Loading...
HomeMy WebLinkAboutNCC221758_Modification Confirmation Email_20220811Georgoulias, Bethany From: laserfiche@ncdenr.gov Sent: Thursday, August 11, 2022 1:32 PM To: osherrill@are.com Cc: Georgoulias, Bethany; osherrill@are.com; taylor.hollingshead@bolton-menk.com Subject: Modification Confirmation This e-mail is to notify you that the modification information for COC No. NCC221758 for the project Bioprocess Innovation Center Expansion that you submitted on 8/9/2022 has been added to the permit file records as of 8/11/2022. Modification Reason: Other Revision(s) to E&SC Plan Additional Details (if provided): A bay of Parking was VE'ed out resulting in 1 proposed bay instead of 2. This ultimately reduced the proposed impervious area as well as the disturbed area. You can find all Construction COC Permit files in our Document Repository here. Questions? Please contact The NC Stormwater Program at (919) 707-3640. This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not monitored.