HomeMy WebLinkAboutNC0063029_Authorization to Construct_20070627NPDES DOCIMENT SCANNIN. COVER SHEET
EET
NPDES Permit:
NC0063029
Camp Lejeune WWTP
Document Type:
Permit Issuance
Wasteload Allocation
Authorization to Construct (AtC)t
Permit Modification
Complete File - Historical
Engineering Alternatives (EAA)
Correspondence
Owner Name Change
Instream Assessment (67b)
Speculative Limits
Environmental Assessment (EA)
Document Date:
June 27, 2007
This document is printed on reuse paper - ignore any
content on the resrerse side
US Marine Corps -Camp Lejeune
A To C No. 063029A01
Issued August 16, 2006
Engineer's Certification
c?kij
bz;6c575 -b-04-16
L4tyI,Pd 4.as a dul re ofessional En Weer in
the State of North Carolina, having beenuthorized to obse (periodically
the construction of the modifications and improvements to the 'am Le eune Advanced WWTP,
located on Gonzalez Boulevard in Onslow County for the US Marine Corps, here y s a e a, o
the best of my abilities, due care and diligence was used in the observation of the following
construction:
The fourth 1,600 square foot sludge drying bed, in conformity with the project
plans, specifications, and other supporting data subsequently filed and approved
by the Department of Environment and Natural Resources.
I certify that the construction of the above referenced project was observed to be built within
substantial compliance and intent of the approved plans and specifications.
Signature
Date to (7-1107
Send to:
Registration No.
Construction Grants & Loans
DENR/DWQ
1633 Mail Service Center
Raleigh, NC 27699-1633
o/yy33
14' 33 II
`,: /i I '�' �•i (If
italAwbvtio
toz
C33 •
4
Michael F. Easley. Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
August 16, 2006
Mr. Carl Baker, P.E.
US Marine Corps -Camp Lejeune
PSC Box 20004
Camp Lejeune, NC 28542-0004
SUBJECT: Authorization to Construct
A to C No. 063029A01
Camp Lejeune Advanced WWTP
Construction of Sludge Drying Beds
Onslow County
Dear Mr. Baker:
A letter of request for Authorization to Construct was received June 15, 2006, by the
Division, and final plans and specifications for the subject project have been reviewed and found
to be satisfactory. Authorization is hereby granted for the construction of modifications to the
existing 15.0 MGD Camp Lejeune Advanced WWTP, with discharge of treated wastewater into
the New River in the White Oak River Basin.
This authorization results in no increase in design or permitted capacity and is awarded
for the construction of the following specific modifications:
Three 1,600 square foot sludge drying beds with a fourth 1,600 square foot sludge
drying bed to be added as budget allows, to be certified separately or all at once,
in conformity with the project plans, specifications, and other supporting data
subsequently filed and approved by the Department of Environment and Natural
Resources.
This Authorization to Construct is issued in accordance with Part III, Paragraph A of
NPDES Permit No. NC0063029 issued December 6, 2002, and shall be subject to revocation
unless the wastewater treatment facilities are constructed in accordance with the conditions and
limitations specified in Permit No. NC0063029.
The sludge generated from these treatment facilities must be disposed of in accordance
with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Water Quality.
In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those as may
be required by this Division, such as the construction of additional or replacement wastewater
treatment or disposal facilities.
Onc
NiarthCarolina
,Naturally
North Carolina Division of Water Quality 1617 Mail Service Center Raleigh. NC 27699-1617 Phone (919) 733-7015 Customer Service
Internet:rc' atercj aiitv.orn 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-2496 1-877-623-6748
An Equal Opportunity/Affirmative Action Employer — 50% Recycled/1O% Post Consumer Paper
US Marine Corps -Camp Lejeune
August 16, 2006
Page 2
The Wilmington Regional Office, telephone number (910) 796-7215, shall be notified at
least forty-eight (48) hours in advance of operation of the installed facilities so that an on site
inspection can be made. Such notification to the regional supervisor shall be made during the
normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State
Holidays.
Upon completion of construction and prior to operation of this permitted facility, a
certification must be received from a professional engineer certifying that the permitted facility
has been installed in accordance with the NPDES Permit, this Authorization to Construct and the
approved plans and specifications. Mail the Certification to Cecil G. Madden, Jr., P.E.,
Construction Grants & Loans, DWQ / DENR, 1633 Mail Service Center, Raleigh, NC 27699-
1633.
Upon classification of the facility by the Certification Commission, the Permittee shall
employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the
wastewater treatment facilities. The operator must hold a certificate of the type and grade at
least equivalent to or greater than the classification assigned to the wastewater treatment
facilities by the Certification Commission.
The Permittee must also employ a certified back-up operator of the appropriate type and
grade to comply with the conditions ofT15A:8G.0202. The ORC of the facility must visit each
Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding
weekends and holidays, must properly manage the facility, must document daily operation and
maintenance of the facility, and must comply with all other conditions of T15A:8G.0202.
A copy of the approved plans and specifications shall be maintained on file by the
Permittee for the life of the facility.
During the construction of the proposed additions/modifications, the permittee shall
continue to properly maintain and operate the existing wastewater treatment facilities at all times,
and in such a manner, as necessary to comply with the effluent limits specified in the NPDES
Permit.
You are reminded that it is mandatory for the project to be constructed in accordance
with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North
Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's
responsibilities shall be in complying with these Acts.
Failure to abide by the requirements contained in this Authorization to Construct may
subject the Permittee to an enforcement action by the Division of Water Quality in accordance
with North Carolina General Statute 143-215.6A to 143-215.6C.
The issuance of this Authorization to Construct does not preclude the Permittee from
complying with any and all statutes, rules, regulations, or ordinances which may be imposed by
other government agencies (local, state, and federal) which have jurisdiction.
US Marine Corps -Camp Lejeune
August 16, 2006
Page 3
One (1) set of approved plans and specifications is being forwarded to you. If you have
any questions or need additional information, please contact Cecil G. Madden, Jr., P.E. at
telephone number (919) 715-6203.
Sincerel
an W. Klimek, P.E.
MM:cgm
cc: Christopher H. Brown, P.E., Dewberry & Davis, Inc.
Onslow County Health Department
DWQ Wilmington Regional Office, Surface Water Protection
Technical Assistance and Certification Unit.
Daniel Blaisdell, P.E.
Point Source Branch, NPDES Program
Cecil G. Madden, Jr., P.E.
Michelle McKay, E.I.
A to C File