Loading...
HomeMy WebLinkAbout20130352 Ver 1_U2800 sediment loss May 16 2014_20140522Strickland, Bev From: Euliss, Amy Sent: Thursday, May 22, 2014 2:44 PM To: Wanucha, Dave Cc: Wyrick, Scott D; Guy, Jeremy M Subject: U2800 sediment loss May 16, 2014 Attachments: U2800 NPDES inspection records 5 -12 to 5- 19.pdf Attached are the NPDES inspection records from 5 -12 to 5 -19, including 3 inspections. The sediment loss at Y -2 occurred on May 16, 2014. The loss was the result of a 1.724 rain event. Erosion control measures at the time of the event were installed per plan. During the weekly inspection on May 12, no problems were noted at the SDO that drains the area of the loss. As you saw during your site review on May 19, the off -site sediment has been removed, and the deposits in the jurisdictional stream were removed to our satisfaction. The erosion control measures have been fortified and the area has been mulched. We'll let you know if we have any more issues. Let me know if need anything else. Amy - - - -- Original Message---- - From: Wyrick, Scott D Sent: Tuesday, May 20, 2014 4:00 PM To: Euliss, Amy Cc: Guy, Jeremy M Subject: Erosion I believed we had silt loss on RP -D because of the amount of open grade along with the large amount of rain in a short time span. These conditions overwhelmed the measures and caused the silt to go off the project. We have revisited the area and mulched the open grade and fortified the measures. Scanned with DocScan HD Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1 71201^ �WPFORM30 j I INSPECTION RECORD FOR ACTIVITIES UNDER STORMWATER GENERAL PERMIT NCG010000 SELF - INSPECTION RECORD FOR LAND DISTURBING ACTIVITIES PER § 113A -54.1 RESPONSE FOR EROSION CONTROL FORM 1675 PROJECT LOCATION Macy Grove Rd. Kemersville NC TIP # U -2800 LEVEL If SUPERVISOR Austin Hiott COUNTY Forsyth/ Guilford CONTRACTOR Blythe Development All erosion and sedimentation control measures and stormwater discharge outfalls must be inspected at least once (twice, if on 303(d) listed stream impaired by turbidity, see ht¢://portaLncdero.orgR/ document_l ibr ary /getfle ?u id= d8cJOccL6d8d- 47e8 -96e6 f/69jca0cca4 &grovpld= 38364) per seven Calendar days and within 24 hours of a rainfall of 0.5 inch per 24 hour period. Permittee must keep a record of inspections. Attach Multi Precipitation Estimator (MPE) rainfall data for weekly period. If using on site rain gage, complete daily rainfall measurement Phase of Grading lace a check in the box of the current paject phase) Installation of erimeter erosion and sediment control measures x Clearino and kb;--of existing ound cover x Com letion of an "se of —ding of slo es or FiIts x Installation of stone drainage facilities x Com letion of construction or devel0 mint Establishment of permanent Eound cover sufficient to restrain erosion Has all land disturbing activity been completed? (Y/N) Has the final permanent ground cover been completed and established? (Y/N) By this signature, I certify (in accordance with Part If Section B,10 of the NCG010000 permit) that this report is accurate and complete to the best of my knowledge: el If 6325 NCDOT Cert. Level II Representative Cert. # RECEIVED MAY 2 2 2014 Div. 9 Division Office 07/20U 'DPPFORM30 Stormwater Discharge Outfalls (S J) Re uired to list during each inspection) Sheet I of 1 vl__ ..e sedimentation and Stream Turbidity Inspection Date Station Number Corrective Actions Taken Priority * Date Corrected * *other Pollutants ** *Sediment Deposited * ** *Stream Clarity 5/16/14 Y7- 18 +39 RT No Actions Needed at this time NO NO NO 5/16/14 L- 56 +28 RT No Actions Needed at this time NO NO NO 5116114 Y2 -24 +16 RT No Actions Needed at this time NO NO NO 5/16/14 Y2 -35 +00 +/- RT No Actions Needed at this time NO NO NO 5/16/14 Y2 -35 +00 +/- LT No Actions Needed at this time NO NO NO 5/16/14 Y2 -40 +00 RT No Actions Needed at this time I NO NO NO 5/16/14 Y2 45 +00 RT No Actions Needed at this time NO NO NO 5/16/14 Y246 +00 LT No Actions Needed at this time NO NO NO 5/16/14 Y247 +50 LT No Actions Needed at this time NO NO NO 5/16/14 Y2-19+00 RT No Actions Needed at this time NO NO NO 5/16/14 Y12 -14 +50 RT No Actions Needed at this time NO NO NO 5/16/14 Y -2 35 +40 EB RT No Actions Needed at this time NO NO NO 5/16/14 Y -2 38 +52 EB RT No Actions Needed at this time NO NO NO 5/16/14 Y -2 39 +60 EB RT No Actions Needed at this time I NO NO NO 5/16/14 Y -2 40 +56 EB RT No Actions Needed at this time NO NO NO 5/16/14 Y -2 41 +40 EB RT No Actions Needed at this time NO NO NO 5/16/14 Y -2 44 +89 EB RT No Actions Needed at this time NO NO NO 5/16/14 Y -2 45 +35 EB RT No Actions Needed at this time NO NO NO 5/16/14 Y -2 45 +61 EB RT No Actions Needed at this time NO NO NO 5/16/14 Y -2 45 +80 EB RT No Actions Needed at this time NO NO NO 5/16/14 Y -2 47 +00 WB LT No Actions Needed at this time NO NO NO 5/16/14 Y -2 47 +40 WB LT No Actions Needed at this time NO NO NO 5/16/14 Y -2 47 +55 WB LT No Actions Needed at this time NO NO NO 5/16/14 Y -9 18 +50 RT No Actions Needed at this time NO NO NO 5116114 L- L62 +50LT No Actions Needed at this time NO NO NO 5/16/14 Y -2 93 +00 LT Silt lost of site, all has been cleaned up U 5/20/14 NO YES NO * R= Routine, needs attention within 5 days; U= Urgent, needs attention within 24 hrs. * *Is there evidence of other pollutants discharging from site such as oil sheen, discoloration, cement wastes, sanitary waste, fertilizers, or fuel or storage leakage? (Y /N) * *If Other Pollutants is marked Yes, describe extent of discharge and list the corrective actions taken. * * *Is there any visible sediment deposited in a stream, wetland, buffer or adjacent property? (Y /N) * ** Contact DWQ /DLR -LQ within 24 hours if visible sediment is deposited in surface waters or wetlands. * * * *Is there any visible decrease in stream clarity (increase turbidity - cloudy) because of a discharge? (Y /N) 07�r 'PPPFORM30 Erosion & Sedimentation Antrol Devices Sheet of (Re uired to list all devices that need maintenance — — Inspection Date Station Number Corrective Actions Taken Priority " Date Corrected 5/12/14 Ramp B Add rip rap and 57 stone to rock checks at basin R 5/12/14 L -L 20 +00 L Re work ditch and install proper protection R 5/13/14 5/121 14 L -L 12 +75 L: refresh stone at outlet of skimmer basin R 5/12/14 5/12/14 Structure 1703 Add stone to inlet protection R 5/12/14 5/12/14 L -L 23 +00 R Clean rock checks in ditch at outlet of basin R 5/13/14 5/12/14 L -L 23 +00 R Silt fence repair R 5/12/14 5/12/14 L -L 24+00 R Clean /replace wattles in ditch line R 5/12/14 L -L 23 +00 R Place core matting at inlet/outlet of basin R 5/12/14 L -L 24 +00 R Silt fence repair R 5/12/14 5/12/14 Ramp C Silt removal and refresh rip rap outlet pad R 5/12/14 Ramp A Clean silt and debris from wattles in silt ditch R 5113/14 5/12/14 Bridge 3 EB I Remove loose dirt from wattles on slope R 5/14/14 5/12/14 Y -5 29+00 R Add stone to check dam R 5/12/14 Ramp A Clean stone at inlet of RCP R 5/13/14 5/12/14 Ramp A Refresh stone at rock checks R 5/15/14 5/12/14 Ramp Correctly stake wattles R 5115114 5/12/14 Bride 1 EB 2 L Dress up and stabilize soil/ add wattles on sloe R 5/12/14 Y -3 Install baffles in skimmer basin R 5/15/14 5/12/14 Y -3 16 +50 +- Add stone to check dams R 5/12/14 Y -2 3545 +00 R Re install slope drains per plan R 5/1-5/14 5/12/14 Y -2 45- 60 +00R Install rock checks in completed ditch R 5/14/14 5/1214 Y -2 47 +50 R Build earth berm behind catch basin R 5/14/15 5/12/14 All Seed and matt all completed areas / slopes R 5/15/14 5/12/14 All Re-apply PAM per plan R 5/15/14 5/16/14 Ramp C Clean silt and debris from check dams R 5/16/14 5/16/14 Y- 289 +00R Repair silt fence R 5/16/14 5/16/14 Ramp B Clean silt and debris from check dams R 5116114 5116114 Ramp C Repair silt fence at fill areas R 5/17/14 5/16/14 L- L40 +00R Silt removal R 5/17/14 5/16/14 Y -5 43 +00 R Silt fence repair R 5/17/14 5/16/14 Y- 293 +00 L Silt removal R 5/20/14 5/16/14 Ramp B Resta le fabric on spillway of skimmer basin R 5/16/14 Y -2 30 +00 L Silt removal at wattle outlet R 5/17/14 5/16/14 L -Line 42 +00 L Repair silt fence It 5/16/14 Bridge 2 EB I Repair silt fence R 5/16/14 Bridge 2 EB I Silt removal at bottom of wing wall R 5/16/14 Bridge 2 EB I Silt removal at wattle at top of sloe R 5/16/14 Y -3 13 +50 L Silt removal at rock checks R 5/16/14 L -Line 48 +00 R Silt removal at rock checks R 5/16/14 L -Line 55 +00 R Refresh rip rap R *R= Routine, needs attention within 5 days; U =Ur ent, needs attention within 24 hours. "'PPPFORM30 INSPECTION RECORD FOR ACTIVITIES UNDER STORMWATER GENERAL PERMIT NCG010000 SELF - INSPECTION RECORD FOR LAND DISTURBING ACTIVITIES PER § 113A -54.1 RESPONSE FOR EROSION CONTROL FORM 1675 PROJECT LOCATION Macy Grove Rd. Kemersville NC TIP # 1-2800 LEVEL 11 SUPERVISOR Austin Hiott COUNTY Forsyth/ Guilford CONTRACTOR Blythe Development All erosion and sedimentation control measures and stormwater discharge outfails must be inspected at least once (twice, if on 303(d) listed stream impaired by turbidity, see h/ tp: / /portal.ncdennorg/ddocnment library/ getfr le ?uuid= d6cfOcc2- Gd8d- i7e8 -96e6 f/69jca0ccad &gronp/d= 38364) per SCVen Calendar days and within 24 hours of a rainfall of 0.5 inch per 24 hour period. Permittee must keep a record of inspections. Attach Multi Precipitation Estimator (MPE) rainfall data for weekly period. If using on site rain gage, complete dally rainfall measurement. Day Date Rain Notes x -'om letion of an phase of grading of slopes or fills Amt in installation of storm drainage facilities [j M 5/19/74 0.00 Ins coon Performed T 5/20/14 0.00 W 5/21/14 0.00 Th 5/22/14 0.00 F 5/23/14 0.00 Sat 1 5/24/14 1 0.00 Sun 5/25/14 L 0.00 Phase of Grading Place a check in the box of the current project phase) [Clearin-and- jb]bi nstallation er erosion and sediment control measures x of existin o und cover x -'om letion of an phase of grading of slopes or fills x installation of storm drainage facilities [j x om letion of construci stablishment of Rermanent ground cover sufficient to restrain erosion Has all land disturbing activity been completed? (YIN) ,n Has the final permanent ground cover been completed and established? (Y/N) I By this signature, I certify (in accordance with Part 11 Section B, 10 of the NCG010000 permit) that this report is accurate and complete to the best of my knowledge: I NCDOT Cert. Level 11 Cert 6325 Cert- 9 7 lr ' nPPFORM30 Stormwater Discharge Outfaiis (,-,,. a) R uired to list during each inspection) Inspection Station Number Corrective Actions Taken Date 5/19/14 Y7- 18+39 RT No Actions Needed at this time 5/19174 L- 56 +28 RT No Actions Needed at this time 5/19/14 Y2 -24 +Ib RT No Actions Nccdcd at this time 5/19/14 Y2 -35+00 +/- RT No i Sheet 1 of 1 Priority Date "Other " Corrected Pollutants NO NO NO NO NO Vi:, .e Sedimentation and Stream Turbidity ** "Sediment * *" *Stream Deposited Clarity NO NO NO NO NO NO NO NO NO NO 5/19/14 5/19/14 Actions Needed at this time Y2 -35+90 +I- LT No Actions Needed at this time Y2-40 +00 RT No Actions 5/19/14 Needed at this time Y2 45 +00 RT No Actions ( NO NO NO Needed at this time 5/19/14 Y246+00 LT No Actions Needed at this time 5/19114 Y247 +50 LT No Actions Needed at this time 5/19/14 Y2 -19+00 RT No Actions Needed at this time 5/t 9/14 Y12 -14 +50 RT No Actions Needed at this time 5/19/14 Y -2 35 +40 EB RT No Actions Needed at this time 5/19/14 Y -2 38 +52 EB RT No Actions Needed at 5119114 Y -2 this time 39 +60 EB RT No Actions Needed at this t me 5/19/14 Y -2 40 +56 EB RT No Actions Needed at this time 5/19/14 Y- 241 +40EBRT No Actions Needed at this time 5/19/14 Y -2 44 +89 EB RT No Actions Needed at this time 5/19/14 Y -2 45 +35 EB RT No Actions Needed at this time 5/19/14 Y -2 45 +61 EB RT No Actions Needed at this time 5/19/14 Y -2 45 +80 EB RT No Actions Needed at this time 5/19/14 Y -2 47 +00 W LT No Actions Needed at this time 5/19/14 Y -2 47 +40 WB LT No Actions Needed at this time 5 /19 /1 4 Y -2 47 +55 WB LT No Actions Needed at this time 5/19/14 Y -9 18 +50 RT No Actions Needed at this time 5/19/14 L- 262 +50LT No Actions Needed at this time 5/19/14 Y -2 93 +50 LT Silt lost off site, all has been cleaned up. 5/19/14 Y -2 35 +00 LT No Actions Needed at this time 5/19/14 Y -2 33 +75 LT No Actions Needed at this time 5/19/14 Y -2 36 +00 LT No Actions Needed at this time U NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO 5/20/14 NO NO NO NO YES NO NO NO NO NO NO u NO NO NO NO * R= Routine, needs attention within 5 days; U= Urgent, needs attention within 24 hm * *Is there evidence of other pollutants discharging from site such as oil sheen, discoloration, cement wastes, sanitary waste, fertilizers, or fuel or storage leakage? (Y /N) * *if Other Pollutants is marked Yes, describe extent of discharge and list the corrective actions taken. * * *Is there any visible sediment deposited in a stream, Is there any visible wetland, buffer or adjacent property? (Y/N) decrease in stream clarity * ** Contact DWQ /DLR -LQ within 24 hours if visible (increase turbidity - cloudy) sediment is deposited in surface waters or wetlands. because of a discharge? (Y /N) 07/201P °PPPFORM30 Erosion & Sedimentatioh —ontrol Devices _ _ (Re uired to list all devices that need maintenance) Sheet Of Inspection Date Station Number Corrective Actions Taken Priority * Date Corrected 5/19/14 Ramp D Remove silt from inlet protection stone R 5/19/14 Ramp D Add stone to all inlet protections R 5/19/14 Y -2 85 +00 -90 L Replace wattles with rock checks in ditch fine R 5/19/14 Y -2 91 -93 +50 L Remove silt from rip rap ditch R si I I i i.1 5/19/14 Y -2 93 +50 L Silt removal from ditch at outfall U 5/20/14 5/19/14 Ramp B Stabilize area at headwall structure by basins R 5/19/14 Y -2 40 +OOR Add rip rap to check dam at FES R 5/19/14 L -L 54 +00 R Remove silt from rip rap ditch R 5/19/14 Bridge 2 EB I Retie silt fence R 5/19/14 Bridge 2 EB 2 Re tie silt fence R 5/19/14 Bridge 2 EB I Silt removal at bottom of wing wall R 5/19/14 L -L 24 +00 R Remove silt from rip rap ad and refresh silt fenc R 5/19/14 All Reinstall all sloe drains/ removed for filling R L %/ /'L! 5/19/14 Y -2 90+00 L Seed and matt slopes and all bare areas R 5/19/14 Y -2 90 +00 L Install silt basins R 5/19/14 Y -2 91 -93 +50 L Refresh rip rap in ditch R 5/19/14 Ramp D Clean silt from inside catch basins R 5/19/14 Y -2 93 +50 L Install double row silt fence R'i 5/19/14 L -L 49 +00 R Silt removal at check dams R 5/19/14 Y -2 93 +50 L Install large rip rap dam at outfall R 5/19/14 Y -2 93 +50 L Replace hardware cloth outlet and stone R 5/19/14 Ramp D Build earth berm behind catch basins R 5/19/14 Ramp D Trench in matting at structure 1601 U 5/19/14 Ramp D Left Stabilize inlet U 5/19/14 Macy Grove Construction entrance maint. to prevent tracking U 5/19/14 Y -2 WBL Install basin immediately U 5/19/14 Structure 1018 Remove loose fill and isolate outlet drainage with U V with silt fence per plans 5/19114 Structure 1008 Install type Asilt check Per C &G plans and install U Wattle properly w/ matting and PAM to stop scour Install berm across top of fill to direct runoff Behind silt check 5/19/14 Y -2 39 +50 Repair gully and move slope drain to low point U I) `-i 5/19/14 Y -2 Silt checks in ditchline are not shaped properly U for the ditch. Widen and drop weir height to prevent runoff from running around the sides, keep runoff in center of ditchline. *R= Routine, needs attention within 5 days; U =Ur ent, needs attention within 24 hours.