HomeMy WebLinkAboutNCC190696_NOT Closeout Documents_20220812Adk
C� Greenville
,W#K NO R T H CAROL INA
ENGINEERING
Engineering Department-Sedimentation/Erosion Control Program
August 9, 2022
Letter of Final Inspection
Dillard Wallace
Blackwood Ridge — Dillard Wallace Construction
2017 Sedbrook Lane
Winterville, NC 28590
Re: Project Name: Blackwood Ridge — Dillard Wallace Construction
Project Number: ESCP-2019-0026
County: Pitt
Disturbed Acreage:
Responsible Party:
Dear Mr. Wallace,
.35
Dillard Wallace
At your request, this office has completed its final site inspection of the referenced project. We
find the site stable and in compliance with the approved Sedimentation and Erosion Control
Plan.
Upon issuance of this letter, the referenced Sedimentation and Erosion Control Plan has been
closed for this project and you will need to terminate your NCG01 permit.
Please do not hesitate to call if you have any questions.
R spectfully,
Victor C. Long
Engineer Assistant III
Engineering Department
City of Greenville
vlongl@greenvillenc.gov
www.greenvillene.gov
252-329-4888