Loading...
HomeMy WebLinkAboutNC0081949_Permit (Issuance)_20090820NPDES DOCUHENT SCANNING: COVER SHEET NC0081949 Tuckertown Powerhouse NPDES Permit: Document Type: ermit Issuance Wasteload Allocation Authorization to Construct (AtC) Permit Modification Complete File - Historical Engineering Alternatives (EAA) Staff Report Instream Assessment (67b) Speculative Limits Environmental Assessment (EA) Document Date: August 20, 2009 This documerit is printed on reuse paper - ignore arty content on the rezrerse side AriA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary August 20, 2009 Mr. Mark Gross Alcoa Power Generating, Inc. P.O. Box 576 Badin, North Carolina 28009 Subject: Issuance of NPDES Permit NC0081949 Tuckertown Powerhouse Stanly County Dear Mr. Gross: Division personnel have reviewed and approved your application for renewal of the subject permit. Accordingly, we are forwarding the attached NPDES discharge permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). This final permit includes no major changes from the draft permit sent to you on July 1, 2009. If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to an adjudicatory hearing upon written request within thirty (30) days following receipt of this letter. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings (6714 Mail Service Center, Raleigh, North Carolina 27699-6714). Unless such demand is made, this decision shall be final and binding. Please note that this permit is not transferable except after notice to the Division. The Division may require modification or revocation and reissuance of the permit. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-63001 FAX: 919-807-64921 Customer Service:1-877-623-6748 Intemet: www.ncwaterquality.org An Equal Opportunity 1 Affirmative Action Employer NonrthCarolina 7Vaturaiij • Division of Land Resources, the Coastal Area Management Act or any other Federal or Local governmental permit that may be required. If you have any questions concerning this permit, please contact Sergei Chernikov at telephone number (919) 807-6393. cc: MRO-Surface Water Protection NPDES File Central Files 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 • Phone: 919-807-63001 FAX: 919.807-64921 Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org An Equal opportunity \ Affirmative Action Employer NorthCarolina ,Naturally Permit NC0081949 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY PERMIT TO DISCHARGE WASTEWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Alcoa Power Generating, Inc. is hereby authorized to discharge wastewater from a facility located at the Tuckertown Powerhouse on NCSR 1164 Stanly County to receiving waters designated as Yadkin River in the Yadkin -Pee Dee River Basin in accordance with effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III and IV hereof. This permit shall become effective October 1, 2009. This permit and authorization to discharge shall expire at midnight on January 31, 2014. Signed this day August 20, 2009. �•� een H. Sullins, Director ' ''j Division of Water Quality . . By Authority of the Environmental Management Commission • Permit NC0081949 SUPPLEMENT TO PERMIT COVER SHEET All previous NPDES Permits issued to this facility, whether for operation or discharge are hereby revoked. As of this permit issuance, any previously issued permit bearing this number is no longer effective. Therefore, the exclusive authority to operate and discharge from this facility arises under the permit conditions, requirements, terms, and provisions included herein. Alcoa Power Generating, Inc. is hereby authorized to: 1. Continue to discharge once -through cooling water from outfalls 001, 002 and 003, and water from a sump drain (Outfall 004) located at the Tuckertown Powerhouse [NCSR 1164, near Tuckertown] in Stanly County. 2. Discharge from said treatment works at the location specified on the attached map into the Yadkin River, currently classified as WS-IV & B CA waters in the Yadkin -Pee Dee River Basin. ( Discharge Point �11,r NC0081949 — Tuckertown Powerhouse Latitude: 35°29'07" Longitude: 80°10'34" Quad #: F18NW Stream Class: WS-IV & B CA Receiving Stream: Yadkin River Permit NC0081949 A. (1) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS [001 / 002 / 003] During the period beginning on the effective date of the permit and lasting until expiration, the Permittee is authorized to discharge once through cooling water from outfalls 001, 002 and 003. Such discharges shall be limited and monitored by the Permittee as specified below: PARAMETER DISCHARGE LIMITATIONS Monitoring Requirements. Monthly Average Daily Maximum Effluent Measurement Frequency Sample Type Sample Location* Flow (MGD) Annual Estimate Effluent Temperature1 1 1 Annual Grab Effluent pH2 Annual Grab Effluent NOTES: Effluent or at the point closest to discharge where a representative sample of the discharge can feasibly be obtained. 1 The temperature of the effluent will be regulated so that the temperature of the receiving stream does not increase by more than 2.8 °C above the natural water temperature. In no case should the receiving stream temperature exceed 32 °C due to the facility's operation. Temperature of the effluent may be obtained anywhere downstream of the heat exchanger effluent that is representative of the discharge. 2 The pH of the effluent shall not be less than 6.0 standard units nor greater than 9.0 standard units, unless ambient river conditions prevent compliance with this range. Monitoring results obtained during the calendar year shall be recorded and reported on a Discharge Monitoring Report (DMR) form and postmarked no later than January 30th following the completed reporting period. Samples obtained for monitoring purposes may be collected anytime during the calendar year. There shall be no discharge of floating solids or visible foam (other than trace amounts) in the effluent, unless ambient river conditions prevent compliance. A. (2) BIOCIDE CONDITION There shall be no chromium. zinc or copper added to the treatment system except as pre -approved additives to biocidal compounds. The permittee shall obtain approval from the Division's Aquatic Toxicology Unit prior to the use of any biocide (not previously approved by the Division) in the effluent discharged under this permit. Approval for use of any biocide not previously approved should be requested at least 90 days in advance of any planned usage. Contact the Aquatic Toxicology Unit for detailed instructions on requesting approval of biocides: NC DENR / DWQ / Aquatic Toxicology Unit 1621 Mail Service Center Raleigh, North Carolina 27699-1621 Permit NC0081949 A. (3) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS 1004] During the period beginning on the effective date of the permit and lasting until expiration, the Permittee is authorized to discharge stormwater from outfall 004 [Sump Drain]. Such discharges shall be limited and monitored by the Permittee as specified below: PARAMETER DISCHARGE LIMITATIONS Monitoring Requirements Monthly Average Daily Maximum Measurement Frequency Sample • Type Sample Location Flow Annual Estimate Effluent Oil and Grease' 15.0 mg/L 20.0 mg/L Annual Grab Effluent pH2 Annual Grab Effluent NOTES: * Effluent or at the point closest to discharge where a representative sample of the discharge can feasibly be obtained. 1 The tailrace shall be visually inspected for oil sheen attributed to facility operations on a weekly • basis in conjunction with inspections of the floor sump and rope skimmer. Confirmation that a visual inspection was conducted shall be recorded in the operating log for the facility and provided to the Division upon request. 2. The pH of the effluent shall not be less than 6.0 standard units or greater than 9.0 standard units, • unless ambient river conditions prevent compliance with this range. Best Management Practices (BMPs) must be employed to ensure that excessive pollutants are not discharged to the surface water of the state. These practices should include as a minimum, routine maintenance of the rope skimmer type oil/water separator and cleaning accumulated sediment in the bottom of the sump annually. Chemical wheel pit cleaning is permitted on a monthly basis. When wheel pit cleaning occurs, the tailrace shall be inspected visually for foam and oil. Cleaning shall be conducted only with pre - approved solvents. Should the Permittee wish to change solvents, a written request should be made to the Division including the MSDS for the proposed solvent. Mechanical cleaning operations, which do not contribute any wastewater to the discharge are not limited by this permit. Non -discharging cleaning operations may be conducted as often as necessary to ensure safety and proper facility operation. Monitoring results obtained during the calendar year shall be recorded and reported on a Discharge Monitoring Report (DMR) form and postmarked no later than January 30th following the completed reporting period. Samples obtained for monitoring purposes may be collected anytime during the calendar year. There shall be no discharge of floating solids or visible foam (other than trace amounts) in the effluent, unless ambient river conditions prevent compliance. MEMORANDUM To: July 1, 2009 Britt Setzer, Regional Engineer NC DENR / DEH / Public Water Supply Section Mooresville Regional Office From: Sergei Chernikov, Environmental Engineer II, NPDES-West, Division of Water Quality (fax-919-807-6495) Subject: Review of the discharge locations for the following: Tuckertown Powerhouse NC0081949 Stanly County Please indicate below by August 3, 2009 your agency's position or viewpoint on the facility listed above. We cannot issue the permit without your concurrence. Please return this form at your earliest convenience. RESPONSE: ?( Signed cc: file This agency has reviewed the draft permit and determined that the proposed discharge will not be sufficiently close to any existing or known proposed public water supply intake so as to create an adverse effect on water quality. We concur with the issuance of this permit provided the facility is operated and maintained properly, the stated effluent limits are met prior to discharge, and the discharge does not contravene the designated water quality standards. Concurs with issuance of the above permit, provided the following conditions are met: Opposes the issuance of the above permit, based on reasons stated below, or attached: North Carolina } ss Mecklenburg County) The Charlotte Observer Publishing Co. Charlotte, NC Affidavit of Publication THE CHARLOTTE OBSERVER DINA SPRINKLE NCDENR/DWQ/POINT SOURCE BRANCH 1617 MAIL SERVICE CENTER RALEIGH NC 27699 REFERENCE: 30063432 6361919 wastewater permit Before the undersigned, a Notary Public of said County and State, duLy authorized to administer oaths affirmations, etc., personally appeared, being duly sworn or affirmed according to law, doth depose and say that he/she is a representative of The Charlotte Observer Publishing Company, a corporation organized and doing business under the laws of the State of Delaware, and publishing a newspaper known as The Charlotte Observer in the city of Charlotte, County of Mecklenburg, and State of North Carolina and that as such he/she is familiar with the books, records, files, and business of said Corporation and by reference to the files of said publication, the attached advertisement was inserted. The following is correctly copied from the books and files of the aforesaid Corporation and Publication. PUBLISHED ON: 07/04 AD SPACE: FILED ON: NAME: 90 LINE 07/10/09 In Testimony Whereof I have hereunto day andjear aforesaid. Nota TITLE: DATE: Public Notice North Caiolina Environmental Management Commission/NPDES Unit 1617 Mail Service Center . Raleigh, NC 27699-1617 ' + Notice of Intent to Issue a.NPDES Wastewater Permit b � . •'(: The North Carolina Environmental Management Co rnrnisssiOn proposes to -issue a NPDFS wastewater discharge Pen^it to the p idea) listed theproposed Permt wll'be Written •umm30td regarding rOe publih ate of this notice. o ce. Theld a irforof the N0 dDy5 udlia Director hearing the should here be Water aesignificantDdegree of-.P public .Plase requests to interest. Please a addremmenerestedpr information DWQ MO at t.rSabove address. Interested Raleigh, NC to revrew.informatbn on file. A N. Salisbury Street, DE permits and this notice may fie. ound onaour webson on w Spa org. or by calling be found on our website: www.ncwaterqu+'� _ . (919) 807-6304. The Al197oon ueeted 'renewal facility emet NC0085Naws Poerhouse•iStmy CoMfs discharge is once -through _ in. cooling water and sump dreln.waterto; the Yadkin River, Yadkin River Basin. " e- i. • -' i.. The Alcoa PowerGenerating, Inc. requested rr rhit NC0081949 tor. Tuckertown Powerhddse in Stoney Counh't• this facility discharge' eonce-through ghr Basing water and :sump drain water to Yadkta-ifiv .. qu NC jdcoa"P or Falls Powerhouse fn retested ed renewal arer a this facility discharge h cooling water. stbrmwater, and sump discharge r once -through ..., drain water to Yadkin River, Yadkin River Basin. renewal � permit The Alcoa Power Generating, Inc. requested NC0081931 for High Rock Powerhouse inFowair County: this. facility discharge is once -through cooling water end stormwaterto, Yadkin River, Yadkin River Basin. rrirt NCotIOSttor -fhe,Tyson Foods, Inc requested renewal of pe a 0.tiamed Harmony Plant in Iredell Counttyy:� this Rivedischr industrial wastewater to Yadkin River, Yadkin LP6361919. - • i JUL 0 2009 set my hand and affixed my seal, the Commission Expires: _/_/_ My Commission Expires May 27, 2011 DENR/DWQ FACT SHEET FOR NPDES PERMIT DEVELOPMENT NPDES No. NC0081949 Facility Information Applicant/Facility Name: Alcoa Power Generating, Inc.. /Tuckertown Powerhouse Applicant Address: PO Box 576, Badin, NC 28009-0576 Facility Address: On NCSR 1164 Permitted Flow Monthly Average —1,362,850 gpd Type of Waste: Once though cooling water and sump discharges. Facility/Permit Status: Renewal County: Stanly Miscellaneous Receiving Stream: Stream Classification: Yadkin River WS-IV & B CA Regional Office: USGS Topo Quad: Mooresville F 18 NW 303(d) Listed?: NO Permit Writer: Sergei Chernikov Subbasin: 03-07-08 Date: June 3, 2009 Drainage Area (mi2): Summer 7Q10 (cfs) Winter 7Q10 (cfs): Average Flow (cfs): IWC (%): Primary SIC Code: 4911 adielPF SUMMARY This facility maintains 4 outfalls (001, 002, 003, and 004) With the exception of outfall 004 (sump drain) the source of water for the other outfalls is once through cooling water. The permit stipulates that outfalls 001 through 003 monitor (with no limits) flow, temperature and pH. For the outfall 004 monitoring was required for oil and grease, flow and pH; monthly average and daily maximum oil and grease limits were 15 mg/L and 20 mg/L respectively. Discharge monitoring reports have to be submitted yearly. The receiving stream, Yadkin River, is classified as WS-IV and B CA waters, from a point 0.6 mile upstream of the High Rock Lake Dam to the Badin Dam. This reach is not listed on the 303(d) list as impaired water. COMPLIANCE SUMMARY: The facility has an excellent compliance history. During the last 5 years, facility did not violate the permit terms and conditions. Compliance Evaluation Inspection conducted on 11/30/2006 determined that the facility is in compliance. PROPOSED CHANGES: None PROPOSED SCHEDULE FOR PERMIT ISSUANCE: Draft Permit to Public Notice: July 1 (est.). Permit Scheduled to Issue: August 24 (est.). STATE CONTACT: If you have any questions on any of the above information or on the attached permit, please contact Sergei Chernikov at (919) 807-6393. Alcoa Power Generating, Inc. . Tuckertown Hydroelectric Powerhouse Fact Sheet NPDES Renewal Page 1 Regional Office Comments Name: Date: Alcoa Power Generating, Inc. . Tuckertown Hydroelectric Powerhouse Fact Sheet NPDES Renewal Page 2 To: Western NPDES Program Unit Water Quality Section Attention: Dina Sprinkle SOC Priority Project: No Date: September 8, 2008 NPDES STAFF REPORT AND RECOMMENDATIONS County: Stanly NPDES Permit No.: NC0081949 PART I - GENERAL INFORMATION 1. Facility and address: Tuckertown Powerhouse Alcoa Power Generating, Inc. Post Office Box 576 Badin, N.C. 28009 Cc( ;l ► SEP 1 1 2008 DENR, - WATER 01JAtTY ?p/NT SOURCE HRANCN 2. Date of investigation: N/A 3. Report prepared by: Samar Bou-Ghazale, Environmental Engineer II 4. Person contacted and telephone number: Mr. Mark Gross, (704) 422-5623 5. Directions to site: From the jct. of Hwy. 49 and SR 1164 on the eastern edge of Montgomery County, travel south on SR 1164 .6 miles. The Tuckertown Powerhouse is located on the right (west) side of the road. 6. Discharge point(s), list for all discharge points: - Latitude: 35° 29' 07" Longitude: 80° 10' 34" Attach a USGS Map extract and indicate treatment plant site and discharge point on map. USGS Quad No.: E 18 NE 7. Size (land available for expansion and upgrading): There is little, if any area available for the construction of wastewater treatment facilities should they be needed. • 8. Topography (relationship to flood plain included): The Powerhouse is located on the main segment of the Yadkin River; however, the hydroelectric generation facilities are not subject to flooding. Page Two 9. Location of nearest dwelling: The nearest dwelling is at least 1000 feet from the Powerhouse site. 10. Receiving stream or affected surface waters: Yadkin River a. Classification: WS-IV and B, CA b. River basin and subbasin no.: Yadkin 03-07-08 c. Describe receiving stream features and pertinent downstream uses: The Yadkin River is used for primary and secondary recreation and electricity generation. There are no known water intakes several miles below this Powerhouse. PART II - DESCRIPTION OF DISCHARGE AND TREATMENT WORKS 1. a. b. Volume and type of Wastewater: (MGD) Outfalls 001, 002, & 003: Outfall 004: Outfalls 001, 002, & 003: Outfalls 004: 0.04536 MGD 0.0001 MGD Generator thrust bearing cooling water. Wheelpits drainage, powerhouse floor drains, oil and sludge skimmer, and powerhouse sump. Current permitted capacity: N/A c. Actual treatment capacity: N/A d. Description of existing or substantially constructed treatment works: There are no existing treatment works nor are any proposed. For domestic wastewater disposal, employees have an on -site subsurface disposal system. e. Possible toxic impacts to surface waters: None. There are no biocides added to the cooling water at this facility. 2. Residuals handling and disposal scheme: There are no residuals generated at any of the outfalls. 3. Treatment Plant Classification: This facility does not meet the minimum criteria for a class I rating. 4. SIC Code(s): 4911 Wastewater Code(s): 48 MTU Code(s): N/A Page Three PART III - OTHER PERTINENT INFORMATION 1. Is this facility being constructed with Construction Grants Funds (municipals only)? No 2. Special monitoring requests: None at this time. 3. Additional effluent limits requests: None at this time. 4. Air Quality and/or Groundwater concerns or hazardous materials utilized at this facility that may impact water quality, air quality or groundwater? No AQ or GW concerns nor are hazardous materials utilized at this facility. PART IV - EVALUATION AND RECOMMENDATIONS The applicant, Alcoa Power Generating, Inc., operates a powerhouse (dam) on the Yadkin River known as the Tuckertown Powerhouse. There have been no changes and/or modifications to this facility or the subject permit since the permit was last issued. Pending review and approval by the Western NPDES Program Unit, it is recommended that the permit be renewed as requested. og Signature of Rep iffPreparer Date e Surface Water Quality Regional Supervisor Date it� u 1.1 SEP 1 1 2008 WA 7F rf 4cH A ALCOA August 1, 2008 N. C. Department of Environment and Natural Resources Division of Water Quality 1617 Mail Service Center Raleigh, N. C. 27699-1617 Attention: Mr. Charles H. Weaver, Jr. RE: NPDES PERMIT RENEWAL APPLICATIONS - FALLS POWERHOUSE - NC0076775 NARROWS POWERHOUSE - NC0081957 TUCKERTOWN POWERHOUSE - NC0081949 HIGH ROCK POWERHOUSE - NC0081931 Mr. Weaver: Alcoa Power Generating Inc. Yadkin Division 293 NC 740 Hwy PO Box 576 Badin, NC 28009-0576 USA CERTIFIED MAIL RETURN RECEIPT REQUESTED 7005 3110 0003 6918 9935 ALCOA POWER GENERATING, INC Attached, please find the NPDES permit renewal applications for Alcoa Power Generating, Inc.'s four hydroelectric facilities. Alcoa Power Generating, Inc.'s present NPDES permits are due to expire on January 31, 2009. The renewal application package contains the following items: • N. C. Short Form C - One signed original and two copies for each facility. • Schematic of Water Flow - Three copies for each facility. • Location Map - Three copies for each facility. If you should have any questions or comments, please don't hesitate to contact me @ 704-422-5701. Yours Very Truly, Tommy Gibson Alcoa - Badin Works cc: M. J. Gross - attachments RECEIVED AUG - 5 2008 DEN R - WATER QUALITY POINT SOURCE BRANCH NPDES PERMIT APPLICATION - SHORT FORM C -• Minor Industrial Minor industrial, manufacturing and commercial facilities. Mail the complete application to: N. C. Department of Environment and Natural Resources Division of Water Quality / NPDES Unit 1617 Mail Service Center, Raleigh, NC 27699-1617 NPDES Permit Number [C048I949 If you are completing this form in computer use the TAB key or the up - down arrows to move from one field to the next. To check the boxes, click your mouse on top of the box. Otherwise, please print or type. 1. Contact Information: Owner Name Facility Name Mailing Address City State / Zip Code Telephone Number Fax Number e-mail Address Alcoa Power Generating, Inc Tuckertown Powerhouse RECEIVER P.O. Box 576 Badin AUG - 5 2008 N.C. 28009 (704)422-5774 (704)422-5776 Mark.Gross@alcoa.com 2. Location of facility producing discharge: Check here if same as above ❑ Street Address or State Road Tuckertown Road City State / Zip Code County New London N.C. 28127 Montgomery 3. Operator Information: Name of the firm., consultant or other entity that operates the facility. (Note that this is not referring to the Operator in Responsible Charge or ORC) Name Mailing Address City State / Zip Code Telephone Number Fax Number Alcoa Power Generating, Inc P.O. BOX 576 Badin N.C. 28009 (704)422-5774 (704)422-5776 Page 1 of 4 C-MI 03/05 NPDES PERMIT APPLICATION - SHORT FORM C - Minor Industrial Minor industrial, manufacturing and commercial facilities. 4. Ownership Status: Federal 0 State 0 Private 1/ Public 0 5. Standard Industrial Classification (SIC) code(s): 4911 6. Number of employees: 4 7. Describe the treatment system List all installed waste treatment components with capacities, describe the processes that generate wastewaters. If the space provided is not sufficient attach a separate sheet of paper with the system description. See Attached Flow Diagram 8. Is facility covered under federal effluent limitation guidelines? No ® Yes ❑ If yes, specify the category? 9. Principal product(s) produced: Electricity Principal raw material(s) consumed: N/A Briefly describe the manufacturing process(es): Hydroelectric Generation Page 2 of 4 C-MI 03/05 NPDES PERMIT APPLICATION - SHORT FORM C - Minor Industrial Minor industrial, manufacturing and commercial facilities. 10. Amount of principal product produced or raw material consumed (List specific amounts consumed and/or units oroduction over the last three years Product Produced or Raw Material Consumed (AVERAGE) Product Produced or Raw Material Consumed (PEAK) per Day 440 MW 1020 MW per Month 13,379 MW 31,025 MW per Year 160,542 mw 372,300 11. Frequency of discharge: Continuous ❑ Intermittent El If intermittent: Days per week discharge occurs: 7 Duration: _ 12. Types of wastewater discharged to surface waters only Discharge Flow (GALLONS PER DAY) Sanitary - monthly average NA Utility water, etc. - monthly average NA Process water - monthly average 1,050 Stormwater - monthly average NA Other - monthly average Explain: Cooling Water 1,361,800 Monthly Average total discharge (all types) 1,362,850 13. Number of separate discharge points: 4 Outfall Identification number(s) 001, 002, 003, 004 14. Name of receiving stream(s) (Provide a map showing the exact location of each outfall, including latitude and longitude): Yadkin River Page 3 of 4 C-MI 03/05 NPDES PERMIT APPLICATION - SHORT FORM C - Minor Industrial Minor industrial, manufacturing and commercial facilities. 15. Effluent Data Provide data for the parameters listed. Temperature and pH shall be grab samples, for all other parameters 24-hour composite sampling shall be used. If more than one analysis is reported, report daily maximum and monthly average. If only one analysis is reported, report as daily maximum. Parameter Daily Maximum Monthly Average Units of Measurement Biochemical Oxygen Demand (BOD5) NA NA NA Chemical Oxygen Demand (COD) NA NA NA Total Organic Carbon NA NA NA Total Suspended Solids NA NA NA Ammonia as N NA NA NA Temperature (Summer) NA NA NA Temperature (Winter) 27 21 Celsius pH 7.6 7.0 Units Fecal Coliform (If sanitary waste is present) NA NA NA Total Residual Chlorine (if chlorine is used) NA NA NA 16. List all permits, construction approvals and/or applications (check all that apply and provide permit numbers or check none if not applicable): Type Permit Number Type Permit Number Hazardous Waste (RCRA) NA NESHAPS (CAA) NA UIC (SDWA) NA Ocean Dumping (MPRSA) NA NPDES NC0081949 Dredge or fill (Section 404 or CWA) NA PSD (CAA) NA Other NA Non -attainment program (CAA) NA 17. List any chemicals that may be discharged (Please list and explain source and potential amounts.) Oil & Grease 18. Is this facility located on Indian country? (check one) Yes ❑ No El Page 4 of 4 C-MI 03/05 NPDES PERMIT APPLICATION - SHORT FORM C - Minor Industrial Minor industrial, manufacturing and commercial facilities. 19. Applicant Certification I certify that I am familiar with, the information contained in the application and that to the best of my knowledge and belief such information is true, complete, and accurate. Mark J. Gross Printed name of Person Sig /ing Facility Manager Title Signaturplicant Date North Caro'in: General Statute 143-215.6 (b)(2) provides that: Any person who knowingly makes any false statement representation, or certification in any application, record, report, plan, or other document files or required to be maintained under Article 21 or regulations of the Environmental Management Commission implementing that Article, or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under Article 21 or regulations of the Environmental Management Commission implementing that Article, shall be guilty of a misdemeanor punishable by a fine not to exceed $25,000, or by imprisonment not to exceed six months, or by both. (18 U.S.C. Section 1001 provides a punishment by a fine of not more than $25,000 or imprisonment not more than 5 years, or both, for a similar offense.) Page 5 of 4 C-MI 03/05 Powerhouse Floor Drains 50 Gal/Day UNITS 1, 2, 3 SCROLL CASES Units 1,2 and 3 Wheelpits Drainage TUCKERTOWN POWERHOUSE NPDES PERMIT NO. NC0081949 Yadkin River XIIMMI Unit One Generator Thrust Bearing Cooling Water 453,600 Gal/Day_ Oil and Sludge Skimmer 1,000 Gal/Day 4 POWERHOUSE SUMP w Outfall # 004 Into Yadkin River Outfall # 003 Into Yadkin River Unit One Generator Discharge per 24 Hrs. 2,068,329,600 Gals. Unit Two Generator Thrust Bearing Cooling Water 453.600 Gal/Dai v Outfall # 002 Into Yadkin River Unit Two Generator Discharge per 24 Hrs. 2,068,329,600 Gals. Unit Three Generator Thrust Bearing Cooling Water 453,600 Gal/Day lIrMilr Outfall # 001 Into Yadkin River Unit Three Generator Discharge per 24 Hrs. 2,068,329,600 Gals. GEL Engineering OF NC, Inc. an Affliafe of THE GEL GROUP, Inc. GEL Post Office Box 14262 Research Triangle Park, NC 27709 (919) 544.1100 PROJECT: almx01606 Tuckertown Powerhouse Montgomery County, North Carolina SITE LOCATION MAP FIGURE 1 DATE: August t. 2006 DRAWN BY: KM IAPPRV. BY: ADE FACT SHEET FOR EXPEDITED PERMIT RENEWALS Basic Information to determine potential for expedited permit renewal Reviewer/Date G '` Vs t02,u H o / 4 4/ - O $ Permit Number WG 0 d 619 4 9 Facility Name 414 o a pp e r -4 TV e_ ice riaawei Basin Name/Sub-basin number tr6 d k i 3 010 e Receiving Stream Yo G@ k.t4 at uer Stream Classification in Permit IN 5 — N c. 0.61 t3 CA Does permit need NH3 limits? ov o Does permit need TRC limits? No Does permit have toxicity testing? N 0 Does permit have Special Conditions? N b . Does permit have instream monitoring? N v Is the stream impaired (on 303(d) list)? NO Any obvious compliance concerns? u 0 Any permit mods since last permit? `f a ,5 Existing expiration date /— 3 / —0 9 New expiration date / — 3 /— / PI New permit effective date Miscellaneous Comments C u o G-i,v 6. U, AT Cre g. 5 U A P O R A I N O N L't Et: S -fv 1-vi wccc-r YESJ This is a SIMPLE EXPEDITED permit renewal (administrative renewal with no changes, or only minor changes such as TRC, NH3, name/ownership changes). Include conventional WTPs in this group. YES_ This is a MORE COMPLEX EXPEDITED permit renewal (includes Special Conditions (such as EAA, Wastewater Management Plan), 303(d) listed, toxicity testing, instream monitoring, compliance concerns, phased limits). Basin Coordinator to make case -by -case decision. YES_ This permit CANNOT BE EXPEDITED for one of the following reasons: • Major Facility (municipal/industrial) • Minor Municipals with pretreatment program • Minor Industrials subject to Fed Effluent Guidelines (lb/day limits for BOD, TSS, etc) • Limits based on reasonable potential analysis (metals, GW remediation organics) • Permitted flow > 0.5 MGD (requires full Fact Sheet) • Permits determined by Basin Coordinator to be outside expedited process TB Version 8/18/2006 (NPDES Server/Current Versions/Expedited Fact Sheet) YESJ This is a SIMPLE EXPEDITED permit renewal (administrative renewal with no changes, or only minor changes such as TRC, NH3, name/ownership changes). Include conventional WTPs in this group. YES_ This is a MORE COMPLEX EXPEDITED permit renewal (includes Special Conditions (such as EAA, Wastewater Management Plan), 303(d) listed, toxicity testing, instream monitoring, compliance concerns, phased limits). Basin Coordinator to make case -by -case decision. YES_ This permit CANNOT BE EXPEDITED for one of the following reasons: • Major Facility (municipal/industrial) • Minor Municipals with pretreatment program • Minor Industrials subject to Fed Effluent Guidelines (lb/day limits for BOD, TSS, etc) • Limits based on reasonable potential analysis (metals, GW remediation organics) • Permitted flow > 0.5 MGD (requires full Fact Sheet) • Permits determined by Basin Coordinator to be outside expedited process TB Version 8/18/2006 (NPDES Server/Current Versions/Expedited Fact Sheet)