HomeMy WebLinkAbout20151065 Ver 2_2022-00680 No Permit Required Tearsheet_20220816U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW-2022-00680
Requestor:
Address:
County: Guilford U.S.G.S. Quad: NC -Guilford
NO DEPARTMENT OF THE ARMY AUTHORIZATION REQUIRED
NCDOT
Attn: Jerry Parker
1584 Yanceyville Street
Greensboro, NC 27415-4996
Size (acres) -40 Nearest Town Greensboro
Nearest Waterway Brush Creek River Basin Cape Fear
USGS HUC 03030002 Coordinates 36.1203, -79.9531
Location description: The project area is located along both sides of Interstate Highway 73, between NC Highway 68 and Ted
Johnson Parkway, at the Piedmont Triad International Airport (PTIA), in Greensboro, Guilford County, North Carolina.
Description of Activity: The North Carolina Department of Transportation (NCDOT) proposes to construct project HE-0005,
which includes two new roadway sections, north and south of Interstate 73 (I73) between SR 2133 (Pleasant Ridge Road) and
SR 4156 (North Regional Road). The proposed project also includes a roadw y bridge over I-73. The purpose of this project is
to facilitate access to the Boom Supersonic manufacturing facility at PTIA.
Your work as proposed does not require Department of the Army authorization for the following reason(s):
►1
The project cut/fill limits is composed of high ground. Therefore, your proposed activity will not occur in any
aquatic resources.
❑ The proposed activity will occur in non jurisdictional waters and/or wetlands.
❑ The proposed activity is not regulated and/or does not include regulated discharges of dredged or fill material. A
jurisdictional determination was not completed with this request. This letter does not address nor include any
consideration for jurisdiction on aquatic resources and shall not be interpreted as such. This is not an appealable action.
However, you may request an approved JD, which is an appealable action, by contacting the Corps for further instruction.
❑ The proposed activity is exempt from Department of the Army regulations. A jurisdictional determination was not
completed with this request. This letter does not address nor include any consideration for jurisdiction on aquatic
resources and shall not be interpreted as such. This is not an appealable action. However, you may request an approved
JD, which is an appealable action, by contacting the Corps for further instruction.
Remarks: The project cut/fill limits as referenced above includes those areas as shown on the attached project plans
entitled "Wetland and Surface Water Impacts Permit", Permit Drawing Sheet Nos. 1 through 6. Note especially
that Permit Drawing Sheets 2 and 3 show proposed fill (rip rap) immediately to the north of Stream SB, and
Permit Drawing Sheets 4 and 5 shows a bridge that would completely span Stream SD with abutments that occur
just south of Wetland WO. Note that no discharges of dredged or fill material are authorized in waters of the US
for any portion of HE-0005 or the Boom Supersonic project at PTIA.
This Department of the Army determination does not relieve the permittee of the responsibility to obtain any other required Federal,
State, or local approvals/permits. The permittee may need to contact appropriate State and local agencies before beginning work.
For any activity within the twenty coastal counties, before beginning work, you must contact the N.C. Division of Coastal
Management to discuss any required State authorization.
Any changes in the above -described work must be coordinated with the Corps of Engineers prior to commencement. If there are any
questions regarding this notification or the Corps of Engineers regulatory program, please contact David E. Bailey at (919) 817-2436
or David.E.Bailey2nn,usace.army.mil.
Corps Regulatory Official: Date: 2022.08.16 16:18:30 04'00'
Date: 08/16/2022
Copies furnished by e-mail:
Ryan Conchilla, NCDWR
Nancy Oberle, Three Oaks Engineering
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so,
please complete our Customer Satisfaction Survey, located online at https://regulatory.ops.usace.army.mil/customer-service-survey/
09/08/99
Igs\Boom_hyd_permit_wet_tsh.dgn
PROJECT: HE-0005
See Sheet 1A For Index of Sheets
See Sheet 1 B For Conventional Plan Sheet Symbols
L
PiedrnQD1 Triad
Inte Inationa I
Argent
BEGIN
PROJEC
GREENSBORO
; CITY LIMITS
VICINITY MAP
BEGIN TIP PROJECT HE-0005
-LRT- STA. 11 + 85.00
--------
ATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
GUILFORD COUNTY
-LRT-
SR 1695
REGIONAL RD.
A PORTION OF THIS PROJECT IS WITHIN THE GREENSBORO MUNICIP ''>.:OUNDARIES
\\
CLEARING ON THIS PROJECT WILL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD -LRT- STA. 33+76.97
LOCATION: ACCESS IMPROVEMENTS FOR BOOM FACILITY
ALONG INTERSTATE 73 ON THE NORTH SIDE
OF PIEDMONT TRIAD INTERNATIONAL AIRPORT
TYPE OF WORK: GRADING, PAVING, DRAINAGE, STRUCTURES,
SIGNING, CULVERTS, AND RETAINING WALLS
WETLAND AND SURFACE WATER IMPACTS PERMIT
BEGIN BRIDGE
—LRT— STA. 35 +
BEGIN BRIDGE
THIS IS A PARTIAL CONTROLLED -ACCESS PROJECT WITH ACCESS BEING LIMITED TO POINTS SHOWN ON THE PLANS
3
END TIP PROJECT HE-0005
-LRT- STA. 86 + 41.93
STATE
STATE PROJECT REFERENCE NO.
SHEET
NO.
TOTAL
SHEETS
N.C.
HE-0005
1
STATE PROLNO.
F.A.PROLNO.
DESCRIPTION
50338.1.1
PE
50338.2.1
PM
50338.2.2
UTIL
50338.3.1
CONST
PERMIT DRAWING
SHEET 1 OF 6IP
I
PRELIMINARY PLANS
DO NOT USE FOR CONSTRUCTION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
J
GRAPHIC SCALES
5iii511°
50 100
PLANS
50 25 0 50 100
PROFILE (HORIZONTAL)
10 5 0 10 20
11I11 \�
PROFILE (VERTICAL)
DESIGN DATA
ADT 2022
ADT 2042
K
D
T
V
= X
X
= X %
= X %
X % *
40 MPH
* TTST =X DUAL X
FUNC CLASS =
MINOR COLLECTOR
REGIONAL TIER
PROJECT LENGTH
LENGTH ROADWAY TIP PROJECT HE-0005 = 1.385 MILES
LENGTH STRUCTURES TIP PROJECT HE-0005 = 0.027 MILES
TOTAL LENGTH OF TIP PROJECT HE-0005 = 1.412 MILES
PROJECT LENGTHS BASED ON —LRT— ALIGNMENT.
MOTT M
MACDONALD
Prepared in the Office of:
7621 Purfoy Rd., Suite 115
Fuyuay-Vorina, NC 27526
(919)552-2253
(929)552-2254 (Fax)
License No. F-0669
www.mofmoc.conVamericns
2018 STANDARD SPECIFICATIONS
RIGHT OF WAY DATE:
XX XX, XXXX
LETTING DATE:
XX XX, XXXX
DAVID C. WALLER, PE
PROJECT ENGINEER
JEFFREY R. COOKE, PE
PROJECT DESIGN ENGINEER
BRIAN KETNER
NCDOT CONTACT - DIVISION 7
HYDRAULICS ENGINEER
P.E.
SIGNATURE:
ROADWAY DESIGN
ENGINEER
P.E.
SIGNATURE:
-D
m
0
NO WETLAND AND SURFACE WATER IMPACTS
-DRI-
POT Sto. 10+00.00
lEGIN CONSTRUCTION
POT Sta. 10+25.00
-DRI- PC Sta. 11+5/.36
PIEDMONT TRIAD
AIRPORT AUTHORITY
DB 8067 PG 717
SPEC. LATERAL 'V' DITCH
SEE DITCH DETAIL B /
PIEDMONT TRIAD_/6:
AIRPORT AUTHORIY
DB 7857 PG 945Py/ch
O/Nr
PT Sto. 11+93.76 /
/
L " DITC
2GI y FOE
_ _ _ - - Eo- �2GI)A)-
oNONT t Po EARTH BERM, SEE - - - -
DITCH DETAIL
PO
15" RCP -III
" RCP -IV
ISBW
XISTING R/
/( ROCK PLATTING
- DRI- POT Sta. 12+17.98
- LRT- POC Sta.17+77.451
CLASS 'B' RIP RAP
EST. 3 TONS
10 SY GEOTEXTILE
LATERAL 2'
BASE DITCH
SEE DITCH
DETAIL A
/01
1%/
I JURISDICTIONAL
BEGIN
�m STREAM
RETAIN <t.'
TIME SOUTHEAST LLC
WARNER CABLE
DB 7403 PC 2638
PB 133 PC 34 RETAIN
PIEDMONT TRIAD
AIDBRPORT AUTHORITY
7857 PG 945
CUSS 'B' RIP RAP
EST. B TONS
EST. 21 SY GEOTEXTILE
EST.CLASS TO'B' NS RIP RAP
B
EST. 21 SY GEOTEXTILE
RETAIN
1b1 oo
OIECTION WiPSRM
48. EXPRESSWAY C&G �������
.. __ RETAIN
23+00
RETAIN 15" C
4' REMOVE EXX CB
15" RCP -IV LRT- PCC Sto. 15+04.1
24+00
ENDWALL
CHANNEL
IMPROVEMENT
SEE DETAIL N
BEGIN
JURISDICTIONAL
STREAM
CABLE
RETAI= NE
+1� 7._P.,R,0,.T.ECTION-WP-SRM-__
SEECH DETAIL L
-LRT- PCC Sta. 23+38.08
-LRT- PC Sto.13+49.12
RETAIN
-LRT- PT Sta. 24+93.07
PIEDMONT TRIAD
AIDBRPORT5042 AUTHORITYPC1643
27+00
STANDARD 2' BASE DITCH
W/CL B RIP RAP
SEE DITCH DETAIL K
SITE 1 - SEE ENLARGED
AREA SHEET 4A
BEGIN PROJECT HE-0005
-LRT- PC Sta. 11 + 85.00
GRAPHIC SCALE
PLAN VIEW
TOE PROTECTION
W/CL B RIP RAP
SEE DITCH DETAIL M
TIE TO
EXISTING
SWALE
CLASS 'B' RIP RAP
EST. 2 TONS
7 SY GEOTEXTILE
LATERAL 2' BASE DITCH
SEE DITCH DETAIL C
PI Sto 14+26.68 PI Sto 22+63.23
A = 5' 55' 12.4" (RT) A = /27' 25' 18.4" (RT)
D = 3' 49' 11.0" D = /5' /6' 43.9°
L = /54.99' L = 833.97'
T = 77.56' T = 759.12'
R = 1,500.00' R = 375.00'
-LRT-
PI Sto 29+34.32
A = /3° //' 54.5" (RT)
D = 3° 58' 43.9"
L = 331.7/'
T = 166.59'
R = 1,440.00'
Pls Sto /5+72.67
es = P31'21.9"
Ls = 250.09'
LT = 166.73'
ST = 83.37'
PI Sto 33+50.69
A = 19' 47' 41.7" (LT)
D = 3° 58' 43.9"
L = 497.50'
T = 25/25'
R = 1,440.00'
PI Sta 11+73.93
A = 48' 35' 02.0" (RT)
D = 114° 35' 29.6"
L = 42.40'
T = 22.57'
R = 50.00'
PROJECT
REFERENCE NO.
HE-0005
RAN SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
HYDRAULICS
ENGINEER
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
MOTT MAC SF 40. & 9' LLC
LICENSE NO. F-0669
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
Prepared in the
Office of: M
M 76 1 Purfoy Rd, Suite 115
Fuquay-Vann,, NC 27526
MACo0NALD ww.v.monmac.. ,*n.,, ,
PERMIT DRAWING
SHEET 2 OF 6
PROPZ-6"
C&G
-LRT- PRC Sta. 30+99.44
P/ Sto 24+15.65
A = 5'55'12.4"(RT)
L = 154.'
D
T=77.5699'
R=1,500.00'
FOR -LRT- PROFILE SEE SHEET 11
FOR DITCH DETAILS, SEE SHEETS ? THRU ?
PROJECT REFERENCE NO. SHEET NO.
HE-0005 4A
03
oL
LLI
LLI
Q J
o?CO64 CO CO
■
NO WETLAND AND SURFACE WATER IMPACTS
\ \
\\
—
_----TFo-- \2G1(A)
ROCK PLATTING
STA. 22+00 — 23+00 LT.
iii�a� v,'!2?6.:®®i!i.!:t:a:®C�®:aiis��i'i�"-!i'i'��� s.a a
ENLARGED PLAN SITE 1
ENDWALL
CHANNEL
IMPROVEMENT
SEE DETAIL N
BEGIN
JURISDICTIONAL
STREAM
RAY SHEET NO.
ROADWAY DESIGN
ENGINEER
HYDRAULICS
ENGINEER
INCOMPILIET]E PLANS
DO NOT USE FOR R®W ACQUISITION
MOTT MACDONALD & E, LLC
LICENSE NO. F-0669
MOTT MACDONALD 8 E, LLC
LICENSE NO. F-0669
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
Prepared in the
Office of:
M
M 76 1 Furfoy Rd, Su. 115
Fuquay-Norma, NC ]75]6
MACDDNALD weeve.monmoc.convbmericas
PERMIT DRAWING
SHEET 3 OF 6
40' 0' 40' 80'
■ ■ ■ ■ ■
■ ■ ■ ■ ■
GRAPHIC SCALE
PROJECT REFERENCE NO.
et_psh_05.dgn
410,
SPEC. LATERAL 4' BASE DITCH
W,PSRM
SEE DITCH DETAIL H
SPEC. LATERAL 4' BASE DITCH
SEE DITCH DETAIL J
T's tt`�i•PR&� ..
GUARDRAI
PROP.2'-6" "1
C&G
RIPRAP
-LLT -
PROP.2'-6"
-
C&G _-
PIII INV=903.9'
------------------ N DI -
-i Fo-
BST
N
co
A
Z
CREST
-LLT- STA. 34+78.78
ELEV. 931.42
PIEDMONT TRIAD
AIRPORT AUTHORITY
DB 8304 PG 2780
- SPEC. LATERAL 2' BASE DITCH 3.36 7.70
SEE DITCH DETAIL F
-LLT - PRC Sta. 33+ 9°38
E
E
X x x_X X X X
_ --_-_
-
CLASS 'RIP-RAP-1 PIKE �Ai F r \
-ES175 TONS F CLASS 'B' RIP RAP
EST.14 BY GEOTEXTILE EST. 2 TONS
=909.35' EST. 7 SY GEOTEXTILE
PROP. RETAINING WALL
-
11
V903 7Y - - - p _ _ Ste-
RETAIN-
X. II aE6mN-T ECwNST-RAT-IL7L� - x T
2DfOR/Eo=
L o FLY II _ IL ---POE . -R
- 5+4_0�
JRETAIN 19+00_ _T PP=908.W
- 11
INV=903.38' ' OIINV 902.99
RETAIN
/=3 SBL JOSEPH Al BRYAN BLVD qD%BST-
71-2 SCRUB 24
7Y
SITE 2 - SEE ENLARGED
AREA SHEET 5A
INV=895,83
PROP.2'-6"
C&G
RETAIN
-LRT- Sta. 34+48.7/
PLAN VIEW
-EL-
PI Sto 23+34.94
A = /6° 25' 18.4" (LT)
D = r /3' 03.9"
L = 1,348.52' wP
T = 678.9/' ( \/
R = 4,705.00' a �\
n
BLH4
SKEW = 90'38'17"
-SPEC-x2=BASE-D1
ELEV. 905.0 MTL
SEE DITCH DETAIL F
TIE TO EX.
GUARDRAIL
NO WETLAND AND SURFACE WATER IMPACTS
SPEC. LATERAL 2' BASE DITCH
SEE DITCH DETAIL F
-LLT- PT Sta. 35+65.07
N �
36+00
15 RC
SPEC. LATERAL 2' BASE DITCH
W/CLASS 'B' RIP RAP
SEE DITCH DETAIL K
\1
RIPRAP
-Y/- Pr Sta.10+00.00
-LLT- PO Sta.36+35.12
E
RIP AP
E
E -LLT- PC St
Pt Sta 34+77.50
= 1r 02' 57.8" (RT)
D=6°I7'21.6"
L = 175.68'
T = 88.12'
R = 911.00'
Pt Sta 39+16.75
A = 3° 43' 09.0" (RT.
D = 2°l7' 30.6°
L = 162.28'
T = 81.17'
R = 2,500.00'
-LLT- PT Sta. 39+97.86 PIEDMONT TRIAD
AIRPORT AUTHORITY
DB 8304 PG 2780
----���� -C PB 130 PG 95
-.,r„ FE /
°"•��� sE / TOEAPROTECTION
'�"��iroomii�::::;;!!�'u,'�LLi L B RIP RAP
L,,.,,,, mop , ,,,� :E PITCH DETAIL M
-----' "`"•F-` Lu,Fuiiini,ir,n��iiiiy F� �, C
�i-
TOE PROTECTION
�___ WKLB RIP RLP� Fu+�11 .BW
E- PROTE DETAIL
- ni unnnn Su
x X X X x X -nin:m
,,�uum.i:i(�Yu � F p
/ r R S 'B' RIP RAP
I EST 3 TONS
CLASS 'ONS RAP 5j1 RETAIN EST. 10 SY GEOTEXTI
EST. z r Ns =ND CONSTRUCTION
EST. 5 Sl� GEOT _ 8 6q - OF=913.56 -EL- POC Sto- 27+17.71
CB
INV-908.47' UII RETAIN
\ 24' RCP _
OP=895.71' � ��RETA N
0.6 •' DIC'•.: GREU TL-3 -
8-77 INV=890.58' -
15" RCP -III _B9mLL9BIT 0. -
p_ - - - - 2GI -RETAIN --------
-- FL= --3
+28.70
-LLT-
PI Sto 30+42.95
A = 4r 10' 27.8" (LT)
D = 5' 40' 22.3"
L = 725.8/'
T = 379.38'
R = 1,0/0.00'
38+35.58
+1.29 -5.85
-Yl- POT Sto. /5+36.56
-LRT - POT Sto. 37+20.95
-LRT-
LBOWS
-LLT -
HE-0005
SHEET NO.
5
RAY SHEET NO.
ROADWAY DESIGN
ENGINEER
HYDRAULICS
ENGINEER
INCOMPLE TE PLANS
DO NOT USE FOR R/w ACQUISITION
MOTT MAC SF 60. & E, LLC MOTs MAC SF 80. 8 E, LLC
LICENSE NO. F-G669 LICENSE NO. F-0669
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
Prepared in the
Office of: M
M 76 1 Pudoy Rd, Suite 115
MOTT FFoq -noon,,NC 27526
MACDONALD ma.ombmeriws
-s-m-g@Y1L4 1n
15" RCP -IV
PROP-2' S6"
EETER C&G 78.
__SEE
-FALSE-SOW
_
SEE DIL M _ _-;;T 8LV0 52 BSi
- - - - - - - - TOP=BII N=L ETAJOSEP���
290)0376.13' NC
x X-
PERMIT DRAWING
SHEET 4 OF 6
C
------- 124i91 00
FALSE SUMP TVP
2:1 /2:1
SEE€ DETAIL II
M
RCP -IV
4CCTV 5s 28+00 INV=876.TT II RETAIN
52'BST
24+00__--iPW=B 7.42' D sE 0- JOS=M BM��
TOP �B TP,IN CABLE 1-17
PU/547°9�- ���
PUC 523+3884 �L------ _ _------ II
--- INV=877.48'
----------- TOP=881.31'
MTL we. REMOVE
TYPE B-77
\JB
F�
24" RCP -II TO
PI Sto 33+50.69 PI Sto 42+52.42
A = /9' 47' 41.7" (LTI A = 34° 55' 25.6" (LT)
D = 3' 58' 43.9" D = 3° 58' 43.9"
L = 497.50' L = 877.73'
T = 25/25' T = 452.98'
R = 1,440.00' R = 1,440.00'
TIE TO EX.
GUARDRAIL
PROP. RETAINING WALL
LATERAL V DITCH
SEE DITCH DETAIL E
X./8'WW
LATERAL 2' BASE DTCH..,
W,CLASS 'B' RIP RAP
SEE DITCH DETAIL D
LATERAL 2' BASE DITCH
SEE DITCH DETAIL A
X X
O
CLASS
EST. 2
EST. 7
�XW
B' RIP RAP
ONS
Y GEOTEXTILE
15" W/ELB
WS
GREU TL-2
F
-LRT- PC Sto.37+99.45
100'
PIEDMONT TRIAD
AIRPORT AUTHORITY
nR an42 PG 1643
0'
100'
200'
GRAPHIC SCALE
-EL- PT Sta.30+04 5
8)
x
P. -6"
C&G
PROP.2'-6"
C&G
PIEDMONT TRIAD
AIRPORT AUTHORITY
DB 8304 PG 2780
PB 130 PG 95
x
0
d
70
FOR -LRT- PROFILE SEE SHEET 11 & 12
FOR -LLT- PROFILE SEE SHEET 14 & 15
FOR -Y1- PROFILE SEE SHEET 15
FOR DITCH DETAILS, SEE SHEETS ? THRU ?
i
PROJECT REFERENCE NO.
HE-0005
SHEET NO.
5A
c
NO WETLAND AND SURFACE WATER IMPACTS
3O%-1TO
ELEV. 905.0 MIL
SEE DITCH DETAIL F
TIE 10 EX.
GUARDRAIL
ENLARGED PLAN SITE 1
4 0' 0'
■ • • • .
GRAPHIC SCALE
RAY SHEET NO.
ROADWAY DESIGN
ENGINEER
HYDRAULICS
ENGINEER
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
mOTT MAC SF 60. & E, LLC
LICENSE NO. F-0669
MOTT MAC SF 60. 8 E, LLC
LICENSE NO. F-0669
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
Prepared in the
Office of:
M
M 76 1 Purfoy Rd,Suit, 115
MOTT FF q - rinc, NC ]1536
mncoorvnLo ma. ombmariws
PERMIT DRAWING
SHEET 5 OF 6
40'
80'
FOR —LRT— PROFILE SEE SHEET 11 & 12
FOR —LLT— PROFILE SEE SHEET 14 & 15
FOR —Y1— PROFILE SEE SHEET 15
FOR DITCH DETAILS, SEE SHEETS ? THRU ?
Revised
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS
SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
1
-LRT- Sta 22+50 RT
54" RCP Outlet Extension
---
---
---
---
2
-LRT Sta 32+50 - 33+42 LT
Embankment
---
---
---
---
---
2
-LRT Sta 33+85 - 35+07
Bridge
---
---
---
---
TOTALS*
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
*Rounded totals are sum of actual impacts
NOTES:
SITE 1 & 2 - NO WETLAND OR SURFACE WATER IMPACTS
2018 Feb
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
AUGUST 1, 2022
GUILFORD COUNTY
HE-0005
WBS #50338.1.1
SHEET 6 OF 6