HomeMy WebLinkAboutWQ0004268_Freeboard_20091111Shields, Joel
From: Laura Mushinski [Imushinski@allens,com]
Sent: Wednesday, November 11, 2009 5:00 PM
To: Shields, Joel
Cc: Martin Griess; Reid Wells; Neel Sathi
Subject: FW: Freeboard
Joel, we have lost a lot of ground as far as lagoon freeboard with the rainfall (adding to the lagoon and stopping
irrigation). Earlier today, Aliens initiated the process to shut down production. They are wrapping up day shift and night
shift today with no •production planned for tomorrow. We'II see where things stand after that. Prior to the rains, we had 6
to 7 inches of available freeboard.
Laura Mushinski
Aliens, Inc.
479-228-0102
From: Reid Wells
Sent: Wednesday, Novemberll, 2009 3:53 PM
To: Laura Mushinski
Cc: Martin Griess
Subject: Freeboard
As of 4:30 pm, freeboard is'1.50 Total rainfall 4.20".
This electronic message and all contents contain information, from Allens, Inc. which may be privileged,
confidential or otherwise protected from disclosure. The information is -intended to be for the addressee only. If
you are not an addressee, any disclosure, copy, distribution or use of the contents of this message is prohibited.
If you have received this electronic message in error, please notify the sender by reply e-mail and destroy the
original message and all copies.