 1070 900 790 720 560 590 520 100% 1200 1000 880 810 730 660 580 S \4685\0003\20-Tech\Stormwater\Pond_D\ Wet Detention Pond D As Reference - SA-DA Ratios 2/26/2007 STEVENS STORM SEWER COMPUTATION SHEET Storrs Sewer Computation Sheet PROJECT STEVISTEVENSPARK Revi.ed WSM7 LOCATION C77T(CRV OF SOUTHPORT NC 5inucture Drainage A x C Velod InvM Elav Rim Are. A f e Elev D a = t g E on ~ IIAI IL OIP m % O N IsL dOf C A%G I O d Vf U L. S Wet Pond A fFES 52 CB 57 CB 56 21890 O66 Ofi6 O6W 0395 0395 11 146d 10 5P 326 1083 1417 OW3 1960 30] CO 56 1 FE5 1 55 1 10740 042 1D] O6W 0250 0645 117 759 18 1D 53 596 1407 13W 0010 1840 283 CB 81 CB 76 Sow on or 0600 0132 D132 11T7 155 15 355 289 1531 151d OW3 2110 454 CB 80 CB 79 1 30W 014 1 014 OWO D085 0085 1177 1W 15 355 289 1626 1616 0W3 23W 549 GB 79 CB 78 5630 O20 034 v0W 0119 0204 11 ]] 240 15 355 289 1606 1590 OW3 F. 569 CB 78 CB 77 5600 014 Ode 06W 0085 0289 1177 340 15 355 289 1580 1563 OW3 2240 535 CB 77 CB 76 12980 020 068 0600 0119 0409 11 ]] 481 18 5P 326 1053 1 1514 1 0003 1 2240 53] CB 76 54 286 W 0 29 1 20 FD 0177 D 717 1177 8 44 24 12 42 3 95 15 04 11 4 8 0 003 21 10 d 06 CB 62 EB GB 59 5fi 00 022 022 0600 0132 0132 1177 155 15 355 289 1420 td 03 0003 1630 285 CB 61 CB 60 3260 014 014 06DD 0085 0085 1171 100 15 355 289 1505 1495 0W3 1890 260 CB 60 CB 59 27300 020 034 0600 0119 0204 1177 240 15 355 289 1485 1403 OOW 18W 270 CB 59 CB 53 17050 029 0&5 0600 0177 0513 11 ]] 604 24 1242 395 1393 1342 OW3 1830 237 CB 58 CB 54 59W 022 O22 06W D132 0132 —Ti ]] 155 15 355 289 I436 1418 O003 194D 379 CB 56 CB 53 21890 020 161 06W 0119 0968 1177 1140 W 2253 459 1409 1342 OW3 1940 282 CB 53 iiiFE6 52 10740 030 277 0WD 0181 1662 it 77 1957 36 3663 518 1332 130D 0003 1840 208 Wet Pond A FES 31 CB 51 CB 5O W10 O11 011 0600 0069 OO69 1177 081 15 355 289 1168 1159 DW3 18W 597 CB 50 CB 32 15090 014 026 0600 0085 0154 1177 181 15 355 289 1149 1103 0W3 1820 546 CB 49 GB 42 3310 022 022 0600 0132 0132 11 ]7 155 15 355 289 1093 1083 OW3 194D ]22 CB 48 G8 43 3310 022 022 OWO 0132 0132 1177 155 15 355 289 1187 1178 OW3 1880 568 CB 47 CB 44 3310 022 022 0Soo 0132 0132 11T 155 15 355 289 1246 1236 OW3 1760 389 GB 46 CB 05 34020 032 032 0600 0192 0192 if 77 226 15 355 289 1375 1273 0003 173D 2 W CB 45 CB 44 e970 011 043 0600 0069 0261 1177 307 15 355 289 1263 1236 OW3 174D 352 CB 44 1 CB 43 16120 014 080 0600 0085 0478 117] 562 18 577 326 1226 1178 0003 1760 1 384 CB 43 1 CB 42 28060 020 121 06W 0119 0729 1177 858 24 1242 395 1169 1083 0W3 1880 512 CB 42 CS 33 4450 029 173 O600 0177 1038 1177 1221 24 1242 395 10 ]3 1060 0003 1940 1 657 GB 41 CB 38 3310 022 032 0600 0132 0132 11 ]] 155 15 355 289 1317 130] 0003 1920 478 CB 40 CB 39 4770 032 032 0600 0192 0192 1177 226 15 355 289 1391 1376 DW3 170 244 CB 39 CB 38 19920 032 064 6600 0192 0384 1177 452 18 577 325 1366 1307 D003 1790 274 OB 38 CB 37 2d8W 032 1t8 06W 0192 07M 1177 833 24 1242 1 OW3 1920 423 CSI 37 1 CB 1 36 1 10 032 1 W O6W 0192 09W 1177 1059 24 12 d2 395 1212 1202 0003 2040 628 CBI 36 1 CB 1 35 1 3 00 029 1 179 06W 0172 1072 1177 1262 30 2253 459 1192 1182 OOW 2040 598 CB 35 L. C8 34 4190 011 190 OfiW 0069 1141 11 ]7 1363 30 2253 459 11 ]2 1160 OW3 2050 628 CB CB 33 29920 014 204 O6W —Dogs 1226 11 ]] 1443 W 2253 459 1150 IOW OW3 2040 640 CS 33 CB 32 4330 020 1 397 06W 0119 2382 1177 2B 04 36 3663 518 10W 103] OW3 19W 610 CB 32 CB 31 9DW 013 435 060D 0075 2611 1177 W73 36 3663 518 1027 low UW3 1940 613 Wet Pond A (FES 1 1 CB 30 I CB 1 26 1 3310 022 022 0 00 0132 0132 11T7 155 15 355 289 1215 1205 OW3 1890 550 CB 29 CB 27 3310 022 022 06W 0132 0132 1177 155 15 355 289 1278 1268 0D03 1925 22 4 CBI 28 1 CB 1 27 1 7980 032 032 0600 0192 0192 1177 226 15 355 289 1292 1268 0003 1 1800 1 383 CB 27 CB 26 17750 029 083 OWO 0172 0496 1117 584 24 1242 395 1258 1205 0003 1B25 367 CB 26 CB 25 32070 011 116 OWO OW9 0697 11 77 820 24 1242 395 1195 1099 OW3 1890 495 CBI 25 1 CB 1 24 1 4010 014 130 0600 0D85 0782 11T7 920 24 1242 395 1089 1077 OOW 1820 531 CB 24 CB 23 331D 020 150 O6 0 0119 0901 1177 1060 24 1242 395 1067 1057 0003 1790 523 GB 23 CB 2 3210 008 158 0600 6048 0949 117] 1116 24 1242 395 1047 1037 0003 1790 Sd3 CB 22 CB 18 3310 022 022 0600 0132 0132 117] 155 15 355 289 1239 1229 OOW3 1860 496 CB 21 CB 20 167W 032 032 O6W 0192 0192 1177 226 15 355 289 14W 1359 OW3 1780 246 CB 20 CB 19 48W 029 Ofi1 O6W 0172 0364 1177 029 16 5T/ 326 1349 1334 OW3 1840 341 CB 19 GB 18 31950 011 0]2 0600 0069 0433 1177 509 18 SP 326 1324 1229 OW3 1840 366 CB 16 CB 17 19510 014 108 0 600 Doss 0 650 1177 70 24 1242 395 1219 1160 0003 18 W 441 CB 17 CB 16 42W 020 128 DWO 0119 0769 1177 905 24 1242 395 1150 1137 OW3 1840 490 GB 16 CB 3 =70 004 133 O6W OO26 0795 11T7 936 24 1242 395 1127 1120 OW3 1030 503 CB 15 CB fi 3 DO 056 056 0600 0335 0335 11A 394 19 577 326 1326 1316 0003 18W 404 CB 14 CB 6 95DO 025 025 05M 0152 0 552 1177 179 15 355 289 1345 1316 0003 i8W 330 CB 13 CB 12 fi025 049 049 06W 0293 0293 11 ]] 345 15 355 289 1305 12W 0003 21W 670 00 12 CB 11 13960 048 097 0600 0268 0581 1177 684 24 1242 395 1271 1235 OOW 2100 623 CB 11 CB 5 33 10 016 113 0600 0097 0678 1177 798 24 1242 395 1225 12 55 0003 18W 435 CB 10 CB 5 6610 050 050 0600 0302 0.2 1177 355 19 577 326 1235 1215 0003 20W 615 CB 9 CB 4 3300 021 021 0600 0129 0129 1177 152 15 355 289 1152 1142 00W 1840 563 STORM TABLE» P.,1 of 2 2 6R007121 PM Storrs Sewer Computation Sheet PROJECT STEVf STIV NSPARK Ren..d =6107 LOCATION CfIY( CITY OF SOIJTHPORT NC Stmc ure I I I rama e A x 'C V.1ochv 11 Invert Elev Rim J Afee A U F p LL 1 a >; EL n J 31 J ie; y Ebv E Q U L A At C PxG O If m VI U Lo S CB CB CB CB 8 ] 6 5 CS CB CB CB ] 6 5 4 3300 20258 30420 21146 049 032 016 Ot6 049 O81 178 358 060D Ofi00 Ofi00 D600 D29fi D192 0096 0095 0296 0488 1W1 214D 11 ]] 11 ]] itA 1111 349 5]5 1260 252 15 18 30 36 355 57 2253 3663 289 326 459 51B 1397 13" 1306 1205 1387 1316 1215 1142 0003 0003 0003 0003 1750 1830 1880 1860 228 303 324 355 CB CB 4 3 CB CB 3 2 3770 24470 . 21 0.4 429 537 0 600 0600 9126 0026 2 4M 3221 1177 it ]7 28 25 3791 36 42 36 63 5525 518 570 1132 1110 1120 1037 0 003 0003 18 00 1830 4 08 370 CB 2 FES 1 Se 00 022 71) 0600 01M 4304 11 T1 5066 42 5525 574 1627 low OW3 1800 425 Overflow Wet PondA St Mre FES117 OF 124 JB 123 20811 Va4e from ofbw 2398 30 2402 489 1352 1281 0003 1]50 NA JB 123 JB 122 4W 2398 30 24W OB9 1271 1134 0003 1900 319 JB 122 JB 121 39680 4318 42 5525 574 1124 ID05 0003 19W 426 JB 121 JB 120 396 BD 4318 42 5525 574 995 876 0003 19 D0 555 JB JB JB 12D 119 118A JB JB JB 119 118A 118 13873 11400 9983 4318 4318 6962 di 42 48 5525 5525 7889 574 574 62B 86fi a15 770 825 780 740 D003 0003 0003 1700 1680 1680 484 515 510 JB 118 FES 117 43479 6962 48 7889 628 7W 600 0003 1700 570 Wet Pond Pond B FES 73 CB 74 CB 73 5600 020 020 0600 0119 0119 11 ]] 140 15 355 289 u4z 1425 0003 2180 613 CB CB 74 ]3 CB FE5 ]3 ]3A 21284 4939 220 02 020 0049 0600 0600 0119 017 0119 0296 11 ]7 1177 14D 348 24 24 1242 1242 395 395 1507 1415 1443 1400 DD03 0D03 2180 2180 473 565 Wet Pond FES 63 CBHE 71 5600 020 020 06M 0119 a119 11P 140 15 355 289 1519 1503 0003 2280 CB71A 1.240 025 045 0600 0149 0269 11A 316 15 355 289 1520 14 B9 0003 218. 535 535 CB 64 16500 032 Dn 0600 0192 0461 117] 542 1B 57] 326 1493 1443 0003 2280 638 CB020 CB 63 1ID 00 029 020 126 0600 0600 0119 O1]] 0119 O7A 11 ]7 11 ]] 14D 891 15 24 355 1242 289 395 14 ]9 1433 1443 1400 0003 0003 21 do496 2200 567 Overflow SW cture Wet PondB FES117 OF 137 JB 136 13867 Value fromH ,11. 10 ]5 24 1242 395 1737 1695 0003 2235 NA JB 136 JB 135 21711 1075 24 1242 395 1685 1620 0003 2250 365 JB 135 JB I 134 1 22613 1 1 1 1 110 ]5 1 24 1242 395 161D 1542 0003 2250 440 JB 134 JB 133 24121 1075 24 1242 395 1532 1460 0003 23W 568 JB 133 JB 132 33911 1075 24 1242 395 1450 1348 0003 23 DO 650 JB 132 JB I 130 1 21721 1 1 1075 24 1242 395 133E 1273 0003 2420 882 at Pond Pond (FES 81 CB BB CB 85 3300 029 029 0600 0177 0177 1177 208 15 355 289 1440 1430 0003 2160 595 CB 87 CB 86 3300 014 0085 00115 1177 1D0 15 355 289 1621 1611 OW3 2050 304 CB 86 CB 85 21950 032 0192 02R 1177 326 15 355 289 1601 1535 0003 2050 324 CB 85 CB 84 11210 O11 11a OW9 0522 1177 615 24 1242 395 1525 1491 0003 2160 435 CB B4 CB 83 10530 01a 5 Dfi07 11 ]] 715 24 1242 395 1481 14W 0003 239D 709CB 83 CB 82 330. 020 9 0]2] 117] 855 241242 395 144D 143D D003 2420 780 CB 82 FE9 81 6630 029 0177 0903 1177 1063 24 1242 395 1420 1400 0003 2420 800 Overflow Wet Pond Structure L FES 117 OF JS JB 131 130 129 J8 JB JB 1 130 121) M 1 15050 14600 25010 I lue immH&.fi. 845 1920 1920 18 30 30 1290 2253 2253 730 459 459 1499 1263 1209 1273 1219 113r 0015 0003 ONO 2500 22 DO 22 DO NA 687 741 Wet Pond Pond D FE5106 CB 105 CB 104 T. 020 020 .600 .119 011. 1177 140 15 355 289 1395 1384 OOD3 1760 240 CS 104 CB 95 5570 029 049 0600 017 O2 1177 348 15 355 289 1374 1358 0003 17W 281 CB 103 CB 102 1800 02D 020 0600 0119 0119 it ]] 140 15 355 2B9 1469 14.4 0003 1800 2D5 CB 102 CB 97 0210 029 O49 O600 01]] 0296 1177 348 15 355 289 1454 1441 0003Of00 221OBHCB 97 M40 032 032 0600 1171 226 15 355 289 1458 1441 000300 217CB9fi 1253. O11 093 0600 11 ]] 655 N 1242 395 14311394 000340 209CB95 8660 014 10] 0600 Ml�l 11A 755 24 1242 395 13M 1358 000330 2d6CB94 21 fi0 020 176 06M 11Ti 1244 30 2253 459 13481341 000300 202 93 1 4420 029 206 06D0 11 ]] 1452 30 2253 459 1331 1300 0003 1800 1 219 Overflow Wet Pond Structure (FES 117 OF 125 JB 118A 180 Vetre fromH Oow 2644 24 3208 j 1021 1 817 1 7B0 1 0020 I 2000 NA STORM TABLEJ1a Pape 2 of 2 MWW71 21 PM STEVENS PARK Stormwater Calculations Pre vs. Post Development Conditions (2, 10, 25, & 100 Year Events) Project Name Stevens Park Client Cape Fear Trading Group Project Number 4685-0003 Prepared By Date 2/26/2007 Basin Analysis for PrePost Development Conditions Basin A Drainage area= Wooded (Fair) __T22�'O Grassland (Fair) -�.i, _ 778 0 Sum ll;„$,10001 Curve numbers taken from v*,1 c1VlViC.3 C1V= Area 52 91 acres = 0 083 miz A B C D Sum 75 01,,'- 0 0>., --50 0' _ _ 25 0,; d - ei? .100 Of CN A CN B CN C CN D Weighted CN 98 98 98 98 t" . 0 00S 36 60 73 79 49 69 79 84 Sum 55 33 TR-55 Use 5574 Basin A Drainage area= Land Use % of Basin CN Water/Impervious � 98 (includes pond) Wooded (Good) „� +.,+,50 30 Grassland (Good) Sum 524 F 771100 0 39 Curve numbers taken from 52 91 acres = 0 083 mil B C D Sum �0`0Z ,' 25 01,,t �( .1'00 0`: CN B CN C CN D Weighted CN 98 98 98 ),'-�.4174; 55 70 77 2 09 61 74 80 Sum 69 64 TR-55 Use S k1685\0003\20-Tech\Stormwater\ STEVENS PARK Curve Numbers PHASE 1 As Pre -Post CN PHS1 1 of 4 2/26/2007 Protect Name Stevens Park Client Cape Fear Trading Group Protect Number 4685-0003 Prepared By Date 2/26/2007 Basin Analysis for PrePost Development Conditions Basin B Drainage area= Pre Use % of Basin /Impervious 0 0 ?d (Fair) and (Fair) 66 00 Sum 100 0 Curve numbers taken from v�1vI�KIlVi�CREED Area 19 92 acres = 0 031 miz A B C D Sum 5 0 - 00,.a,�00F, �250 # 'f >10001 'N A CN B CN C CN D Weighted CN 98 98 98 98 "''c0 00 36 60 73 79 49 69 79 84 Sum 54 Ol TR-55 Use Basin B Drainage area= 19 92 acres = 0 031 miz Post rve Number HSG of e % of (includes pond) Wooded (Good) Grassland (Good) 1'�4 Sum , « ^ l0O O7 Curve numbers taken from A B C D Sum 75 0,,,-n O'O';!.* 0 07 ,",2,5 0 _ 21 00-0 CN A CN B CN C CN D Weighted CN 98 98 98 98 `° 22.74� 30 55 70 77 --* 4 41] 39 61 74 80 ° 24 03 Sum -„O 1,8,1 TR-55 Use S \4685\0003\20-Tech\Stormwater\ STEVENS PARK Curve Numbers PHASE 1 As Pre -Post CN PHS1 2 of 4 2/26/2007 Project Name Stevens Park Client Cape Fear Trading Group Project Number 4685-0003 Prepared By Date 2/26/2007 Basin Analysts for PrePost Development Conditions Basin C Drainage area= 1 (Fair) I 1-_- 35 0 nd (Fair) ;�.65 0 Sum?! _100�01 Curve numbers taken from v�McK NI&CREED Area 11 27 acres = 0 018 mil A B C D Sum „75 0" `%0"0:. 0 0'- t5' 25 0 "=r100 0 CN A CN B CN C CN D Weighted CN 98 98 98 98 IT - 0 00 36 60 73 79 e 16=36 49 69 79 84 37 54 Sum 2 53 90 TR-55 Use Basin C Drainage area= 11 27 acres = 0 018 miz pnct Curve Number HSG % of Basin A S C D Sum �k'75'0'f: 0 0� '10 0,'Z?125'0 �(. «100 07 Land Use % of Basin CN A CN B CN C CN D Weighted CN Water/Impervious F" Aa,r„3311 98 98 98 96 .9'32-39 (includes pond) Wooded (Good) (ff--�� 3^0 30 55 70 77 1 25'1 Grassland (Good) �''-64 0' 39 61 74 80 31�50 Sum , N„ „ 10001 Sum - 65'1=443 Curve numbers taken from TR-55 Use S \4685\0003\20-Tech\Stormwater\ STEVENS PARK Curve Numbers PHASE 1 xls Pre -Post CN PHS1 3 of 4 2/26/2007 Project Name Stevens Park Client Cape Fear Trading Group Project Number 4685-0003 Prepared By Date 2/26/2007 Basin Analysis for PrePost Development Conditions Basin D Drainage area= ,$ 1V1`KLLV &CFZGL1L Area 20 83 acres = 0 033 mil Pre Curve Number HSG A B C D Sum % of Basin 't°75 - 0 0 _'" ,, OO,Ota °s25 OA LL1200-0 Land Use % of Basin CN A CN B CN C CND Weighted CN Water/Impervious l 0e:,O 0 98 98 98 98 Y, 4"0 001 Wooded (Fair) 'i , 25'0 36 60 73 79 11 69 Grassland (Fair) 5 0 49 69 79 84 43 31 Sum Sum 55 00 Curve numbers taken from TR-55 Use Basin D Drainage area= 20 83 acres = 0 033 miz Land Use % of Basin Water/Impervious ?"-'t.` 3lt 36°1 (includes pond) Wooded (Good) 4140 Grassland (Good) - z 49 9 Sum ET,an100`0� Curve numbers taken from A B C D Sum 750V,-00r.'�.Q0-`",250«; i ..100Of CN A CN B CN C CN D Weighted CN 98 98 98 96p,, , 35 35J 30 55 70 77 75 85 39 61 74 80 :.' 24 59 Sum 65 78j TR-55 Use S Y4685\0003\20-Tech\Stormwater\ STEVENS PARK Curve Numbers PHASE 1 As Pre -Post CN PHS1 4 of 4 2/26/2007 TR55 Tc Worksheet Hydmflow Hydrogmphs by Intelisolve Hyd No 1 DA POND A PRE Description A B C Totals Sheet Flow Manning's n-value = 0 011 0 011 0 011 Flow length (ft) = 3000 00 00 Two-year 24-hr preclp (in) = 410 000 000 Land slope (%) = 013 000 000 Travel Time (min) = 765 + 000 + 000 = 765 Shallow Concentrated Flow Flow length (ft) = 45700 000 000 Watercourse slope (%) = 013 000 000 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 059 000 000 Travel Time (min) = 1299 + 000 + 000 = 1299 Channel Flow X sectional flow area (sqft) = 000 000 000 Wetted perimeter (ft) = 000 000 000 Channel slope (%) = 000 000 000 Manning's n-value = 0 015 0 015 0 015 Velocity (ft/s) = 000 000 000 Flow length (ft) = 00 00 00 Travel Time (min) = 000 + 000 + 000 = 000 Total Travel Time, Tc 20 64 min TR55 Tc Worksheet Hyd. No. 2 DA POND A POST Description Sheet Flow Manning's n-value Flow length (ft) Two-year 24-hr precip (In) Land slope (%) Travel Time (min) Shallow Concentrated Flow Flow length (ft) Watercourse slope (%) Surface description Average velocity (ft/s) Travel Time (min) Channel Flow X sectional flow area (sqft) Wetted perimeter (ft) Channel slope (%) Manning's n-value Velocity (fUs) Flow length (ft) Travel Time (min) Total Travel Time, Tc Hydraflow Hydrogmphs by Intelisolve A B C Totals = 0 011 0 011 0 011 = 3000 00 00 = 410 000 000 = 014 000 000 = 743 + 000 + 000 = 743 = 45700 000 000 = 014 000 000 = Paved Paved Paved = 077 000 000 = 994 + 000 + 000 = 994 = 000 000 0 00 = 000 000 000 = 000 000 000 = 0015 0015 0015 = 000 000 000 = 00 00 00 = 000 + 000 + 000 = 000 17 37 min Kirpich Method (drainage areas less 20 acres) Tc = Tt = ((L^3/H)^0 385)/128 Pond B Pre Height of most remote point Low point of interest Hydraulic Length Slope Tc Pond C Pre Height of most remote point Low point of interest Hydraulic Length Slope Tc Pond B Post 242 Height of most remote point 254 22 Low point of interest 22 497 Hydraulic Length 497 0004427 Slope 0006841 75 Tc 63 Pond C Post 232 Height of most remote point 242 20 Low point of interest 20 773 Hydraulic Length 773 000414 Slope 0005433 108 Tc 97 S \4685\0003\20-Tech\Sto=water\Pond_B\ Kirpich Method (B & C) xis Sheetl 2/26/2007 TR55 Tc Worksheet Hydmflow Hydrographs by Intelisolve Hyd No. 10 DA POND D PRE Description A B C Totals Sheet Flow Manning's n-value = 0 011 0 011 0 011 Flow length (ft) = 3000 00 00 Two-year 24-hr preclp (In) = 410 000 000 Land slope (%) = 026 000 000 Travel Time (min) = 585 + 000 + 000 = 585 Shallow Concentrated Flow Flow length (ft) = 78700 000 000 Watercourse slope (%) = 026 000 000 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 0 82 0 00 0 00 Travel Time (min) = 1602 + 000 + 000 = 1602 Channel Flow X sectional flow area (sqft) = 0 00 000 000 Wetted perimeter (ft) = 000 000 000 Channel slope (%) = 000 000 0 00 Manning's n-value = 0 015 0 015 0 015 Velocity (ft/s) = 000 000 000 Flow length (ft) = 00 00 00 Travel Time (min) = 000 + 000 + 000 = 000 Total Travel Time, Tc 21 87 min TR55 Tc Worksheet Hydmflm Hydmgmphs by Intelisolve Hyd. No. 11 DA POND D POST Description A B C Totals Sheet Flow Manning's n-value = 0 011 0 011 0 011 Flow length (ft) = 3000 00 00 Two-year 24-hr precip (in) = 410 000 000 Land slope (%) = 021 000 000 Travel Time (min) = 638 + 000 + 000 = 638 Shallow Concentrated Flow Flow length (ft) = 78700 000 000 Watercourse slope (%) = 029 000 000 Surface description = Paved Paved Paved Average velocity (ft/s) = 1 09 000 000 Travel Time (min) = 1204 + 000 + 000 = 1204 Channel Flow X sectional flow area (sqft) = 000 000 000 Wetted perimeter (ft) = 000 000 000 Channel slope (%) = 000 000 000 Manning's n-value = 0 015 0 015 0 015 Velocity (ft/s) = 000 000 000 Flow length (ft) = 00 00 00 Travel Time (min) = 000 + 000 + 000 = 000 Total Travel Time, Tc 18 42 min Hydrograph Return Period Recap Hyd Hydrograph Inflow Peak Outflow (cis) Hydrograph No type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 SCS Runoff 345 -- 1954 3259 6283 DA POND A PRE 2 SCS Runoff 2576 6816 9249 14039 DA POND A POST 3 Reservoir 2 027 11 13 1758 2398 A Wet Detention Pond 4 SCS Runoff 1 10 916 1515 2808 DA POND B PRE 5 SCS Runoff 432 1674 2423 4031 DA POND B POST 6 Reservoir 5 010 224 496 1075 B Wet Detention Pond 7 SCS Runoff 062 -- -- 433 741 1397 DA POND C PRE 6 SCS Runoff 338 1072 1537 2476 DA POND C POST 9 Reservoir 8 007 335 570 845 C Wet Detention Pond 10 SCS Runoff 1 63 922 1538 2965 DA POND D PRE 11 SCS Runoff -- 838 2540 3594 -- 5713 DA POND D POST 12 Reservoir 11 --- 014 --- -- 632 1036 2644 D Wet Detention Pond Proj file pre post - SP phase 1 gpw Monday, Feb 26 2007, 3 52 PM Hydraflow Hydrographs by Intelisolve Hydrograph Summary Report Hyd No Hydrograph type (origin) Peak flow (cfs) Time interval (min) Timeto peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (tuft) Hydrograph description 1 SCS Runoff 345 6 228 42,120 — DA POND A PRE 2 SCS Runoff 2576 6 156 137,515 — DA POND A POST 3 Reservoir 027 6 384 129,603 2 1543 134,547 A Wet Detention Pond 4 SCS Runoff 110 3 246 13 147 -- DA POND B PRE 5 SCS Runoff 432 3 153 27 107 — DA POND B POST 6 Reservoir 010 3 372 25,353 5 1898 26 159 B Wet Detention Pond 7 SCS Runoff 062 6 252 7,422 — -- DA POND C PRE 8 SCS Runoff 338 6 156 20 961 — -- DA POND C POST 9 Reservoir 007 6 378 20 858 8 1764 20 151 C Wet Detention Pond 10 SCS Runoff 1 63 6 228 19 878 — -- DA POND D PRE 11 SCS Runoff 838 6 156 49 812 -- -- DA POND D POST 12 Reservoir 014 6 384 49,637 11 1391 48 261 D Wet Detention Pond pre post - SP phase 1 gpw Return Period 2 Year Monday, Feb 26 2007, 3 52 PM Hydraflow Hydrographs by Intelisolve Hydrograph Summary Report Hyd No Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (tuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (tuft) Hydrograph description 1 SCS Runoff 1954 6 168 153 774 — DA POND A PRE 2 SCS Runoff 68 16 6 150 318 028 — DA POND A POST 3 Reservoir 11 13 6 360 299,964 2 1672 262,804 A Wet Detention Pond 4 SCS Runoff 9 16 3 153 50 712 — DA POND B PRE 5 SCS Runoff 1674 3 150 78,089 — DA POND B POST 6 Reservoir 224 3 363 64,921 5 2061 73 901 B Wet Detention Pond 7 SCS Runoff 433 6 156 28 691 — -- DA POND C PRE 8 SCS Runoff 1072 6 150 54,168 — DA POND C POST 9 Reservoir 335 6 222 54,065 8 1815 27,059 C Wet Detention Pond 10 SCS Runoff 922 6 168 72,571 — DA POND D PRE 11 SCS Runoff 2540 6 150 125,736 — DA POND D POST 12 Reservoir 632 6 270 125,287 11 1499 79 304 D Wet Detention Pond pre post - SP phase 1 gpw Return Period 10 Year Monday, Feb 26 2007, 3 52 PM Hydraflow Hydrographs by Intelisolve Hydrograph Summary Report Hyd No Hydrograph type (origin) Peak flow (CIS) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 SCS Runoff 32 59 6 162 225,701 — DA POND A PRE 2 SCS Runoff 9249 6 150 418 138 — DA POND A POST 3 Reservoir 1758 6 282 400 037 2 1685 275,576 A Wet Detention Pond 4 SCS Runoff 15 15 3 150 75,065 — DA POND B PRE 5 SCS Runoff 2423 3 147 108,653 — -- DA POND B POST 6 Reservoir 496 3 294 95,445 5 2070 76,594 B Wet Detention Pond 7 SCS Runoff 741 6 156 42,469 — DA POND C PRE 8 SCS Runoff 1537 6 150 73 306 — -- DA POND C POST 9 Reservoir 570 6 186 73 203 8 1823 28,226 C Wet Detention Pond 10 SCS Runoff 1538 6 162 106 516 — DA POND D PRE 11 SCS Runoff 3594 6 150 169 173 -- -- DA POND D POST 12 Reservoir 1036 6 216 168 724 11 1508 82,263 D Wet Detention Pond pre post - SP phase 1 gpw Return Period 25 Year Monday, Feb 26 2007, 3 52 PM Hydraflow Hydrographs by Intelisolve Hydrograph Summary Report Hyd No Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 SCS Runoff 6283 6 162 378 926 — DA POND A PRE 2 SCS Runoff 14039 6 150 615 734 — DA POND A POST 3 Reservoir 2398 6 282 597,472 2 1750 342 696 A Wet Detention Pond 4 SCS Runoff 2808 3 150 127,633 — DA POND B PRE 5 SCS Runoff 4031 3 147 171 518 — DA POND B POST 6 Reservoir 1075 3 207 158,291 5 20 84 80,849 B Wet Detention Pond 7 SCS Runoff 1397 6 156 72,194 -- DA POND C PRE 8 SCS Runoff 2476 6 150 111,917 -- DA POND C POST 9 Reservoir 845 6 186 111 814 8 1893 38 555 C Wet Detention Pond 10 SCS Runoff 2965 6 162 178 828 — DA POND D PRE 11 SCS Runoff 57 13 6 150 256,363 — DA POND D POST 12 Reservoir 2644 6 168 255,913 11 1537 91,508 D Wet Detention Pond pre post - SP phase 1 gpw Return Period 100 Year Monday, Feb 26 2007, 3 52 PM Hydraflow Hydrographs by Intelisolve Pond Report Hydraflow Hydrographs by Intelisolve Monday Feb 26 2007 3 52 PM Pond No 1 - POND A Pond Data Pond storage is based on known contour areas Average end area method used Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr Storage (cuft) Total storage (cult) 000 1400 91,349 0 0 100 1500 94,989 93169 93,169 200 1600 98,683 96,836 190 005 300 1700 102 432 100 558 290 563 4 00 1800 106 234 104 333 394,896 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 3000 300 000 000 Crest Len (ft) = 16 00 000 000 000 Span (in) = 3000 300 000 000 Crest El (ft) = 16 38 000 000 000 No Barrels = 1 1 0 0 Weir Coeff = 333 333 000 000 Invert El (ft) = 1352 1400 000 000 Weir Type = Riser — — — Length (ft) = 218920 000 000 000 Multi -Stage = Yes No No No Slope (%) = 030 000 000 000 N-Value = 013 013 000 000 Dint Coeff = 060 060 000 000 Multi -Stage = n/a Yes No No E>fiiltrabon = 0 000 in/hr (Contour) Tailwater Elev = 0 00 ft Stage (ft) 400 300 200 1 00 000 000 200 — Total Q 400 600 Note CulveNOnFoe outflows have been analyzed under Inlet and outlet control Stage / Discharge Stage (ft) 400 300 200 1 00 I I I I i I I I I I 000 800 1000 1200 1400 1600 1800 2000 2200 2400 2600 Discharge (cfs) Pond Report HydraFlow Hydrographs by Intelisolve Monday Feb 26 2007 3 52 PM Pond No 2 - POND B Pond Data Pond storage is based on known contour areas Average end area method used Stage / Storage Table Stage (it) Elevation (it) Contour area (sqft) Incr Storage (cuft) Total storage (cult) 000 1800 25,726 0 0 1 00 1900 27 593 26 660 26 660 200 2000 29 517 28 555 55,215 300 21 00 31 497 30 507 85,722 400 2200 32 516 32 007 117,728 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 2400 200 000 000 Crest Len (ft) = 16 00 000 000 000 Span (in) = 2400 200 000 000 Crest El (ft) = 20 50 000 000 000 No Barrels = 1 1 0 0 Weir Coeff = 333 333 000 333 Invert El (ft) = 1737 1800 000 000 Weir Type = Riser — — — Length (ft) = 137950 000 000 000 Multi -Stage = Yes No No No Slope I%) = 030 Goo 000 000 N-Value = 013 013 000 000 Onf Coeff = 060 060 000 000 Multi -Stage = n/a Yes No No Exfiltration = 0 000 In/hr (Contour) Tailwater Elev = 0 00 it Stage (ft) 400 3 00 200 1 00 000 Note CulvertlOnfice out to have been analned under mlel and oullet control Stage / Discharge Stage (it) 400 300 200 1 00 000 000 200 400 600 800 1000 1200 1400 1600 Discharge (cfs) — Total Q Pond Report Hydraflow Hydrographs by Intelisolve Monday, Feb 26 2007 3 52 PM Pond No 3 - POND C Pond Data Pond storage Is based on known contour areas Average end area method used Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr Storage (cuft) Total storage (cuft) 000 1600 10 949 0 0 1 00 1700 12,404 11,677 11,677 200 1800 13,915 13 160 24 836 300 1900 15 483 14 699 39 535 400 2000 17 108 16 296 55 831 Culvert / Orifice Structures [A] [gl [C] [D] Rise (in) = 1800 1 50 000 000 Span (in) = 1800 1 50 000 000 No Barrels = 1 1 0 0 Invert El (ft) = 1499 1600 000 000 Length (ft) = 54660 000 000 000 Slope (%) = 030 000 000 000 N-Value = 013 013 000 013 Orif Coeff = 060 060 000 060 Multi -Stage = n/a Yes No No Stage (ft) 400 300 200 1 00 000 000 Weir Structures [A] [131 [C] [D] Crest Len (ft) = 1600 000 000 000 Crest El (ft) = 18 00 000 000 000 Weir Coeff = 333 333 000 000 Weir Type = Riser — — — Multi -Stage = Yes No No No Exfiltrabon = 0 000 In/hr (Contour) Tailwater Elev = 0 00 ft Note CulvertiOnfice out lo+vs have been analyzed under inlet and outlet control Stage / Discharge 1 00 200 300 400 500 600 700 800 Total 0 Stage (ft) 400 300 200 100 1 1 000 900 1000 Discharge (cis) Pond Report Hydraflow Hydrographs by Intellsolve Monday Feb 26 20D7, 3 52 PM Pond No 4 - POND D Pond Data Pond storage Is based on known contour areas Average end area method used Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr Storage (cuft) Total storage (cuft) 000 1200 22,936 0 0 1 00 1300 25 331 24 134 24,134 200 1400 27 782 26 557 50,690 300 1500 30,290 29,036 79,726 400 1600 32 854 31 572 111,298 Culvert / Orifice Structures [A] [B] [C] [D] Rise (in) = 2400 200 000 000 Span (in) = 2400 200 000 000 No Barrels = 1 1 0 0 Invert El (ft) = 8 17 1200 000 000 Length (ft) = 1807 000 000 000 Slope (%) = 200 000 000 000 N-Value = 013 013 000 000 Drif Coeff = 060 060 000 000 Multi -Stage = n/a Yes No No Stage (ft) 400 300 200 1 00 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 16 00 000 000 000 Crest El (ft) = 14 75 000 000 000 Weir Coeff = 333 333 000 000 Weir Type = Riser — — — MultiStage = Yes No No No Exfiltration = 0 000 in/hr (Contour) Tallwater Elev = 0 00 ft Note CulveNOrdioe ouMlows have been analyzed under inlet and outlet control Stage / Discharge 400 800 1200 1600 2000 2400 2800 Total Q Stage (ft) 400 300 200 1 00 l 000 3200 3600 4000 Discharge (ds) STEVENS PARK 2 Year Event Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Feb 26 2007, 3 52 PM Hyd. No. 1 DA POND A PRE Hydrograph type = SCS Runoff Peak discharge = 3 45 cfs Storm frequency = 2 yrs Time Interval = 6 min Drainage area = 52 910 ac Curve number = 55 Basin Slope = 0 0 % Hydraulic length = Oft Tc method = TR55 Time of conc (Tc) = 20 60 min Total precip = 3 09 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Q (cfs) 400 300 200 1 00 DA POND A PRE Hyd No 1 -- 2 Yr Hydrograph Volume = 42 120 cult Q (cfs) 400 300 200 1 00 000 1 1 1 1 1 1 ' ' ' 000 00 10 20 30 40 50 60 70 Time (hrs) — Hyd No 1 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday Feb 26 2007, 3 52 PM Hyd. No. 2 DA POND A POST Hydrograph type = SCS Runoff Peak discharge = 25 76 cfs Storm frequency = 2 yrs Time Interval = 6 min Drainage area = 52 910 ac Curve number = 70 Basin Slope = 0 0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc (Tc) = 17 40 min Total preclp = 3 09 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Q (cfs) 2800 2400 2000 1600 1200 800 400 000 00 10 20 — Hyd No 2 DA POND A• POST Hyd No 2 — 2 Yr 30 40 50 Hydrograph Volume = 137,515 cuff Q (cfs) 2800 2400 2000 1600 1200 800 400 000 60 70 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday Feb 26 2007 3 52 PM Hyd. No. 3 A Wet Detention Pond Hydrograph type = Reservoir Peak discharge = 0 27 cfs Storm frequency = 2 yrs Time Interval = 6 min Inflow hyd No = 2 Max Elevation = 15 43 ft Reservoir name = POND A Max Storage = 134,547 cuft Storage Indication method used Hydrograph Volume = 129 603 cult A Wet Detention Pond 0 (cfs) Hyd No 3 — 2 Yr Q (cfs) 2800 2800 2400 2400 2000 2000 1600 1600 1200 1200 800 800 400 400 000-L I I I — - 000 0 29 58 87 116 145 174 203 232 261 290 Time (hrs) — Hyd No 3 — Hyd No 2 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday Feb 26 2007, 3 52 PM Hyd. No. 4 DA POND B PRE Hydrograph type = SCS Runoff Peak discharge = 1 10 cfs Storm frequency = 2 yrs Time Interval = 3 min Drainage area = 19 920 ac Curve number = 54 Basin Slope = 0 4 % Hydraulic length = 497 ft Tc method = KIRPICH Time of conc (Tc) = 7 49 min Total precip = 3 09 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Q (cfs) 200 1 00 DA POND B PRE Hyd No 4 -- 2 Yr 000 1 ' 00 05 10 15 20 25 30 — Hyd No 4 Hydrograph Volume = 13,147 cuft Q (cfs) 200 1 00 I I ' ' ' ' ` ' 000 35 40 45 50 55 60 65 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Inteltsolve Hyd. No. 5 DA POND B POST Hydrograph type = SCS Runoff Storm frequency = 2 yrs Drainage area = 19 920 ac Basin Slope = 0 7 % Tc method = KIRPICH Total precip = 3 09 in Storm duration = 6 hrs Q (cfs) 500 400 300 200 1 00 DA POND B POST Hyd No 5 — 2 Yr Monday Feb 26 2007, 3 52 PM Peak discharge = 4 32 cfs Time interval = 3 min Curve number = 61 Hydraulic length = 497 ft Time of conc (Tc) = 6 34 min Distribution = SCS 6-Hr Shape factor = 484 Hydrograph Volume = 27,107 cult Q (cfs) 500 400 300 200 1 00 000 I 1 I I j I I I I I I I----'- 000 00 05 10 15 20 25 30 35 40 45 50 55 60 65 Time (hrs) — Hyd No 5 Hydrograph Plot HydraFlow Hydrographs by Intelisolve Monday Feb 26 2007 3 52 PM Hyd. No. 6 B Wet Detention Pond Hydrograph type = Reservoir Peak discharge = 0 10 cfs Storm frequency = 2 yrs Time Interval = 3 min Inflow hyd No = 5 Max Elevation = 18 98 ft Reservoir name = POND B Max Storage = 26,159 cuft Storage Indication method used B. Wet Detention Pond Hydrograph Volume = 25,353 cult Q (cfs) Hyd No 6 -- 2 Yr Q (cfs) 500 500 400 400 300 300 200 200 1 00 1 00 000 000 0 15 29 44 58 73 87 102 116 131 145 Time (hrs) — Hyd No 6 — Hyd No 5 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Feb 26 2007, 3 52 PM Hyd. No. 7 DA POND C PRE Hydrograph type = SCS Runoff Peak discharge = 0 62 cfs Storm frequency = 2 yrs Time Interval = 6 min Drainage area = 11 270 ac Curve number = 54 Basin Slope = 0 4 % Hydraulic length = 773 ft Tc method = KIRPICH Time of conc (Tc) = 10 80 min Total precip = 3 09 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Q (cfs) 1 00 0 90 080 070 060 050 040 030 020 0 10 - — 000 DA POND C PRE Hyd No 7 — 2 Yr 0 Hydrograph Volume = 7,422 cuft Q (cfs) 1 00 090 0 80 070 060 050 040 030 020 0 10 000 00 10 20 30 40 50 60 70 Time (hrs) — Hyd No 7 Hydrograph Plot HydraFlow Hydrographs by Intelisolve Monday Feb 26 2007, 3 52 PM Hyd. No 8 DA POND C POST Hydrograph type = SCS Runoff Peak discharge = 3 38 cfs Storm frequency = 2 yrs Time Interval = 6 min Drainage area = 11 270 ac Curve number = 65 Basin Slope = 0 5 % Hydraulic length = 773 ft Tc method = KIRPICH Time of conc (Tc) = 9 73 min Total precip = 3 09 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Q (cfs) 400 300 200 1 00 rTU7 DA POND C• POST Hyd No 8 — 2 Yr Hydrograph Volume = 20,961 cult Q (cfs) 400 300 1 00 00 10 20 30 40 50 60 70 Time (hrs) — Hyd No 8 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Feb 26 2007, 3 52 PM Hyd. No. 9 C Wet Detention Pond Hydrograph type = Reservoir Peak discharge = 0 07 cfs Storm frequency = 2 yrs Time Interval = 6 min Inflow hyd No = 8 Max Elevation = 17 64 ft Reservoir name = POND C Max Storage = 20,151 cuft Storage Indication method used C Wet Detention Pond Hydrograph Volume = 20,858 cult Q (cfs) Hyd No 9 -- 2 Yr Q (cfs) 400 400 300 300 200 200 1 00 1 00 000 000 0 20 40 60 80 100 120 140 160 180 200 Time (hrs) — Hyd No 9 — Hyd No 8 Hydrograph Plot Hydraflow Hydrographs by Inteltsolve Monday Feb 26 2007, 3 52 PM Hyd. No. 10 DA POND D PRE Hydrograph type = SCS Runoff Peak discharge = 1 63 cfs Storm frequency = 2 yrs Time Interval = 6 min Drainage area = 24 970 ac Curve number = 55 Basin Slope = 0 0 % Hydraulic length = Oft Tc method = TR55 Time of conc (Tc) = 21 87 min Total precip = 3 09 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Q (cfs) 200 1 00 DA POND D PRE Hyd No 10 -- 2 Yr Hydrograph Volume = 19 878 cult Q (cfs) 200 1 00 00 10 20 30 40 50 60 70 Time (hrs) — Hyd No 10 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Feb 26 2007 3 52 PM Hyd. No. 11 DA POND D POST Hydrograph type = SCS Runoff Peak discharge = 8 38 cfs Storm frequency = 2 yrs Time Interval = 6 min Drainage area = 24 970 ac Curve number = 66 Basin Slope = 0 0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc (Tc) = 18 40 min Total precip = 3 09 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Q (cfs) 1000 Um [:Y9IH 400 r e� 000 ' 00 10 — Hyd No 11 Hydrograph Volume = 49 812 cult DA POND D POST Hyd No 11 — 2 Yr 20 30 40 50 60 Q (cfs) 1000 MI M 400 200 1 000 70 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday Feb 26 2007, 3 52 PM Hyd. No. 12 D Wet Detention Pond Hydrograph type = Reservoir Peak discharge = 0 14 cfs Storm frequency = 2 yrs Time Interval = 6 min Inflow hyd No = 11 Max Elevation = 13 91 ft Reservoir name = POND D Max Storage = 48,261 cuft Storage Indication method used D Wet Detention Pond Hydrograph Volume = 49 637 cult Q (cfs) Hyd No 12 — 2 Yr Q (cfs) 1000 1000 1 8 00 800 6 00 600 400 400 200 200 I 000 000 0 28 56 84 112 140 168 196 224 252 280 Time (hrs) — Hyd No 12 — Hyd No 11 STEVENS 10 Year Event Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday Feb 26 2007 3 52 PM Hyd. No. 1 DA POND A PRE Hydrograph type = SCS Runoff Peak discharge = 19 54 cfs Storm frequency = 10 yrs Time Interval = 6 min Drainage area = 52 910 ac Curve number = 55 Basin Slope = 0 0 % Hydraulic length = Oft Tc method = TR55 Time of conc (Tc) = 20 60 min Total precip = 4 63 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Q (cfs) 21 00 1800 1500 1200 900 600 300 000 00 10 20 — Hyd No 1 DA POND A PRE Hyd No 1 -- 10 Yr 30 40 50 Hydrograph Volume = 153,774 cull Q (cfs) 21 00 1800 1500 1200 900 600 300 000 60 70 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday Feb 26 2007, 3 52 PM Hyd No. 2 DA POND A POST Hydrograph type = SCS Runoff Peak discharge = 68 16 cfs Storm frequency = 10 yrs Time Interval = 6 min Drainage area = 52 910 ac Curve number = 70 Basin Slope = 0 0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc (Tc) = 17 40 min Total precip = 4 63 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Q (cfs) 7000 6000 5000 4000 3000 2000 1000 { 000 00 10 — Hyd No 2 DA POND A POST Hyd No 2 — 10 Yr Hydrograph Volume = 318 028 cult Q (cfs) 7000 6000 5000 4000 3000 2000 1000 000 20 30 40 50 60 70 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday Feb 26 2007 3 52 PM Hyd. No. 3 A Wet Detention Pond Hydrograph type = Reservoir Peak discharge = 11 13 cfs Storm frequency = 10 yrs Time Interval = 6 min Inflow hyd No = 2 Max Elevation = 16 72 ft Reservoir name = POND A Max Storage = 262,804 cuft Storage Indication method used A Wet Detention Pond Hydrograph Volume = 299,964 cuft Q (cfs) Hyd No 3 -- 10 Yr Q (cfs) 7000 — - - 7000 6000 6000 _ I 5000 5000 40 00 4000 3000 3000 2000 2000 1000 1000 0 00 000 0 24 48 72 96 120 144 168 192 216 240 264 Time (hrs) — Hyd No 3 — Hyd No 2 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Feb 26 2007 3 52 PM Hyd. No. 4 DA POND B PRE Hydrograph type = SCS Runoff Peak discharge = 9 16 cfs Storm frequency = 10 yrs Time Interval = 3 min Drainage area = 19 920 ac Curve number = 54 Basin Slope = 0 4 % Hydraulic length = 497 ft Tc method = KIRPICH Time of conc (Tc) = 7 49 min Total precip = 4 63 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Q (cfs) 1000 : 11 L. 11 400 200 bird 6T� DA POND B PRE Hyd No 4 — 10 Yr Hydrograph Volume = 50 712 cult Q (cfs) 1000 M . WI 400 200 <IIQI] 00 05 10 15 20 25 30 35 40 45 50 55 60 65 Time (hrs) — Hyd No 4 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Feb 26 2007, 3 52 PM Hyd. No. 5 DA POND B POST Hydrograph type = SCS Runoff Peak discharge = 16 74 cfs Storm frequency = 10 yrs Time Interval = 3 min Drainage area = 19 920 ac Curve number = 61 Basin Slope = 0 7 % Hydraulic length = 497 ft Tc method = KIRPICH Time of conc (Tc) = 6 34 min Total precip = 4 63 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Hydrograph Volume = 78 089 cult DA POND B POST Q (cfs) Q (cfs) Hyd No 5 -- 10 Yr 1800 1500 1200 900 600 300 000 1800 1500 1200 900 600 300 000 00 05 10 15 20 25 30 35 40 45 50 55 60 65 Time (hrs) — Hyd No 5 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Feb 26 2007 3 52 PM Hyd. No. 6 B Wet Detention Pond Hydrograph type = Reservoir Peak discharge = 2 24 cfs Storm frequency = 10 yrs Time Interval = 3 min Inflow hyd No = 5 Max Elevation = 20 61 ft Reservoir name = POND B Max Storage = 73,901 cuft Storage Indication method used B Wet Detention Pond Q (cfs) Hyd No 6 — 10 Yr 1800 1500 1200 •M rim 300 Hydrograph Volume = 64 921 cult Q (cfs) 1800 1500 1200 . W 300 WiIlIe] 0 15 29 44 58 73 87 102 116 131 145 Time (hrs) — Hyd No 6 — Hyd No 5 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Feb 26 2007, 3 52 PM Hyd. No. 7 DA POND C PRE Hydrograph type = SCS Runoff Peak discharge = 4 33 cfs Storm frequency = 10 yrs Time Interval = 6 min Drainage area = 11 270 ac Curve number = 54 Basin Slope = 0 4 % Hydraulic length = 773 ft Tc method = KIRPICH Time of conc (Tc) = 10 80 min Total precip = 4 63 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Q (cfs) 500 400 300 200 1 00 DA POND C. PRE Hyd No 7 -- 10 Yr Hydrograph Volume = 28,691 cuft Q (cfs) 5 00 4 3 2 1 M1111111111 IM1111111111 IM1111111111 1 11 1 1ill w� 10 Hyd No 7 20 30 40 50 a 70 Time (hrs) Hydrograph Plot HydraBow Hydrographs by Intelisolve Monday Feb 26 2007, 3 52 PM Hyd. No. 8 DA POND C POST Hydrograph type = SCS Runoff Peak discharge = 10 72 cfs Storm frequency = 10 yrs Time interval = 6 min Drainage area = 11 270 ac Curve number = 65 Basin Slope = 0 5 % Hydraulic length = 773 ft Tc method = KIRPICH Time of conc (Tc) = 9 73 min Total precip = 4 63 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Q (cfs) 12 00 1000 800 600 400 200 000 00 10 — Hyd No 8 DA POND C POST Hyd No 8 -- 10 Yr Hydrograph Volume = 54 168 cult Q (cfs) 1200 1000 800 600 400 200 000 20 30 40 50 60 70 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Feb 26 2007, 3 52 PM Hyd. No. 9 C Wet Detention Pond Hydrograph type = Reservoir Peak discharge = 3 35 cfs Storm frequency = 10 yrs Time Interval = 6 min Inflow hyd No = 8 Max Elevation = 18 15 ft Reservoir name = POND C Max Storage = 27,059 cuft Storage Indication method used C Wet Detention Pond Hydrograph Volume = 54,065 cult Q (cfs Q (cfs) ) Hyd No 9 -- 10 Yr 1200 1200 1000 10 00 800 800 6 00 600 400 400 200 200 000 000 0 10 20 30 40 50 60 70 80 90 100 110 Time (hrs) — Hyd No 9 — Hyd No 8 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday Feb 26 2007, 3 52 PM Hyd. No. 10 DA POND D PRE Hydrograph type = SCS Runoff Peak discharge = 9 22 cfs Storm frequency = 10 yrs Time Interval = 6 min Drainage area = 24 970 ac Curve number = 55 Basin Slope = 0 0 % Hydraulic length = Oft Tc method = TR55 Time of conc (Tc) = 21 87 min Total precip = 4 63 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Q (cfs) 1000 400 200 DA POND D PRE Hyd No 10 — 10 Yr Hydrograph Volume = 72 571 cult Q (cfs) 1000 200 own 00 10 20 30 40 50 60 70 Time (hrs) — Hyd No 10 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Feb 26 2007, 3 52 PM Hyd. No. 11 DA POND D POST Hydrograph type = SCS Runoff Peak discharge = 25 40 cfs Storm frequency = 10 yrs Time interval = 6 min Drainage area = 24 970 ac Curve number = 66 Basin Slope = 0 0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc (Tc) = 18 40 min Total precip = 4 63 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Hydrograph Volume = 125,736 cuft DA POND D POST Q (cfs) Hyd No 11 — 10 Yr 2800 2400 2000 1600 1200 i:IltI�l 400 000 00 10 20 30 40 50 60 — Hyd No 11 Q (cfs) 2800 2400 2000 1600 1200 800 400 000 70 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Feb 26 2007, 3 52 PM Hyd. No. 12 D Wet Detention Pond Hydrograph type = Reservoir Peak discharge = 6 32 cfs Storm frequency = 10 yrs Time Interval = 6 min Inflow hyd No = 11 Max Elevation = 14 99 ft Reservoir name = POND D Max Storage = 79,304 cuft Storage Indication method used D Wet Detention Pond Hydrograph Volume = 125 287 cult Q (cfs) Hyd No 12 - 10 Yr Q (cfs) 2800 2800 2400 2400 2000 2000 1600 - -- - 1600 1200 1200 800 800 1 400 400 000 000 0 15 30 45 60 75 90 105 120 135 150 Time (hrs) — Hyd No 12 — Hyd No 11 STEVENS 25 Year Event Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday Feb 26 2007 3 52 PM Hyd. No. 1 DA POND A PRE Hydrograph type = SCS Runoff Peak discharge = 32 59 cfs Storm frequency = 25 yrs Time Interval = 6 min Drainage area = 52 910 ac Curve number = 55 Basin Slope = 0 0 % Hydraulic length = Oft Tc method = TR55 Time of conc (Tc) = 20 60 min Total precip = 5 38 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Q (cfs) 3500 3000 2500 2000 1500 1000 500 000 00 10 — Hyd No 1 DA POND A PRE Hyd No 1 -- 25 Yr 20 30 40 50 Hydrograph Volume = 225 701 cult Q (cfs) 3500 3000 2500 2000 1500 1000 500 000 60 70 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday Feb 26 2007, 3 52 PM Hyd. No. 2 DA POND A POST Hydrograph type = SCS Runoff Peak discharge = 92 49 cfs Storm frequency = 25 yrs Time interval = 6 min Drainage area = 52 910 ac Curve number = 70 Basin Slope = 0 0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc (Tc) = 17 40 min Total precip = 5 38 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Q (cfs) 10000 90 00 8000 7000 60 00 5000 4000 3000 2000 1000 000 00 10 — Hyd No 2 DA POND A• POST Hyd No 2 — 25 Yr Hydrograph Volume = 418 138 cult Q (cfs) 10000 9000 8000 7000 6000 5000 4000 3000 2000 1000 000 20 30 40 50 60 70 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Feb 26 2007, 3 52 PM Hyd. No. 3 A Wet Detention Pond Hydrograph type = Reservoir Peak discharge = 17 58 cfs Storm frequency = 25 yrs Time Interval = 6 min Inflow hyd No = 2 Max Elevation = 16 85 ft Reservoir name = POND A Max Storage = 275,576 cuft Storage Indication method used Hydrograph Volume = 400,037 cuft A Wet Detention Pond Q (cfS) Hyd No 3 — 25 Yr Q (cfS) 10000 9000 8000----7 7000 6000 5000 4000 3000 2000 1000 0 00 L - 0 18 36 — Hyd No 3 54 72 90 — Hyd No 2 100 00 9000 8000 7000 6000 5000 4000 3000 2000 1000 000 108 126 144 162 180 198 Time (hrs) Hydrograph Plot HydraFlow Hydrographs by Intelisolve Monday Feb 26 2007, 3 52 PM Hyd. No. 4 DA POND B PRE Hydrograph type = SCS Runoff Peak discharge = 15 15 cfs Storm frequency = 25 yrs Time Interval = 3 min Drainage area = 19 920 ac Curve number = 54 Basin Slope = 0 4 % Hydraulic length = 497 ft Tc method = KIRPICH Time of conc (Tc) = 7 49 min Total precip = 5 38 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Q (cfs) 1800 1500 if•AIII1 •M . 61 300 000 00 05 10 — Hyd No 4 DA POND B PRE Hyd No 4 — 25 Yr Hydrograph Volume = 75 065 cuR Q (cfs) 1800 1500 1200 M . If S 300 I I 1I I I i I I I I -- 000 15 20 25 30 35 40 45 50 55 60 65 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Feb 26 2007 3 52 PM Hyd. No. 5 DA POND B POST Hydrograph type = SCS Runoff Peak discharge = 24 23 cfs Storm frequency = 25 yrs Time Interval = 3 min Drainage area = 19 920 ac Curve number = 61 Basin Slope = 0 7 % Hydraulic length = 497 ft Tc method = KIRPICH Time of conc (Tc) = 6 34 min Total precip = 5 38 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Q (cfs) 2800 MINIII7 2000 1600 1200 800 400 DA POND B. POST Hyd No 5 -- 25 Yr Hydrograph Volume = 108,653 cuft Q (cfs) 2800 f'Z[0I1] 2000 1600 1200 800 Ellie] 000 ' ' ' ' 000 00 05 10 15 20 25 30 35 40 45 50 55 60 65 Time (hrs) — Hyd No 5 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Feb 26 2007 3 52 PM Hyd. No. 6 B Wet Detention Pond Hydrograph type = Reservoir Peak discharge = 4 96 cfs Storm frequency = 25 yrs Time interval = 3 min Inflow hyd No = 5 Max Elevation = 20 70 ft Reservoir name = POND B Max Storage = 76,594 cuft Storage Indication method used Q (cfs) 2800 2400 2000 1600 1200 400 B Wet Detention Pond Hyd No 6 -- 25 Yr Hydrograph Volume = 95 445 cult Q (cfs) 2800 2400 2000 1600 1200 400 000 000 0 15 29 44 58 73 87 102 116 131 145 Time (hrs) — Hyd No 6 — Hyd No 5 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 7 DA POND C PRE Hydrograph type = SCS Runoff Storm frequency = 25 yrs Drainage area = 11 270 ac Basin Slope = 0 4 % Tc method = KIRPICH Total precip = 5 38 in Storm duration = 6 hrs Q (cfs) 800 .M 400 200 000 00 10 20 Hyd No 7 DA POND C PRE Hyd No 7 -- 25 Yr Monday Feb 26 2007 3 52 PM Peak discharge = 7 41 cfs Time Interval = 6 min Curve number = 54 Hydraulic length = 773 ft Time of conc (Tc) = 10 80 min Distribution = SCS 6-Hr Shape factor = 484 Hydrograph Volume = 42 469 cult Q (cfs) 800 �6 400 200 I I I I ' o00 30 40 50 60 70 Time (hrs) Hydrograph Plot HydraFlow Hydrographs by Intelisolve Monday Feb 26 2007, 3 52 PM Hyd. No. 8 DA POND C POST Hydrograph type = SCS Runoff Peak discharge = 15 37 cfs Storm frequency = 25 yrs Time interval = 6 min Drainage area = 11 270 ac Curve number = 65 Basin Slope = 0 5 % Hydraulic length = 773 ft Tc method = KIRPICH Time of conc (Tc) = 9 73 min Total precip = 5 38 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Q (cfs) 18 00 15 00 1200 900 600 300 0 00 DA POND C POST Hyd No 8 — 25 Yr 00 10 20 30 — Hyd No 8 Hydrograph Volume = 73 306 cult Q (cfs) 1800 1500 1200 900 600 300 000 40 50 60 70 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Feb 26 2007 3 52 PM Hyd. No. 9 C Wet Detention Pond Hydrograph type = Reservoir Peak discharge = 5 70 cfs Storm frequency = 25 yrs Time Interval = 6 min Inflow hyd No = 8 Max Elevation = 18 23 ft Reservoir name = POND C Max Storage = 28,226 cuft Storage Indication method used Hydrograph Volume = 73,203 cult C Wet Detention Pond Q (cfs) Hyd No 9 -- 25 Yr Q (cfs) 1800 1500 1200 900 600 300 000 18 00 1500 1200 900 600 300 000 0 6 12 18 24 30 36 42 48 54 60 Time (hrs) — Hyd No 9 —Hyd No 8 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday Feb 26 2007 3 52 PM Hyd. No 10 DA POND D PRE Hydrograph type = SCS Runoff Peak discharge = 15 38 cfs Storm frequency = 25 yrs Time Interval = 6 min Drainage area = 24 970 ac Curve number = 55 Basin Slope = 0 0 % Hydraulic length = Oft Tc method = TR55 Time of cone (Tc) = 21 87 min Total precip = 5 38 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Q (cfs) 1800 1500 1200 900 600 300 000 00 10 — Hyd No 10 DA POND D PRE Hyd No 10 -- 25 Yr Hydrograph Volume = 106 516 tuft Q (cfs) 1800 1500 1200 900 600 300 000 20 30 40 50 60 70 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 11 DA POND D POST Hydrograph type = SCS Runoff Storm frequency = 25 yrs Drainage area = 24 970 ac Basin Slope = 0 0 % Tc method = TR55 Total precip = 5 38 in Storm duration = 6 hrs DA POND D POST Q (cfs) Hyd No 11 -- 25 Yr 4000 3000 2000 1000 Monday Feb 26 2007 3 52 PM Peak discharge = 35 94 cfs Time Interval = 6 min Curve number = 66 Hydraulic length = 0 ft Time of conc (Tc) = 18 40 min Distribution = SCS 6-Hr Shape factor = 484 Hydrograph Volume = 169,173 cuft Q (cfs) 4000 3000 2000 f1IIIII1 Emw 00 10 20 30 40 50 60 70 Time (hrs) — Hyd No 11 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday Feb 26 2007, 3 52 PM Hyd. No. 12 D Wet Detention Pond Hydrograph type = Reservoir Peak discharge = 10 36 cfs Storm frequency = 25 yrs Time interval = 6 min Inflow hyd No = 11 Max Elevation = 15 08 ft Reservoir name = POND D Max Storage = 82,263 cuft Storage Indication method used Q (cfs) 4000 3000 2000 1000 D Wet Detention Pond Hyd No 12 -- 25 Yr 000 0 10 20 30 40 50 60 — Hyd No 12 — Hyd No 11 Hydrograph Volume = 168 724 cult Q (cfs) 4000 3000 2000 1000 000 70 80 90 100 110 Time (hrs) STEVENS 100 Year Event Hydrograph Plot Hydrallow Hydrographs by Intelisolve Monday, Feb 26 2007 3 52 PM Hyd. No. 1 DA POND A PRE Hydrograph type = SCS Runoff Peak discharge = 62 83 cfs Storm frequency = 100 yrs Time Interval = 6 min Drainage area = 52 910 ac Curve number = 55 Basin Slope = 0 0 % Hydraulic length = Oft Tc method = TR55 Time of conc (Tc) = 20 60 min Total precip = 6 76 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Q (cfs) 7000 6000 5000 4000 3000 2000 1000 000 00 10 — Hyd No 1 DA POND A* PRE Hyd No 1 -- 100 Yr Hydrograph Volume = 378 926 cult Q (cfs) 7000 6000 5000 4000 3000 2000 1000 000 20 30 40 50 60 70 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Inteltsolve Monday Feb 26 2007, 3 52 PM Hyd. No. 2 DA POND A POST Hydrograph type = SCS Runoff Peak discharge = 140 39 cfs Storm frequency = 100 yrs Time interval = 6 min Drainage area = 52 910 ac Curve number = 70 Basin Slope = 0 0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc (Tc) = 17 40 min Total precip = 6 76 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Q (cfs) 160 00 14000 12000 10000 8000 6000 4000 2000 0 00 DA POND A POST Hyd No 2 -- 100 Yr Hydrograph Volume = 615 734 cult Q (cfs) 16000 14000 12000 10000 8000 6000 4000 2000 000 00 10 20 30 40 50 60 70 Time (hrs) — Hyd No 2 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Feb 26 2007, 3 52 PM Hyd. No. 3 A Wet Detention Pond Hydrograph type = Reservoir Peak discharge = 23 98 cfs Storm frequency = 100 yrs Time Interval = 6 min Inflow hyd No = 2 Max Elevation = 17 50 ft Reservoir name = POND A Max Storage = 342,696 cuft Storage Indication method used A Wet Detention Pond Q (cfs) Hyd No 3 — 100 Yr 16000 14000 12000 10000 8000 6000 4000 2000 0 00 Hydrograph Volume = 597 472 cult Q (cfs) 16000 14000 12000 10000 8000 6000 4000 2000 000 0 12 24 36 48 60 72 84 96 108 120 132 Time (hrs) — Hyd No 3 — Hyd No 2 6 Hydrograph Plot Hydraflow Hydrographs by Inteltsolve Monday Feb 26 2007 3 52 PM Hyd. No. 4 DA POND B PRE Hydrograph type = SCS Runoff Peak discharge = 28 08 cfs Storm frequency = 100 yrs Time Interval = 3 min Drainage area = 19 920 ac Curve number = 54 Basin Slope = 0 4 % Hydraulic length = 497 ft Tc method = KIRPICH Time of conc (Tc) = 7 49 min Total precip = 6 76 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Hydrograph Volume = 127,633 cult DA POND B PRE Q (cfs) Hyd No 4 -- 100 Yr Q (cfs) 3000 2500 2000 1500 1000 500 000 30 00 2500 2000 1500 1000 500 000 00 05 10 15 20 25 30 35 40 45 50 55 60 65 Time (hrs) — Hyd No 4 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Feb 26 2007, 3 52 PM Hyd. No. 5 DA POND B POST Hydrograph type = SCS Runoff Peak discharge = 40 31 cfs Storm frequency = 100 yrs Time Interval = 3 min Drainage area = 19 920 ac Curve number = 61 Basin Slope = 0 7 % Hydraulic length = 497 ft Tc method = KIRPICH Time of conc (Tc) = 6 34 min Total precip = 6 76 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Q (cfs) 5000 4000 3000 2000 1000 9 M.. DA POND B• POST Hyd No 5 — 100 Yr Hydrograph Volume = 171 516 cult Q (cfs) 5000 3000 2000 1000 00 05 10 15 20 25 30 35 40 45 50 55 60 65 Time (hrs) — Hyd No 5 Hydrograph Plot Hydraflow Hydrographs by Intellsolve Monday, Feb 26 2007 3 52 PM Hyd. No. 6 B Wet Detention Pond Hydrograph type = Reservoir Peak discharge = 10 75 cfs Storm frequency = 100 yrs Time Interval = 3 min Inflow hyd No = 5 Max Elevation = 20 84 ft Reservoir name = POND B Max Storage = 80,849 cuft Storage Indication method used Q (cfs) 5000 4000 3000 076 19 1000 B Wet Detention Pond Hyd No 6 -- 100 Yr Hydrograph Volume = 158 291 cult Q (cfs) 5000 4000 3000 2000 1000 000 1 I I i 1 I I 1 000 0 9 18 27 36 45 54 63 72 81 90 Time (hrs) — Hyd No 6 — Hyd No 5 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Feb 26 2007 3 52 PM Hyd. No. 7 DA POND C PRE Hydrograph type = SCS Runoff Peak discharge = 13 97 cfs Storm frequency = 100 yrs Time Interval = 6 min Drainage area = 11 270 ac Curve number = 54 Basin Slope = 0 4 % Hydraulic length = 773 ft Tc method = KIRPICH Time of conc (Tc) = 10 80 min Total precip = 6 76 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 DA POND C PRE Q (cfs) Hyd No 7 — 100 Yr 1400 12 00 1000 800 600 400 200 000 00 10 — Hyd No 7 Hydrograph Volume = 72 194 cult Q (cfs) 1400 1200 1000 800 600 400 200 " 000 20 30 40 50 60 70 Time (hrs) Hydrograph Plot HydraFlow Hydrographs by Intelisolve Monday Feb 26 2007 3 52 PM Hyd. No. 8 DA POND C POST Hydrograph type = SCS Runoff Peak discharge = 24 76 cfs Storm frequency = 100 yrs Time Interval = 6 min Drainage area = 11 270 ac Curve number = 65 Basin Slope = 0 5 % Hydraulic length = 773 ft Tc method = KIRPICH Time of conc (Tc) = 9 73 min Total precip = 6 76 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Q (cfs) 2800 2400 2000 1600 1200 800 400 0 00 00 10 — Hyd No 8 DA POND C POST Hyd No 8 -- 100 Yr Hydrograph Volume = 111,917 cult Q (cfs) 2800 2400 2000 1600 1200 800 400 000 20 30 40 50 60 70 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday Feb 26 2007, 3 52 PM Hyd. No. 9 C Wet Detention Pond Hydrograph type = Reservoir Peak discharge = 8 45 cfs Storm frequency = 100 yrs Time Interval = 6 min Inflow hyd No = 8 Max Elevation = 18 93 ft Reservoir name = POND C Max Storage = 38,555 cuft Storage Indication method used C Wet Detention Pond Q (cfs) Hyd No 9 -- 100 Yr 2800 2400 2000 1600 1200 800 400 - 000 00 10 20 30 — Hyd No 9 — Hyd No 8 Hydrograph Volume = 111,814 cult Q (cfs) 2800 2400 2000 1600 1200 800 400 000 40 50 60 70 80 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday Feb 26 2007, 3 52 PM Hyd. No. 10 DA POND D PRE Hydrograph type = SCS Runoff Peak discharge = 29 65 cfs Storm frequency = 100 yrs Time Interval = 6 min Drainage area = 24 970 ac Curve number = 55 Basin Slope = 0 0 % Hydraulic length = Oft Tc method = TR55 Time of conc (Tc) = 21 87 min Total precip = 6 76 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Q (cfs) 3000 2500 2000 1500 1000 500 000 00 10 — Hyd No 10 DA POND D PRE Hyd No 10 -- 100 Yr Hydrograph Volume = 178 828 cult Q (cfs) 3000 2500 2000 1500 1000 500 000 20 30 40 50 60 70 Time (hrs) Hydrograph Plot HydraFlow Hydrographs by Intelisolve Monday Feb 26 2007, 3 52 PM Hyd. No. 11 DA POND D POST Hydrograph type = SCS Runoff Peak discharge = 57 13 cfs Storm frequency = 100 yrs Time Interval = 6 min Drainage area = 24 970 ac Curve number = 66 Basin Slope = 0 0 % Hydraulic length = Oft Tc method = TR55 Time of conc (Tc) = 18 40 min Total precip = 6 76 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Q (cfs) 6000 5000 4000 3000 2000 1000 000 DA POND D. POST Hyd No 11 -- 100 Yr Hydrograph Volume = 256 363 cuff Q (cfs) 6000 5000 4000 3000 2000 1000 000 00 10 20 30 40 50 60 70 — Hyd No 11 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday Feb 26 2007, 3 52 PM Hyd. No. 12 D Wet Detention Pond Hydrograph type = Reservoir Peak discharge = 26 44 cfs Storm frequency = 100 yrs Time Interval = 6 min Inflow hyd No = 11 Max Elevation = 15 37 ft Reservoir name = POND D Max Storage = 91,508 cuft Storage Indication method used Hydrograph Volume = 255,913 cuft D Wet Detention Pond Q (cfs) Hyd No 12 -- 100 Yr Q (cfs) 6000 5000 4000 3000 2000 1000 0 00 60 00 5000 4000 3000 2000 1000 000 00 10 20 30 40 50 60 70 80 90 — Hyd No 12 Hyd No 11 Time (hrs) CAPE FEAR REALTY January 31, 2007 Eric Lappala, P E CPHG Eagle Resources P A. 4005 Lake Springs Court Raleigh, NC 27613 Re Cape Fear Trading Group, IV Dear Mr Lappala With respect to our Southport Crossing, Stevens Park, Yacht Basin and Ninth Street projects in Southport, North Carolina, we authorize you to submit and execute on our behalf 1 Any permit application to the City of Southport, Brunswick County, the State of North Carolina or the U S Army Corps of Engineers, 2 Plans sets for any Phase of consideration, review, and approval by the City of Southport, its planning board, and staff, 3 Any operating agreement for the maintenance of facilities for water, sanitary sewer, and storm water management, 4 Any agreement with the City of Southport or other entity for construction and maintenance of all off site water and sanitary sewer infrastructure, and Cape Fear Realty, LLC 109 North Davis Street Southport, North Carolina 28461 www capefearrealty com www baldlieadislandrentals com www middleislandolantation con Phone 910 454 8212 • FAX 910 454 8210 Real Estate Sales Vacation Rentals Property Management January 31, 2007 Paae 2 All such authorities shall be valid unless and until we revoke any of them by written notice to you Very truly yours, Cal EN PC Rob Gandy, City Manager City of Southport Chad Hicks, Planning Director City of Southport Bob Grant, Director of Public Services City of Southport 04 NELlJ 4allovee-� Si�i2 �� Ka r C�vp1;Na `��r�((JJ�� C_ ff e_eLreo 'Sg\E Cq�iP i �pTAl�Y Z s p`3 _ CBtrrv�i sSlo� eX����s �`'----1G o, �q;�OVEFi �o•`' SLO9070/ 3S(', NCDENR North Carolina Department of Environment and Natural Resources Division of Land Resources James D Simons, PG, PE Land Quality Section Michael F Easley, Governor Director and State Geologist William G Ross Jr, Secretary 1 /31 /2007 LETTER OF RECEIPT FOR AN EROSION CONTROL PLAN EXPRESS REVIEW Cape Fear Trading Group, LLC Mr Rodney J Hyson, Jr, LLC, Agent/ Development Mgr 109 North Davis Street Southport, NC 28461 RE Protect Name Stevens Park- Municiple Park Express Reviewer Id N 3 t 2007 Protect Number Bruns-2007-268 Y County Brunswick, Southport, Maple Street River Basin Cape Fear Submitted By McKim & Creed Date Received by LOS January 31, 2007 Plan Type NEW Dear Mr Hyson, This office has received a soil erosion and sediment control plan for the protect listed above which was submitted as required by the North Carolina Sedimentation Pollution Control Act (G S 113A-57 (4)) The Act requires that all persons disturbing an area of one or more acres of land must obtain approval of a soil erosion control plan pnor to the commencement of the land -disturbing activity (G S 113A-54(d) (4)) The review penod for an express review is three days of receipt of a complete plan If additional information is requested, it must be submitted within five working days of receipt Commencement or continuation of a land -disturbing activity under the tunsdiction of this Act prior to the approval of an erosion and sediment control plan is a violation of the Act We have performed a preliminary review of your submitted plan and have determined that additional information will be necessary before a final review can be completed Enclosed is a checklist of items that must be submitted before we can complete the review process Failure to provide the additional information may result in disapproval of your plan The approval of an erosion and sediment control plan is conditioned on the applicant's compliance with Federal and State water quality laws, regulations and rules If you have questions please do not hesitate to contact this office Your cooperation in this matter is appreciated and we look forward to working with you on this protect Sincerely, Carol N Miller Assistant Regional Engineer cc Mr Ray Marconi, El, McKim & Creed LOS-WiRO SWS-WiRO Wilmington Regional Office 127 Cardinal Drive Ext , Wilmington, North Carolina 28405-3845 • Phone 91 D-796-7215 / FAX 910-350-2004 NORTH CAROLINA DEPARTMENT OF ENVIRONMENT & NATURAL RESOURCES LAND QUALITY SECTION EROSION and SEDIMENTATION CONTROL PLAN PRELIMINARY REVIEW CHECKLIST PROJECT NAME Stevens Park- Municiple Park DATE 1/3112007 0 00 00 PROJECT NO • Bruns-2007-268 COUNTY Brunswick To expedite the approval process a cursory review of your submitted Erosion and Sediment Control Plan application has been made and has shown the need for additional information as specified below To meet our review schedule, any additional information should be received by this office no later than_2/6/07 Failure to meet this schedule may result in disapproval of your plan The following items shall be incorporated with respect to specific site conditions in an erosion and sediment control plan LOCATION INFORMATION Project location (roads streets landmarks) North arrow and scale GENERAL SITE FEATURES (Plan elements) Legend North arrow, scale, etc Property lines Existing contours (topographic lines) Proposed contours Limits of disturbed area (provide acreage total delineate limits, and label) Planned and existing building locations and elevations Planned & existing road locations & elevations Lot and/or building numbers Geologic features rock outcrops seeps, springs, wetland and their limits streams lakes ponds dams etc Easements and dramageways Profiles of streets, utilities, ditchlines etc Stockpiled topsoil or subsoil locations If the same person conducts the land disturbing actr ty & any related borrow or waste activity, the related borrow or waste activity shall constitute part of the landdisturbing activity unless the borrow or waste activity is regulated under the Mining Act of 1971 ores a landfill regulated by tie Divexin of Waste Management If the land -disturbing activity and any related borrow or waste activity are not conducted by the same person they shall be considered separate land -disturbing activities and must be permited either thni the Sedimentation Pollution Control Act as a one -use borrow erte orthmugh the Mining Act Required Any Corps 404 permit and Water Duality 401 certification (e g stream disturbances over 150linear feet) EROSION CONTROL MEASURES (on plan) Legend Location of temporary measures Location of permanent measures Construction drawings and details for temporary and permanent measures Maintenance requirements of measures Contact person responsible for maintenance SITE DRAINAGE FEATURES Existing and planned drainage patterns (include off -site areas that drain through project) Method of determination of and calculations for Acreage of land being disturbed Size and location of culverts and sewers Soil information type special characteristics Sod information below culvert storm outlets Name and classification of receiving water course (only where stommater discharges are to occur) Comments Ck ditch calculations for bare earth Velocities n= 022 Line where they exceed 2 5ft(sec STORMINATER CALCULATIONS Pre -construction runoff calculations for each outlet from the site (at peak discharge points) Design calculations for peak discharges of runoff (including the construction phase & the final runoff coefficients of the site) Design talcs of culverts and storm sewers Discharge and velocity calculations for open channel and ditch flows (easement & right -of ways) Design talcs of cross sections and method of stabilization of existing and planned channels (include temporary linings) Design talcs and construction details of energy dissipators below culvert and storm sewer outlets (diameters & apron dimensions) Design talcs and dimension of sediment basins Surface area and settling efficiency information for proposed sediment traps and/or basins VEGETATIVE STABILIZATION Area & acreage to be vegetatively stabilized Method of soil preparation Seed type & rates (temporary & permanent) Fertilizer type and rates Mulch type and rates NOTE Plan should include provisions for groundcover on exposed slopes within 15 working days or 30 calendar days (whichever Is shorter), following completion of any phase of grading, permanent groundcover for all disturbed areas within 15 working days or 90 calendar days (whichever is shorter) following completion of construction or development FINANCIAL RESPONSIBILITYIOWNERSHIP FORM Completed signed & notarized FR/O Form Accurate application fee ($50 00 per acre rounded up the next acre with no ceiling amount) _ Certificate of assumed name, if the owner is a partnership _X_ Name of Registered Agent (if applicable) Copy of the most current Deed for the site NOTE For the Express Permitting Option, inquire at the local ReglonalOffice for availability NARRATIVE AND CONSTRUCTION SEQUENCE Narrative describing the nature and purpose of the construction activity Construction sequence related to erosion and sediment control(includmg installation of critical measures prior to the initiation of the land -disturbing activity & removal of measures after areas they serve are permanently stabilized) Bid specifications related only to erosion control v, - K M&CREED TO Rhonda Hall, Express Permitting NCDENR — DWQ - W1RO 127 Cardinal Drive Wilmington, NC 28405 ATTENTION Rhonda Hall WE ARE SENDING ® Originals ® Prints ❑ Specifications ❑ Calculations LETTER OF TRANSMITTAL DATE February 27, 2007 PROJECT NO 4685-0003 TASK NO 40 RE Stevens Park Municipal Park Stormwater Application TRANSMITTAI NO PAGE 1 OF 1 ❑ Shop Drawings ❑ Samples ❑ Other - Quantity Drawing No Rev Description Status 2 C I Full size plan set G 2 SWU-101 Form (original + copy) G 2 4 SWU-102 Form (original + copy) G 2 Stormwater Design Narrative & Calculations G 2 Deed i C 2 1 1 1 Wetland Map signed by USACE I C I2 I 1I Notarized Agent Authorization Letter I C Issue Status Code A Preliminary B Fabrication Only C For Information D Bid E Construction F For Review & Comments G For Approval H See Remarks Action Status Code 1 No Exceptions Taken 2 Make Corrections Noted 3 Other 4 Amend & Resubmit 5 Rejected -See Remarks REMARKS A check for $4000 00 (Check No 128061) was subrr fee along with the EC application and EC fee on January 30, 2007 for the express 241 NORTH FRONT SIRFEF WILMINGTON NC 28401 (910) 441 1048 FAX (910) til 8282 oc Eric Lappala w/ enclosure McKIM & CREED, PA File w/ enclosure Signed /jMe t c Ramon Marconi for Richard Colher, PE 5 \4689\0001\10 Comm\022707 NCDENR SW Submit Trsm Doc RET TOTAL REV REC#— --CY, WT q Exctae lax $4x�z-w Prepared by Mad After Recording to Brun5tncK County —Register of C\eeds Robert J Robinson Inst #285859 Hook 222013age 1117 08/24/2005 09.13.20am RecO q yyei 7r-I ei1JA -- _ Parcel Idcnnfier No' —WITHOUT OPINIONON rITLE Tames R Prevatte Jr (md) PREVAITE, PREVAI T E AND CAMPHELT_ PLLC 08/24/2005 P O Box 10969, Southport NC 28461 411,362 00 51 Brief Descnpucn for the Index 9 q0 Ar-1Q gn _ „ eprw G 0pp0L1HA i, ,�. Raal Esiarx NORTH CAROLINA GENERAL WARRANTY DEED THIS DEED made this ol-34 day of 4000,S,r, 2005 by and between GRANTOR GRANTEE JAMES M HARPER, III and Wife, CAPE FEAR TRADING EDNA VIRGINIA CANADY HARPER, GROUP IV, LLC EDWARD T HARPER, Separated, 120 East Moore Street KATHERINE HUFHAM HARPER, Separated, Southport, North Carol ma 28461 And JAIIAILA MORRIS HARPER, Divorced The designation Grantor and Grdntee as used herein shall include said p,"es, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context W ITNESSETII THAT said GRANTORS, for a valuable consideration paid by the GRANTEE, the receipt of which is hereby acknowledged, have and by these presents do grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in ARUNS W ILK COUNT Y, NORTH CAROLINA, and more particularly described as follows 1 If erU L>r 35y' p — 5 id-05 _ Jrr-rr cLc r'.rG'• in Iust # 285859 Book 2220Page• 1118 SEE EXHIBIT "A" Al (ACHED HERETO AND INCORPORAI ED HEREIN BY REFERENCE TO HAVE AND TO HOLD the above described tract or parcel of land, together with all privileges and appurtenances thereunto belonging, unto lire said Grantee, its successors and assigns, to the only use and behoof of Grantee and its said successors and assigns, FOREVER AND said Grantors covenant to and with said Grantee that they are seized of the property at fee simple, and have the right to convey the same in fee simple, that the title is marketable and free and clear of all encumbrances except deeds of tmst of record which are conveyed herewith, and that they do hereby and will forever warrant and defend title to the same against the lawful claims of all persons whomsoever EXCEPT for the exceptions hereinafter stated 1 Zoning ordinances of the City of Southport and/or Brunswick County, 2 Utility easements and easements of record, 3 Lien of ad valorem taxes for 2005 (taxes shall he pro -rated an a calendar year basis as of the date of closing, 4 Terms of the Lease Agreement with the City of Southport for "Stevens Park"; and 5 Streets and roads of the "Cul[agc Tract" as appears of record IN PES"I IMONY WHEREOF, said Grantors have hereunto set their hands and seats, the day and year first above written J (— r L — (SF.AI ) JAJMAS M 11 ARPE.R,,j!! , Gran tar C�-u_ 4 SLAL) LDNA VIRC !A CANADY ARPE , Grantor 011 Inst k 285859 Book 22202age: 1119 �-77�- -- —(SEAL) EDWARD T. HARPER, raptor KATHG NE 1 UFHAibI HARPER, itor L/ JAHAILA MORRIS HARPER, Giantor STATE OF NORTH CAROLINA COUNTY OF BR jU`�N�SWICK I _ / �t Rp.l( `e- Notary Public for said County and State, do hereby certi that JAMES M HARPER, III and wife, EDNA VIRGINIA CANADY HARPER, personally appeared before me this day and acknowledged the due execution of the foregoing instrument Witness my hand and notarial stamp or seal, this the a13d day of 2005 (Notary S(amp/Seal) My commission eapues -' QI/n4/a� 3 1 Notary Pi he