June 14, 2022
LETTER OF APPROVAL WITH MODIFICATIONS
Truliant Federal Credit Union
ATTN: Joseph W Kloeker, Director of Facilities
PO Box 26000
Winston-Salem, NC 27114
RE: Project Name: Truliant Federal Credit Union Lexington
Acres Approved: 1.3
Project ID: DAVID-2022-053
County: Davidson
City: Lexington
Address: Lowes Blvd.
River Basin: Yadkin-PeeDee
Stream Classification: C
Submitted By: DMP, Inc.
Date Received by LQS: May 17, 2022
Plan Type: New
Dear Sir or Madam:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable with modifications and hereby issue this Letter of Approval with Modifications.
The Modifications Required for Approval are listed on the attached page. This plan approval shall
expire three (3) years following the date of approval, if no land -disturbing activity has been
undertaken, as is required by Title 15A NCAC 413.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000
Construction General Permit. After the form is reviewed and found to be complete, you will receive
a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will
receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted
for this project, you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about
the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator
of this project changes in the future, the new responsible party must obtain a new COC.
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 271O3
336.776.9800
Letter of Approval with Modifications
Truliant Federal Credit Union
June 14, 2022
Page 2 of 3
Title 15A NCAC 413 .0118(a) and the NCG01 permit require that the following documentation be
kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control plan
is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973
(North Carolina General Statute 113A-51 through 66), this office may require revisions to the
plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules
may also apply to this land -disturbing activity. This approval does not supersede any other
permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. This permit allows for a land -disturbance,
as called for on the application plan, not to exceed the approved acres. Exceeding the acreage
will be a violation of this permit and would require a revised plan and additional application fee.
You are requested to file an amended form if there is any change in the information included on
the form. In addition, it would be helpful if you notify this office of the proposed starting date for
this project. Your cooperation is appreciated.
Sincerely,
Digitally signed by Zachary
Zachary Lentz Lentz
Date: 2022.06.14 12:1824
-04'00'
Zachary Lentz, PE
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCG01 Fact Sheet
cc: Eddie MacEldowney of DMP, Inc. (via email)
WSRO File
Letter of Approval with Modifications
Truliant Federal Credit Union
June 14, 2022
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Truliant Federal Credit Union Lexington
Project ID: DAVID-2022-053
County: Davidson
Modifications pursuant to applicable North Carolina General Statutes and/or Regulations:
1. Additional measures may be required, particularly along the western perimeter initially and
for on -site inlets after pipe installation. The applicant is responsible for the control of
sediment on -site. If the approved erosion and sedimentation control measures prove
insufficient, the applicant must take those additional steps necessary to stop sediment from
leaving this site. [15A NCAC 4B .0115]
2. The NCGO10000 NPDES Stormwater Permit for Construction Activities has several
inspection requirements, including inspection of the stormwater discharge outfalls (SDOs)
at least once per 7 calendar days and within 24 hours of a rain event greater than or equal to
1.0 inch in 24 hours. SDOs were not identified on the plan; it is your responsibility to ensure
that self -inspections are conducted as required. Please contact this office with any questions
or concerns regarding the location of SDOs for your site. [NCG01 Part III Section A]
3. Concrete washout station and stockpiles should not be located within 50 feet of any storm
drain, basin, or stream unless no alternative is feasible. [G.S. 143-215.1]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities