Loading...
HomeMy WebLinkAbout20130456 Ver 1_Approval Letter_20140821-A-5,4PA MCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor August 21, 2014 NCDENR Ecosystem Enhancement Program John E Skvarla, III Secretary DWR Project # 2013 0456 Onslow County Attn Tim Baumgartner 217 West Jones Street, STE 3000A Raleigh, NC 27603 Subject Property: Bear Basin Restoration Site, Richlands Approval of 401 Water Quality Certification with Additional Conditions Dear Mr Baumgartner You have our approval, In accordance with the attached conditions and those listed below, to conduct mitigation activities within 0 11 acres of open water impacts at the subject property, as described within your application dated August 1, 2014 and received by the N C Division of Water Resources (Division) In the Wilmington Regional Office (WiRO) on August 5, 2014 After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3885 (GC3885) The Certification(s) allows you to use Nationwide Permit 27 when issued by the US Army Corps of Engineers (USACE) In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non - discharge regulations Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 Permit. This approval is for the purpose and design that you described in your application If you change your project, you must notify us and you may be required to send us a new application If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H 0506 (h) This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. Conditions of Certification: 1 The approved plans and specifications for this project are incorporated by reference and are an enforceable part of the permit 2 The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met No other impacts are approved including incidental impacts 1601 Mall Service Center, Raleigh, North Carolina 27699 -1601 Phone 919 - 707 -86001 Internet www ncdenr gov An Equal Opportunity 1 Affirmative Acton Employer — Made in part by recycled paper NCDENR Ecosystem Enhancement Program Attn Tim Baumgartner DWR Project # 2013 0456 August 21, 2014 Page 2 of 5 3 Anv final construction plans for this proiect must include or reference the application and plans approved by the Division under this authorization letter and certification. It shall be the responsibility of the permitee to review all construction drawings with the approved permit drawings to determine that the drawings are consistent. Documentation via letter or e-mail must be provided to the Division prior to the start of construction confirming that the construction drawings are consistent with the permitted drawings If the drawings are not consistent, the applicant is required to notify the Division, c/o Joanne Steenhuis Wilmington Regional Office and address the inconsistencies prior to working in wetlands 4 Sediment and Erosion Control Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards a The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits associated with the project c For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual d The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act 5 All mechanized equipment will be regularly inspected and maintained to prevent contamination of waters and wetlands from hydrocarbons or other potential toxic chemicals In the event of a hydrocarbon or chemical spill, the permitee /contractor shall immediately contact the Division of Water Quality, between the hours of 8 am to 5 pm at the Wilmington regional office at 910 796 7215 or Steve Lewis at 919 807 6308 and after hours and on weekends call the USCG National Response Center at 1 800 424 8802 6 Fueling, lubrication and general equipment maintenance should not take place within 50 feet of a waterbody or wetlands to prevent contamination by fuel and oils Amount Approved (Units) Plan Location or Reference Stream Impacts N/A 404/401 Wetlands N/A Waters Impacts 0 11 acres of Jurisdictional tributaries Sheet 4 of 10 Bear Basin Restoration Site (attached) Buffers N/A 3 Anv final construction plans for this proiect must include or reference the application and plans approved by the Division under this authorization letter and certification. It shall be the responsibility of the permitee to review all construction drawings with the approved permit drawings to determine that the drawings are consistent. Documentation via letter or e-mail must be provided to the Division prior to the start of construction confirming that the construction drawings are consistent with the permitted drawings If the drawings are not consistent, the applicant is required to notify the Division, c/o Joanne Steenhuis Wilmington Regional Office and address the inconsistencies prior to working in wetlands 4 Sediment and Erosion Control Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards a The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits associated with the project c For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual d The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act 5 All mechanized equipment will be regularly inspected and maintained to prevent contamination of waters and wetlands from hydrocarbons or other potential toxic chemicals In the event of a hydrocarbon or chemical spill, the permitee /contractor shall immediately contact the Division of Water Quality, between the hours of 8 am to 5 pm at the Wilmington regional office at 910 796 7215 or Steve Lewis at 919 807 6308 and after hours and on weekends call the USCG National Response Center at 1 800 424 8802 6 Fueling, lubrication and general equipment maintenance should not take place within 50 feet of a waterbody or wetlands to prevent contamination by fuel and oils NCDENR Ecosystem Enhancement Program Attn Tim Baumgartner DWR Project # 2013 0456 August 21, 2014 Page 3 of 5 No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the 404 /401Permit Application All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed by NCDENR Ecosystem Enhancement Program and its authorized agents /contractors so that no violations of state water quality standards, statutes, or rules occur 8 Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within two months of the date that the Division of Energy, Mineral and Land Resources (DEMLR) has released the project, 9 This General Certification shall expire on the same day as the expiration date of the corresponding Nationwide Permit. The conditions in effect on the date of issuance of the Certification for a specific project shall remain in effect for the life of the project, regardless of the expiration of this Certification 10. Pre - Construction Notification The permitee shall notify the Division in writing via e-mail or phone within two weeks prior to the beginning of the work authorized under this certification. A pre- construction meeting may be required with the Division prior to the start of this project. 11 Mitigation Credit Approval of the restoration plan and issuance of the 401 Water Quality Certification means that DWQ has determined that the proposed activity will not remove or degrade significant existing uses of the surface water (15A NCAC 2H 0506(a)) The issuance does not represent an approval of credit yield for the project 12 The applicant / permitee and their authorized agents shall conduct all activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with 303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal law If the Division determines that such standards or laws are not being met, including failure to sustain a designated or achieved use, or that State or Federal law is being violated, or that further conditions are necessary to assure compliance, than the Division may reevaluate and modify this General Water Quality Certification The applicant /permitee shall require its contractors (and /or agents) to comply with all of the terms of this Certification and shall provide each of its contractors (and /or agents) a copy of this Certification. A copy of this Certification shall be included in the construction contract and available on the job site at all times. NCDENR Ecosystem Enhancement Program Attn Tim Baumgartner DWR Project # 2013 0456 August 21, 2014 Page 4 of 5 12 Protective Fencing The wetland or water boundaries within 50 feet of the construction corridor(s) of the project boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) These boundaries shall be identified as depicted on the jurisdictional determination map signed by the US Army Corps of Engineers prior to any land disturbing activities These wetland boundary identifications (flagging, fencing, etc ) must be maintained on the property until the construction phase is completed 13 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant and /or authorized agent is required to return the enclosed certificate of completion form to the NCDENR DWR 401 and Buffers Unit North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699 within ten days of project completion (the certification of completion is also available at http / /portal ncdenr org/ web /wq /swp /ws/ 401 /certsandPerm its /apply /forms) Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and /or civil penalties The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 Permit If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing If you wish to contest any conditions in the enclosed certification (associated with the approved wetland or waters impacts) you must file a petition for an administrative hearing You may obtain the petition form from the office of Administrative hearings You must file the petition with the office of Administrative Hearings within thirty (30) days of receipt of this notice A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8 00 am and 5 00 pm, except for official state holidays The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings The petition may be faxed - provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission The mailing address for the Office of Administrative Hearings is Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699 -6714 Telephone (919)- 733 -2698, Facsimile (919)- 733 -3478 • NCDENR Ecosystem Enhancement Program Attn Tim Baumgartner DWR Project # 2013 0456 August 21, 2014 Page 5 of 5 A copy of the petition must also be served on DENR as follows Lacy Presnell, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699 -1601 This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act If you have any questions, please contact Eric Kulz in the Central Office in Raleigh at 919 807 6476 or Eric Kulz @ncdenr gov or Joanne Steenhuis in the DWR Wilmington Regional Office at 910 796 7306 or Joanne Steenhuis @ncdenr gov Sincerely, Jim Gregson, Re Su ervisor Water Quality Regional Operations Section Wilmington Regional Office Division of Water Resources, NCDENR Enclosures GC 3885 Certificate of Completion cc Timothy Morris — KCI Technologies, Inc - electronic copy Mickey Sugg -USACE Wilmington Regulatory Program Kenneth Jones - Owner Jennifer Burdette — 401 Wetlands and Buffers Unit Karl Hammers - DEMLR Wilmington Regional Office — electronic copy Eric Kulz — 401 Wetlands and Buffers Unit — electronic copy Jonathan Howell - DCM Morehead City — electronic copy WiRO MG 2 201fi - --QUALITY QU Bra -4—IOz 0000 mD0� zram bZ<�� z -x; mmOD ' cyG)m 5� O Mono -I� *iim 4>MZ 0 5, m z Z) R ') 0 m pD9D! �oz ry, G) m r .F 1 7 � f 1 r Q N Z A 1 i e fA i m � z I � I i I r i I I i O 6 yr � o .q 0 1 � C, Y �f 1 o to, ol17 i If _ i / J it� NOI1VAa3SND0 _ ..qyy♦ �09.► "s iN3 3Stl3 ��° fir ttt��� 46 JD 9� L� f BEAR BASIN g KC Y 6K _ WGIIilEUM1iH KPMT�ON RAXV1 °°""a PFASEU f011•M IN�aEMni AImw+NN MYAI. 5v Z RESTORATION SITE vru ans pyq 6QEN yT9 O RICHLANDS ONSLOW COUNTY NORTH CAROLINA wlsa vaixanwo surre a� nuewn wanm cwoltt�mm (11}�tlitl lox wn REASIONS ,� RO, ns IF Wg 1 ANTS OW 1* ......... MON, si yu ygxv A, 63 V6 ymp low 0 Wso . . . . . . . . . . . . . . . . .