Loading...
HomeMy WebLinkAboutNCC190019_NOT Closeout Documents_20220811North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200 County: Warren Project: Five Forks Solar Person financially responsible: Rosendin Electric, Inc. - David Lincoln, VP Renewable Div. Address: 1730 South Anaheim Way, Anaheim, CA 92805 1. Project Location: Robinson Ferry Road, Macon Pictures: Yes - Digital 2. Weather and soil conditions: Sunny, warm, workable 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: River basin: Roanoke Project #: WARRE-2019-005 Initial inspection: No If no, check violations below: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: June 28, 2022 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Field Report has pictures included. Yes Reported by: Dylan Kirk Others present: Date of inspection: June 23, 2022 Time arriving on site: 9:30 AM Time leaving site: 11:30 AM cc: