Loading...
HomeMy WebLinkAboutSW8030704_CURRENT PERMIT_20211202STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO SW8 0301 o4 DOC TYPE ® CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 20Z1 12G2 YYYYMMDD ROY COOPER Governor ELIZABETH S BISER NORTH CAROLINA £nrfrwunmta/ Quality December 2, 2021 Alliance U S Properties, LLC Attn Linda Bumgardner, manager P O Box 1226 Sneads Ferry, NC 28460 Subject Permit Renewal Post -Construction Stormwater Management Permit No SW8 030704 Rick's Restaurant and Sports Bar Onslow County Dear Ms Bumgardner Effective August 1, 2013 the Post -Construction Stormwater Management Program has been transferred from the Division of Water Quality ("DWQ") to the Division of Energy, Mineral and Land Resources ("DEMLR") All previous references to DWQ will remain in older permits issued prior to August 1, 2013 until they are modified Please note that this permit will now reference DEMLR as the Division responsible for enforcement of the permit On August 5, 2009, the Governor signed Session Law 2009-406 This law impacted any development approval issued by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which was current and valid at any point between January 1, 2008, and December 31, 2010 The law extended the effective period of any permit that was set to expire during this time frame to three (3) years from its current expiration date On August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for a total of four (4) years extension The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for the subject permit on November 22, 2021 The Division is hereby notifying you that permit SW8030704 has been renewed, updated, and re -issued on December 2, 2021, as attached Please be aware that the renewal and re - issuance of this stormwater permit does not imply that the site is currently in compliance This permit shall be effective until February 11, 2026, which includes all available extensions, and does not supersede any other agency permit that may be required_ The project shall be subject to the conditions and limitations as specified therein Thus permit does not impose new or increased stormwater control requirements, it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit Failure to comply with these requirements will result in future compliance problems Please note that this permit is not transferable except after notice to and approval by the Division If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH) The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit You should contact the OAR with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www NCOAH corn Unless such demands are made this permit shall be final and binding If you have any questions concerning this permit, please contact Ashley Smith in the Wilmington Regional Office, at (910) 796-7215 or ashleym smith@ncdenr gov Sincerely, Z37- Brian Wrenn, Director Division of Energy, Mineral and Land Resources D E QJ� North Carolina Department of Environmental Quality I Dmsron of Energy Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington North Carolina 28405 ^�+•�+�r� / 9107%7215 State Stormwater Permit No SW8 030704 Page 2 of 2 Enclosures DES/am cc Attachment C — Permitting History Renewal Application Documents WStotmwaterTermns & Pro3ects\2003W30704 HD12021 12 permit 030704 Wilmington Regional Office Stormwater File rolft Mn /�Zy� North Carolina Department of Environmental Quality I Division of Energy Mineral and Land Resources L/— ����JJ Wiimington Recponal Office 1 127 Cardinal Drive Extension I Wilmington North Carolina 28405 ea Post -Construction Stormwater Management Permit No SW 8 030704 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Alliance U S Properties, LLC Rick's Restaurant and Sports Bar 510 Petes Way, Onslow County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H 1000 (hereafter referred to as the "stormwater rules') and the as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR") The project shall be constructed, operated and maintained in accordance with these approved plans and specifications The approved plans and specifications are incorporated by reference and are enforceable part of this permit This permit shall be effective from the date of issuance until February 11 2026 and shall be subject to the following specified conditions and limitations The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission, however, these actions do not stay any condition The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H 1000 and NCGS 143-215 1 et al I DESIGN STANDARDS 1 This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data 2 This stormwater system has been approved for the management of stormwater runoff as described on page 2 of this permit, the Project Data Sheet The stormwater control has been designed to handle the runoff from 42,213 square feet of impervious area 3 The tract will be limited to the amount of built -upon area indicated on page 2 of this permit, and per approved plans 4 All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans 5 The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system A permit modification must be submitted Page 1 of 5 Post -Construction Stormwater Management Permit No SW 8 030704 and approved prior to the construction of additional built -upon area from outside of the approved drainage area DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES PROJECT DESIGN DATA SHEET Protect Name Permit Number Location Applicant Mailing Address Application Date Receiving Stream/River Basin Stream Index Number Classification of Water Body " Protect not within'/ mile Drainage Area, acres Onsite, sq ft Offsite, sq ft Total Impervious Surfaces, sq ft Pond Depth, feet TSS removal efficiency Permanent Pool Elevation, FMSL Permitted Surface Area, sq ft Permitted Storage Volume, cubic ft Temporary Storage Elevation, FMSL Controlling Orifice Permitted Forebay Volume, cubic ft II SCHEDULE OF COMPLIANCE Ricks Restaurant and Sports Bar SW8 030704 Onslow County Ms Linda Bumgardner, Manager Alliance U S Properties, LLC P O Box 1226 Sneads Ferry, NC 28460 November 22, 2021 Goose Bay / White Oak WOK02 19-39-2 "SA ORW" 1 38 59,982 none, per engineer 42,213 50 90% (no filter is required) 305 3,072 @ Permanent Pool 4,270 31 7 1" � (drawdown in 2-5 days) 3.904 1 The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface 2 During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately 3 The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to Semiannual scheduled inspections (every 6 months) Sediment removal Mowing and revegetation of slopes and the vegetated filter Immediate repair of eroded areas Maintenance of all slopes in accordance with approved plans and specifications Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping Access to the outlet structure must be available at all times Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR The records will indicate the date, activity, name of person performing the work and what actions were taken Page 2 of 5 Post -Construction Stormwater Management Permit No SW 8 030704 Decorative spray fountains are allowed in the pond, subject to the following criteria a The minimum permanent pool volume is 30,000 cubic feet b The fountain must draw its water from less than 2' below the permanent pool surface c Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond d The fountain may not be placed into the forebay e The falling water from the fountain must be centered in the main pond, away from the shoreline f The maximum horsepower for a fountain in this pond is 1/8 horsepower 6 The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division 7 No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below For changes to the protect or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification a Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc b Redesign or addition to the approved amount of BUA or to the drainage area c Further development, subdivision, acquisition, lease or sale of any, all or part of the protect and/or property area as reported in the approved plans and specifications d Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan e The construction of any allocated future BUA f The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications g Other modifications as determined by the Director Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification A modification may be required for those deviations If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility 10 The permittee must maintain compliance with the proposed built -upon area and ensure that the runoff from all the built -upon is directed into the permitted system 11 The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made Page 3 of 5 Post -Construction Stormwater Management Permit No SW 8 030704 12 The permittee must maintain the current permitted drainage area No additional runoff from outside of the permitted drainage area boundary may enter the permitted stormwater facilities without first applying for and receiving a permit modification III GENERAL CONDITIONS CORRECTIVE ACTIONS REQUIRED If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems These additional or replacement measures shall receive a permit from the Division prior to construction 2 PERMIT RENEWAL A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H 1045(3) 3 CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes 4 TRANSFER This permit is not transferable to any person or entity except after notice to and approval by the Director Neither the sale of the protect and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit TRANSFER REQUEST The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H 1045(2) This request must be submitted within 90 days of the permit holder meeting one or more of the following i A natural person who is deceased, n A partnership, limited liability corporation, corporation, or any other business association that has been dissolved, ui A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding IV A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur TRANSFER INSPECTION Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the protect and the on -site stormwater system complies with the permit conditions Records of maintenance activities performed to date may be requested Protects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met COMPLIANCE The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request APPROVED PLANS AND SPECIFICATIONS A copy of this permit, approved plans, application, supplement operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times DIVISION ACCESS The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project Page 4 of 5 Post -Construction Stormwater Management Permit No SW 8 030704 ENFORCEMENT Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21 ANNUAL CERTIFICATION The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the protects conformance with permit conditions OBTAINING COMPLIANCE The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made OTHER PERMITS The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215 1 and subject to enforcement procedures pursuant to NCGS 143-215 6 Permit renewed, updated and reissued this the 2nd day of December 2021 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION 0�� / / cJC.Y t rian Wrenn, UireCtor Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 5 of 5 Attachment C - Permitting History Rick's Restaurant and Sports Bar Permit No SW8030704 Approval Date Permit Action BIMS Version Description of the Changes 2/11/2004 Original Approval 10 6/19/2008 Plan Revision I I the addition of a speed bump for the purpose of diverting runoff to the stormwater system 12/2/2021 Renewal 20 Expires February 11, 2026 ULMLK UJt UNLY-" Date Re Ned Fee Paid Permit Number I P I 0 cv W STATE STORMWATER PERMIT INFORMATION UPDATE APPLICATION FORM There is NO FEE for updating project name or permittee information This form is to only to be used by the current permittee to notify the Division of 1) changes to the Point of Contact (signing official) for the current permittee (LLC, Corporation HOA or POA), 2) changes to the mailing address phone number or email address of the current permittee 3) changes to the name of the project, and 4) changes to the legal corporate name as documented by a Name Change or Merger filed with the NCSOS A NEW PERMIT INFORMATION State Stormwater Permit Number Are you updating (check all that apply) If so, please provide the updated information ❑ Project name ❑ Corporation Name' ❑ Permit Contact Name2 3 ❑ Permit Contact Title Mailing Address3 P O Box 1226 Sneads Ferry, NC 28460 ❑ Phone number ❑ Email address Provide documentation such as a Name Change / Merger filed with the NCSOS Provide supporting documentation such as NCSOS filing The permit contacts position must be in accordance with 15A NCAC 02H 1040(1) If more than one point of contact or mailing address is being changed please attach a separate sheet B CERTIFICATION OF PERMITTEE I Linda Bumgardner the current permittee hereby notify DEMLR that I am making the changes as listed in Section A above I further attest that this application for an update to the permit information currently on file is accurate and complete to theAest of my knowledge 41 • F)- 102-1 I, Taa/e L Aggize//c a Notary Public for the State of 9,9r. h Coa� al,-ei County of df")SYdold do A l/hereby certify that hd ��iAQ22, ILIIrIV2 personally appeared before me this the day of 20 o?/ , and acknowledge the due exeqµtlmn mf,>0e forgoing instrument Witness my hand and off ial seal 1. ROr<:',,. •;aN0TAt2y156 m_ �otary Sian ture y16, 2°%6 okkpires 2"a V a/, o?OaG NUV 2 2 2021 By Stormwater Permit Information Update Form Page 1 of 1 May 11 2017 UJt UNLY` _`_________.�."'"""' Date Rece ved Fee Paid Permit Numbe NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H 1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60 (c) This application form Is for permit renewals only A PROJECT INFORMATION 1 State Stormwater Permit Number SW8 030704 2 Project name Rick's Restaurant and Sports Bar 3 Project street address 510 Petes Way City Sneads Ferry County Onslow ZIP 28460 4 What, if any, changes have been made to the project as permitted? If the project has changed from the original approved plans please complete SWU-101 for a Major Modification or Minor Modification Application form available at https //deg nc gov/about/divisions/energy- minera I -la nd-resources/energV-mineral-la nd-rules/stormwater-program/post-construction r T11 ik • C it 1 • If changes to the permittee or project name have been made please complete either the Permit Update form or the Permit Transfer form available at https //deg nc qov/about/divisions/energy-mineral-land- resources/energy-mineral-land-rules/stormwater-program/post-construction State Stormwater Permits do not automatically transfer with the sale of the property 1 Current Permit Holder s Company Name/Organization Alliancc U S Properties, LLC 2 Signing Official's Name Linda Bum rare dner 3 Signing Officials Title Manager 4 Mailing Address 200 Seascape Drive or P O Box 1226 City Sneads Ferry 28460 5 Street Address 510 Pete's Way Sneads Ferry NC NC ZIP City State ZIP 6 Phone (910) 330-0789 Email ricklb54(@gmail com EGOEi wugaz2a Stormwater Permit Renewal Form Page 1 of 3 May 11 2018 C SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQ W/ORl4) Only applications packages that include all required items listed below will be accepted and reviewed Initial each item below to indicate that the required information is provided in the application package ✓�,b 1 A permit application processing fee of $505 00 payable to NCDEQ ✓ 2 One original signed hard copy and one electronic copy of this completed form The signing official named on this application to represent the current permittee must meet one of the following a Corporation — a principle executive officer of at least the level of vice-president, b Limited Liability Company (LLC) — a manager or company official as those terms are defined in G S 57D' North Carolina Limited Liability Company Act c Public Entity — a principal executive officer ranking official or other duly authorized employee, d Partnership or limited partnership — the general partner, e Sole proprietor, or f Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity ,I 4 3 One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR including deed restrictions, protective covenants, condominium/planned community declaration and easements If the project has been built include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date ✓ 4 O&M Agreements Please select one ® I have a copy of the current recorded O&M Agreement for all SCMs and I will continue to keep this on file with the permit or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am ` MM requesting a copy be sent to me I agree to keep this on file with the permit ✓ �1J 5 Designer Certifications, Please select one ® A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed, or ❑ The project has not yet been built 6 [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed sealed, and dated letter from a licensed professional stating that the SCMs have been inspected and that they have been built and maintained in accordance with the permit ✓ 7 [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC) Provide one hard copy and one electronic copy of documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Section C 2 per 15A NCAC 2H 1043(3)(b) https //www sosnc gov/online services/search/by title/ Business Registration NUV 2 2 2021 BY_ b Stormwater Permit Renewal Application Form Page 2 of 3 May 11 2018 D PERMI/TTEE'S CERTIFICATION I, L I nl d A 'gcn n!QAejfireA the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site) that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the protect, SCMs, or ownership All information provided on this permit renewal application is to the best of my knowledge, correct and complete Signature Date NOTARIZATION I Ting&L R&Mme a Notary Public for the State of iidf 5L%7 L✓/,t`D///7LL County of do hereby certify that JYI dQ ,IQL1h 1 n/jrr�/�G!^ personally appeared before me this the 47 /f, day of 200, and acknowledge the due execution of the forgoing instrument fitness my hand and official seal, L Rrn OL''''' , s >NornRyP m: Nov 2 2 2021 gr Stormwater Permit Renewal Application Form Page 3 of 3 May 11 2018 rA r 11 Permit No Z 3076 y (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details I PROJECT INFORMATION Project Name Contact Person For projects with multiple basins, specify elevations Basin Bottom Elevation , 6 ft Permanent Pool Elevation 30 i J ft Temporary Pool Elevation 3 17 ft kv,r Phone Number (W) 330 ^ t7]F39 basin this worksheet applies to /JA (floor of the basin) (elevation of the orifice) (elevation of the discharge structure overflow) areas Permanent Pool Surface Area 307Z sq ft (water surface area at the orifice elevation) Drainage Area 1 , 3f3 ac (on -site and off -site drainage to the basin) Impervious Area s q7 ac (on -site and off -site drainage to the basin) volumes Permanent Pool Volume g700 cu ft (combined volume of main basin and forebay) Temporary Pool Volume l 0 cu ft (volume detained above the permanent pool) Forebay Volume 390q cu ft (approximately 20% of total volume) Other parameters SA/DA1 5 03 (surface area to drainage area ratio from DWQ table) Diameter of Orifice in (2 to 5 day temporary pool draw -down required) Design Rainfall in Design TSS Removal 2 0 % (minimum 85% required) Forth SWU-102 Rev 3 99 Page I of 4 Footnotes When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious %and permanent pool depth Linear interpolation should be employed to determine the correct value for non- standard table entries In the 20 coastal counties the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal The NCDENR aMP manual provides design tables for both 85% TSS removal and 90% TSS removal II REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N C Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section 15 A NCAC 2H 1008 Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below If a requirement has not been met, attach justification Applicants Initials effi a P8 b KPA c OA d UJA e The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet) The forebay volume is approximately equal to 20% of the basin volume The temporary pool controls runoff from the design storm event The temporary pool draws down in 2 to 5 days If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) f The basin length to width ratio is greater than 3 1 g The basin side slopes above the permanent pool are no steeper than 3 1 h A submerged and vegetated perimeter shelf with a slope of 6 1 or less (show detail) I Vegetative cover above the permanent pool elevation is specified I A trash rack or similar device is provided for both the overflow and orifice k A recorded drainage easement is provided for each basin including access to nearest right- of-way 08 O 1 If the basin is used for sediment and erosion control during construction, clean out of the yy�/�p basin is specified prior to use as a wet detention basin in A mechanism is specified which will dram the basin for maintenance or an emergency III WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided This system (check one) 0 does O�does not incorporate a vegetated filter at the outlet This system (check one) 0 does noes not incorporate pretreatment other than a forebay Form S WIJ-102 Rev 3 99 Page 2 of 4 Maintenance activities shall be performed as follows 1 After every significant runoff producing rainfall event and at least monthly a Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition b Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed 2 Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed 3 Inspect and repair the collection system (1 a catch basins, piping, swales, riprap, etc ) quarterly to maintain proper functioning 4 Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the onginal design depth (see diagram below) Removed sediment shall be disposed of in an appropnate manner and shall be handled in a manner that will not adversely impact water quality (1 e stockpiling near a wet detention basin or stream, etc ) The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments When the permanent pool depth reads .75 feet in the main pond, the sediment shall be removed When the permanent pool depth reads 3,76 feet in the forebay, the sediment shall be removed BASIN DIAGRAM (fill in the blanks) 5� � Permanent Pool Elevation t Sediment Re oval El 2�5 75 -------------- - - Sediment Removal Elevation 2 :9 76 F25 Bottom Ele ation ZS' t % ---------------------- ----------- BottomElevation Z5 $ FOREBAY MAIN POND 5 Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface These plants shall be encouraged to grow along the vegetated shelf and forebay berm 6 If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency dram shall be minimized to the maximum extent practical Fore SWU-102 Rev 3 99 Page 3 of 4 7 All components of the wet detention basin system shall be maintained in good working order I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party Print na e ( t `' Title/eStt��wl Address aOf Q! l Phone '//V ' 3 cl Signature Date /t9//0/03 u/h6- (2_0 oetL Note The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president 1, k 4P_ eNf A , a Notary Public for the State of N C Countyof r� %ot.) —,do hereby certify that " iJG met a ro�n P r personally appeared before me this l7 day of ©r,-t, and acknowledge the due execution of the forgoing wet detention basin maintenance requirements Witness my hand and official seal, RN L WilARY PUBUC EAL My commission expires L 00y Form SWU-102 Rev 3 99 Page 4 of Keith P. Bulla, P E 4710 Highway 117 South Teachey, North Carolina 28464 ENGINEER'S CERTIFICATION Rick's Restaurant NC Highway 210 Stump Sound Township Onslow County Stormwater Project No SW8 030704 I, Keith P Bulla, as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe periodically the construction of the stormwater facilities for the project, Rick's Restaurant, Onslow County, North Carolina for the permittee, Mr Rick Bumgardner, owner of said project, hereby state that the stormwater facilities for said project were observed to be built within substantial compliance of the original plan, State approved February 1 1, 2004 and plan revisions, State approved July 19, 2008 Keith P Bulla, PE ¢L Project Engineer 10724 Registration Nun her 10744 Mr Rick Bmn er i�ehn4 Q �^t M BaTda gengnl Charles Riggs and Associates