Loading...
HomeMy WebLinkAboutSW1220801_Stormwater Report_20220824Sparks Drive Commercial Building Stormwater Narrative 176 Sparks Drive Forest City, NC July 9, 2022 // \, � Q�oFESS/pti9< y ,i SEAL 042797 FHGINE�� Kevin Pulis, PE Senior Civil Engineer Tarr Group, LLC Sparks Drive Commercial Development — Forest City, NC Stormwater Narrative Project Description and Existing Conditions The purpose of this project is to construct a commercial development with one building totaling 7,100 square feet with associated parking, utilities, and landscaping on a 1.37-acre parcel. The site is located at 176 Sparks Drive in the Town of Forest City. The parcel is currently entirely vegetated and historical aerial images show that it is primarily grass in good condition. The site slopes from west to east at approximately a 5 percent slope. Stormwater Quantity Town of Forest City Requirements Per Town Ordinance 10.3.1, post -development runoff rates be the same as pre -development runoff rates for the 1- and 10-year, 24-hour storms. A wet pond is being proposed to meet this requirement. NCDEQ Requirements Since this project exceeds 1 acre of disturbance the NCDEQ stormwater ordinance is in effect. Since a wet pond is being proposed, State Code 15A NCAC 02H.1053(8) requires that "the wet pond shall discharge runoff from the one-year, 24-hour storm in a manner that minimizes hydrologic impacts to the receiving channel. Pre -Development As mentioned in the Project Description, the site currently contains a mixture of scrub trees and grasses in fair condition. According to the NRCS Soil Map, 100% of this site consists of Pacolet Sandy Clay Loam which has a hydraulic soil group of "B". Based on a topographic survey there are three definable watersheds on this site which flow offsite at different locations. Each watershed was modeled and assumed to combine downstream to give a total pre -development site runoff rate. A curve number (CN) of 61 was assigned to each watershed based on the existing land use of "grass — good condition". These CN values were used in the stormwater modeling for pre -development runoff rates. A time of concentration (Tc) for each watershed was calculated based on its most hydraulically remote portion. Given the topography the Tc values ranged from 5 minutes to 13.3 minutes. Using the information above, Hydraflow Hydrographs software (2020 Version) was used to calculate a pre -development peak runoff rate for the site. The table at the end of the Post -Development section displays the results of the pre -development study. Please refer to the Appendix for detailed calculations for the CN, Tc, and peak runoff rates for the 1-, 10-, and 100-year storms. Post -Development In the post -development condition, 36,437 SF of built upon area (BUA) will be created. This BUA can be broken down as 27,108 SF of parking, 1,735 SF of sidewalk, 7,100 SF of roof, and 494 SF of dumpster enclosure. The site will be graded to create 4 distinct watersheds. Storm drain and curb will be installed to take the bulk of the site (48,600 SF) to a proposed wet pond. The remaining portion of the site (11,077 SF) will bypass the wet pond. The portions of the site that bypass the wet pond will not cause any adverse impact to downstream properties. A weighted curve number (CN) for each watershed was calculated based on their land uses. Watersheds 1 and 2 consist of landscaped areas and have been assigned a CN of 61 based on the land use of "lawn — good condition". Watershed 3 was assigned a composite CN of 88 based on the land uses of "lawn — good condition", "impervious area", and "open water" (the proposed wet pond's permanent pool). Watershed 4 was assigned a composite CN of 85 based on the land uses of "lawn — good condition" and "impervious area". Each of these CN values were used in the stormwater modeling for post - development runoff rates. A time of concentration (Tc) of 5 minutes was assigned to each watershed based on the convention for post -development hydrology studies. Using the information above, Hydraflow Hydrographs software (2020 Version) was used to calculate a post -development peak runoff rate for the site for the 1-, 10-, and 100-year, 24-hour storms. These calculations showed an increase in peak flow rates in the post -development condition. In order to meet the requirements of the Town of Forest City and NCDEQ, a wet pond with a peak rate attenuation control structure will be created. This wet pond was designed to limit overall site peak runoff rates for the 1- and 10-year, 24-hour storms. The pond was also analyzed for the 100-year, 24- hour storm to ensure that it would not overtop and maintains a minimum 1 foot of freeboard. Following is a summary of the results of the site's post -development versus pre -development peak hydrology study when routed through the wet pond: Wet Pond— Permanent Pool = 994.00, Emergency Spillway = 997.00, Top of Dam = 998.00 Storm Event Pre -Development Post -Development Wet Pond Max WSE 1-year, 24 hr 0.606 cfs 0.421 cfs 995.58' 10-year, 24 hr 3.251 cfs 2.682 cfs 996.61' 100-year, 24 hr 7.261 cfs 13.16 cfs 996.90' Based on the results shown in the table above the site is confirmed to meet the stormwater quantity requirements of the Town of Forest City and NCDEQ. Stormwater Quality Town of Forest City Requirements The Town of Forest City doesn't have any water quality requirements. NCDEQ Requirements Since this project exceeds 1 acre of disturbance the NCDEQ stormwater ordinance is in effect. Since this project is considered high density and is located in an urbanizing area, State Code 15A NCAC 02H.1017(5) requires water quality treatment for the one -inch storm to achieve an 85% TSS annual removal. SCM Utilized Under the most current version of the NCDEQ Stormwater Design Manual, all "Primary" SCMs are considered to provide at least 85% TSS annual removal if they're designed in accordance to the NCDEQ minimum design criteria. For this project a wet pond was utilized. This wet pond is designed to treat the first inch of runoff (85% TSS removal) per the MDC in 15A NCAC 2H.1053 and SCM credit document C-3 of the NCDEQ Stormwater Design Manual. To meet the MDC for wet ponds, there are two main design elements that must be considered — water quality treatment volume and the design of the main pool. The following information describes those requirements and how they are met. Water Quality (First Inch) Treatment To meet the MDC each wet pond has to be designed to capture and treat the first inch of runoff from the impervious areas that drains to it. For this project though there is a portion of the site that is downhill of the pond and therefore cannot drain to it. The pond was oversized to account for the lack of water quality treatment of that area. Below is a breakdown of the impervious areas and the calculated water quality volume: • Direct area draining to wet pond = 48,600 square feet (1.116 acres) • Impervious area to wet pond = 32,560 square feet • Impervious area that bypasses the wet pond = 3,877 square feet • Impervious area percentage not including bypass impervious = 67% • Impervious area percentage including the bypass imperious = 75% • Design Volume = 3630 * 1 inch * (0.05 + 0.9 * 0.75) * 1.116 = 2,936 cubic feet For this design an overflow weir will be installed at elevation 995.25 which provides a water quality treatment volume of 3,188 cubic feet. Additionally, the water quality volume must be drawn down over a period of 2 to 5 days. Per the results of the hydrology study the following draw down times are achieved: • Beginning of drawdown at 24.80 hours • Complete drawdown at 78.83 hours • Total drawdown time of 54.03 hours = 2.25 days Main Pool Design To meet the MDC the main pool shall be designed with an average depth between 3 and 8 feet and a surface area to drainage area ratio (SA/DA) that varies based on the average impervious area of the watershed draining to it. Below is a breakdown of those values and how they were met: Average Depth • Equation 3 of the MDC is being used since the vegetated shelf is submerged. • Volume of permanent pool = 2,550 cubic feet • Volume of submerged portion of vegetated shelf = 330 cubic feet • Net volume of main pool = 2,220 cubic feet • Area at bottom of submerged shelf = 730 square feet • Average depth = 3.04 feet SA/DA Ratio • Drainage area to wet pond = 48,600 square feet • Impervious area of drainage area (including bypassed impervious area) = 75% • Required SA/DA ratio per Table 1 of the MDC = 2.72 • Surface area of permanent pool = 1,547 square feet • Provided SA/DA ratio = 3.18 Operations and Maintenance Requirements Permanent maintenance of the wet pond is critical to ensure they function as designed. The wet pond will require inspections and maintenance on a regular basis. The engineering drawings contain a specific operations and maintenance schedule. NCDEQ also provides guidance and requirements on operations and maintenance of the wet pond. The owner of record shall refer to NCDEQ documents throughout the life of the property as the guidance is constantly being updated and improved. Appendix A Pre -Development and Post -Development Maps FINAL DRAWING - RELEASED FOR CONSTRUCTIO, PRE -DEVELOPMENT WATERSHEDS "PRE-WS 1" AREA = 0.31 AC Tc = 13.3 MINUTES CN = 61 (100% GRASS - GOOD CONDITION) "PRE-WS 2" AREA = 0.99 AC Tc = 12.3 MINUTES CN = 61 (100% GRASS - GOOD CONDITION) "PRE-WS 3" AREA = 0.06 AC Tc = 5 MINUTES (ASSUMED) CN = 61 (100% GRASS - GOOD CONDITION) I / I � l / / I I I / I i Benchmark-1/2"IRS N:591384.16 99� 990 1128369.12 Z:999 I I 1 I I I Darrill Burnett DBA Tri-City Tire Service DB 2022 Pg 20�0 PR -WS 2 245-1-21 G II / / I 1 100' OF SHEET I �I / FLOW AT 2.5% / 80' OF �HALLOYV tpA: � \ CONCENTRATED FLOW AT 5% *1111 al 1� / Imo♦ / I / 1 00'OF SHEET / too FLOW AT 2% _i / we ` , �_ _�P"RE-WS 1 --- / 1 1 . — 1000 — — g9 - — — — — — — 999 ftl — — — — — - 998 P � � PREP-WS 3 STUDY POINT PRE-WS 3 l I\ PRE-WS 1 STUDY POINT ( 80' OF SHALLOW CONCENTRATED \ FLOW AT 6.25% PRE-WS 2 STUDY PO PGT \ Forest City NC 2020, LLC DB 2035 Pg 3305 PB 41 Pg 211 245-1-21 1 NC FIRM 4P-1919 IU C _j w }-U z � Y U jj) Of j � a- w J p 0 LL LL N ORIGINAL ISSUE DATE: 1111012112 REVISIONS: PROJ. NO. 22025 PRE -DEVELOPMENT WATERSHED EXHIBIT 40 GRAPHIC SCALE a° E X 1 FINAL DRAWING - RELEASED FOR CONSTRUCTIOA POST -DEVELOPMENT WATERSHEDS "POST-WS 1" AREA = 0.04 AC Tc = 5 MINUTES (ASSUMED) CN = 61 (100% GRASS - GOOD CONDITION) "POST-WS 2" AREA = 0.07 AC Tc = 5 MINUTES (ASSUMED) CN = 61 (100% GRASS - GOOD CONDITION) "POST-WS 3" AREA = 1.12 AC Tc = 5 MINUTES (ASSUMED) CN = 88 (5% WET POND OPEN WATER, 67% IMPERVIOUS, 28% GRASS - GOOD CONDITION) "POST-WS 4 (UNDETAINED)" AREA = 0.11 AC TC = 5 MINUTES (ASSUMED) CN = 85 (64% IMPERVIOUS, 36% GRASS - GOOD CONDITION) I / \ lO l \ I I � Darrill Burnett N DBA Tri-City Tire Service DB 2022 Pg 20�0 245-1-21 G I / / o II 01 i POT-WS 3 STUDY POINT / h PO T-WS a a m N Q 0 N O N O N � M�W� / \ I !�1/002 4'Sg, 1001 52i w1.69 ctx II II I I I 1 / POST-WS 4 (UNDETAINED) /9999 STUDY POINT /� \ N f \ POST-WS 4 SUNDETAINED) TUDY POINT s� \ °\ 1 \ POST-WS 2 STUDY PO P T �v I`\ POST-WS 2 T\ I \\ I\\ I II/ Forest City NC 2020, LLC DB 2035 Pg 3305 PB 41 Pg 211 245-1-21 1 / I \ / POST-WS 1 STUDY POINT ill 1 N ,6 2024 W\ \ \ POST-WS 1 Im NC FIRM 4P-1919 J J W > } -- z Y U >LU a-w 1 p m p Li- r,- LL N 1 � ORIGINAL ISSUE DATE: 1111112112 REVISIONS: PROJ. NO. 22025 POST -DEVELOPMENT WATERSHED EXHIBIT 40 1i EX2 N IF THIS SHEET DOES NOT MEASURE 22"x34", IT HAS BEEN ENLARGED OR REDUCED. PLEASE ADJUST SCALE ACCORDINGLY. Appendix 6 Hydraflow Hydrographs Calculations Hy d raf I ow Table of Contents Forest City Hydrology Calculations.gpw Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hydrograph Return Period Recap............................................................................. 1 1 -Year SummaryReport......................................................................................................................... 2 HydrographReports................................................................................................................... 3 Hydrograph No. 1, SCS Runoff, Pre-WS 1.............................................................................. 3 TR-55 Tc Worksheet........................................................................................................... 4 Hydrograph No. 2, SCS Runoff, Pre-WS 2.............................................................................. 5 TR-55 Tc Worksheet........................................................................................................... 6 Hydrograph No. 3, SCS Runoff, Pre-WS 3.............................................................................. 7 Hydrograph No. 4, Combine, Pre -Development Total.............................................................. 8 Hydrograph No. 5, SCS Runoff, Post-WS 1............................................................................. 9 Hydrograph No. 6, SCS Runoff, Post-WS 2........................................................................... 10 Hydrograph No. 7, SCS Runoff, Post-WS 3........................................................................... 11 Hydrograph No. 8, Reservoir, Wet Pond................................................................................ 12 PondReport - Wet Pond.................................................................................................... 13 Hydrograph No. 9, SCS Runoff, Post-WS 4(Undetained)..................................................... 14 Hydrograph No. 10, Combine, Post -Development Total ........................................................ 15 10 -Year SummaryReport....................................................................................................................... 16 HydrographReports................................................................................................................. 17 Hydrograph No. 1, SCS Runoff, Pre-WS 1............................................................................ 17 Hydrograph No. 2, SCS Runoff, Pre-WS 2............................................................................ 18 Hydrograph No. 3, SCS Runoff, Pre-WS 3............................................................................ 19 Hydrograph No. 4, Combine, Pre -Development Total............................................................ 20 Hydrograph No. 5, SCS Runoff, Post-WS 1........................................................................... 21 Hydrograph No. 6, SCS Runoff, Post-WS 2........................................................................... 22 Hydrograph No. 7, SCS Runoff, Post-WS 3........................................................................... 23 Hydrograph No. 8, Reservoir, Wet Pond................................................................................ 24 Hydrograph No. 9, SCS Runoff, Post-WS 4(Undetained)..................................................... 25 Hydrograph No. 10, Combine, Post -Development Total ........................................................ 26 100 - Year SummaryReport ....................................................................................................................... 27 HydrographReports................................................................................................................. 28 Hydrograph No. 1, SCS Runoff, Pre-WS 1............................................................................ 28 Hydrograph No. 2, SCS Runoff, Pre-WS 2............................................................................ 29 Hydrograph No. 3, SCS Runoff, Pre-WS 3............................................................................ 30 Hydrograph No. 4, Combine, Pre -Development Total............................................................ 31 Hydrograph No. 5, SCS Runoff, Post-WS 1........................................................................... 32 Hydrograph No. 6, SCS Runoff, Post-WS 2........................................................................... 33 Hydrograph No. 7, SCS Runoff, Post-WS 3........................................................................... 34 Hydrograph No. 8, Reservoir, Wet Pond................................................................................ 35 Hydrograph No. 9, SCS Runoff, Post-WS 4(Undetained)..................................................... 36 Hydrograph No. 10, Combine, Post -Development Total ........................................................ 37 OFReport.................................................................................................................. 38 Hydrograph Return Period Recap raflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1 -yr 2-yr 3-yr 5-yr 1 0-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 0.139 ------- ------- ------- 0.753 ------- ------- 1.659 Pre-WS 1 2 SCS Runoff ------ 0.445 ------- ------- ------- 2.403 ------- ------- 5.297 Pre-WS 2 3 SCS Runoff ------ 0.037 ------- ------- ------- 0.177 ------- ------- 0.379 Pre-WS 3 4 Combine 1,2,3 0.606 ------- ------- ------- 3.251 ------- ------- 7.261 Pre -Development Total 5 SCS Runoff ------ 0.025 ------- ------- ------- 0.118 ------- ------- 0.252 Post-WS 1 6 SCS Runoff ------ 0.043 ------- ------- ------- 0.207 ------- ------- 0.442 Post-WS 2 7 SCS Runoff ------ 3.713 ------- ------- ------- 7.589 ------- ------- 12.02 Post-WS 3 8 Reservoir 7 0.278 ------- ------- ------- 2.275 ------- ------- 11.36 Wet Pond 9 SCS Runoff ------ 0.325 ------- ------- ------- 0.703 ------- ------- 1.142 Post-WS 4 (Undetained) 10 Combine 5,6,8, 0.421 ------- ------- ------- 2.682 ------- ------- 13.16 Post -Development Total 9 Proj. file: Forest City Hydrology Calculations.gpw Saturday, 07 / 9 / 2022 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0.139 2 724 515 ------ ------ ------ Pre-WS 1 2 SCS Runoff 0.445 2 724 1,645 ------ ------ ------ Pre-WS 2 3 SCS Runoff 0.037 2 718 91 ------ ------ ------ Pre-WS 3 4 Combine 0.606 2 722 2,251 1, 2, 3 ------ ------ Pre -Development Total 5 SCS Runoff 0.025 2 718 60 ------ ------ ------ Post-WS 1 6 SCS Runoff 0.043 2 718 106 ------ ------ ------ Post-WS 2 7 SCS Runoff 3.713 2 716 7,612 ------ ------ ------ Post-WS 3 8 Reservoir 0.278 2 750 7,574 7 995.58 4,212 Wet Pond 9 SCS Runoff 0.325 2 716 658 ------ ------ ------ Post-WS 4 (Undetained) 10 Combine 0.421 2 718 8,398 5, 6, 8, ------ ------ Post -Development Total 9 Forest City Hydrology Calculations.gpw Return Period: 1 Year Saturday, 07 / 9 / 2022 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hyd. No. 1 Pre-WS 1 Hydrograph type = SCS Runoff Peak discharge = 0.139 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 515 cuft Drainage area = 0.310 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.30 min Total precip. = 3.20 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 Pre-WS 1 Hyd. No. 1 -- 1 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 4 TR55 Tc Worksheet Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Hyd. No. 1 Pre-WS 1 Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.86 0.00 0.00 Land slope (%) = 2.00 0.00 0.00 Travel Time (min) = 12.99 + 0.00 + 0.00 = 12.99 Shallow Concentrated Flow Flow length (ft) = 80.00 0.00 0.00 Watercourse slope (%) = 6.25 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =4.03 0.00 0.00 Travel Time (min) = 0.33 + 0.00 + 0.00 = 0.33 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc.............................................................................. 13.30 min I- Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hyd. No. 2 Pre-WS 2 Hydrograph type = SCS Runoff Peak discharge = 0.445 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 1,645 cuft Drainage area = 0.990 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.30 min Total precip. = 3.20 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 Pre-WS 2 Hyd. No. 2 -- 1 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) TR55 Tc Worksheet Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Hyd. No. 2 Pre-WS 2 Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.86 0.00 0.00 Land slope (%) = 2.50 0.00 0.00 Travel Time (min) = 11.88 + 0.00 + 0.00 = 11.88 Shallow Concentrated Flow Flow length (ft) = 80.00 0.00 0.00 Watercourse slope (%) = 5.00 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =3.61 0.00 0.00 Travel Time (min) = 0.37 + 0.00 + 0.00 = 0.37 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc.............................................................................. 12.30 min I M Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hyd. No. 3 Pre-WS 3 Hydrograph type = SCS Runoff Peak discharge = 0.037 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 91 cuft Drainage area = 0.060 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.20 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.10 0.09 M: 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 0 Pre-WS 3 Hyd. No. 3 -- 1 Year Q (cfs) 0.10 0.09 M M 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hyd. No. 4 Pre -Development Total Hydrograph type = Combine Peak discharge = 0.606 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 2,251 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 1.360 ac Q (cfs) 1.00 0.90 WE 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0 Pre -Development Total Hyd. No. 4 -- 1 Year Q (cfs) 1.00 0.90 M :M 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 — Hyd No. 1 Hyd No. 2 Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hyd. No. 5 Post-WS 1 Hydrograph type = SCS Runoff Peak discharge = 0.025 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 60 cuft Drainage area = 0.040 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.20 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.10 0.09 M: 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 0 Post-WS 1 Hyd. No. 5 -- 1 Year Q (cfs) 0.10 0.09 M M 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) 10 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hyd. No. 6 Post-WS 2 Hydrograph type = SCS Runoff Peak discharge = 0.043 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 106 cuft Drainage area = 0.070 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.20 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.10 0.09 M: 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 0 Post-WS 2 Hyd. No. 6 -- 1 Year Q (cfs) 0.10 0.09 M M 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hyd. No. 7 Post-WS 3 Hydrograph type = SCS Runoff Peak discharge = 3.713 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 7,612 cuft Drainage area = 1.120 ac Curve number = 88* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.20 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(0.060 x 100) + (0.750 x 98) + (0.310 x 61)] / 1.120 Q (cfs) 4.00 3.00 2.00 1.00 0.00 0 120 240 — Hyd No. 7 Post-WS 3 Hyd. No. 7 -- 1 Year 360 480 600 720 840 960 Q (cfs) 4.00 3.00 2.00 1.00 0.00 1080 1200 1320 Time (min) Hydrograph Report 12 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hyd. No. 8 Wet Pond Hydrograph type = Reservoir Peak discharge = 0.278 cfs Storm frequency = 1 yrs Time to peak = 750 min Time interval = 2 min Hyd. volume = 7,574 cuft Inflow hyd. No. = 7 - Post-WS 3 Max. Elevation = 995.58 ft Reservoir name = Wet Pond Max. Storage = 4,212 cuft Storage Indication method used Q (cfs) 4.00 3.00 2.00 1.00 0.00 0 480 — Hyd No. 8 Wet Pond Hyd. No. 8 -- 1 Year 960 1440 1920 Hyd No. 7 2400 2880 3360 3840 4320 ® Total storage used = 4,212 cuft Q (cfs) 4.00 3.00 2.00 1.00 0.00 4800 Time (min) Pond Report 13 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Pond No. 1 - Wet Pond Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 994.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 994.00 2,062 0 0 1.00 995.00 2,760 2,402 2,402 2.00 996.00 3,514 3,129 5,531 3.00 997.00 4,345 3,922 9,453 4.00 998.00 5,155 4,744 14,197 Culvert / Orifice Structures [A] [B] [C] [PrFRsr] Rise (in) = 18.00 1.00 0.00 0.00 Span (in) = 18.00 1.00 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft) = 991.30 994.00 0.00 0.00 Length (ft) = 130.00 0.00 0.00 0.00 Slope (%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a Yes No No Stage (ft) 4.00 rM M 0.00 0.00 4.00 Total Q 8.00 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 16.00 0.50 10.00 0.00 Crest El. (ft) = 996.60 995.25 997.00 0.00 WeirCoeff. = 3.33 2.60 2.60 3.33 Weir Type = 1 Broad Broad --- Multi-Stage = Yes Yes No No Exfil.(in/hr) = 0.000 (by Contour) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge Elev (ft) 998.00 997.00 995.00 994.00 12.00 16.00 20.00 24.00 28.00 32.00 36.00 40.00 44.00 48.00 Discharge (cfs) Hydrograph Report 14 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Hyd. No. 9 Post-WS 4 (Undetained) Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 0.110 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.20 in Storm duration = 24 hrs Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Saturday, 07 / 9 / 2022 = 0.325 cfs = 716 min = 658 cuft = 85* = 0 ft = 5.00 min = Type II = 484 Composite (Area/CN) _ [(0.070 Q (cfs) x 98) + (0.040 x 61)] / 0.110 Post-WS 4 (Undetained) Hyd. No. 9 -- 1 Year Q (cfs) 0.50 0.50 0.45 0.45 7 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 Of 0.00 0 120 Hyd No. 240 360 480 600 720 840 960 1080 9 1200 1320 1440 Time (min) 15 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hyd. No. 10 Post -Development Total Hydrograph type = Combine Peak discharge = 0.421 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 8,398 cuft Inflow hyds. = 5, 6, 8, 9 Contrib. drain. area = 0.220 ac Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 Hydrograph Summary Report 16 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0.753 2 722 2,022 ------ ------ ------ Pre-WS 1 2 SCS Runoff 2.403 2 722 6,459 ------ ------ ------ Pre-WS 2 3 SCS Runoff 0.177 2 718 356 ------ ------ ------ Pre-WS 3 4 Combine 3.251 2 722 8,837 1, 2, 3 ------ ------ Pre -Development Total 5 SCS Runoff 0.118 2 718 237 ------ ------ ------ Post-WS 1 6 SCS Runoff 0.207 2 718 415 ------ ------ ------ Post-WS 2 7 SCS Runoff 7.589 2 716 16,167 ------ ------ ------ Post-WS 3 8 Reservoir 2.275 2 724 16,129 7 996.61 7,924 Wet Pond 9 SCS Runoff 0.703 2 716 1,470 ------ ------ ------ Post-WS 4 (Undetained) 10 Combine 2.682 2 720 18,251 5, 6, 8, ------ ------ Post -Development Total 9 Forest City Hydrology Calculations.gpw Return Period: 10 Year Saturday, 07 / 9 / 2022 17 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hyd. No. 1 Pre-WS 1 Hydrograph type = SCS Runoff Peak discharge = 0.753 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 2,022 cuft Drainage area = 0.310 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.30 min Total precip. = 5.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 WE 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0 Pre-WS 1 Hyd. No. 1 -- 10 Year Q (cfs) 1.00 0.90 M :M 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report 18 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hyd. No. 2 Pre-WS 2 Hydrograph type = SCS Runoff Peak discharge = 2.403 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 6,459 cuft Drainage area = 0.990 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.30 min Total precip. = 5.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-WS 2 Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) 19 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hyd. No. 3 Pre-WS 3 Hydrograph type = SCS Runoff Peak discharge = 0.177 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 356 cuft Drainage area = 0.060 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 Pre-WS 3 Hyd. No. 3 -- 10 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 20 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hyd. No. 4 Pre -Development Total Hydrograph type = Combine Peak discharge = 3.251 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 8,837 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 1.360 ac Pre -Development Total Q (cfs) Hyd. No. 4 -- 10 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 4 — Hyd No. 1 Hyd No. 2 Hyd No. 3 21 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hyd. No. 5 Post-WS 1 Hydrograph type = SCS Runoff Peak discharge = 0.118 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 237 cuft Drainage area = 0.040 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 Post-WS 1 Hyd. No. 5 -- 10 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) 22 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hyd. No. 6 Post-WS 2 Hydrograph type = SCS Runoff Peak discharge = 0.207 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 415 cuft Drainage area = 0.070 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 Post-WS 2 Hyd. No. 6 -- 10 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) 23 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hyd. No. 7 Post-WS 3 Hydrograph type = SCS Runoff Peak discharge = 7.589 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 16,167 cuft Drainage area = 1.120 ac Curve number = 88* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) _ [(0.060 x 100) + (0.750 x 98) + (0.310 x 61)] / 1.120 Post-WS 3 Q (cfs) Hyd. No. 7 -- 10 Year Q (cfs) 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 — Hyd No. 7 Time (min) Hydrograph Report 24 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hyd. No. 8 Wet Pond Hydrograph type = Reservoir Peak discharge = 2.275 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 16,129 cuft Inflow hyd. No. = 7 - Post-WS 3 Max. Elevation = 996.61 ft Reservoir name = Wet Pond Max. Storage = 7,924 cuft Storage Indication method used Q (cfs) 8.00 .M 4.00 2.00 0.00 0 240 — Hyd No. 8 Wet Pond Hyd. No. 8 -- 10 Year 480 720 960 Hyd No. 7 1200 1440 1680 1920 2160 ® Total storage used = 7,924 cuft Q (cfs) 8.00 M 4.00 2.00 —6- 0.00 2400 Time (min) 25 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hyd. No. 9 Post-WS 4 (Undetained) Hydrograph type = SCS Runoff Peak discharge = 0.703 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 1,470 cuft Drainage area = 0.110 ac Curve number = 85* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(0.070 x 98) + (0.040 x 61)] / 0.110 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 9 Time (min) Hydrograph Report 26 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hyd. No. 10 Post -Development Total Hydrograph type = Combine Peak discharge = 2.682 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 18,251 cuft Inflow hyds. = 5, 6, 8, 9 Contrib. drain. area = 0.220 ac Q (cfs) 3.00 2.00 1.00 e Post -Development Total Hyd. No. 10 -- 10 Year 240 480 720 Hyd No. 10 — Hyd No. 5 Hyd No. 9 960 1200 Hyd No. 6 1440 1680 Hyd No. 8 Q (cfs) 3.00 2.00 1.00 �- 0.00 1920 Time (min) Hydrograph Summary Report 27 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 1.659 2 720 4,328 ------ ------ ------ Pre-WS 1 2 SCS Runoff 5.297 2 720 13,820 ------ ------ ------ Pre-WS 2 3 SCS Runoff 0.379 2 718 761 ------ ------ ------ Pre-WS 3 4 Combine 7.261 2 720 18,909 1, 2, 3 ------ ------ Pre -Development Total 5 SCS Runoff 0.252 2 718 508 ------ ------ ------ Post-WS 1 6 SCS Runoff 0.442 2 718 888 ------ ------ ------ Post-WS 2 7 SCS Runoff 12.02 2 716 26,414 ------ ------ ------ Post-WS 3 8 Reservoir 11.36 2 718 26,377 7 996.90 9,044 Wet Pond 9 SCS Runoff 1.142 2 716 2,460 ------ ------ ------ Post-WS 4 (Undetained) 10 Combine 13.16 2 718 30,232 5, 6, 8, ------ ------ Post -Development Total 9 Forest City Hydrology Calculations.gpw Return Period: 100 Year Saturday, 07 / 9 / 2022 Hydrograph Report 28 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Hyd. No. 1 Pre-WS 1 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 0.310 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 8.37 in Storm duration = 24 hrs Q (cfs) 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre-WS 1 Hyd. No. 1 -- 100 Year 120 240 360 480 600 720 840 960 Hyd No. 1 Saturday, 07 / 9 / 2022 = 1.659 cfs = 720 min = 4,328 cuft = 61 = 0 ft = 13.30 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 29 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hyd. No. 2 Pre-WS 2 Hydrograph type = SCS Runoff Peak discharge = 5.297 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 13,820 cuft Drainage area = 0.990 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.30 min Total precip. = 8.37 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-WS 2 Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) 30 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hyd. No. 3 Pre-WS 3 Hydrograph type = SCS Runoff Peak discharge = 0.379 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 761 cuft Drainage area = 0.060 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.37 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 Pre-WS 3 Hyd. No. 3 -- 100 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 31 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hyd. No. 4 Pre -Development Total Hydrograph type = Combine Peak discharge = 7.261 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 18,909 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 1.360 ac Q (cfs) 8.00 M 4.00 2.00 0.00 0 120 240 360 480 600 720 — Hyd No. 4 - Hyd No. 1 Pre -Development Total Hyd. No. 4 -- 100 Year Q (cfs) 8.00 M 4.00 r M� 0.00 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Hyd No. 3 Time (min) 32 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hyd. No. 5 Post-WS 1 Hydrograph type = SCS Runoff Peak discharge = 0.252 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 508 cuft Drainage area = 0.040 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.37 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 Post-WS 1 Hyd. No. 5 -- 100 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) 33 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hyd. No. 6 Post-WS 2 Hydrograph type = SCS Runoff Peak discharge = 0.442 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 888 cuft Drainage area = 0.070 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.37 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 Post-WS 2 Hyd. No. 6 -- 100 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) 34 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hyd. No. 7 Post-WS 3 Hydrograph type = SCS Runoff Peak discharge = 12.02 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 26,414 cuft Drainage area = 1.120 ac Curve number = 88* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.37 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(0.060 x 100) + (0.750 x 98) + (0.310 x 61)] / 1.120 Q (cfs) 14.00 12.00 10.00 : M . 11 4.00 2.00 e Post-WS 3 Hyd. No. 7 -- 100 Year Q (cfs) 14.00 12.00 10.00 M . We 4.00 2.00 —' '_""-_ I ' I I T 0.00 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 7 Time (min) 35 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hyd. No. 8 Wet Pond Hydrograph type = Reservoir Peak discharge = 11.36 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 26,377 cuft Inflow hyd. No. = 7 - Post-WS 3 Max. Elevation = 996.90 ft Reservoir name = Wet Pond Max. Storage = 9,044 cuft Storage Indication method used. Wet Pond Q (cfs) Hyd. No. 8 -- 100 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Time (min) Hyd No. 8 Hyd No. 7 ® Total storage used = 9,044 cult Hydrograph Report 36 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Hyd. No. 9 Post-WS 4 (Undetained) Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 0.110 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.37 in Storm duration = 24 hrs Composite (Area/CN) = [(0.070 x 98) + (0.040 x 61)] / 0.110 Q (cfs) 2.00 1.00 0.00 0 120 240 360 480 600 720 840 Hyd No. 9 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post-WS 4 (Undetained) Hyd. No. 9 -- 100 Year Saturday, 07 / 9 / 2022 = 1.142 cfs = 716 min = 2,460 cuft = 85* = 0 ft = 5.00 min = Type II = 484 960 1080 Q (cfs) 2.00 1.00 0.00 1200 Time (min) 37 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020 Saturday, 07 / 9 / 2022 Hyd. No. 10 Post -Development Total Hydrograph type = Combine Peak discharge = 13.16 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 30,232 cuft Inflow hyds. = 5, 6, 8, 9 Contrib. drain. area = 0.220 ac Q (cfs) 14.00 12.00 10.00 M .UR 4.00 2.00 Post -Development Total Hyd. No. 10 -- 100 Year Q (cfs) 14.00 12.00 10.00 M I. �r@ 4.00 ItM 1 1 It 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 10 Hyd No. 5 Hyd No. 6 Hyd No. 8 Time (min) Hyd No. 9 Hydraflow Rainfall Report 38 Hydraflow Hydrographs Extension for Autodeskg Civil 3DO by Autodesk, Inc. v2020 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (NIA) 1 0.0000 0.0000 0.0000 -------- 2 73.8799 13.2000 0.8898 -------- 3 0.0000 0.0000 0.0000 -------- 5 0.0000 0.0000 0.0000 -------- 10 73.4818 12.4000 0.8020 -------- 25 0.0000 0.0000 0.0000 -------- 50 0.0000 0.0000 0.0000 -------- 100 59.4098 9.6000 0.6647 -------- File name: NC Forest City.IDF Intensity = B / (Tc + D)^E Saturday, 07 / 9 / 2022 Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.59 4.50 3.79 3.27 2.89 2.59 2.35 2.15 1.99 1.85 1.73 1.62 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10 7.44 6.07 5.17 4.52 4.03 3.64 3.33 3.07 2.86 2.67 2.51 2.37 25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100 10.00 8.22 7.07 6.25 5.63 5.15 4.76 4.43 4.16 3.92 3.72 3.54 Tc = time in minutes. Values may exceed 60. PreciD. file name: C:\Users\Kevin Pulis\tarr-arouD.com\Dvlan Tarr - Production\Stormwater\NC - Forest Citv.DcD Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.20 3.86 0.00 0.00 5.60 0.00 0.00 8.37 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-1 st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Appendix C Water Quality Drawdown Table 17 Wet Pond 1 inch WQ volume draw down begins Hydrograph Discharge Table at hour 24.80 Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 23.90 0.034 995.28 11.43 0.029 ----- ----- ----- 0.011 ----- ----- ----- 0.041 23.93 0.034 995.28 11.43 0.029 ----- ----- ----- 0.011 ----- ----- ----- 0.041 23.97 0.034 995.28 11.43 0.029 ----- ----- ----- 0.011 ----- ----- ----- 0.041 24.00 0.034 995.28 11.43 0.029 ----- ----- ----- 0.011 ----- ----- ----- 0.041 24.03 0.027 995.28 11.43 0.029 ----- ----- ----- 0.011 ----- ----- ----- 0.040 24.07 0.013 995.28 11.43 0.029 ----- ----- ----- 0.011 ----- ----- ----- 0.040 24.10 0.004 995.28 11.43 0.029 ----- ----- ----- 0.011 ----- ----- ----- 0.040 24.13 0.000 995.27 11.43 0.029 ----- ----- ----- 0.011 ----- ----- ----- 0.040 24.17 0.000 995.27 11.43 0.029 ----- ----- ----- 0.011 ----- ----- ----- 0.040 24.20 0.000 995.27 11.43 0.029 ----- ----- ----- 0.010 ----- ----- ----- 0.039 24.23 0.000 995.27 11.43 0.029 ----- ----- ----- 0.010 ----- ----- ----- 0.039 24.27 0.000 995.27 11.43 0.029 ----- ----- ----- 0.010 ----- ----- ----- 0.039 24.30 0.000 995.27 11.43 0.029 ----- ----- ----- 0.010 ----- ----- ----- 0.039 24.33 0.000 995.27 11.43 0.029 ----- ----- ----- 0.009 ----- ----- ----- 0.039 24.37 0.000 995.26 11.43 0.029 ----- ----- ----- 0.009 ----- ----- ----- 0.038 24.40 0.000 995.26 11.43 0.029 ----- ----- ----- 0.009 ----- ----- ----- 0.038 24.43 0.000 995.26 11.43 0.029 ----- ----- ----- 0.009 ----- ----- ----- 0.038 24.47 0.000 995.26 11.43 0.029 ----- ----- ----- 0.009 ----- ----- ----- 0.038 24.50 0.000 995.26 11.43 0.029 ----- ----- ----- 0.008 ----- ----- ----- 0.037 24.53 0.000 995.26 11.43 0.029 ----- ----- ----- 0.008 ----- ----- ----- 0.037 24.57 0.000 995.26 11.43 0.029 ----- ----- ----- 0.008 ----- ----- ----- 0.037 24.60 0.000 995.25 11.43 0.029 ----- ----- ----- 0.008 ----- ----- ----- 0.037 24.63 0.000 995.25 11.43 0.029 ----- ----- ----- 0.008 ----- ----- ----- 0.037 24.67 0.000 995.25 11.43 0.029 ----- ----- ----- 0.007 ----- ----- ----- 0.036 24.70 0.000 995.25 11.43 0.029 ----- ----- ----- 0.007 ----- ----- ----- 0.036 24.73 0.000 995.25 11.43 0.029 ----- ----- ----- 0.007 ----- ----- ----- 0.036 24.77 0.000 995.25 11.43 0.029 ----- ----- ----- 0.007 ----- ----- ----- 0.036 24.80 0.000 995.25 11.43 0.029 ----- ----- ----- 0.007 ----- ----- ----- 0.035 Continues on next page... 75 Wet Pond 1 inch WQ volume draw down ends at hour Hydrograph Discharge Table 78.83 --> 54.03 hour (2.25 day) draw down time Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 78.03 0.000 994.05 5.428 0.003 ----- ----- ----- ----- ----- ----- ----- 0.003 78.07 0.000 994.05 5.407 0.003 ----- ----- ----- ----- ----- ----- ----- 0.003 78.10 0.000 994.05 5.393 0.003 ----- ----- ----- ----- ----- ----- ----- 0.003 78.13 0.000 994.05 5.372 0.003 ----- ----- ----- ----- ----- ----- ----- 0.003 78.17 0.000 994.05 5.358 0.003 ----- ----- ----- ----- ----- ----- ----- 0.003 78.20 0.000 994.05 5.337 0.003 ----- ----- ----- ----- ----- ----- ----- 0.003 78.23 0.000 994.05 5.323 0.003 ----- ----- ----- ----- ----- ----- ----- 0.003 78.27 0.000 994.05 5.309 0.003 ----- ----- ----- ----- ----- ----- ----- 0.003 78.30 0.000 994.05 5.288 0.003 ----- ----- ----- ----- ----- ----- ----- 0.003 78.33 0.000 994.05 5.274 0.003 ----- ----- ----- ----- ----- ----- ----- 0.003 78.37 0.000 994.05 5.254 0.003 ----- ----- ----- ----- ----- ----- ----- 0.003 78.40 0.000 994.05 5.240 0.003 ----- ----- ----- ----- ----- ----- ----- 0.003 78.43 0.000 994.05 5.226 0.003 ----- ----- ----- ----- ----- ----- ----- 0.003 78.47 0.000 994.05 5.205 0.003 ----- ----- ----- ----- ----- ----- ----- 0.003 78.50 0.000 994.05 5.191 0.003 ----- ----- ----- ----- ----- ----- ----- 0.003 78.53 0.000 994.05 5.177 0.003 ----- ----- ----- ----- ----- ----- ----- 0.003 78.57 0.000 994.05 5.156 0.003 ----- ----- ----- ----- ----- ----- ----- 0.003 78.60 0.000 994.04 5.142 0.003 ----- ----- ----- ----- ----- ----- ----- 0.003 78.63 0.000 994.04 5.128 0.003 ----- ----- ----- ----- ----- ----- ----- 0.003 78.67 0.000 994.04 5.107 0.003 ----- ----- ----- ----- ----- ----- ----- 0.003 78.70 0.000 994.04 5.093 0.003 ----- ----- ----- ----- ----- ----- ----- 0.003 78.73 0.000 994.04 5.079 0.003 ----- ----- ----- ----- ----- ----- ----- 0.003 78.77 0.000 994.04 5.058 0.003 ----- ----- ----- ----- ----- ----- ----- 0.003 78.80 0.000 994.04 5.044 0.003 ----- ----- ----- ----- ----- ----- ----- 0.003 78.83 0.000 994.04 5.030 0.003 ----- ----- ----- ----- ----- ----- ----- 0.003 End Appendix D Wet Pond Supplemental Data Sheet SUPPLEMENT-EZ COVER PAGE FORMS LOADED OJECT IN RMATION 1 Project Name 2 Project Area (ac) 3 Coastal Wetland Area ac 4 Surface Water Area (ac) 5 Is this project High or Low Density? 6 Does this project use an off -site SCM? Sparks Drive Commercial Buildin 1.37 0 0 High No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet N/A 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d =1 N/A 10 Is streambank stabilization proposed on this project? No MBER AND TYPE 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 1 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting RWH 18 JGreen Roof 19 Level S reader -Filter Strip LS-FS 20 Disconnected Impervious Surface DIS 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Ba filter 26 Filterra FORMS LOADED SIGNER CERTIFICATION 27 Name and Title: Kevin Pulis, PE 28 Or anization: Tarr Group, LLC 29 Street address: 8650 E. State Rd 32 30 Cit , State, Zip: Zionsville, IN 46077 31 Phone number(s): 843-633-3579 32 Email: kevin@tarr-group.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision, that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete, and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. SEAL 042797 A Seal Signature of Designer Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM Wet Pond Wet Pond 5 Total drainage area (sq ft 59677 48600 6 Onsite drainage area (sq ft 59677 48600 7 Offsite drainage area (sq ft) zero zero 8 Total BUA in project (sq ft) 36437 sf 36437 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft zero zero 10permitting) New BUA not on subdivided lots (subject to s zero zero 11 Offsite BUA (sq ft zero zero 12 Breakdown of new BUA not on subdivided lots: Parkin (sq ft 27108 sf 27108 sf Sidewalk (sq ft 1735 sf 1735 sf Roof (sq ft) 7100 sf 7100 sf Roadway s ft zero zero Future (sq ft) zero zero Other, please specify in the comment box below (sq ft 494 sf 494 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft) zero zero 14 New infiltrating permeable pavement not on Isubdivided lots (sq ft zero zero 15permitting) Existing BUA that will remain (not subject to s ft zero zero 16 Existing BUA that is already permitted (sq ft zero zero 17 Existing BUA that will be removed (sq ft) zero zero 18 Percent BUA 61% 75% 19 Design storm (inches) 1.0 in 1.0 in 20 Design volume of SCM cu ft 2979 cf 2936 cf 21 lualculation method for design volume Simple Simple ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the drainage area(s): 494 sf represents dumpster enclosure. Calculations for impervious area treated in SCM 1 includes 3,877 sf of drive aisle that bypasses the SCM. The pond is being oversized to account for this bypassed impervious. WET POND area number ERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? No 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 10 ? N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 161 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensedprofessional? I Yes 18 Sizing method used SA/DA 19 Has a stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl) 989.00 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 989.50 22 Elevation of the bottom of the vegetated shelf (fmsl) 993.00 23 Elevation of the permanent pool (fmsl) 994.00 24 Elevation of the top of the vegetated shelf (fmsl) 994.00 25 Elevation of the temporary pool (fmsl) 995.25 26 Surface area of the main permanent pool (square feet) 1547 27 Volume of the main permanent pool (cubic feet) 2550 cf 28 Average depth of the main pool (feet) 3.04 ft 29 Average depth equation used Equation 3 30 If using equation 3, main pool perimeter (feet) 110.0 ft 31 If using equation 3, width of submerged veg. shelf (feet) 6.0 ft 32 Volume of the forebay (cubic feet) 490 cf 33 Is this 15-20% of the volume in the main pool? Yes 34 Clean -out depth for forebay (inches) 6 in 351 Design volume of SCM (cu ft) 3188 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice, orifice diameter (inches) 1 in 38 If weir, weir height (inches) 39 If weir, weir length (inches) 40 Drawdown time for the temporary pool (days) 2.25 41 Are the inlet(s) and outlet located in a manner that avoids short- arcuitin ? Yes 42 Are berms or baffles provided to improve the flow path? Yes 43 Depth of forebay at entrance (inches) 42 in 44 Depth of forebay at exit (inches) 1 in 45 Does water flow out of the forebay in a non -erosive manner? Yes 46 Width of the vegetated shelf (feet) 6 ft 47 Slope of vegetated shelf (H:V) 6:1 48 Does the orifice drawdown from below the top surface of the ermanent pooI? Yes 49 Does the pond minimize impacts to the receiving channel from the 1- r, 24-hr storm? Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC 9 is met. No 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment Fescue 54 Has a P antinq plan been provided for the vegetated shelf? Yes DITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): Exact SHWT elevation not established, geotech report says it is deep. Clay liner used to establish permanent pool. Wet Pond 1 11:50 AM 7/10/2022 Appendix E Wet Pond Operations and Maintenance Agreement Operation & Maintenance Agreement Project Name: Project Location: Sparks Drive Commercial Building 176 Sparks Drive, Forest City, NC Cover Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s) on this project include (check all that apply & co Infiltration Basin Quantity: Infiltration Trench Quantity: Bioretention Cell Quantity: Wet Pond Stormwater Wetland Permeable Pavement Sand Filter Rainwater Harvesting Green Roof Level Spreader - Filter Strip Proprietary System Treatment Swale Dry Pond Disconnected Impervious Surface User Defined SCM Low Density Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Present: Present: Present: ponding O&M sheets will Location(s): Location(s): Location(s): 1 Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): No Location(s): No Location(s): No Type: )e aaaea automaticai I NW Corner of Site I I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Signature County of personally appeared before me this Jack Featherston Manager - RZ Forest City, LLC 1437 Wintercress Court Marietta, GA 30066 678-492-2182 jack@realzealpropertygroup.com , a Notary Public for the State of , do hereby certify that day of acknowledge the due execution of the Operations and Maintenance Agreement . Witness my hand and official seal, Date: and Seal My commission expires STORM-EZ 7/7/2022 Version 1.5 O&M Agreement Page 1 of 1 Wet Pond Maintenance Requirements Important operation and maintenance procedures: Immediately after the wet detention basin is established, the plants on the vegetated shelf and - perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). No portion of the wet pond should be fertilized after the initial fertilization that is required to establish the plants on the vegetated shelf. _ Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wet pond. If the pond must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain will be minimized as much as possible. At least once annually, a dam safety expert will inspect the embankment. Any problems that are found will be repaired immediately. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. After the wet pond is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance shall be kept in a known set location and shall be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: The entire wet pond Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to remove the gully, plant ground pond erosive gullies have cover and water until it is established. Provide lime and a one - formed. time fertilizer application. The inlet pipe is clogged Unclog the pipe. Dispose of the sediment off -site. (if applicable). The inlet pipe is cracked or otherwise damaged (if Repair or replace the pipe. The inlet device applicable). Erosion is occurring in the Regrade the swale if necessary and provide erosion control swale (if applicable). devices such as reinforced turf matting or riprap to avoid future problems with erosion. Sediment has accumulated to a depth Search for the source of the sediment and remedy the problem greater than the original if possible. Remove the sediment and dispose of it in a design depth for sediment location where it will not cause impacts to streams or the SCM. storage. The forebay Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Wet Pond Maintenance Requirements (Continued) SCM element: Potential problem: How to remediate the problem: Sediment has accumulated to a depth Search for the source of the sediment and remedy the problem greater than the original if possible. Remove the sediment and dispose of it in a design sediment storage location where it will not cause impacts to streams or the SCM. depth. Algal growth covers over Consult a professional to remove and control the algal growth. p g The main treatment area 50% of the area. Cattails, phragmites or Remove the plants by wiping them with pesticide (do not other invasive plants cover spray). 50% of the basin surface. Best professional practices show that pruning is needed to Prune according to best professional practices. maintain optimal plant health. Determine the source of the problem: soils, hydrology, The vegetated shelf Plants are dead, diseased disease, etc. Remedy the problem and replace plants. Provide or dying. a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Shrubs have started to Remove shrubs immediately. grow on the embankment. Evidence of muskrat or Consult a professional to remove muskrats or beavers and beaver activity is present. repair any holes or erosion. A tree has started to grow Consult a dam safety specialist to remove the tree. The embankment on the embankment. An annual inspection by an appropriate professional shows that Make all needed repairs immediately. the embankment needs repair. Clogging has occurred. gg g Clean out the outlet device and dispose of any sediment in a location where it will not cause impacts to streams or the SCM. The outlet device The outlet device is Repair or replace the outlet device. damaged. Weeds or volunteer trees Remove the weeds or trees. re growing on the mat. a Floating wetland island (if applicable) The anchor cable is damaged, disconnected or Restore the anchor cable to its design state. missing. Wet Pond Maintenance Requirements (Continued) SCM element: Potential problem: How to remediate the problem: Erosion or other signs of damage have occurred at Repair the damage and improve the flow dissipation structure. the outlet. Discharges from the wet The receiving water pond are causing erosion Contact the local NCDEQ Regional Office. or sedimentation in the receiving water. Wet Detention Pond Design Summary wat Pond Diagran FOREBAY MAIN POND WET POND ID 1 Pretreatment other than forebay? EN Has Veg. Filter?s Permanent Pool El. 994 Temporary Pool El: 995.25 Clean Out Depth: 2.5 Sediment Removal E 991.5 Bottom Elevation: 991 Permanent Pool El. 994 Temporary Pool El: 995.25 Clean Out Depth: 4.5 Sediment Removal E 989.5 Bottom Elevation: 989 Appendix F USGS Quad Map USGS Quad Map Rutherfordton South, NC Quad 2019 Not to Scale Appendix G NRCS Soils Map Hydrologic Soil Group —Rutherford County, North Carolina o 418180 418190 418200 418210 418220 418230 418240 418250 418260 418270 35° 20' 25" N I I I 35° 20' 25" N rt � 8 8 _ 8 � � S 8 8 8 � 0 0 8 � 8 8 8 � 8 � 8 � o � _ � o o 8 � 8 � Soil MaN may not he valiel at this Scale. 35° 20' 21" N 35° 20' 21" N 418180 418190 418200 418210 418220 418230 418240 418250 418260 418270 y Map Scale: 1:674 if printed on A portrait (8.5" x 11") sheet. ° Meters o ° N 0 5 10 20 30 Feet 0 30 60 120 180 Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: lfrM Zone 17N WGS84 usoA Natural Resources Web Soil Survey 7/10/2022 Conservation Service National Cooperative Soil Survey Pagel of 4 Hydrologic Soil Group —Rutherford County, North Carolina MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D C 0 C/D 0 D 0 Not rated or not available Soil Rating Lines r 0 A r 0 A/D B B/D N 0 C r 0 C/D r 0 D r 0 Not rated or not available Soil Rating Points 0 A 0 A/D 0 B 0 B/D ❑ C 0 C/D 0 D ❑ Not rated or not available Water Features Streams and Canals Transportation — Rails ­0 Interstate Highways US Routes Major Roads Local Roads Background D6 Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Rutherford County, North Carolina Survey Area Data: Version 23, Jan 21, 2022 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Oct 2, 2020—Mar 20, 2021 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. usoA Natural Resources Web Soil Survey 7/10/2022 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group —Rutherford County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI PaC2 Pacolet sandy clay loam, 8 to 15 percent slopes, moderately eroded B 1.2 98.1 % Ur Urban land 0.0 1.9% Totals for Area of Interest 1.2 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. USDA Natural Resources Web Soil Survey 7/10/2022 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Rutherford County, North Carolina Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 7/10/2022 Conservation Service National Cooperative Soil Survey Page 4 of 4 Appendix H NOAA Precipitation Data 6/16/22, 9:37 AM Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Forest City, North Carolina, USA" Latitude: 35.34°, Longitude:-81.89990 Elevation: 999.73 ft** * source: ESRI Maps'% ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)' Average recurrence interval (years) 1 2 5 10 25 50 100 200 500F 1-000 0.392 0.466 0.553 0.620 0.707 0.771 0.836 0.901 0.986 1.06 5-min (0.357-0.431) (0.425-0.513) (0.503-0.609) (0.562-0.681) (0.638-0.775) (0.691-0.846) (0.746-0.919) (0.798-0.993) (0.864-1.09) (0.915-1.17) 0.626 0.745 0.886 0.992 1.13 1.23 1.33 1.43 1.56 1.66 10-min (0.570-0.689) (0.680-0.820) (0.806-0.975) (0.899-1.09) 1 (1.02-1.24) 11 (1.10-1.35) 1 (1.19-1.46) 1 (1.37-1.73) (1.44-1.85) 0.783 0.937 1.12 1.25 1.43 1.56 1.68 1.80 1.96 2.09 15-min (0.713-0.861) (0.855-1.03) 1 (1.02-1.23) 11 (1.14-1.38) 1 (1.29-1.57) 11 (1.39-1.71) 1 (1.50-1.85) 11 (1.60-1.99) (1.72-2.17) (1.81-2.32) 1.07 1.29 1.59 1.82 2.11 2.34 2.57 2.81 3.12 3.38 30-min (0.977-1.18) 11 (1.18-1.42) 1 (1.45-1.75) 11 (1.65-2.00) 1 (1.91-2.32) 11 (2.10-2.57) 1 (2.30-2.83) 11 (2.49-3.09) (2.74-3.46) (2.93-3.76) 1.34 1.62 2.04 2.37 2.82 3.17 3.54 3.94 4.48 4.93 60-min (1.22-1.47) 11 (1.48-1.79) 1 (1.86-2.25) 11 (2.15-2.60) 1 (2.54-3.09) 11 (2.85-3.48) 1 (3.16-3.90) 11 (3.49-4.34) (3.93-4.96) (4.28-5.48) 1.56 1.90 2.39 2.79 3.35 3.81 4.31 4.84 5.60 6.25 2-hr (1.42-1.72) 11 (1.73-2.09) 1 (2.17-2.63) 11 (2.53-3.06) 1 (3.02-3.68) 11 (3.41-4.19) 1 (3.83-4.74) 11 (4.26-5.33) (4.88-6.21) (5.38-6.95) 1.68 2.03 2.55 2.98 3.62 4.15 4.72 5.36 6.30 7.11 3-hr (1.52-1.86) 11 (1.84-2.25) 1 (2.31-2.82) 11 (2.69-3.30) 1 (3.24-4.00) 11 (3.70-4.59) 1 (4.17-5.23) 11 (4.69-5.95) (5.43-7.03) (6.04-7.95) 2.13 2.56 3.19 3.71 4.49 5.16 5.89 6.70 7.91 8.96 6-hr (1.95-2.34) 11 (2.35-2.82) 1 (2.91-3.50) 11 (3.38-4.07) 1 (4.05-4.92) 11 (4.62-5.66) 1 (5.22-6.47) 11 (5.88-7.38) (6.82-8.75) (7.63-9.94) 2.65 3.19 3.96 4.60 5.50 6.27 7.09 7.98 9.30 10.4 12-hr (2.43-2.91) 11 (2.93-3.50) 1 (3.62-4.35) 11 (4.19-5.04) 1 (4.98-6.03) 11 (5.65-6.87) 1 (6.33-7.78) 11 (7.06-8.78) (8.11-10.3) (8.99-11.6) 3.20 3.86 4.83 5.60 6.65 7.49 8.37 9.27 00.5 11.5 24-hr (2.98-3.46) 11 (3.59-4.17) (4.49-5.21) (5.19-6.03) (6.14-7.16) (6.90-8.06) (7.67-8.99) 1 1(9.56-11.3)jl(10.4-12.4) 3.81 4.59 5.69 6.57 7.76 8.72 9.70 10.7 12.1 7F 13.2 2-day (3.56 4.10) 11 (4.28-4.93) (5.31-6.12) (6.11-7.05) (7.21-8.33) (8.06-9.36) (8.94-10.4) 1 (11.1-13.0) (12.0-14.2) 4.05 4.86 6.00 6.89 8.12 9.09 10.1 11.1 12.5 13.6 3-day (3.79 4.34) 11 (4.55-5.21) (5.61-6.43) (6.43-7.38) (7.55-8.68) 11 (8.43-9.72) 1 (9.32-10.8) 1 (11.5-13.4) (12.4-14.6) 4.29 5.14 6.30 7.22 8.47 9.45 10.5 11.5 12.9 7F 14.0 4-day (4.02 4.59) (4.82-5.50) (5.90-6.74) (6.75-7.72) (7.89-9.04) 11 (8.79-10.1) 1 (9.70-11.2) 1 1(11.9-13.8)jl(12.9-15.0) 5.00 5.96 7.23 8.25 9.62 10.7 11.8 13.0 14.5 7F 15.7 7-day (4.70 5.34) (5.61-6.36) (6.80-7.71) (7.74-8.78) (9.00-10.2) (9.99-11.4) 1 (11.0-12.6) 11 (12.0-13.8) (13.4-15.5) (14.5-16.8) 5.71 6.78 8.12 9.18 10.6 11.7 12.8 14.0 15.5 16.7 10-day (5.39-6 07) (6.40-7.21) (7.66-8.64) (8.64-9.75) (9.94-11.2) (11.0-12.4) 1 (12.0-13.6) 11 (13.0-14.8) (14.4-16.5) (15.4-17.8) 7.63 9.01 10.6 11.9 13.5 14.8 16.1 17.4 19.1 20.5 20-day (7.23-807) (8.53-9.52) (10.0-11.2) (11.2-12.5) (12.7-14.3) 11 (13.9-15.6) 1 (15.1-17.0) 1 1(17.8-20.3) (19.0-21.7) 9.34 11.0 12.7 14.0 15.7 17.1 18.3 19.6 21.3 22.5 30-day (8.89-984) 11 (10.4-11.6) 1 (12.1-13.4) 11 (13.3-14.8) 1 (14.9-16.6) 11 (16.1-18.0) 1 (17.3-19.3) 11 (18.5-20.7) (20.0-22.5) (21.1-23.8) 11.8 13.8 15.7 17.2 19.0 20.4 21.7 22.9 24.6 25.8 45-day (113-12.4) 11 (13.2-14.5) 1 (15.0-16.5) 11 (16.3-18.0) 1 (18.1-19.9) 11 (19.3-21.3) 1 (20.6-22.7) 1 1(23.2-25.8) (24.3-27.1) 14.1 16.4 18.5 20.1 22.0 23.5 24.9 26.3 28.0 29.2 60-day (135-14.8) (15.7-17.2) (17.7-19.4) (19.2-21.0) (21.0-23.1) (22.4-24.6) (23.7-26.1) (25.0-27.5) (26.5-29.4) (27.7-30.7) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=35.3400&Ion=-81.8999&data=depth&units=english&series=pds 1/3 6/16/22, 9:37 AM C Ju 25 f Precipitation Frequency Data Server PD5-based depth -duration -frequency {DDF} curves Latitude: 35.3400°, Longitude:-81-8999' C C N f1�5 U� ry Ul u'n p y'y O O rl f+l N A V r, O O O L n O rl '-I M LO rl N fn q LG Duration 30 25 G L 20 5 0 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAAAtlas 14, Volume 2, version 3 Created (GMTY Thu Jun 16 13:34:37 2422 Back to Top Maps & aerials Small scale terrain T r r ar , '0 ndton ` • rlotteC{ osti 5pindala 1 J�4ain St f + c.,rotr ri+„ F Average recurrence miervaI {years) — 1 2 — 5 — 10 25 50 100 200 500 1000 Duration — 5-min — 2-day — 10-min — 3-day 15-min — 4-day — 30-min — 7-day — 60 mm — 10-clay — 2fir — 2"ay — 3fir — 3"ay — 6anr — 45-aay — 12fir — 60-clay - 2"r w � P 1 3km 74 Y ?+ + {n I 2mi https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage. htmI?Iat=35.3400&Ion=-81.8999&data=depth&units=engIish&series=pds 2/3 6/16/22, 9:37 AM Precipitation Frequency Data Server Large scale terrain Kingsport' Bristol ` Johnson City• 0 at Winston-Salem -xvi lie di •`4�, E. ti Greensho � F:1t Mitchell p t�ii � `, • Ashelille I NORTH C A R O L 9 Charlotte ;Greenville + 1 100km SOUTH CAROL A mi Allier, a Large scale map ,_, Kingsport Johnson City Winston-Salem G Ash lie I ■� ari atte :�- -- ` _J Gre le 4 4 — n 100km ml GOlklenbia ,omens Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Quest-ions@Lnoaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?Iat=35.3400&Ion=-81.8999&data=depth&units=english&series=pds 3/3