PROJECT DESCRIPTION:
SOUTH RIVER ELECTRIC COOPERATIVE IS BUILDING A NEW ELECTRICAL SUBSTATION IN
EASTERN CUMBERLAND COUNTY, AT THE SITE INDICATED.
THE ELECTRICAL SUBSTATION WILL CONTAIN ELECTRICAL EQUIPMENT AND STEEL
SUPPORT STRUCTURES AS WELL AS AN ENCLOSURE FOR THE STATIONS ELECTRONIC
AND COMPUTERIZED CONTROLS. ONCE COMPLETED, THE ONLY TRAFFIC/PERSONNEL
ANTICIPATED AT THE SITE WILL BE FOR SHORT DURATION INSPECTIONS AND
MAINTENANCE OF THE STATIONS EQUIPMENT AND BACK-UP SYSTEMS.
SCOPE OF WORK
1. INSTALL ALL EROSION CONTROL MEASURES PRIOR TO START OF CONSTRUCTION.
2. CLEAR AND GRUB APPROXIMATELY 4.00 ACRES.
3. GRADE AND GRAVEL ACCESS DRIVE AT UPTON TYSON ROAD.
4. INSTALL SUBSTATION PAD AND FENCE INCLUDING WASHED STONE SURFACE.
5. TRANSMISSION LINE CONSTRUCTION OUTSIDE OF THE SHOWN LIMITS OF
DISTURBANCE WILL BE PERMITTED SEPARATELY AND AS NECESSARY.
ORIGINAL SITE TOPOGRAPHIC SURVEY PROVIDED BY LAWRENCE AND ASSOCIATES
DATED NOV 8 2021
PROJECT DATA:
PROPERTY OWNER / DEVELOPER:
SOUTH RIVER ELECTRIC MEMBERSHIP CORPORATION
17494 US 421 SOUTH
FAYETTEVILLE, NC 28311
PHONE: 910-892-8071
ENGINEER:
PIKE ENGINEERING, LLC
123 N. WHITE ST.
FORT MILL, SC 29715
PROJECT NAME:
REBEKAH EVANS 230 KV POD
PROJECT LOCATION:
PIN #: 09345033A
DB: 11389 PG. 0591
3266 UPTON TYSON ROAD, FAYETTEVILLE, NC 28306
EXISTING USE:
VACANT WITH UTILITY EASEMENTS AND INFRASTRUCTURE
PROPOSED USE:
ELECTRICAL SUBSTATION: DEV-0162-22
UNION COUNTY SPECIAL USE PERMIT (SUP) #2021158
PROPERTY DATA:
JURISDICTION: CUMBERLAND COUNTY, NC
TOTAL PROPERTY SIZE (COMBINED): 2.73 ACRES
EXISTING BUA % OF LOT OF RECORD: 0.0%
PROPOSED AREA UNDER NCDEQ A-4: 0.63 ACRES
PROPOSED LIMIT OF DISTURBANCE: 4.00 ACRES
PROPOSED AREA UNDER NCDEQ A-4 % OF LOT OF RECORD: 21.97%
PROPOSED BUILT UPON AREA OF LOT OF RECORD: 0.56 AC
DUKE ENERGY EXISTING R/W: 1.26 AC.
STORMWATER REQUIREMENTS
WATERSHED: GRAY'S CREEK
RIVER BASIN: CAPE FEAR
EXISTING POND LOCATED ON PROPERTY
FLOOD:
FEMA FLOOD ZONE - X, NOT IN 100-YEAR FLOODPLAIN
FEMA FIRM: MAP# 3720044200J, DATED JAN 5, 2007
WETLANDS:
THERE ARE NO WETLANDS WITHIN THE PROPOSED LIMITS OF
DISTURBANCE ON THE SITE. SEE ACCOMPANYING ENVIRONMENTAL
REPORT PREPARED BY ASHEVILLE CONTRACTORS, INC.
LR�
Know whars below.
Call before you dig
o REBEKAH EVANS 230KV POD
32bb UPTON TYSON RD, FAYETTEVILLE, NC, 28300
LATITUDE: 34'55'53"N LONGITUDE: -78° 50' 4"W
CUMBERLAND COUNTY, NORTH CAROLINA
SITE PLAN FOR ELECTRICAL SUBSTATION
Smith Rd
ISSUED FOR CONSTRUCTION
y
Case #: D EV-O 1 62-22
0
Upton Tyson Rd
Via. Ingress/Egress Easement
r
Substation Site
� ySo� FZd
0001
i
cS�O
0
SITE DATA
JURISDICTION:
CUMBERLAND COUNTY
NON-RESIDENTIAL SITE PLAN FOR
APPROVAL TYPE:
AN ELECTRICAL SUBSTATION
ZONING:
Al
PIN #:
0442996729000
TOTAL ACREAGE:
2.73 ACRES
DISTURBED ACREAGE:
4.00 ACRES
BUILT UPON AREA:
0.60 ACRES (21.97%)
SETBACKS:
FRONT: 50 FT
SIDE: 20 FT
REAR: 50 FT
PROJECT DRAWING LIST
DWG. NO.
REV.
DRAWING TITLE
17343-000 CV01
2
COVER SHEET
17343-000 SP01
2
SITE PLAN FOR ELECTRICAL SUBSTATION
17343-000 EC01
0
EROSION CONTROL PLAN - PHASE 1
17343-000 ECO2
1
EROSION CONTROL PLAN - PHASE 2
17343-000 ECO2
0
DRAINAGE AREA MAPS
17343-000 GR01
0
GRADING PLAN
17343-000 DT01
1
EROSION CONTROL DETAILS
17343-000 DT02
1
SITE DETAILS
17343-000 DT03
1
SITE DETAILS
NOTES:
THE CONTRACTOR SHALL SCHEDULE A PRE -CONSTRUCTION MEETING A MINIMUM OF 48 HOURS
PRIOR TO ANY LAND DISTURBING ACTIVITY.
1. THE SUBDIVISION WAIVER REQUEST MADE BY THE APPLICANT FOR A SUBDIVISION
WAIVER FROM SECTION 2303.0 STREET FRONTAGE REQUIREMENTS FOR A PROPOSED
LOT CONTAINING APPROXIMATELY 2.75 +/- ACRES AND LOCATED APPROXIMATELY
5600 +/- FEET EAST OF SOUTH NC 87 HWY ON A PRIVATE ACCESS EASEMENT TITLED
UPTON TYSON ROAD. ACCESS TO THE SITE WILL NOT MEET THE MINIMUM
REQUIREMENTS OF FOR A CLASS "C" STREET. THUS, THE PROPOSED LOT DOES NOT
MEET THE REQUIREMENTS OF SECTION 2303. ACCESS IS PROPOSED TO OCCUR
ALONG A TWENTY -FOOT -WIDE ACCESS EASEMENT THAT HAS BEEN OBTAINED BY THE
APPLICANT FROM TWO PROPERTY OWNER- VANCE TYSON AND SHERWOOD CHURCH.
AS THE NEW LOT WILL NOT HAVE ACCESS TO A STANDARD PUBLIC OR PRIVATE CLASS
"C" STREET. THE SUBDIVISION WAIVER REQUEST ABOVE WAS APPROVED ON
DECEMBER 21, 2021, BY THE JOINT PLANNING BOARD WITH THE FOLLOWING
CONDITIONS:
- PRIOR TO ERECTING THE UTILITY SUBSTATION PERMANENT SECURITY FENCE
OR WITHIN SIXTY DAYS AFTER CLEARING AND GRADING OF THE SUBSTATION
SITE COMMENCES, WHICHEVER OCCURS FIRST, OWNER SHALL ENSURE THE
EXISTING ACCESS ALONG UPTON TYSON ROAD BETWEEN HIGHWAY 87 AND THE
UTILITY SUBSTATION COMPLIES WITH MINIMUM STANDARDS SET FORTH IN
CHAPTER V, SECTION 503 OF THE STATE FIRE CODE: 20 FOOT WIDE, 13.6 FOOT
HIGH CLEARING; CAPABLE OF SUPPORTING AT MINIMUM A 75,000 LBS. VEHICLE
IN ALL-WEATHER DRIVING CONDITIONS, PROVIDES A SUITABLE TURNAROUND
AREA IN THE FORM OF A CUL-DE-SAC OR HAMMERHEAD AT THE END OF THE
ACCESS DRIVEWAY; AND AS FURTHER DESCRIBED IN SECTION 503 AND BY THE
2 COUNTY FIRE MARSHAL.
��ti�lLlllllll���1
........ Rp.
t £ffir
'4�cSSI•
.} . A:
C9
0)
U '�
6
Zino)
W
Of =moo
W
w�cnU
z�=m
0 0 �.�
wz��
a Z
11tiU
Uj
W
s
a o
z
m
0
w
Df
Q
a-
w
Df
a-
�o
ao
U0
0
a-2
O O J
�
N
0 W
a�
�0W
Co
E z
_W
o�W
�
a m Y
W
o
W
- N N
Qs
O. .0
CD
U
Z
Q 0
a:5
Q 3
�CLzCD
U
W
Z
z
Lu
0
o
M
W
U
U
tL
U
0
W
o
g,Ld
o
o
W
o
W
M
W
W
�
o
V)
f/1
U
Z
N
N
CV
N
N
N
\
\
\
w
rnol�v
N
O
Q
�
U
0
co
0
00
0
0
0
M
W
W
M
Z
M
zo
z
0
>
W
1-0
N
—
0
W
of
Ir
01
o
(�
U
_
~ LO
$
O M
U) M o
ys.
O
V
d
_ N 00
N U
W
N
z 00
Dz—
Lu
z
O
01
U
z
Z
Z
L
>00
=
L
0—
v
cn
_>
�
�Yz
�
J
0
moCY)
L
�
m
U
z
w
U
�w
a
o
SHEET
CV01
M
L
Aug 19, 2022 — 11:19am R:\FPS\PROJECTS\South—River—EMC\Vander—Cape Fear Transmission Line\SITE DEVELOPMENT\7B—ISSUED—DOCUMENTS\03—ISSUED—FOR—CONSTRUCTION\2022 0818 IFC`