TO: DWQ
Unit
512 North Salisbury Street
Raleigh, 27604
LETTER OF TRANSMITTAL
DATE September 12, 2014
JOB NO. PROPOSAL NO.
ATTN:
RE: 401 Permit Submittal
WE ARE SENDING YOU Fx Attached 8 Via FedEx the following items:
Via Mail
Shop Drawings Prints Plans Samples
Copy of Letter Change Order
Photographs Control Photographs Contact Prints Manuscripts
Diapositives x See Below
Specifications
Diskettes
COPIES
DATE
NO.
DESCRIPTION
5
09/12/14
DWQ Cover Letter
5
09/12/14
Agent Authorization Form
5
09/12/14
PCN
nn
1�
H W
W
np
5
09/12/14
11 X 17 Construction Plans
1
09/12/14
$240.00 Fee
S E P 1 a 2014
DENR • WATER RESOURCES
401 R BUFFER P
THESE ARE TRANSMITTED a
For approval
For your use
As requested
x For review and comment
Control survey required
See below remarks
s checked below:
Approved as submitted Resubmit
Approved as noted Submit
Return for corrections Return
For your records
Analytical aerial triangulation required
For review and comment
copies for approval
copies for distribution
corrected prints
❑ FOR BIDS DUE 20 ❑ PRINTS RETURNED AFTER LOAN TO US
REMARKS
Please contact me with any questions. Thank you!
COPY TO: file SIGNED:
ale Hvatt. P .
� S P
September 9, 2014
Karen Higgins
NCDWQ
1617 Mail Services Center
Raleigh, NC 27699 -1617
RE: PCN Application Package for 40 Linear Feet of Stream Impacts
For RTP Bank Stabilization near Little Drive.
Research Triangle Foundation
RTP, Wake County, North Carolina
Dear Ms. Higgins;
15401 Weston Parkway
Suite 100
Cary. NC'275I I
Man 919 678'0035
www wspgroup conVusa
The project consists of the placement of Class I rip -rap along a 40 foot section of bank of an unnamed
tributary (UT) of Kit Creek in Research Triangle Park. The unnamed tributary to Kit Creek 1s a perennial
stream that is located within the Cape Fear River Basin. The subject area is an existing wooded parcel
in the Southeast corner of the intersection of Davis Drive and Little Drive. An existing 20 -foot town of
Cary sanitary sewer easement parallels the stream in this location. Additionally, construction of a
greenway trail within this easement is on -going at this time.
A debris dam developed within the stream approximately 200 feet upstream from Little Drive. This debris
jam and heavy rainfall events this summer have caused severe erosion of the left stream bank., This
eroded /undercut stream bank has encroached into the sanitary sewer easement and is a potential risk
for exposing the sanitary sewer main located within this easement if not stabilized This project will
place compacted fill 'in the area of undercutting and erosion to provide a more stable bank slope.
Additionally, this slope will be stabilized with class I rip -rap to provide protection from future erosion.
The project will permanently impact the UT stream. The project will create 40 If of permanent stream
impacts. Permanent stream impacts are for riprap slope stabilization of the left bank of the stream. No
wetlands are present at this location of stabilization.
It is WSP's pleasure to submit this PCN application package on behalf of the Research Triangle
Foundation. Please feel free to contact me at (919) 678 -0035 or dale.hyatt@wsr)grour).com if you have
any questions oir comments.
Sincerely,
FDalet, PE, CFM
AGENT AUTHORIZATION FORM
PROPERTY LEGAL DESCRIPTION:
OWNER:_ Research Triangle Foundation of NC PIN: 0736850004 Deed Book, Page No: 1670, 239
STREET ADDRESS: SE Corner of Intersection of Little Drive& Davis Drive in RTP
Please print:
Applicant: Research Triangle Foundation of NC
The undersigned, applicant,of the above noted property, do hereby authorize
Dale Hyatt, PE, CFM , of WSP
(Contractor / Agent) (Name of consulting firm)
to act on my behalf and take all actions necessary for the processing, issuance and acceptance of
this permit or certification and any and all standard and special conditions attached.
Applicant Address:
Liz,Rooks
Executive Vice President &COO
The Research Triangle Park
U Davis'Dnve, PO Box 12255
Research Triangle Park, NC 27709
Telephone: 919- 433 -1662
We hereby certify the above information submitted in this application is true and accurate to the
best of our knowledge.
Authori d Signature
Date: � �Y
.t
OF W A TF9
o� pG Office Use Only:
9 n 1 !! 0 9 8 2 Corps action ID no
DWQ project no. ID
Form Version 1.3 Dec 10 2009 -1
Page I of 11
PCN Form — Version 1.3 December 10, 2008 Version
Pre - Construction Notification (PCN) Form
A. Applicant Information
1.
Processing
1 a.
Type(s) of approval sought from the
Corps:
®Section 404 Permit ❑Section 10 Permit
1b.
Specify Nationwide Permit (NWP) number: 13 or General Permit (GP) number:
1c.
Has the NWP or GP number been verified by the Corps?
❑ Yes ® No
1 d.
Type(s) of approval sought from the DWQ (check all that apply):
® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e.
Is this notification solely for the record
because written approval is not required?
For the record only for DWQ 401
Certification:
❑ Yes ® No
For the record only for Corps Permit:
❑ Yes ® No
1f.
Is payment into a mitigation bank or in -lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu
fee program.
❑Yes ®No
1 g.
Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below.
❑ Yes ® No
1 h.
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes ® No
2.
Project Information
2a.
Name of project:
Research Triangle Park - Bank Stabilization near Little Drive
2b.
County:
Wake
2c.
Nearest municipality / town:
Mooresville
2d.
Subdivision name:
Research Triangle Park
2e.
NCDOT only, T.I.P. or state
project no:
D 15 u
3.
Owner Information
3a.
Name(s) on Recorded Deed:
Research Triangle Foundation of NC
3b.
Deed Book and Page No.
01670 -0239
DENR - WATER RESOURCES
3c.
Responsible Party (for LLC if
applicable):
Elizabeth Rooks, Vice President and COO
3d.
Street address:
12 Davis Drive, P.O. Box 12255
3e.
City, state, zip:
Research Triangle Park, NC, 27709
3f.
Telephone no.:
919 - 549 -8181
3g.
Fax no.:
919 - 549 -8246
3h.
Email address:
rooks @rtp.org
Page I of 11
PCN Form — Version 1.3 December 10, 2008 Version
4.
Applicant Information (if,different from owner)
4a
Applicant is
® Agent ❑ Other, specify
4b
Name
Dale Hyatt, PE_
4c
Business name
(if applicable)
WSP
4d
Street address
15401 Weston Parkway Suite 100
4e. City, state, zip
Cary, NC 27513
4f
Telephone no
919'678 -0035
4g
Fax no
919 - 678 -0206
4h.
Email address
dale hyatt@wspgroup com
5.
Agent/Consultant Information (if applicable) -
5a
Name
Dale Hyatt, PE
5b
Business,name
(if °applicable)
WSP
5c
Street.address
15401 Weston Parkway Suite 100
5d. City, state, zip
Cary, NC 27513
5e
Telephone no
919 - 678 -0035
5f
Fax no
919- 678 -0206
5g
Email,address
dale hyatt@wspgroup com
fJ
Page 2 of 11'
PCN Form — Version 1 3 December 10, 2008 Version,
B. Project Information and Prior Project History
1. Property Identification t
1,a Property identification no (tax PIN or parcel ID)
0736850004
1b Site coordmates,(in decimal degrees)
Latitude. 35 84531 Longitude. - 78 85642
(DD DDDDDD) ( =DD DDDDDD)
1c Property'size
609,acres
2. Surface Waters
2a Name of nearest body of water (stream, fiver, etc) to
proposed project
Kit Creek
2b Water Quality,Classification of nearest receiving water
WS -IV, NSW
2c River basin
Cape Fear /Jordan Lake r
3. Project Description
3a Describe the existing conditions on the site and the general,land use in the vicinity of the project at the time of this
application
There is an existing 20' Town of'Cary sanitary sewer easment that parallels the UT to Kit Creek at the intersection of Little
Drive,and Davis Drive The existing site is wooded with the exception of the grassed sanitary sewer easement A aspahlt
greenway trail is being constructed in the sanitary sewer easement at this time
3b List the total estimated acreage of all existing wetlands on the property
Unknown for entire property, no wetlands exist in th&area of the bank stabilization
3c List the total estimated linear feet of all existing, streams,(intermittent and perennial) on the property
unknown forentire property,
3d Explain,the purpose of1the proposed project
During a recent heavy rainfall a,debrns,jam located within the channel ohhe unnamed'tnbutary to Kit Creek caused
severe erosion of the left (south) channel bank adjacent to the Town of'Cary sanitary sewer easement near the
intersection of Little Drive and Davis Drive This bank erosion has migrated into the sanitary sewer easement and without
stabilization may continue to migrate and expose the sanitary sewer pipe in this location This project-will provide hard
stabilization, in the form of rip -rap to provide bank stabilization and to mirnmimze future erosion of this channel bank
3e Describe the overall project in detail, including the type of equipment to be used
The project will involve placement of compacted fill'to provide a more stable 2 1 bank slope Non -woven geotextde filter
fabric will be placed over the 2 1 slope The slope will then be stabilized by a layer of class I rip-rap- Majority of the work
shall be performed with a large excavator and small skid steer
4. Jurisdictional Determinations
4a Have jurisdictional wetland or stream determinations by,the
Corps or State been Fequested or obtained for this property /
❑ Yes ® No ❑ Unknown
project (including all prior phases), in the pasty
Comments -
4b If ,the Corps made the jurisdictional determination; what type
❑ Preliminary ❑ Final
of determination was m-ade7
4c If yes, who,delineated the.junsdictional areas2
Agency /Consultant Company
Name (&knoWn)
Other
4d If yes, list the,dates of the Corps jurisdictional determinations or State determinations and attach documentation
5. Project History
5a- Have permits or certifications been requested or obtained for
❑ Yes ® No ❑ Unknown
this project (including all prior phases) in the past?
5b If yes, explain in detail according to "help file" instructions
Page 3 of 11
PCN Form — Version 1 3 December 10, 2008 Version
6. Future Project Plans
6a Is this a phased project? ❑ Yes ® No
6b If yes, explain
t
Page 4 of 11
PCN Form — Version 1.3 December 10, 2008 Version
6 Proposed Impacts Inventory -
1 Impacts Summary
1 a. Which secfions,Were completed below for your project (check,all that apply)
❑ Wetlands ® Streams - tributaries ❑ Buffers
❑ Open;Waters ❑ Pond Construction
2 Wetland Impacts
Ifthere,are wetland'impacts proposed on,the site, then complete this question for °each wetland,area impacted
'2a. 2b 2c - -- 12d - 2e. 2fJ -
Wetland impact Type of,lunsdicUon
;number - Type of impact' Type of 'wetland Forested (Corps - 404, V0 Area:of impact
Permanent (P) or (if, known), QWQ - non -404, other) (acres)
Temoorary (Tl ,
Page 5 of f 1
P,CN Form - Version 1.3 December 10, 2008 Version
W1 ❑, P [IT
❑ Yes ❑' Co`rps
--
❑ No, ❑ DWQ
W2 ❑ P,❑ T
'❑ es '❑ -
Y Corps
-
- El No ❑DWQ
W3 ❑;P ❑ T
❑ Yes ❑ Corps -
❑ No, ❑, DWQ
W4 ❑ P ❑, T
❑Yes ❑ Corps -
❑ No ❑ DWQ
W5 ❑ P,❑ T
❑`Yes ❑Corps -
❑ 'No ❑ DINQ.-
W6 ❑,P ::T,:
❑ Y,es ❑ Corps, -
-
❑ No, ❑
_DWQ
2g. `Total' wetland,impacts
2h Comments
3. Stream Impacts - -
If'theYe areiperenrnal or intermittent stream impacts (including r` temporary impact "s) proposed on the site, then complete this
question foall stream sites impacted
3a
Stream impact
number -
Permanent (P) or
Temporary (T)
3b 3c 3d 3e 3f
Type of impact Stream name Perennial Type of �unsdiction Average
PER or
( )' (Corps,404, 10 stream
intermittent DWQ =non =404, width
(!NT)? other). If
Fill/Rip-Rap UT1 to,Kit,Creek , PER ®Corps
❑`INT ❑ DWQ 6
.3g
Impact
length
(linear
feet),
S1 ® P Ell
"-
40,
S2 ❑ P�❑ T
❑ PER ❑ Corps -
'❑ INT _ ❑ DWQ
S3 �❑ iR ❑ T
-
_
❑ 'PER ❑ Corps
_ ❑ INT ❑ DWQ
--
S4 ❑ P ❑ T
--
❑ PER, ❑ Corps
❑ INT ❑ DWQ
-
S5 ❑ PC T
-
❑ PER �� Corps �
- f❑ INT ❑ DWQ_
-
"S6°
❑ P n, --r
F-1 'PER ❑ Corps
-
- - ❑ INT ❑DWQ
3h Total stream,and tributary impacts
40'
31 'Comments _'Rip -rap placement for stream bank stabilization 6
Page 5 of f 1
P,CN Form - Version 1.3 December 10, 2008 Version
Page 6 of 11
PCN Form — Version 1 3 December 10, 2009 Version
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, �estuanes, tributaries, sounds, the Atlantic Ocean, or°any otheropen water of
the U S then individually list all open water impacts below
4a 4b 4c
Open water Name of waterbody
4d 4e
impact number — (if applicable) Type of impact
Permanent (P) or
Waterbod Y tYPe Area of impact (acres)
Tern ora T
01 ❑P ❑T
02 ❑,P ❑T
03 ❑P ❑T
04 ❑ PEI T
4E Total open water impacts
4g Comments
5. Pond or Lake Construction
If and or lake construction, ro osed, then complete the chart below
5a
5b. 5c
5d 5e
Pond ID
Wetland'Impacts (acres)
Proposed use or purpose
Stream Impacts,(feet) Upland
I
of pond'
(acres)
Flooded Filled Excavated
Flooded, Filled Excavated Flooded
P1
P2
5f. Total
5g Comments
5h Is a dam high hazard permit required?
❑ Yes ❑ No Wyes, permit ID no
51 Expected pond surface area (acres)
5� Size of pond watershed (acres)
5k Method of construction
6. Buffer Impacts (for DWO)
If project will impact a protected riparian buffer, then complete the chart below
below If any impacts require
If yes, then individually list.all buffer impacts
mitigation, then you MUST fill out Section D
of this form
6a.
❑ Neuse
Project is in, which protected basing ❑ Catawba
❑ Tar - Pamlico ❑ Other
❑ Randleman
6b 6c 6d 6e
Buffer impact
6f 69
number— Reason Buffer
Permanent (P) or for Stream name mitigation
Zone 1 impact Zon_e'2;impact
(square feet )
Temporary T im act _ re cared,
(square feet)
131 ❑P ❑T El Yes
'❑ No
B2 ❑P ❑T El Yes
❑ No
B3 ❑ P (IT ❑ Yes
❑ No
6h Total buffer impacts
61 Comments
Page 6 of 11
PCN Form — Version 1 3 December 10, 2009 Version
D. Impact Justification and Mitigation
Page 7 of 11
PCN Form — Version 1 3 December 10, 2008 Version
ce�and Minimization
c f ically describe measures taken to avoid or minimize'the ro osed im acts in desi inn P P P g g protect ation shall be limited to the area of erosion and the area in which bank erosion poses potential risk of existing sanitary sewer
ff
1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques
Construction access will be along the sanitary sewer�easment to minimize impacts to the,npanan buffer,and stream banks,in
this area
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a �Does the pr o�ect-require Compensatory Mitigation for
ts to Waters of the U S or Waters of the State
❑ Yes , ® No
2b If yes, rmtigatibn is required by (check all that apply)
❑ DWQ ❑ Corps
2c If yes, which mitigation option will be used for this
project'
❑ Mitigation bank
❑ Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a Name of'Mitigation Bank
3b Credits Purchased (attach receipt and letter)
Type
Quantity
3c Comments
4. Complete if Making a Payment to In-lieu ,Fee Program
4a Approval letter from. in -lieu fee program is attached
❑ Yes
4b. Stream mitigation requested
linear feet
4c If using stream, mitigation, stream temperature,
❑ warm ❑ cool ❑cold
4d Buffer mitigation requested (DWQ only)
squaretfeet
4e Riparian wetland mitigation requested
acres
4f Non - riparian wetland `mitigation requested
acres
4g Coastal (tidal) wetland - mitigation requested,
acres
4h Comments
if
5. Complete if Using a Permittee Responsible Mitigation Plan
5a If using a responsible mitigation plan, provide a description of,the proposed mitigation plan
Page 7 of 11
PCN Form — Version 1 3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a Will the project,result in an impact within a protected riparian buffer that requires
❑ Yes ®No
buffer mitigation?
6b If yes, then identify the square feet of impact to each zone,of the riparian buffer that requires mitigation Calculatefth&
amount of mitigation required
Zone
6c
Reason for impact
6d
Total impact
Multiplier
6e
Required mitigation
(square feet)
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1 5
6f Total buffer mitigation required:
6g- If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private, mitigation bank,
permittee responsible riparian buffer`restoration, payment into an approved in- lieu,fee fund)
tin comments
Page 8 of 11
PCN Form — Version 1'.3 December 10, 2008 Version
E.. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1a Does,the project include or is it adjacent to protected riparian buffers identified
Within one of the NC Riparian Buffer Protection Rules? ❑ Yes ®No
1b If yes, then is a diffuse flow plan included2 If'no, explain why
Comments ❑ Yes ® No
2., Stormwater Mana ementTlan
2a What is the overall percent imperviousness of this project? HEEIN/A %
2b Does this project require a Stormwater Management Plan? Yes No
2c - If this project DOES NOT require a Stormwater Management Plan, explain why
2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative.descnption of the plan
2e Who will be responsible,for the review of the Stormwater Mana ement Plans
FE Certfied Local Government 9 DWQ Stormwater Program DWQ 401 U It
3. Certified Local Government,Stormwater Review
3a In which local government's jurisdiction is this project?
❑ Phase II
3b Which of the following locally - implemented stormwater management programs ❑ NSW
apply (check -all that apply) El USMP
❑ Water Supply Watershed
❑ Other
3c Has the approved Stormwater Management Plan with proof of'approval been El Yes ❑ No
attached?
4. DWQ'Stormwater Program Review
❑ Coastal counties
4a Which of the following state - implemented stormwater management programs apply LEI] HOW
(check all that apply) ❑ ORW
❑ Session Law 2006 -246
❑ Other
4b Has the approved Stormwater Management Plan with proof of approval been
attached
❑ Yes ❑ No
5: DWQ 401 Unit Stormwater Review,
5a Does the Stormwater Management Plan meet the,approprnate requirements?
❑ Yes ❑ No
5b Have all of the 401 Unit submittal requirements been mete
❑ Yes ❑ No
Page 9 of 11
PCN Form — Version 1 3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
la Does the project involve an expenditure of public (federal/state/local) funds or the
use of public (federal /state) land? ❑ Yes ® No
lb If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of'the National or State ❑ Yes ❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c If you answered "yes" to the above; has the document review been, finalized by the
State Clearing House?' (If so, attach a,copy of the NEPA or SEPA final approval
letter )
❑ Yes ❑ No
Comments-
2. Violations (DWQ Requirement)
2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H - 0500), Isolated
Wetland Rules 6 5A NCAC 2H 1300), DWQ Surface Water or Wetland StandardTO es ;[DNo
or Riparian Buffer Rules (15A NCAC 2B 0200)
2b Is this an after- the -fact permit application? es
2c If you answered `yes" to one or both of the above questions, provide an explanation of the violation(s)
3. Cumulative Impacts (DWQ Requirement)
3a Will this project (based on past and reasonably anticipated future impacts) result, in
additional developmeht, ,which could impact nearby downstream water quality? ❑ Yes ® No
3b If you answered "yes" to the, above,, submit a qualitative orrquantitative cumulative impact analysis in accordance. with the
most recent DWQ policy- If you answered "no," provide -a short narrative description
4. Sewage Disposal (DWQ Requirement)
4a Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility
NA
L
Page .10 of 1,1
RCN Form — Version 1 3 December 10, 2008 Version
5. Endangered Species and'Designated Critical Habitat (Corps Requirement)
5a Will this,project<occur in or nearran- _area -with federally protectedlsp- - or
habitats ❑ Yes ® No
5b HaVe yowchecked with, the USFWS concerning Endangered Species Act
Impacts? ❑Yes No
5c. If yes, Indicate the USFWS,Field�Office,you have contacted ❑ 'Raleigh
❑ Asheville
5d What,data sources'did you,use;to determine - whether yoursite�wculd Impact Endangered Species or Designated Critical
Habitat?
6. Essential Fish HabltaC(Corps Requirement)
6a ,,WIII this project occur in or,near amarea,designated as essential fish habitat? ❑ Yes No
6b 'What'data sources did you use to, determine whether your site would'impact Essential Fish Habitat?
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a W,ill this, project occur`irn or'near an area that the,state, federal or tribal
governments have, designated' as having historic or cultural preservation
status (p,g ,,National Hlstoric,Trust designation or'properties significant in - ❑ Yes ® No
North Carolina history and archaeology)?
7b,, What datwsources did you,use to determine whether your site would impact,histori- or archeological resources
S. ,Flood Zone Designation (Corps Requirement)
,-8a Will this project occur in a FEMA - designated 100 -year floodplain? ❑ Yes ® No
8b If yes, explain how project,meets FEMA requirements
8c What sources) did you use to make the floodplain determination?
Dale Hyatt,, PE % September 9,
/ 2014
AppllcanUAgent;s Printed Name Apt nt/ gent's Signature
(Agent's signature is ali .only, rf�ah,authonzatlon letter,from,the,applicant Date
Is provided
Page 11 ,of 11
RCN Form — Version 1 3 December 10, 2008 Version
IL
C-o s i
•
>- F-
cyz a
\ \C)
•
�
•
W
OW
O
Sz
CO
0
R
W
e� ...
LL
ON 'dl2i - 3n1a4 311lll
`- NO IldZR8d1S )i NV8 dill
ji�:j
0311WNObtl �1CB31W %3 CI'tlll3b tl6M IY04i N016GiW113G bONtl LgHLM 1N31V1�00 CINL i0 3Y!
IO bO NOLL]fg011d3b'NppC3B9pd ANY O3AYiY3b 3W iUXNtl TV a1gb0 Atl/A
�\ W
N 2 Z
a 0 p = -
R a oo� m Q
• s N00 ti•O< �" OWW 1I-
Ile 5 El 0
4
N � I— U
ao 1a� `� �,' ' II W
LLI
U d Y ty Y w
41 1 (n J (n _ x
W
V) Z -
'�tt J O V)
U N
x - I -1T_I_ ui
I -
` r ....� =1 I I =1 I I- o Z
J 3 •err I I —III o U o a
LJ
LLJ
Y •W o —III W 3� Uw
�►a`� m a
ate' z II D zW a�
WX� F- WY N� UW
I (n OZ OJ
W O m
■
i�
a
j
i
Q •
M
CD Y �
A
W � ♦•
W .�
00 •
W •
Z Y I•••••
D O i••
i
•
i9 p1 �•
,J •
a
U
■
O N
Z r-
57<
(� Q
0
v �
•
>- F-
•
�
•
W
OW
O
Sz
CO
0
R
W
LL.
O
•
N;
O Z
a
F
Z
•
F- w
�//
m_
r
i•
W
x
w
�
z
a
w
IO bO NOLL]fg011d3b'NppC3B9pd ANY O3AYiY3b 3W iUXNtl TV a1gb0 Atl/A
�\ W
N 2 Z
a 0 p = -
R a oo� m Q
• s N00 ti•O< �" OWW 1I-
Ile 5 El 0
4
N � I— U
ao 1a� `� �,' ' II W
LLI
U d Y ty Y w
41 1 (n J (n _ x
W
V) Z -
'�tt J O V)
U N
x - I -1T_I_ ui
I -
` r ....� =1 I I =1 I I- o Z
J 3 •err I I —III o U o a
LJ
LLJ
Y •W o —III W 3� Uw
�►a`� m a
ate' z II D zW a�
WX� F- WY N� UW
I (n OZ OJ
W O m
■
i�
a
j
i
Q •
M
CD Y �
A
W � ♦•
W .�
00 •
W •
Z Y I•••••
D O i••
i
•
i9 p1 �•
,J •
a
U
■
O N
Z r-
57<
(� Q
0
v �
Z F-
OW— W
OL`0 2
W0W
N
< i
mQO
O :� W
wow W
a.
QQav
Z
_ 0
z
O
M
.-1
N
O
O
M
_II
L
J
V)
•
>- F-
•
U
•
W
OW
O
Sz
CO
0
W
LL.
O
•
N;
O Z
��
•
Z
•
F- w
�//
%�
i•
W
Z F-
OW— W
OL`0 2
W0W
N
< i
mQO
O :� W
wow W
a.
QQav
Z
_ 0
z
O
M
.-1
N
O
O
M
_II
L
J
V)