Loading...
HomeMy WebLinkAboutGW1-2022-07276_Well Construction - GW1_20220809 WELL CONSTRUCTION RECORD(Gw-l) For h2temal Use Only 1.Well Contractor Information: Alfred Kiesling Sr well co'.M. To ?JT FROM?1%1 DUC_.MON'Pt 2670-A V L NC Well Contractor Certification Number TO '10 B & K Well Drilling Inc 10 9� i_DLA_N1ETE,7RL l)MTHJ(JNESS�M:R**L:*A'L Company Name 16 V4 in ISDR-21 JPVC 2.Well Construction Permit#: (3 3ePPLT6 FROM I TO DIA-ME'RERP I TRICKNESS AtAIERtAI Lit all OPPIXdhk well emstrucdon permits,;_e.L11C.co­rv.State MC,*o,,C,-.wC.) I ft. i ft. in. 3.Well Use(check well use): ft- I in. Water Supply Well: I DIAMETER SLOTSILE T ICKNFSq -MATCRIAL f N 0A.gricultura! 0-MUn' iPaVPLbliC FFIRONT rL I is rmal(HeatillaiCoolilig Supply) de7itial War- Sul OGeothe ly) a< v )Ply(single] ClUdIISM&COmmercial CResidential Wateer Supply(Shared) 01rrigation 0 Wells> 100,000 GPD FR NI DiPLACKMEN r rdmoD .Motto Nun-Water Supply Well: 0 20 nite Pour ONIonitoring OR=ovc-.v Injection welt: CAquifer Recbarge LIGroundwater Remediatior. OAquiler Storage and Recovery Maliuiry Barrier FRO,'%l TO NLATERIAL I EMPLACEMENT METHOD Aquifer Test CStormwater Drainage ft. ft_ I OExperimental Technology 0SUbsidence Control ft. OGoothen-nal(Closed Loop) OTracer 0 L fL'Gg:k T CGeothermal(HeatiELS(Cooling Return) 130the,(explain under#21 Remarks) FROM MT01 D&SCRrPT10'N(wJo,hrdn�:gWr-k Mn R­Sim nu 4.Date Well(s)Completed- eU rD# ft. t. s-ev—e, t_S 5a.Well Location: ft. Z F_ "- Iry "6-ca ��Kdp&� _T 14 .dL ft. it. t FacilitY/Owrerhlarne Facil4tv Ml�(ifzppj;cable� fr. fe Q,A ?4e'f Afewy*15') V M U Physica!Address.City.and Zip 9 1 ft. A I IL.411_ 'An99 Couary ?amcl Identification No.(PLN) kgogajakn PrncoGs jng Unt,, 56.Latitude and longitude in degrees/minatesiseconds or decimal degrees: MAVQ180G (if-ell field,one latJon,is suflicic"t) 22 Oct LM cati n: W 0 1 1 7— 6-is(are)the well(s): OPermanent or OTemporary SiParurcgccnzificd Well Coaz=or Date *r I herei*r re,7.:mar rile.:rll rsl,.as Nere)constructed accordance with 7.Is this 2 repair to an existing welh r_.-Yes or !]No 15.4'VCJC 02C-010r or 15-41,1,'CAC 02C.0200 IMc/7 Coacmerion Standards and that a corn L1*rhhvix a repair.fill our knonr well e infol Mofin,,and explair.,h,, ffh�s record has bernprmided ro the­fl o­rr. repair rarda,#21 rem&,-kj section or on the back ofthislorm. 23.She diagram or additional well details: 8-For CAvprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction.only I GW-11 is nccdod. Indicate TOTAL NUMBER of wells (add'See Ovee ju Remarks Box).You may also attach additional pages if necessary. drilled: 24.SUBMITTAL rNSTRUCTTONS, 9.Total well depth below land surface: UL) Fur-m u iziple i t VUS list lid[depths if&ffc renr(crumple-3(5�2 0 0,(In'l 2 0 0�J Submit this GW-1 within 30 days of well completion per the following: 10.Static water level below top of casing:40 24a. For All Wells: Original form 'to Division of Water Resources (DIA'R), ff"'Iter lew/is abol'r casing,use- (ft*) Information Processing Unit,1617 MSC.Ralei&NC 27699-1617 11.Borehole diameter: 6 1/8 1 24b.For Infection Wells:Copy to DWR_Underground Injection Control(rUC) Proz-arn, 1636 MSC.Raaeil;:�NC 27/699 1636 12-Well construction method:Air Rotary I - (i.e.auger,rotary.cable.direct push etc.) 24c.For Water Snppiv andOwen-Loop Geothermal Return Wells:Copy to the county enNironmcatal health department Of the votary where,ilLstalled. FOR WATER SUPPLY WELLS ONLY: 71 24d.For Water WeRs producing over, 100.000 GPD:Copy to DWR,CCPCUA 133-Yield(gpm) Method of test. Lift P—,t 161 1 MSC.Raleigh-N i C 27699-1611 13b.Disinfection vjN: Chlor. Tabs .kmount: 1 1/2 Lbs Form GW-1 North Carolina Dpanmcnt of-En,iro cL=nral Quality-Divisiou of NA'aTcr Kc.sOL=. c.q Revised b-6-2019