Loading...
HomeMy WebLinkAboutNCC190696_NOT Closeout Documents_20220812Adk C� Greenville ,W#K NO R T H CAROL INA ENGINEERING Engineering Department-Sedimentation/Erosion Control Program August 9, 2022 Letter of Final Inspection Dillard Wallace Blackwood Ridge — Dillard Wallace Construction 2017 Sedbrook Lane Winterville, NC 28590 Re: Project Name: Blackwood Ridge — Dillard Wallace Construction Project Number: ESCP-2019-0026 County: Pitt Disturbed Acreage: Responsible Party: Dear Mr. Wallace, .35 Dillard Wallace At your request, this office has completed its final site inspection of the referenced project. We find the site stable and in compliance with the approved Sedimentation and Erosion Control Plan. Upon issuance of this letter, the referenced Sedimentation and Erosion Control Plan has been closed for this project and you will need to terminate your NCG01 permit. Please do not hesitate to call if you have any questions. R spectfully, Victor C. Long Engineer Assistant III Engineering Department City of Greenville vlongl@greenvillenc.gov www.greenvillene.gov 252-329-4888