HomeMy WebLinkAboutNCC222720_Site Plan or Location Map_20220810NV
5
BE FOR: YOU DIG
STOP
GRAPHIC SCALE
30 a 15 30 60
( IN FEET)
120
I LN.C.ONE-CALL
8�i32.4949 \ 1 inch = 30 ft.
CENTER Know what's below. \ N/F GREGOR: R. IDENTCEIRE LAW I I ,\ CURREND8 3175 8SIOENIIAL
Call before you dig. i I \\ PN ZONINOW4G-
96N
ZONING: AR
I
\
1 I I I ,
I \
----- ---- ----------I
I I I N/F ROSE S. HENLEY \ I _-_
I I CURRENT USE: RESIDENTIAL � Ir /� _ _
I I DB 1354 PC 570 \ ` - - - \ \\\ 0 - -� -
2 I I N/F JONAIHAN GIGS I N/F NICOLE REM-DAHL I PN 05104196L N/F \ - - - - - 1 \ \ \I r/�//y/
CURRENT USE: RESIDENTIAL i
CURRENT USE: RESIDENTIAL I ZONNG AR ` - - - - _ _ - - - \ \ \ \ \ 1111` ` /
< I I I OB 5809 PG 666 OB 5430 PG 632 \\ I- - - - _ _ _ - \ \ \ \ \ `� I I
N j I N/F DAVIO CEORGE PN 05104196H PN 05104196J \ ` - - - - � � \ \ \ \ \ \ 11 \ \ \ \ \ \ \ 1 I I I I � . I I
* CURRENT USE RESIDENTIAL I ZONING: AR I ZONING AR I _ _ _ _ - - - - - - - - - - - - \ 1 \ \ \ \ 1 IIIII I
__--- \\11 \\\ II I I I 063908PG881 I I I L_-------------- -- -�� -
\\ \1 III, I N
PN05I04196F I L----------------- \ \
o I I ZONING AR I I --------- \------- _ - -�` \ \ \ \ \ 1 \ \1\1l �I IIII 1111 -
a7 1 N/F JACK LEWIS I I L - I % / I I I , 1 11 1 `o 1 I I I I I I
_ aJRRENT USE RESIDENTIAL L - - - - - - - --- - - - - - - - - / / / I I I I I I \ 1 \ \ \ q l \ \I \\\ 1 R
S�, V
I __ __ ------ I I III\ \I
m _ _ - _-------- --- ------11 - / I I \\1\\\�\\\\ \\\\
i , I , 1 \\\\ NIIF
0�- = �� N/F JOHN DAMS I PN QR90419604 \ �� I I / -\\/' / - \ \\\\
I /L C = CURRENT USE: VACANT I -
I / � , 064801PC664 I ZONING: AR /- / -, � 11 \\ _ I L__�----_-__-- � \ I 1 \ \ 1
I \ - I- - _ I - / / / I 1 1 1\\I \\\
I II J I r__/ \_ - I / \ - L------- -�-- / / % / l \ \ \1�11\\�\\\\\\\ \ 1
- - ZONING AR / �� - _ - 1 _ _ _ _ _ / / '� \ I
�_� _ - �_ - \ / / /_ a� I I1 _���__�_�_�- _ I / / / - \ I \ \ \ \ \ 1 \ _ - 1 / __ I TRl`EE PROTECTION11 UNITS / / / / / / // / / / \ \�_I1I, / III r - - \� _��`��� _ - TREE PROTECTION I / / / / / \ 1 \ \\ \ \ \ � - ) / / 1 ` \� \ lijl / /' / TURBANCE / / / / / / /�// // �7,
/ / // / \ \ \\\\\\ �\ C I -
1 I' I -�-- �` _- \ 1 FENCE IPF \ \ \ _ - / / / 1 \ � ` \ ' / / -, / 1 A \ \ \ �\ \ I 1 P/p I - - - - ;; ;� - \ \ \ I /
/ r� - ��\ -� �� - _ / S11' '21'E �99.3d` / / „ / / - 1 \
\ I 7 IIII d / _ �� I / �e c o IIG�TES / 1 \ \ \ \ \ \ \ 1 - \ \ ) / / / / / / \\ \ r 'ti �Qi / / / / / / / / / sos 37'E 2fi7.o2' \ \ \ \ \ \ \ \\\\ \ \ \ i �\
Y AN GAUGE i�S -� -� �� \ -- - / ^- / / \ \ �" \ \ ll \ \\\
�CflO�' �� �� - - /7 � \ \ \ \ 51124'2 1 .39' / / / / / -� \ �- 3 / T h AN BOX ENTRMIL� \ �� \ \ \ -, - � _- ��IIL - 67 8�485 / / \ I \ \ \ \ / / \ \SI1 E�% I /� / / /� \ \
I I III I I / \ \ \ \ \ \ \ \ \ \\ \ _ - / E�2]A1197.099 j /S11�'32`E 135.08' \ \ \ 1119�40`E 13 fi9' \ / / \ \ / / / / / / // -� / / IPf> /5 I / / \ \ \ \ \\\ \1 1\\ 1
\ S�4 24 \ ,59'6' P \ ,
�P3P IY\ _ / _- \ IPF / / / /"\ \ \ /- _, /�' 6 / // --� _/ _-�./ \\ \\ \\ 1\
1 I I - \ \\ \ \ \ --- / - �' \ \ IPF _ / / jF \ \\ \ \ -.. �- _ - /`Lti /5 /`i f- / tk / �/ �__/ __ - � _- / \\ \� \\\\\\ �� \11`1`Ik'lltl`\�\�
_ \\ -- _ --
\ II i \ \ \\ \ \ \ \ \\\ / �/ \ 1 �( 1\ \ ,� r / / / I I I / \ \ \_ -///� /---/ / `L`L // /� �� i I c Rol A\ \\\ \ \\ \
- / r� \ \ \ - - - - / \ \ \ \ \ \ _ / / I / \ \ \ _ J - / / / / / _ N E 7 5 \\\\ \\\\ 1
_ / OB 1250 PC 624 \\ I
25 IIIII I \ \ \ \ \ 1.1 - � / _ \ �� \ / / I l I I l _ - / / . .1-1 ^ / / / N TJ, \ 42 \ \ \ \\ \\
\ \ \ \ \ _ / / / - / _ / - / \ \
I I I I I I / / \ \ \ \ \ \ \ \ \ \ - - / - , _ / I I I - - \ \� _ _ _ - - - - - _ CURRENT USE: VACANT \ \ \\ \\
I I 1 / \ \ \ \ \ \� \ \ \ I I \ \ \ �� �� \ 1 I I \ - - - \ / 22� / \ \
/ \ \ / -- 1 \ � % \ / / / - -- / I / � \ \ \ \\
- - - i / � PN 05104199X
1 / I \ \ \ - / / ' \ I \ \ \ \ \ � \ \ \ - - / / / I I III - \ \ \ � / / - / .222_ � - ' ' / / - \ \ 62614W 14374AC 1 \\ \\ \
"- 1 \ l ` \\ \\ \ \
/ II III 1 1 / / /I\ \ \ \ \ \\ \\ \ \\ \\-----_-/ ,// �- \ \ \ \ \ \ \ \ \ \ \ ------ / // I I I I I \ ( `\\\ \ � ✓ /' // _ ��'\ \ LIMITS OF \ I I I \\ \ \\\\\\\`. T3
\ / / \ \ \ \ \ \\ \ \ - ---- / \ 1 \ \ / I I I \ \ \ c� \ \ \ / -titi �/ ___--- \ \\ ��\\\\ \\ o
/ \ \\ \ _ _ / �,- \ 1 ` \ \ - - - _ _ _ / J / I I r \\ _ _ _ \ DISTURBANCE \ M
\ \ \ - _ - _ 1 - - / I \ \ \ � / / � -' / / / - - - - � TEMPORARY DIVERSION I � ❑ �
I 1 / / \ \ \ \ \ \ \ \ - _ , / / \ \ 1 1 \ \ 1 1 \ \ \ / / / / I 1 1 / /� -- \ \ \ __ /' / / / / - � do - - - - - - \ �. OI1CHF4 ADJUST LOCATION `,� \ \I\\ --\ - `n
/ \ \ - - - - - / / / / `• �' / - \ \ \ AS NECESSARY TG MAINTAIN BU} ER \ � L- O (] U LO
1 / \ \ \ - // \ \ - / / I / / / \ \\ / /� - - - - / / \ \ POSITIVE DRAINAGE 1O 50'VtIPARIA \ \\\ \\\\ \\\\ 770 ~ ( L_>
.11
\ \ \ \ \ \ \ \ \ \ - / / \ / / / � \ \ H- � 0
� \ � / � / / / � \ \ \ - �. / 1-1 // / - - - � ` -2�9' � / / / /- - - � �,. sKINMER BASIN \ \\ \ \\\ � r z �n =
I \\\ \ \ \ \ \ \ \ /,�� \ \ \ \ \ \ \ - / - / // / l / / l l l ///l / *\ \\�\ � -// / i _ � 21 // �\ \ \ \\I�I/ 1` Q _
I�1 \ \ \\ \ \ / / \ \ \ \ \ \\- -'/ '\ \ \ \ \ \ \ \ ?? \ \ / / / / / // / / / / / \ \ \ \` \ / / / / / -? �2�6. 21'. 8 /__' // // / / _ \\\ \ \ \\ \\ \ \I I \ \ 111I z m �n LL
\ \ \ l l I / \ \ \ / / / / / 1S \ - __ / / �• \ \ \ \ - \ co LLJ
- 6
/ ,/ / \ \ \ \ DIVERSION DITCH TO BE II p J �
I \ 22' a-1 \\\\\\\\� \\\\\ \ \ /_ \\\\ \\\\\\\ \\ \ \ ` \ \\ \ \ \ \ \\ �\ \\ \ \ / _, // // / / / / / / / N \ \ -- / / XeLNN \ / / \ \ \ �\ \ \ \ \ \.I CZ o o
/ \ / / / / - \ STABIJZED IMTHIN 71IDAYS I Q
V-VIA\ \ \ / \ \ \ \ \ \ ) \ - ✓ / / / / l / / \ \ - _ _ - / / 2j \ / / \\ \ \ \ ` - _ _ \ \ ` s ACCORDING TO STAOGTION 1 \I 1 0-
ri c0 \ \ \ \ \ - _ / / \ \ \ \ \ \ ??%\ I- __ __ __ / / / / / / / / / / / ^ \ '\ \ ` - _ - / / / / / / 3� , � - / / ' / / / / \ \ \ \ � \ l2 AME REQUIREN Ts Z
tiNN� \ . k \ 1 \ l \ \ \ \ \\ � ----- \ I \ \ \ \ \ \ \ \ / / / / / / I, , /// \ \ \ / / / "21__\ \ / / /Zse A \ \ \ \ \ �' , 1 I l2 fl
l LL ill,\ NN \ m \�\1 I 1 - \ \ - �- \ \ � - - / / � / I I l \ \ \ � _ / / 2 / / /xY A B 19P-RAP A \ \ \ \ \ _ _ \ \ \ \ Im N W \ \ 1 I I I \ \ \ \ \ __ __ 1 \ \ \ \ __ / / / \ \ �� / / / / /, . \ \ \ / VtCH,CNTRANCE TO \ � \ / I 1Z
\ 1 I "� I 1 I ��\\ \ \ ------ 1 1 \ \ \ \ / / /l / I / - / \ \ \ \
\ \ \ \ \ \ \ 226 - / / / l I l \ _ _ / / / / 2%I \ \ _ / / SCN�ER BASIN \ \ \ \ \ \ \ 2 %
IIIII -2o I Ill / I I �� 1 I I I // \\\\ \ \�, ------__ 1 \ \ \ // / / / / / / I I' I I `-__ \\ / / \\ \ \\ _ - \ / Z+�.=
\ / / \ _/ / / \ \ \ - � \ \ 2
II1 I I I \ \ \ __-----_ \ \ \ 22S, \ / / /// / I III ��\�----//'/ /'-\�\ - _ / // \\ \\ \ \
1111 IIII / / I I p 1 1 \ I I ( �� \\\ \ \ \ _ \ \ \ \ \ \ \ \ \ \ / / / I 1 / \\ ---/ _ \ ? \ -� / / \\ \\\ \ \ \ \ \ 19 I \l
IIII J Il l / / 1 1 1� 1 \ \ \ - \ \ \ \ \ z24_ \ / / / / / I 1 I I - \ - _ ? `=_ / _ \ � I�
I I \ I p // / N / I I I �) I1\ \ \ \ - \ \ \ \ \ \ \ 223 \ \ I I I \ \----- - \ - _ / / \ � _ 21
/ ---07 \ / / / \\ \\ \\
Il / I I �\ 22 / / III \--- I
2 /I // / ^'/ I I I \ � \ \ \ \ 2 \ / / / II \ - /
\__ / / / / \ \ \ /
II I I` \ II III / / / / / I I I I � \ENC�, !NARK \ \ � \ \ \ \ \ \ _\ \ 2 \ \ / / / / I I l I \ \ -_ -
11111 I / �/ / // N/ I I I TIN 807211,5 % -- --__ \ \ \ \ �_ \ \ `22 2'�� \ \ \ / �/ / / / / / III /III l l / / - ---- 205- _ \, -1 11 _ // / / //� \\\�\`_- \\ \\ \ \ \ \2/ I �/ I
,ill
a I� / / I I it \\ � �_ - _� \ \ \ _\ \ o \ \ / / / / / / / ---- - -203-- \___ // _ \\ \\_ \ \ \ s__/
111111( 2� w II I // / // / / IN I I AE2\4o�i�8 \ \ \ \ \ \\ \ 2?/ \\` \ \ / / // //� / / / /1 / l l � l l l --- - - -202 \\\-- �/ ��/ / \ \\ \ - \ \ _*1 2 ?/s, /I
illI °IIIIII // / / / / / / / 1 / \\\z\2o \ \ \ \ ��� \ \ / / / / / / / / / / /////------ = 201 \ -
I I / I I 1 / l \ _ \ \ \ \ \ 2/ \ / / / / / _ _ �/ \ \1 2 /
\\ / \\ \\ a \ \ /,% / / z
\ / \ -y \ \ \ \ \ \ 2J , \ DIVERSION DITCH To�E \ \ / / ' / / / / / __ / / / \ g % \
I / / I o / / } - TEMPORARY DIVERSION / / / / / / / // - - - - - -- -200 \ / \ \ \ \ s s
III, IQ I / / \ \ \ 6 / / / // /- - � \ \\ / / _1/ \ \ \ \ \__ / Q
\ 2N I / / / J I / cv / / / \ - - \ \ \ \ \ \ 2j DIiNp,ADJUST LOCATION STABILIZED WITHIN 7 DAY$ \ \ / / / / / /� // // _ - \ \ /\ \ \ \ 2oaa - � / i
I I1 / / / I / / , / / \ \ \ i I \ \ \ \ \ \ S 1ts ARY TO MAINTAIN / / / / // - __ - - .199_ \ \ \ ` - - _ /'/ / / - \ \ \ \ \ \ ?
AccaRaNc rG sTAelusArroN \ \ \ f / / / / / / - -
I�II I / / / I I o, I / / \ \ \ \ \ TV) - - , �nvE DRAINAGE To TNNFRAME REWIRENfiCITs \ / / / / / / / / / // /// I 1 - - 1g N \ \ ` - - / / / / \ \ \ \ \ \ \ \ _ ; /
/ 1 o f ( \ \ \ \ \ � _ _ 21 \ �auMER BASN \ / / / / / / / / / / / / I _ _ - 8- \ \ \ / /i / - - \ \ \ \ \ - - x: / / - o-
III ` / / / n/ / L- \ \ \ 4\ / / //� / VERSION DITCH TO BE \ \ - - / \ \ \
I I \ // Eb I p!N AIRY avERgON \ \ \ \ \ \ \ \ \ \ \ \ / / / // / / I I 79/ \ \ _ " / _ \ \\ \ \ \ Ba�cF�TYP)
2�6- = I / / O / 1 \ \ \ \ \ \ \ \ \ \ \ / / / / / / / / STABILIZED WITHIN 7 DAYS \ / / - - \ \ \ \ \ \ _ , I / / J Q
1 I \ / N I OITgI�1 ST LOCATION \ \ \ \ \ \ \ _\ \ \ / / / / / / / / / / / / I I (ITEMPORARY DIVERSION / - / ACcoaaNG TO STABILIZATION \ _ _- - - - / / / \ \ -_ \ \ \ - - - -
II III I � / / / N MACE Y TO MAIN.- / I \ \ \ \ \ \ \ _ _ \ \ \ \ - / / / / / / / / / / // // 1 / DITCHIn ADJUST LOCATION/ / TINEFRAME REQUIREMENTS 196� \ _ _ - - / / - - - - \ \ \\ � \ \ \ \ \ \ / Z
O / - / _ \ \ \ \ / / / CESS�RY TO MAINTAIN / . / / \ 21i1 \
Il44
ll Ip� // / // / ///� ``' �sauu eASTOI \\ \\ \ \\ \ \\ \\ \ \ \ \ // /// j/ // / �// / �7� n / \-195`--_ /� _ \ \ \ \\ - _2�
/ / / / / SI VE ORAINAGf TO - _ / �\ - 1 J
I 5' I / / / 014DITCH To BE \ \ / / / / / / / ER BASN - _ _ ` -
3 IIIII 2� III I ( / / / l / / �o 71 / l sTAeuzEDONtn�INz oAYs \\ \ \ \ �\-�� �/ // ��////// / / /// �/ / / //'� 1194--_� _ __� �1 \\-� \ \\\ \ \ \ // Q
III \ ACCORD! m sTAeu3ATlaea \ \ // / / /�/ / / / / / / / / / - _ _ _ _-�,_ - _ / N
III / / / / / / / / I I I TM RAN IRENENTS \ \ \ \ \ �� , \ \ \ \ \ \ `/ /- - / / / / ' / / / / / 1 - - xY CLASS B PoP-RAP AT _ \ \ \ \ \ \ \ \ \ ` / _ / Z
/ \ \ \ ? \ - // // // / ,/�/// //// / /// / /' _--1923 - - - \ \ \ \\ \ � \ \/`Lj., �I/ z 4-
II \ I I / / I / / / \\ \ \ \ \ \ \ \ \ \ \ / / ' /// / ,- / / / / / / / / / / 1- - - - - - DITCH ENTRANCE TO - \ _ \ \ \ -
\ \ \ SKINNER Of1AC� / / / / / / / SKNAER BASIN -
-I \ - / / / / / / / / - - - - \ 2�,�-\,
D 2Q3 S G ti- L
/ 1 \ \ / / / / / / / / /
IIIIII 214 /\\ / I I l 1 / \\ \ \ \ \ / \ \ / / / / / / / // / / 190 - - - _ - \\ \ \ \` \ \ _ _ _20 ?o . \ 2c o� 01" STdNNfR DE1�EJ / o
1111 P�/P I`� l 1 / o \ I~ /\ _ /„ //// // /� / // / / - _ _ - \ \ - _ _ v
III \\ �;1LJ _-/ \ / a /J I \ \ _/ 2O \ \\ \ \ / - /// / // / / // _ 9/-- \ \ --_ _ Z =
I - I \ \ \ \ \ \ \ // / / / =/ DC z
111111
I 11 \ 11= -7 I \ 1 ' / / \ \ / \PILLW(`Y \ \ - _-----/ / / / / - / / / // / / / _ / -i- / _�---�- -- ------ - S19MMERSIZE,4.0 \\ \ --_-------- �_
- __ / / / / / / ,- / / ' 1 8' / \ \ SKIMMER BA \ _ -19
I A( Ili p� / I I oN / xY ASS B RP -RAP AT \ \ \ \ \ / 2p \ \ \ \ ` J _ - _ _ - �/ / /, / / /// // / - r = -198 - - - - - - - - - Z ~
3 III 1\ 212-!/I STu�1eAN / I I I I \ \ ---_ __--J j / // / / /// / _ .--"/ r �� --- \ -_-_-197--- _ - (n
/ \ N I TRANCE TO \ \ \ - / / // / / / / - / // ' \ 1 - - - - _ S10NNa ORIFICE DIA.: I I \ \ \�\ - �SPI A - _L -
/ \ i \ \ / / / / / / / / / / - / - SKINMEii 0@IFICE R�IU5�1. I� \ \ _ _
IIIII II / I / / SKiKME�@ASN _ \ \ __- __ __., / /// ///-' / / /// / / / / i_ / -\\- \------ -
-- \ \\ - �j 1 19 �195 196---- -Z__ U Z Z
/ / / 1 // / /// / / ff _ ,\ 191 9293- 4 Z
11111 \ �I I / I I I \ \ 1 / / \ \\1 \ \ \ \\ \ \ ---- �� _- _////, /�� /- ,�/i/// / / / --/ ��� x r..,n x \ dx. -_ __- _�--
II I - 1- I I �y I I \ ( ( \ \ O� 1 \ \ X; , \ ._`..r - Y ------- r. • ,, - • - - \ \ \ / - / x- - / /// / J / / // / / // // / v / _ - / ' / - / \ \ - %6 - _TREE ffiOTECiI - - - W
11 \ _-- \ w- - - / / - - _-- 1 1
\ 2 / / / / /i / _ - - � 18 �E PIPE I -
/ \ _ - - / - - - / -j �- -sL / // / / /�'� / - SILT FENCE \ ' - - __ � L. luBAL�GRAOE_1 - - Q
III / I SA T FENCE \ \ \ \ (' - _ _ - / - D SK SIZE'4. NI- / / •�� \ % FENS - - T
�I III 1 Il I I \ \ \ \ \ 1 \ \ \ \ \ \ / - - \ \� s``_./,X� R'OfIFC��IA' 3. IN- / - - - / � � -'n . X- 7 v ouTLET (TYP) " 2a2 \ _ �- 186 � _ S� _ _ I J
NI I111� 21 I / I I I 1 \ \ \ \ \ \ \ \ \ \ \ \ _ _ / - o� sKll o$IFICEReaus i.� IN - i - - - d / // / / - ^ ' MITs of - \ e - 1 - _ _ - -
II I I I / I I / ( \ \ \ \ 1 \ \ \ \ \ \ _ - - / / \ \ �203 \ _ / / / _ _ _ ( rEcnoN - ' / _ / / / r�r3 �G'1T•w SILT FENCEY DISTURBANCE - �� 185 _ lae�c QQ�ouldEi\ - ¢ U
IIIIII \ /�I1 // I \ I I \ ` \ \ \ 1-1 \ - �- /' /'/ 'IP "_-10 s--J/ / /"'F - L: . L \/ / / _ 700 - 184-- \ \--
IlIIII \ 09 I EE PROTEC ON I I \ X _ _ - - - - } - _
II 1 2 cE I I x \ \ \ ��\� -' /'/ / - 24w ' / / ` 4, / / / _ �� 1 �`�^\ / EROSION %ONTROL NOTES: p�OR R ;� - J �- - / / -#C G to COc9478 �E � - - - 7�
3 I Il � I , >s - 2 / - - -Nl / / / \ ' _ _ _ _ _ v �q jo� I 1 eH'b7�670.9458 -7 - - Z
1 IIIII \ I / / SLT CE \ \ \ \ \ \ so �� - - _ _ / / / /� - �/ / / \ i \ - = - _ / �� \ N \ S E 2141837.6395
59a _ / /� / v \ _//�� AN EROSION AND SEDIMENTATION CONTROL PERMIT SHALL BE \ /
Ali IIIII I / ouT1 Efi (TYP) / 1 / \ \ \ N13,2s3s'W - - - - - 196 _ _ _ / / , / -- _ _ SONNER PPE Tom( _ _ / �, / (` ,� \
/ / // / _ N N� / \ ���� . ,� REQUIRED BY JOHNSTON COUNTY PRIOR TO START OF
I IIIIII 1 208' I / 11 / / / / _ - / E a TEE CTI4lV -T!t E --T�E196 197 - _ _ _ - _ : - // - - Ea-- - - / ' / l
I - - I . /// P-RV_ j /I CONSTRUCTION. I
III 11 I \ I 1 \ \ 1 / FENCE /- - / - -F I CAT ouTLET / _
Illllln I _1 III / // // / IE / \ \ EI I / �-_1.IQ5• - ____- /� r I _ _S__ / l-- _-- /// ( I SURVEY NOTE: ,-'
I I \ -G , _/ _�� -� _ - 94 = ' - - - _ -- I / - - / _ - / I ALL EXISTING BOUNDARY AND TOPOGRAPHIC INFORMATION L
TAKEN FROM A LAND SURVEY PREPARED BY: TRUE LINE
Ill i U I II 1 , 1 111 - �'i_ _ _ J = l / - - -\ - - - ' ' / 1/ / NgI�ITRUSE COMMERCIAL \ _ I
I(IIIIII I �-_// �_ _��-____�___-_-_ 1, _ ----- _--- / /1 \ I SURVEYING o63472PG993 \
( II 11 I I \ II I II / - __ _-� -� / / - / \ I PN 05104203P \
r'I I l / % / - _ _ - - - _ _ - / I I / I - ZONING GB \
Ill IIII% fcOBIATES - _ _ I \ / I � N/F JOSEPH C. PAVEL I \
I - _ / N I N/F ANNA PLACE LLC oe s a,aaENT usE: co„MEacIAL STREAM/WETLAND NOTE:
I �-{ - I /f ANNA PLACE, LLC. OB \
,IIIII ill / I S 14 . - N - P I - � \N/F AMA PLACE, LLC. - - 2104 PG 477 1 ?y04 PC 477 S DB 4511 PG 896 I THERE ARE NO EXISTING STREAM/AND OR WETLAND FEATURES \
\ \6 ` ` - CUI"T USE: COMMERCIAL N 05104200Y 3 a PN 05104203H 1
1 All
I N \ \\ \ 24 6�4.11 - CURRENT USE: CON AL \ ` OB1939 PG 512 \ / I PN 0510420OX q�RENT USE COMMERCIAL I \. \ 1 EI I I I 0114 2 512 � / CURRENT USE: COMMERCIAL � zorrNG ce \ I PN o5Io42m. \ - I \ \PN 0510420OW \ / I ZONNG GB ZONING: GO o w
/ II IIII \ I �� I I / I l I Z ZONING: ce I \ \ \zaNNG ce \ ` / I I - F
III IIII 1 �/ /1 I / / ( I 1 _ - - - - - - - - - - I \ \ \ \ \ I I I ALOOD PORRTIONONE NOTE:
THE PROPERTY IS LOCATED IN FLOOD ZONE AE
I IIIIp4_2
II II/1 I ` �. \ I \ \ \ \ I I I
� \ I 1 AND SHADED X AS SHOWN ON FEMA FLOOD PANED
�11I 04- I 11 I I \ I 1 _ - _ _ - - _ - -\ \\ I \\ \\ I 1 3720164700K, DATED JUNE 20, 2018. BASE FLOOD ELEVATION
3 II \y w I I 1 I L \ I - - \ \ i \ i I = 184.8. MAPS SUBJECT TO CHANGE BY FEMA
\\/II L1 I 1 _-- -- I
HYD �rY 11 I I �\ I I I \ \ \ I I 1
1w0L .. II , \ 203.1 .1 � \ \ I I
GQNSTRUCTIpN SEQUENCE: CONTRACTOR TO USE PARKING AREAS ADJACENT TO THE PROPOSED BUILDING FOR LAY-DOWN/STAGING AREAS - MAINTAIN THESE AREAS SO THAT SEDIMENT LADEN RUNOFF WILL BE
1. EROSION & SEDIMENT CONTROL E&SC PERMIT AND A CERTIFICATE OF COVERAGE COC MUST BE OBTAINED BEFORE AND LAND DISTURBING ACTIVITIES OCCUR. THE COC CAN BE OBTAINEDLAY-DOWN
( ) ( ) DIVERTED TO EROSION CONTROL MEASURES. INSTALL SILT FENCE AROUND /STAGING AREA AS SHOWN
BY FILLING OUT THE ELECTRONIC NOTICE OF INTENT (e-NOI) FORM AT deq.nc.gov/NCG01. PLEASE NOTE, THE a-NOI FORM MAY ONLY BE FILLED OUT ONCE THE PLANS HAVE BEEN
APPROVED. A COPY OF THE E&SC PERMIT, THE COC, AND A HARD COPY OF THE PLAN MUST BE KEPT ON -SITE, PREFERABLY IN A PERMITS BOX, AND ACCESSIBLE DURING INSPECTIONS. 8. CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES.
2. CONTACT JOHNSTON COUNTY BEFORE ANY LAND DISTURBANCE OCCURS. ALL APPLICABLE E&S CONTROL MEASURES MUST BE MAINTAINED UNTIL PERMANENT VEGETATION IS ESTABLISHED.
3. CONTRACTOR SHALL ENSURE THAT ALL NECESSARY PERMITS HAVE BEEN RECEIVED AND THAT THOSE REQUIRED TO BE DISPLAYED ON -SITE ARE AVAILABLE. 9. SELF -INSPECTIONS FOR EROSION AND SEDIMENTATION CONTROL MEASURES ARE TO BE PERFORMED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF EVERY RAIN
EVENT OF GREATER THAN 1 INCH. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN MEASURES AS DESIGNED. ALL ESC MEASURES SHALL BE MAINTAINED AS SPECIFIED IN 0
4. CONTRACTOR SHALL HOLD A PRE -CONSTRUCTION MEETING AT LEAST 48 HOURS BEFORE THE ACTUAL START OF CONSTRUCTION. CONTACT JOHNSTON COUNTY INSPECTOR THE CONSTRUCTION DETAILS ON THIS PLAN.
5. CONTRACTOR SHALL CONTACT CAROLINA ONE CALL AND ALL ENTITIES HAVING BURIED UTILITIES AT LEAST 72 HOURS PRIOR TO DIGGING OR AS DIRECTED AT THE PRE -CONSTRUCTION 10. STOCKPILE RIP -RAP ON SITE AND INSTALL ALL EROSION CONTROL MEASURES WHERE THE WORK IS OCCURRING. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED BY THE
MEETING. ENGINEER OR UPON RECOMMENDATION OF NCDEQ INSPECTION PERSONNEL AS CONDITIONS WARRANT.
6. CONTRACTOR SHALL INSTALL TEMPORARY CONSTRUCTION ENTRANCES AT EACH POINT OF ACCESS TO STORAGE AND CONSTRUCTION AREAS. EROSION CONTROL MEASURES SHALL BE 11. ALL DISTURBED AREAS SHALL HAVE GROUND STABILIZATION BY THE CONTRACTOR ACCORDING TO THE CHART ON THIS SHEET.
INSTALLED PRIOR TO DEMOU11ON AND TREE REMOVAL OPERATIONS.
12. STABILIZE SITE AS AREAS ARE BROUGHT UP TO FINISHED GRADE.
7. INITIAL PHASE SEDIMENT AND EROSION CONTROL MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH PLANS BEFORE STARTING WORK INCLUDING SILT FENCE, INLET PROTECTION, SKIMMER
BASIN, DIVERSION DITCHES, TREE PROTECTION, ETC., CLEARING ONLY AS NECESSARY FOR THE INSTALLATION OF THESE MEASURES. 13. UPON COMPLETION OF THE INSTALLATION AND WITH APPROVAL OF NCDEQ, ALL EROSION CONTROL DEVICES SHALL BE REMOVED AND DISPOSED OF IN AN ACCEPTABLE MANNER. EACH - LLIU
SECTION SHALL BE SEEDED/MULCHED IMMEDIATELY AFTER INSTALLATION OF PIPE, STRUCTURE, OR ACCESS. COORDINATE WITH THE EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF
CONTRACTOR SHALL INCLUDE A RAIN GAUGE AND LOG BOOK CONTAINING THE INSPECTION RECORDS FOR THE SITE EROSION CONTROL MEASURES.
INSTALL SKIMMER BASIN AND TEMPORARY DITCHES- STABILIZE EARTH BERMS AS WELL AS BASIN SLOPES & INSTALL EROSION CONTROL MATTING IN TEMPORARY DIVERSIONS PRIOR TO WITH APPROVAL OF NCDEQ, THE SKIMMER BASIN SHALL BE DECOMMISSIONED, REMOVING AND DISPOSING OF ALL ACCUMULATED SEDIMENT IN A LAWFUL MANNER. USE SILT BAG/FILTER BAG
BEGINNING MASS GRADING OF THE SITE FOR DEWATERING THE BASIN AND DIVERSION DITCHES. UPON SKIMMER BASIN REMOVAL, THE AREA SHALL BE CONVERTED INTO THE PERMANENT STORMWATER MANAGEMENT FACILITY - WET
DETENTION POND.
ONCE THE BASIN/DIVERSION ARE INSTALLED SEED/MULCH IMMEDIATELY
DURING DE -WATERING OPERATIONS, WATER SHALL BE PUMPED INTO AN APPROVED FILTERING DEVICE PRIOR TO DISCHARGE TO RECEIVING OUTLET.
ALL DEMOLITION DEBRIS IS TO GO TO AN APPROVED LANDFILL OR RELATED FACILITY
14. ONCE ADEQUATE PERMANENT GROUND COVER IS ESTABLISHED, ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED WITH THE APPROVAL OF NCDEQ INSPECTOR.
REMOVE SKIMMER BASIN #1 AFTER ADJUSTING LOCATIONS OF TEMPORARY DITCHES TO DRAINAGE STRUCTURE (INTERMEDIATE PHASE) PRIOR TO INCLUDING ALL IN AND AROUND SKIMMER
BASIN #1 AREA. CONSTRUCT THE GRADE FOR THE BUILDING PAD AND THE PARKING AREAS THAT ARE DRAINING TO THE TEMPORARY SKIMMER BASIN, MAINTAINING STORMWATER RUNOFF 15. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. EROSION & SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, NCDOT, U.S. DEPT. OF f
TOWARD THE BASIN. ADJUST THE LOCATION OF TEMPORARY DITCHES AS NECESSARY TO DIVERT RUNOFF FROM THE DRAINAGE SYSTEMS TO THE TEMPORARY SKIMMER BASIN. ONCE THESE AGRICULTURE, AND STATE STANDARDS.
AREAS ARE UP TO GRADE AND STABILIZED WITH CONCRETE, PAVEMENT, OR VEGETATION THEN DIVERT STORMWATER RUNOFF TO THE PROPOSED STORM DRAINAGE DEVICES AND THE
TEMPORARY SKIMMER BASIN CAN BE REMOVED AND THE AREA CAN BE BROUGHT UP TO GRADE. ONCE THE AREA IS UP TO GRADE, STABILIZE WITH CONCRETE, PAVEMENT, OR VEGETATION 16. WHEN THE PROJECT IS COMPLETE, THE PERMITTEES SHALL CONTACT DEMLR TO CLOSE OUT THE E&SC PLAN. AFTER DEMLR INFORMS THE PERMITTEE OF THE PROJECT CLOSE OUT, VIA
IMMEDIATELY. INSPECTION REPORT, THE PERMITTEE SHALL VISIT deq.nc.gov/NCGO1 TO SUBMIT AN ELECTRONIC NOTICE OF TERMINATION (e-NOT). A $100 ANNUAL GENERAL PERMIT FEE WILL BE CHARGED
12EA❑ I CP'Cnln
FLOW ARRROW
CWA
CONCRETE WASHOUT AREA
SSA STABILIZED STAGING AREA
IP INLET PROTECTION
SF SILT FENCE
SP STOCKPILE
VTC VEHICLE TRACKING CONTROL
LOD LIMITS OF DISTURBANCE
TSD TEMPORARY SLOPE DRAIN
SB SEDIMENT BASIN
SM SEEDING AND MULCHING
ODD DIVERSION DIKE
RS ROCK SOCK
STABILIZATION TIMEFRAME
SITE AREA
TIMEFRAME
STABILIZATION
DESCRIPTION
EXCEPTIONS
BASIN & TEMPORARY
IMMEDIATELY
NONE
DIVERSION DITCHES
PERIMETER DIKE.i
SWALE.S DITCHES AND
7 DAYS
NONE
SLOPES
HIGH QUALITY WATER
(HOW) ZONES
7 DAYS
NONE
IF SLOPES ARE 10' OR LESS
SLOPES STEEPER THAN
7 DAYS
IN LENGTH AND ARE NOT
3,1
STEEPER THAN 2:1, 14 DAYS
ARE ALLOWED
SOPES 3:1 OR FLATTER
14 DAYS
7 DAYS FOR SLOPES GREATER
THAN 5OFT IN LENGTH
ALL OTHER AREAS WTH
NONE, EXCEPT FOR
SLOPES fZATTER THAN
14 DAYS
PERIMETERS AND HOW ZONES
4.• 1
GROUND COVER REQUIREMENTS:
THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE
ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE
EROSION -CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT
EXPOSED WILL, ACCORDING TO THE FOLLOWING CHART, BE PLANTED OR
OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER,
DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PROVISIONS FOR
PERMANENT GROUNDCOVER SUFFICIENT TO RETAIN EROSION MUST BE
ACCOMPLISHED FOR ALL DISTURBED AREAS ACCORDING TO THE FOLLOWING
HART FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. J
PLAN STATUS
1/20/22
1ST SUBMISSION
5/16/22
2ND SUBMISSION
7/1/22
3RD SUBMISSION
7/12/22
4TH SUBMISSION
DATE
DESCRIPTION
MEL
DESIGN
XXX
DRAWN
XXX
CHKD
SCALE
H: 1" = XXX'
V: 1 " = XXX'
OB No.
000000-00-000
DATE
JANUARY 20, 202
"ILE No.
000000-D-CP-000
SHEET C2.1
Cad file name: P;
gineering Plans\Construction Documents\006-005-ES.dwg
NV
5=
2
rt
N
0
N/F JOHN DAMS
CURRENT USE: VACANT
0e 48DI PG 664
PN 051042DOO
It`\_�
r / = =_
` ZONING AR
'
P IIII
I I Ilr
TEMPORARY
SILT FENCE
TEMPORARY
d
r Y I AN GAUGE
aRS�CflO�'� ` �� ��� ��
`
AT STORAGE
-
CE
AT STOCKP E
T h AN BOX
ENTRMIL� `
\
�A ��
,
I I `� !"A//
I�PI III
�a S�424 •�
�59�6'\
\\
I
0
\
BEFOR: YOU DIG
STOP
GRAPHIC SCALE
50 0 25 50 100
( IN FEET)
200
CALL 1-B08-i32.4949 \ 1 inch = 50 ft.
N.C.ONECALLCENTER Know what's below. \ N/F GREGOR: R. RESIDECEISNENTIAL
IT'S THE LAW I I ,\ CURRENTUSE:36758SIOENIIAL
Call before you dig. i I \\ PN ZONING-
AR
I 1 ,
I I I \
I N/F ROSE S. HENLEY
CURRENT USE: RESIDENTIAL
DB 1354 PC 570 \ ��
N/F JONAIHAN GIGS I N/F NICOLE REM-DAHL I PN 05104196L N/F \ _ _ 1 \ 1
CURRENT USE' RESIDENTIAL I CURRENT USE: RESIDENTIAL I ZONING AR \ _ _ - - `
I N/F DAVID GEORGE PN 05104 96H 6 I PN 050 196J 2 �\ ` - - _ `- - -
CURRENT USERESIOENIIAL
ZONING AR ZONING AR I
1---
---_-------_
OB 3906 PG 861
PN 0510419OF I I _ I.-_- -_-_-
I N/F JACK LEWIS I ZONING AR I I L
-------- - -----
CURRENTU013 20PG16- \ RESIDENTIAL _ -- I I I L-------------- - - - - /ZONING: AR
-\ I
-------_-_ -'\
- - - - - - - - - - _-- / UNITSVS
// / / / / i / l \ \ \ 1 1 \ \ \\V \\\\ \ ( 1
\ I \ \ - _ _ _ _ I /TREE PROTECTION / OISTURM/ / 1 \ \` \\\\ \ \l�\\ \�
4REE PROTECTION 1 / / / / \ \ 1 \ \ \ \ \ \ - _ / / I,1 _ \ / ti , / �+ / /// IPF / // \ \ \ I \ _ -\ I / / / 1 �-- \ \ \ ` J / // / / / / / / /. ! \FENCE \ \ \ \ ' \ � ti � / / / / � j / / ' � / / / \ \ 1, \ \�\IMrES / / \ \� \ \ \ I ) / \ \ y0 / / „ / S09 37 E 267.02/\\\ll///� E�7' .9� / / i h / / I \
T2" - �3 \ \ \ \ S11.24'2 1 .39' / / / \ \ / / i/ -� Ip __TOPS
e \ _"' / E�2yk1197.099 j /S11�'32�E 135.06'\ \ \ \ 111940`E 13 69' \ , 7 - / / / / / / i i \
EDE �---EZFEE�
/ r\Il\�/a\\D►+. 7'
-_....T / ` �'`�jr �`S / - ��'D. / / \ N \ R\o SOD olq`\
N/F Di INC. I \ 2 41 7 42 \\\ \\ \ \\\
� I
-
1
V \ III I I A }f `tQYP)
\ III / I //
21l'��
- 0 W 4RON / / / 190� - - -_ sxIMER BASIN
� ?o \ \ \ \ \ \ \ ` = ` _ � � i � // � T�DT�a���°ri / sT � Yxu1�I.� Ys� /
IIII \ P �� _`''-- J / N ) \ \ \ \ \ / 9 \ \ \ ` - - / '�IaNNER�eAslp'+ ""� / / /
IIraucTTim
SICNINll BA51q P\ \
IIIIII 11 / \l / WMER A-/
Ts S0NNEkO6flCE DI\�1
A198
_sauMSIBtFCE Fill
212-- /II/S/BI In. \ -
I 197927931949
1 s11II /
----__�--
III � \ \ \� -- \ \ _ - --- -
I III I TEMPORARY I // �` - 7 � "" \ \ / � - �` _ ~ 3 - - - - I
\ 2os�` \ _ _ i _ - SILT FENCE l \ - - - 7
ems.
- ME
ffiOTEcnoN
- "� � /8 �€IaT,IlllolFl:-
I / \ _ _ ?�sr �► / / i ' - _ E / Ou1LET (TYP) 812
_ _�
"W
°
II IIII 1 \ 209 IIIII �REE PROTECy� I 11 II 1 \ �...ry _ \ \ \ \ �,^��\� _ // / IPF - - - ' / / - - y�/_^\ //EROSION i.ONTROL NOTES:
3 III III I /" I "- ? - -M1 24 W- / / / \� - = _v AN EROSION AND SEDIMENTATION CONTROL PERMIT SHALL BE
SILT FENCE I \ \ \ N13 '38"W 598. _ _ _ /i j �' I �_ � / �� i \ =� - � �� �� ,
hIl I II oUTI,Efi (TYP) / / \ \ \ I - 0 - 1 ye = __ _ _ _ _ _ _
REQUIRED BY JOHNSTON COUNTY PRIOR TO START OF
IIII II \ 208- 11 / / / / I - - � - •197-- - _ I _/j \ _ / - ''�� CONSTRUCTION.
/ _ _ / / -J _r� _ "�i
III IIIII IIII / E T�EEV>RdEC7 -TELE - -TFLE
IIII"I III / / /FENCE-_1-,45• ! - _ SURVEY NOTE:
III II II \ 01-Gi IIII LP/ / / �_ /j/� - - _ -' ✓ -194= - - - - I / -- I / / / /_ - - I ALL EXISTING BOUNDARY AND TOPOGRAPHIC INFORMATION
I� li III III20
1- ` I TAKEN FROM A LAND SURVEY PREPARED BY: TRUE LINE
r - ----- ---- I / /1 I I SURVEYING
- � I�
I I I I ' 11 or / '�° � s - - - - - - - - I I I STREAM/WETLAND NOTE:
1 _ I \ / I ✓ / N/F JOSEPH C. PAbEL
I I 1 " I � - - - - / I N/F ANNA PLACE, LLC. DS I N/F ANNA PLA¢, LLC. DB \ CURRENT USE- COMMERCIAL
II $ �8 14 .8 82 - - \N/F AMA PLACE, U.C. / I 4 PC 477 � l DB 4511 PG 896 I
\a _ N/F ANNA PLACE, I.I.C. I _ - 2104 PG 477 THERE ARE NO EXISTING STREAM/AND OR WETLAND FEATURES
I I IN \ \ 2V4 6�4.11 CURRENT USE- CON AL \ CUF�2fNT COMMERCIAL \ N 0504200Y PN 05104203H 1
De.�e Pip _ OB 1038 PG 512 / / I CURRENT LIB 4 aAl CURRENT USE COMMERCIAL zoNINc: Ga ON THE PROPOSED PARCEL.
I� I IIII 11 20� 11 I F I I I I I PN 05104200v i \ \ \Pz� G2�W \ // I I ZONING GB I ZONING: GO I
III IIII I =I 1J I I I I l I ? - _ - \\ \ \\ I I i FLOOD ZONE NOTE:
I \ \ \\ I 1 I I I I A PORTION THE PROPERTY IS LOCATED IN FLOOD ZONE AE
I II I 204- I ✓IIII I ` _ - - - - \ I \ \ \ \ \ i I AND SHADED X AS SHOWN ON FEMA FLOOD PANED
1� II I I I ---- \ \ \
I 3720164700K, DATED JUNE 20, 2018. BASE FLOOD ELEVATION
184.8. MAPS SUBJECT TO CHANGE BY FEMA
HYD fir`\III � W
203.1 1
GONSTRUCTIpN SEQUENCE: CONTRACTOR TO USE PARKING AREAS ADJACENT TO THE PROPOSED BUILDING FOR LAY-DOWN/STAGING AREAS - MAINTAIN THESE AREAS SO THAT SEDIMENT LADEN RUNOFF WILL BE
1. EROSION & SEDIMENT CONTROL E&SC PERMIT AND A CERTIFICATE OF COVERAGE COC MUST BE OBTAINED BEFORE AND LAND DISTURBING ACTIVITIES OCCUR. THE COC CAN BE OBTAINEDLAY-DOWN
( ) ( ) DIVERTED TO EROSION CONTROL MEASURES. INSTALL SILT FENCE AROUND /STAGING AREA AS SHOWN
BY FILLING OUT THE ELECTRONIC NOTICE OF INTENT (e-NOI) FORM AT deq.nc.gov/NCG01. PLEASE NOTE, THE a-NOI FORM MAY ONLY BE FILLED OUT ONCE THE PLANS HAVE BEEN
APPROVED. A COPY OF THE E&SC PERMIT, THE COC, AND A HARD COPY OF THE PLAN MUST BE KEPT ON -SITE, PREFERABLY IN A PERMITS BOX, AND ACCESSIBLE DURING INSPECTIONS. 8. CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES.
2. CONTACT JOHNSTON COUNTY BEFORE ANY LAND DISTURBANCE OCCURS. ALL APPLICABLE E&S CONTROL MEASURES MUST BE MAINTAINED UNTIL PERMANENT VEGETATION IS ESTABLISHED.
3. CONTRACTOR SHALL ENSURE THAT ALL NECESSARY PERMITS HAVE BEEN RECEIVED AND THAT THOSE REQUIRED TO BE DISPLAYED ON -SITE ARE AVAILABLE. 9. SELF -INSPECTIONS FOR EROSION AND SEDIMENTATION CONTROL MEASURES ARE TO BE PERFORMED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF EVERY RAIN
EVENT OF GREATER THAN 1 INCH. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN MEASURES AS DESIGNED. ALL ESC MEASURES SHALL BE MAINTAINED AS SPECIFIED IN
4. CONTRACTOR SHALL HOLD A PRE -CONSTRUCTION MEETING AT LEAST 48 HOURS BEFORE THE ACTUAL START OF CONSTRUCTION. CONTACT JOHNSTON COUNTY INSPECTOR THE CONSTRUCTION DETAILS ON THIS PLAN.
5. CONTRACTOR SHALL CONTACT CAROLINA ONE CALL AND ALL ENTITIES HAVING BURIED UTILITIES AT LEAST 72 HOURS PRIOR TO DIGGING OR AS DIRECTED AT THE PRE -CONSTRUCTION 10. STOCKPILE RIP -RAP ON SITE AND INSTALL ALL EROSION CONTROL MEASURES WHERE THE WORK IS OCCURRING. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED BY THE
MEETING. ENGINEER OR UPON RECOMMENDATION OF NCDEQ INSPECTION PERSONNEL AS CONDITIONS WARRANT.
6. CONTRACTOR SHALL INSTALL TEMPORARY CONSTRUCTION ENTRANCES AT EACH POINT OF ACCESS TO STORAGE AND CONSTRUCTION AREAS. EROSION CONTROL MEASURES SHALL BE 11. ALL DISTURBED AREAS SHALL HAVE GROUND STABILIZATION BY THE CONTRACTOR ACCORDING TO THE CHART ON THIS SHEET.
INSTALLED PRIOR TO DEMOU11ON AND TREE REMOVAL OPERATIONS.
12. STABILIZE SITE AS AREAS ARE BROUGHT UP TO FINISHED GRADE.
7. INITIAL PHASE SEDIMENT AND EROSION CONTROL MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH PLANS BEFORE STARTING WORK INCLUDING SILT FENCE, INLET PROTECTION, SKIMMER
BASIN, DIVERSION DITCHES, TREE PROTECTION, ETC., CLEARING ONLY AS NECESSARY FOR THE INSTALLATION OF THESE MEASURES. 13. UPON COMPLETION OF THE INSTALLATION AND WITH APPROVAL OF NCDEQ, ALL EROSION CONTROL DEVICES SHALL BE REMOVED AND DISPOSED OF IN AN ACCEPTABLE MANNER. EACH
SECTION SHALL BE SEEDED/MULCHED IMMEDIATELY AFTER INSTALLATION OF PIPE, STRUCTURE, OR ACCESS. COORDINATE WITH THE EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF
CONTRACTOR SHALL INCLUDE A RAIN GAUGE AND LOG BOOK CONTAINING THE INSPECTION RECORDS FOR THE SITE EROSION CONTROL MEASURES.
INSTALL SKIMMER BASIN AND TEMPORARY DITCHES- STABILIZE EARTH BERMS AS WELL AS BASIN SLOPES & INSTALL EROSION CONTROL MATTING IN TEMPORARY DIVERSIONS PRIOR TO WITH APPROVAL OF NCDEQ, THE SKIMMER BASIN SHALL BE DECOMMISSIONED, REMOVING AND DISPOSING OF ALL ACCUMULATED SEDIMENT IN A LAWFUL MANNER. USE SILT BAG/FILTER BAG
BEGINNING MASS GRADING OF THE SITE FOR DEWATERING THE BASIN AND DIVERSION DITCHES. UPON SKIMMER BASIN REMOVAL, THE AREA SHALL BE CONVERTED INTO THE PERMANENT STORMWATER MANAGEMENT FACILITY - WET
DETENTION POND.
ONCE THE BASIN/DIVERSION ARE INSTALLED SEED/MULCH IMMEDIATELY
DURING DE -WATERING OPERATIONS, WATER SHALL BE PUMPED INTO AN APPROVED FILTERING DEVICE PRIOR TO DISCHARGE TO RECEIVING OUTLET.
ALL DEMOLITION DEBRIS IS TO GO TO AN APPROVED LANDFILL OR RELATED FACILITY
14. ONCE ADEQUATE PERMANENT GROUND COVER IS ESTABLISHED, ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED WITH THE APPROVAL OF NCDEQ INSPECTOR.
REMOVE SKIMMER BASIN #1 AFTER ADJUSTING LOCATIONS OF TEMPORARY DITCHES TO DRAINAGE STRUCTURE (INTERMEDIATE PHASE) PRIOR TO INCLUDING ALL IN AND AROUND SKIMMER
BASIN #1 AREA. CONSTRUCT THE GRADE FOR THE BUILDING PAD AND THE PARKING AREAS THAT ARE DRAINING TO THE TEMPORARY SKIMMER BASIN, MAINTAINING STORMWATER RUNOFF 15. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. EROSION & SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, NCDOT, U.S. DEPT. OF
TOWARD THE BASIN. ADJUST THE LOCATION OF TEMPORARY DITCHES AS NECESSARY TO DIVERT RUNOFF FROM THE DRAINAGE SYSTEMS TO THE TEMPORARY SKIMMER BASIN. ONCE THESE AGRICULTURE, AND STATE STANDARDS.
AREAS ARE UP TO GRADE AND STABILIZED WITH CONCRETE, PAVEMENT, OR VEGETATION THEN DIVERT STORMWATER RUNOFF TO THE PROPOSED STORM DRAINAGE DEVICES AND THE
TEMPORARY SKIMMER BASIN CAN BE REMOVED AND THE AREA CAN BE BROUGHT UP TO GRADE. ONCE THE AREA IS UP TO GRADE, STABILIZE WITH CONCRETE, PAVEMENT, OR VEGETATION 16. WHEN THE PROJECT IS COMPLETE, THE PERMITTEES SHALL CONTACT DEMLR TO CLOSE OUT THE E&SC PLAN. AFTER DEMLR INFORMS THE PERMITTEE OF THE PROJECT CLOSE OUT, VIA
IMMEDIATELY. INSPECTION REPORT, THE PERMITTEE SHALL VISIT deq.nc.gov/NCGO1 TO SUBMIT AN ELECTRONIC NOTICE OF TERMINATION (e-NOT). A $100 ANNUAL GENERAL PERMIT FEE WILL BE CHARGED
UNTIL THE a -NOT HAS BEEN FILLED OUT.
OB 1250 PC 624 \ \E 1 \� \ \ \
\ �axsnY \ \ \ \\ \ o�� ------ / I I -- ------ _22� - PNo5o4199z \ \ \\\ \\\ C\\\ \\\ \\
1 AREA\ \ \ \ \ I I ( \ \\ \ \_ , - CURRENT USE: VACANT \ \ \
s�u"1wrEw \ \ \ - - - / / / I I \ \ \ y / - - - - - 826,14$SF 14.374AC\�
/ \ \ _ - - /� I / -� / - UNITS OF I I \ \ \I
\ ` / 1 Ro r o i I(iYPI \ \ \ \ \ I I \ \ \ _ - ' \ DISTURBANCE TEMPORARY DIVERSION I \ \�\ \\\\ \\ O
\ / / \ ` ` / / / / \ `e.e'l) ` \ ` S NECESSARY TO MAINTAIN 50'\RIPARIA \ \ y\\ \ N {�7
SIONMER BASIN
TO \ \ \\\\\\, U LLJ O U 0 LO
n\ zmo
LL
m Cl) °C
/ / oIM R50N Oal TOY IMET STABIJZED WITHIN 7o Q o R�(TYP)\ ACCORDING I T / i�\ \/ / // RalENROTECTON -RAP \ /A B `
TS
M,6111NCE
I /SKNERBA�N
\
22S-
I III II IIII \3?\24\-
-- ---20-7 -/�/ /
.22It, 206- -
I \\E\\ANK �205-
�\ < 2 10\ / / I //I / -2032 40
♦
-202
I /
-
IlEM
HFL ADANT;DIM7RSIDN STABILIZED
THIN 10 QE \ / / / // / / %/� /// - - 20 g _
\ \ 1 \ \ \ \ \ \ \ S 11SARi To YAINTN STABILIZED WITHIN J 0AY$ \ \ / / / / / / / - - 9 \
I TEMJaR M7tSl \ \ \ \ \ - - - \ WTIVE DRANADE TO ORGINc TO sTAelLjg \ \ \ \ t / / / / / I / - - 1 8 \ \ \ \ - - - / / PoPyR�P t -
I I S I� T MAINATIONTAIN \ \ \ TIMEF'RANE REOUIREM TS / / / I i - - - 9
\ \ \ \ 21 \ OMMER BASIN\ / / / / / / / / / / / ' \ \ piH�:1m
NAGE TO 1 \ \ \ \ \ \ \ \ \ \ \ - - 4 / / / / / / , / // , / / / / I I I / ' ' - _ `79% \ - / � TH-
16 // / c�� / / SKIN ER BASIN 1 \ \ \ \ \ \ ` / / / / / / / / // I I / - \ ` \ \ _ / EX4Y1 FT \
IIIII I \ \ \ \ \ 213 \ \ \ \ / / / / // / I I ( 96 \ _ - - M N. THO( 36 - -
I. /, \ \ IN, � \ ,. / / � / 1 J � 1 -
3 IIIII
III IIIII I I \ \ 21 5' III IIPI I I ► I' / / I/ / // / / / /I // / / / / / / //N / I I I /I I \\ \ \\ \\ // \ \ /19-5j/ / -`-_-_-
--
---
--OFFJER1Tall
STEONEON SHEET BE 4
SOABN73 -F�CONSTRUE1IOFrRQUIREM�EN
\A CCIN ILMTI\RITs 192- 2CrCt#M0FOP-RAP A�TI5Nr
\\ \
-DIICH ENTRANCE Ta
INN \ I
wl \N1I I
/ V
I / / F TRYL,rP N
I I/ JMT MI�1H'" 7 2 F
o III 'NNAINTO�TgI0EK
� IN
L�r
NO2-m-n",
I'm
-TEMPORARY NITS OF"•1�� \ \ TM7tT�
SILT FENCE DISTURBANCE \�TO 0��I,� - LENGTHr1�T-
`�CONSTRI1C7101� \\ \\ EXIT MOTH: 1. FT-
- - \ \ -
MIN. TNICIKSS: 22 1N Cl RID COORDINA I
1 APp / )MIN. STONE S� ElCLA'S�S: IB e�' b75670.9458 - - _ I - -
XX \REFER tO DETAIL ON SHEET C2.5 -
.� \FOR CONSTRUCTON REQUIREMENTS E 2141�37.6395 ` -
\ I
A II
N/F CLEARWATER POOLS, INC.
CURRENT USE COMMERCIAL
DO 3472 PG 993
PN 0504203P
ZONING GB
el..M 1 rn rLIM
FLOW ARRROW
CWA
CONCRETE WASHOUT AREA
SSA STABILIZED STAGING AREA
IP
INLET PROTECTION
SF
SILT FENCE
SP
STOCKPILE
VTC
VEHICLE TRACKING CONTROL
LOD
LIMITS OF DISTURBANCE
TSD
TEMPORARY SLOPE DRAIN
SB
SEDIMENT BASIN
SM
SEEDING AND MULCHING
DD
O
DIVERSION DIKE
RS
ROCK SOCK
IN,
\ I
IN,
IN,
IN,
STABILIZATION TIMEFRAME
SITE AREA
TIMEFRAME
STABILIZATION
DESCRIPTION
EXCEPTIONS
BASIN & TEMPORARY
IMMEDIATELY
NONE
DIVERSION DITCHES
PERIMETER DIKE.__
SWALE.S DITCHES AND
7 DAYS
NONE
SLOPES
HIGH QUALITY WATER
(HOW) ZONES
7 DAYS
NONE
IF SLOPES ARE 10' OR LESS
SLOPES STEEPER THAN
7 DAYS
IN LENGTH AND ARE NOT
3,1
STEEPER THAN 2:1, 14 DAYS
ARE ALLOWED
SOPES 3:1 OR FLATTER
14 DAYS
7 DAYS FOR SLOPES GREATER
THAN 50FT IN LENGTH
ALL OTHER AREAS #1TH
NONE, EXCEPT FOR
SLOPES fZATTER THAN
14 DAYS
PERIMETERS AND HOW ZONES
4.-1
GROUND COVER REQUIREMENTS:
THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE
ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE
EROSION -CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT
EXPOSED WILL, ACCORDING TO THE FOLLOWING CHART, BE PLANTED OR
OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER
DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PROVISIONS FOR
PERMANENT GROUNDCOVER SUFFICIENT TO RETAIN EROSION MUST BE
ACCOMPLISHED FOR ALL DISTURBED AREAS ACCORDING TO THE FOLLOWING
CHART FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT.
z
J
J
0
z
0
C. 7
z
0
0
Ir
w
W
a
C)
W
W
z
z
W
o�
nC
Quo
U
o=Lz
=oo
zo=
�
�o
J
U
PLAN STATUS
1/20/22
1ST SUBMISSION
5/16/22
2ND SUBMISSION
7/1/22
3RD SUBMISSION
7/12/22
4TH SUBMISSION
DATE
DESCRIPTION
MEL
XXX
XXX
DESIGN
I DRAWN
CHKD
SCALE
H: 1" = XXX'
V: 1 " = XXX'
OB No.
000000-00-000
DATE
JANUARY 20, 202
--I LE No.
000000-0-CP-000
SHEET C2.2
Cad file name: P; \006-PaceCommercial\005-Flex-Office-JoCo\Engineering\Engineering Plans\Construction Documents\006-005-ES.dwg
i
GRAPHIC SCALE
50 0 25 50 100 200
BEFORE YOU DIG ,
STOP( IN FEET )
CALL 1-800-632.4949 \ 1 inch = 50 ft.
N.C. ONE-CALLCENTER Know what's below. \ N/F GREGOR: R. CEISNERESIDENTIAL
ITS THE LAW I \\ CURRENDBU3675-837DENTIAL
Call before you dig. I PN ZONING:
AR
I 1 \\ ZONING: AR
I I I
I I \
I
I 1 \
_-------------- I I I N/F ROSE S. HENLEY _
CURRENT USE: RESIDENTIAL
DB 1354 PG 570
= a I N/F I JONATHAN GIGGI N/F NICOLE RIEM-1 - - - - - I DAHL PN 05104196E N/F \ -
CURRENT USE: RESIDENTIAL I CURRENT USE: RESIDENTIAL I ZONING: AR _ _ _
N j I N/F DAND GEORGE I DB 5809 PG 666 I DB 5430 PG 632 ` PN 05104196H PN 05104196J \\
CURRENT USE: RESIDENTIAL I ZONING: AR I ZONING: AR __\
�--
o I I DPN30504196F 1 I I 1 L - - - '- - - - y - - - - - - - - - - - - - -- \
q I ZONING: AR _--- ------
I I I I ---- --- `�111111111 I mN�
I N/F JACK LENS I ct •• _
CURRENT USE: RESIDENTIAL
N/F JOHNDAMS I DB2820PG164 -� �-_� I I I L-----------------------\- \\1\\\\\
FIN 05104196D \ ______ -------------
CURRENT USE: VACANT I ZONING: AR / / 1 - 1 \ ` ( - / / / / _ J 1 \ \\ m
DB4801PG664 I / -� \ - L------------------ % /\ / I I I I \ \ \ 11\\\\�1\\\ \\\\\\\\y I o \
PN 05104200E (/ i ' \ \ \ \\ \ \ �I- _ - _ _ I L _ _ _ ~ - - / / tl\ \
_ _ _ _ l
ZONING: AR I / ��-I \ - - I ( --- -----I-- / / / /� /J� / I ` \ 1 \\\ �� I 1
r _ / / II�� \ 1 �_ _ / \ �\\\ I
_-` - 1 LIMITS I _ - TEE PROTECTIONDISTURBANCE
I 1 T I / FENC /
I ON- - TREE PROTECTION
TEMPORARY
I SILT FENCE TEMPORARY FENCE / /
\ /
AT STORAGE SILT FENCE / N� G ID O�DIN�TES / / \ \ - / \ \ �� / / / / /i A / / / / S09 2 37 E 267.02' \ \ \ \\\ \ \ \ \\ \ II I -` \\� \ LP / �. / / \ \ T \ \ \ \ \ l / / / `L / S11 1'21"E 22%.94 /
I TE P(�RbRY / RAIN GAUGE CaSTJIiCT CSC rsu�c / - 67 �485 \ ' \ / / \7-7
I ATI & PrN BOX ENTRANC \�� \ ARE/\ \ \ EA 0` 1 _ j �/ igg /2 / / / i- \ I \ \ \ \ \ \ 311 24'2r�E 13 .39' / / / / \ \S11 '20 E�13 .07' / - /A it
N / \ \ \ \ \ \ \ \ \ \ Z'2y1'11 77 0993 / \ 111 '40� 13 69' \ 7 / ice / / / IP� / S,
L� e ��
I I III I 1 IG/ /r.0
POE� 24 \ \ �59�6'\ \\ \ \ - �' / - / S11�'3�`E 135.08� \ \ �\ " / _ _ \
�p I f1\ I / / �P,R,ORS CONS E\
G L>-r_ - �� s _ / `L� / / - \ C GfID�05RDIRI\A\� \\\
N/F DTJ, INC. I \ N 2141 7. 42 \ \\\\ \\\\\
\ \� DB 1250 PG 624 \ \E 1, &,
\ _�� I \ / 2 _ PN 05104199X �4\
\ - - - - _ - I - - - - - 0 02 0 0 0 0 / CURRENT USE: VACANT \ 1 1 l\\\\\\\ \
I I C
EAR _ O d O �. 0= -O O O O O O--•G-�
o o \ o\ o 0 0 0 0 0 0 0 0 o O o o O o 0 0 0 TL
o o P I Q _ - �- T =-_-- - -- 626,148SF 14.374AC i \I \\\ \\\\
�/ �/ / �/ \ \ \ l \\\ \�\\
I E \ \ \ - y- 1 -1 � � � � � - - � �� � / / � LIMITS OF I I \ \ \�\\\\\\ Ci)
�- - - - c _ - - - _ / / \ \ / _ _- - ❑ - \ \ DISTURBANCE TEMPORARY DIVERSION I \� C 0 C:) O
ASDITCNECE SARS TO MANT LOCA TAIN \ \\ -� M
I f \ G� \ - o 0 _ - O O - \ \ SPOSITIVEKIMMER BASIN
TO 50 BBFtIPARIAf� \ \ \ \ \ \ W O U It C1 Ln
- - o 0 0 0 0 0 0 0 /� \ \\ \ \\ \\\\
IIII / / _ T
III III ✓ O O O \ ° ° \ O \ \ _� / / / - \ "` O O O / \ - ----- '^
\ E
ca
\ CD LU
\
/ DIVERSION DITCH TO
x I I I \o�Az Cp O JL STABILIZED WITHIN 7 Q
ACCORDING TO STABI_ \\ \ \ DS
EMPORARY RE Q�hZ
W
ROTECTIO "Ir � O
/2CY B RIP -RAP A7 IImNW N„I O
o
II I
IIIIIIIII I 2�= I1 III I / / // // / I / I II III � I�I I I I I(°O � \\\ \ \� \ • � \\� , - -- --�-,\ \21
0 \TO2,92(.DT(S�)
°I P4.\)° • ) \ \ \\\ \\�\\= 2\,2b\✓\ \\ 2\ \
VI\ 7 25,
224-
O N /;,4(
=
o
II I I / IP-S�AP APROIV6 N I ENC MARK
I / TRY'WIDr: 76 qT O I I 1 ) \ O o
IIIII // LE GTH• 15 �T IO I N 80 21.2351 %_ - - - - _ _ \ \' \ \ \ \ 22G \ \ \ \ / / / / / / 1 // _ _ - - \ /
ppII - _ \ - I \ \ � �6 �,.� \
I ITWffiTH/7. / a IIII 2� I` I 1 I �E� �� - - ` - _ ° \ , \ \ / �/ t \
2 4o s.�s11;�- - _ 1 2 (Ts)-203 -
I CKI%SS: 2 211. ) \ �j 9�
IIIII III �1 iT�ryT,� J
o b11N/STO L` DI METER: IN �
/ S N� B I I / / `\ • \ \ \ 0 212.0(�'S� \ 2j� �� \ \'DINtRISION
\ \ TOP=212.
III I I R TO gETAIJION HEE C2 1 ° / ` - \ �-r \ \ \ \ TOW-;�iZ Q 2�6� DITCHHrADJU DIOCATIO STABILIZED WITHI HJ TO
E
\ Z N UC N R�QUI EMEN I / / \ \ \ \ O 2
/ % TEM OR \\ \ \ \ \ O \ \ \ \ _ 15 'AS ECESSAMTO MAINTAIN - - ,
II / I DI�Ep
HID T OC//yyTTII N \ \ s s ` TIMEFRAME REQ QR iBATION \ \ / / g/_ (III \ ;�I
C SA MAINT W \ \ \ \ \ \ \ 21 • IT1V RAINAGE Tl \ / / / 1 I / - _ - _ _ 1 8\ \ \ \ \ \ \
II I \ O \ \ _ _ _ 4 \ IMMER @ASIN / / / / / /// I % /
/ - \ \ \ TRY 15'Fi \
� / / o o � 1 � Fi- - \ \ \ \ I I i BAF (TYP) S
srn ro• 1 \ \ \ \ \ \ \ \ / / / / // // / // / // / / / I I I - - - \ 9� \ \ \ \ �"/ LEN6TH: \ I I I
/ \ \ 1 �- ; \ /
,N �\\ \ \ \ \ ° \ _ /\ 2j3�\\\ // / / I J � '/ �- �1 \ \- _ / Ex1kw1�: 3FT - \ \\ \ � ; � �\ � I r / 0 Q
/ / \ _ - - - - SIN STONE METER: N
_ \ \ O / Z
5 III i / / // / / o / I \ FFE=21 0 \ \ \° \\ _ o o �2J2 \\ \ \ \ \ �i / // / / ---- .19 \ \ \ \ JG II I /
I �J I DIV6 DITCH TO BE \ \ o \ \ \ \// / / // // / _ \19 5 - -REFER TO-BC�XIL ON�LiEELC?5 -
\ \ \ / / � \ / / / / / / / / / / / � 4 _ -FOR.-CQNSTRHETIOF!-REQUIREMENTS \ \ r� f / 7 ^ 0
STABILIZ DAYS \ 2J \ _ / / / / / / / 1 - _ _ - 7 I / / z
IIIII / \ \ 1 // / / // / -- 's
ACCORDING 0 TABILI2-AT19N / _ 2 - - - � -- _
° I TIMEFRAM UIREMENTS \ � \ \ / / // 3- -= = - - _ \ �� �% \ \ \ _��� --_ � � �I/ � Q z
to I \ ° \ \ / �27G \ \ \ \ \ \ \ \ \ \ \ // / / /p0/R �1,+�S� �LDITCiI'�p' B / / / / / / / - 1 - - - - -2�- DiLGH TRB 1 �To �/ \ \ _ I 2-
/ \ O F\\\L�i 6 Y DyVER51
/ \ \ T JIJSi L 0 / STA ILkZED WITHIN�➢AY� / / SKIMMER BA311J
I I \ \ \ / \ \ \ \ / o$'�' V
\ I / I \ \ \ _ - / A5 EC s�sAAKY ro 1�( TRiN _ _ _ _ - -�- Q =
O 0 O I \ \ \ \ \ \ \ / 2G \ \ \ ` / / / � 981 INAGE F0 �IMEMA Ui MENl8 / / � \ � �0 RECT-%IWEft�- /
P <V 1 \ \ \ \ / \ 9 \ - ' / / MERBASI / / / 0 Y INCET / / / - ��� MP6S€ 7
IIIIII \ I L� / / TOP=214. \ L uTtET_ / O II LL Z
I o I 1 o c� . ° 214.0(TS I I \ \ \ \ \ \ \ \ \ _ = , , // / / / / / / / // / / / $8 AIR BAs1N )2 \ \ - - _ - TauGTLSE _ 1 = 0 0
- / \ / _1t1s M ,5IZI:\4.0 \\ \ 1 _ _/� C'3
ITS / I / / / / / / - SKIMME�O IF DTA 3� 1N \- 198 Cl) Z ~
3 IIIIII \ 212-w / I / DISTUf26ANC / ( - / \ j2 _ _ - - - -
/ 1 / SKIMMER 0$IFlOE RA�IUS1. 11tl�\ \ \\1LLWA - - T _ (n
- \ \\ \ 1 1 lg -194 19 - - - - O I-I-i C� Z Z
7 _ \ �9n� \ - _ - _ _ _ --1_ z 0
18gIII
2
IIIII \ fl I / I I I _ ,
III -� �" .. .. n ......... •: rt . - - - - - - • .. � � \ � \ . KII'^RAP APR6N� - - - -
TEMPORARY-
IIIIIII SILTIFENCE\2
' - /
IIIIII 21 I / I I I \ \ \ \ \ \ - _ / ' \ O5, `� / / i / - _ / // / _ OUTLET (TYP)
IIIII IIII / I \ \ \ \_-- 20 \-_- _ rir3�o'11"w
I IIIIII \ /III // I 3 �_-/ //�'�'« ,o. 'I / \. /TRe�QZEcnoN❑=�/ jy � � _�\ � / I \
I I 7EE PROTEC ON I I \ \ - -' /� \� _ / // j / IPF - _ - / / - �,�/\ / EROSION'6ONTROL NOTES:
209 I I I _ _ _
IIIIII 1 \ I NCE \ \ \ • / \ T�MP�AR _ - _ a III I III I / 2G / //' 9a - .I� �36 AN EROSION AND SEDIMENTATION CONTROL PERMIT SHALL BE
SILT FENCE \ 1 598. - - _ � L-�' 1 �� `i / \ - � _ - \
I 1 \ \ N13'25'38"W - - - / / / - _ - 194.2 -
I�II Jill � ouTl�t (TYP) / \ I - 15u- - = 1'E +� / / /� - - F- _ _ - _ - � / � \ / � � /�� 1 REQUIRED BY JOHNSTON COUNTY PRIOR TO START OF
l�l� IIIIII I \ 208- � III / / / / / � _ / \ \ ELE�� I TREE�RROIELT01_N TELE❑ - �E196.197-- -�_ = I -i'%� - = r�� _ � = - � / / � = �� CONSTRUCTION.
111 IIII 1 LP ) \ \ I� I / j I / /I - //
III ^ I \ III / / EL I _ / FENCE -= 1 Q • - - _ _ / I / %
_ , - - / 1 _ _ I SURVEY NOTE:
ll I IIIII \ �I
IIII II 1o� III LP/ - - ALL EXISTING BOUNDARY AND TOPOGRAPHIC INFORMATION
I i I II 1 , IIIII - xi J J�%�'_� _ _ _�_=��-//�%- - -\� - - I / / �� PUMP STATION I TAKEN FROM A LAND SURVEY PREPARED BY: TRUE LINE
III (IIIIII II Il //•- - =--J�/ �1i�� f ----\� /-----�I-/ //i/ i SURVEYING
_ ____
�� FO I� / TES I - ' - - - - - _ - \ / // I N F ANNA PLLC. DB CURRENT COMMERCIAL
III I II '�06 IIL // r _ - ---' -- \ // 1 / I / \ /F PAVEL
II 1 I I 1 _ _ - I N/F ANNA PLACE C DB / I STREAM/WETLAND NOTE:
I II I s s2 % _ '� \N/F ANNA PLACE, LLC. / - - 477 I y94 PG 477 DB 4511 PG 896 1 THERE ARE NO EXISTING STREAM/AND OR WETLAND FEATURES
III I \ 1 N/F ANNA PLACE, LLC. I CURRENT USE: COMMERCIAL - N 0510 477 /� z
I IN \ \ 2tl 4 6?4.It1 CURRENT USE: CO RCIAL \ \ PN 05104200X N 05104200Y o PN 05104203H 1
I I \ \ oefs�a PG� DB 1938 PG 512 / 1 CURRENT USE: COMMERCIAL CURRENT USE: COMMERCIAL - ZONING: GB ON THE PROPOSED PARCEL.
IIIII 1 1 20 \ , I I F1 I I I I PN 05104200V I \ \ \PZONING: GB N 0510420OW \ / I I ZONING: GB
IIII IIII I 1'1� I I - 1\ \ \ZONING: GB \ I 1 1
ZONING: GB
1)a _ 1 FLOOD ZONE NOTE:
II
II IIII Ig of I� I I I � I � - � - - - - I I I I A PORTION THE PROPERTY IS LOCATED IN FLOOD ZONE AE
I IIII r I I✓I I I I I I ` ` \ i \ \ \ \ 1 AND SHADED X AS SHOWN ON FEMA FLOOD PANED
204- II� lI I I I - __ \ I \ \ \I '
I � I ` � \ \ i i 3720164700K, DATED JUNE 20, 2018. BASE FLOOD ELEVATION
JII
3 184.8. MAPS SUBJECT TO CHANGE BY FEMA
\ I
N1R1 11DTH-
3�\ - TREE EfLO 10N - - -
167 _tXIT-WC11 : 3,5. FT FENCE - - - -
812.82
TEMPORARY LIMITS OF
DISTURBANCE
� ' fHCII((tSS: -22 W, \� M--iTAP A 2
` \ �` 6r 11� \ \ ENTRY WIDTH: 7.5 FTC -
MIN. DMElEiER:-6
�� 1 �S� �STO S\B
J
SILT FENCE
REFER TO DE QN� •5 \ `- - - - - - -
- \ EXIT WIDTH: 17.5 EY
PAR �_�
REQII EMENIAA
10 ONSTRU \\ \J11N. THICKNESS:'f22 IN / - - -
INN�E
IB
APp / JMiN STONESTO
EEELA
�NC6%�670.94058REFER tO DETAIL
O
COCA110/v , \ E 214137.6395 I ` -
.� FOR CONSTRUCTION REQUIREMENTS
II
�
\
I
N/F CLEARWATER POOLS, INC.
I
CURRENT USE: COMMERCIAL
DB 3472 PG 993
- I
IN,
PN 05104203P
ZONING: GB
\
\
\
IN,
BMP LEGEND
m
I,
I-
I I
I I I\ ` \\
I
i
I I
I
1
FLOW ARRROW
\
,1203- I
CONSTRUCTION SEQUENCE:
CONTRACTOR TO USE PARKING AREAS ADJACENT TO THE PROPOSED BUILDING FOR LAY-DOWN/STAGING AREAS - MAINTAIN THESE AREAS SO THAT SEDIMENT LADEN RUNOFF WILL BE
1.
EROSION & SEDIMENT CONTROL E&SC PERMIT AND A CERTIFICATE OF COVERAGE COC MUST BE OBTAINED BEFORE AND LAND DISTURBING ACTIVITIES OCCUR. THE COC CAN BE OBTAINED
( ) ( )
-
DIVERTED TO EROSION CONTROL MEASURES. INSTALL SILT FENCE AROUND LAY DOWN STAGING AREA AS SHOWN
/
❑
CWA
CONCRETE WASHOUT AREA
BY FILLING OUT THE ELECTRONIC NOTICE OF INTENT (e-NOI) FORM AT deq.nc.gov/NCGO1. PLEASE NOTE, THE a-NOI FORM MAY ONLY BE FILLED OUT ONCE THE PLANS HAVE BEEN
APPROVED. A COPY OF THE E&SC PERMIT, THE COC, AND A HARD COPY OF THE PLAN MUST BE KEPT ON -SITE, PREFERABLY IN A PERMITS BOX, AND ACCESSIBLE DURING INSPECTIONS.
8.
CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES.
SSA
STABILIZED STAGING AREA
2.
CONTACT JOHNSTON COUNTY BEFORE ANY LAND DISTURBANCE OCCURS.
ALL APPLICABLE E&S CONTROL MEASURES MUST BE MAINTAINED UNTIL PERMANENT VEGETATION IS ESTABLISHED.
3.
CONTRACTOR SHALL ENSURE THAT ALL NECESSARY PERMITS HAVE BEEN RECEIVED AND THAT THOSE REQUIRED TO BE DISPLAYED ON -SITE ARE AVAILABLE.
9.
SELF -INSPECTIONS FOR EROSION AND SEDIMENTATION CONTROL MEASURES ARE TO BE PERFORMED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF EVERY RAIN
cK)
INLET PROTECTION
EVENT OF GREATER THAN 1 INCH. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN MEASURES AS DESIGNED. ALL ESC MEASURES SHALL BE MAINTAINED AS SPECIFIED IN
4.
CONTRACTOR SHALL HOLD A PRE -CONSTRUCTION MEETING AT LEAST 48 HOURS BEFORE THE ACTUAL START OF CONSTRUCTION. CONTACT JOHNSTON COUNTY INSPECTOR
THE CONSTRUCTION DETAILS ON THIS PLAN.
s
SF
SILT FENCE
5.
CONTRACTOR SHALL CONTACT CAROLINA ONE CALL AND ALL ENTITIES HAVING BURIED UTILITIES AT LEAST 72 HOURS PRIOR TO DIGGING OR AS DIRECTED AT THE PRE -CONSTRUCTION
10.
STOCKPILE RIP -RAP ON SITE AND INSTALL ALL EROSION CONTROL MEASURES WHERE THE WORK IS OCCURRING. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED BY THE
MEETING.
ENGINEER OR UPON RECOMMENDATION OF NCDEQ INSPECTION PERSONNEL AS CONDITIONS WARRANT.
SP
STOCKPILE
6.
CONTRACTOR SHALL INSTALL TEMPORARY CONSTRUCTION ENTRANCES AT EACH POINT OF ACCESS TO STORAGE AND CONSTRUCTION AREAS. EROSION CONTROL MEASURES SHALL BE
11.
ALL DISTURBED AREAS SHALL HAVE GROUND STABILIZATION BY THE CONTRACTOR ACCORDING TO THE CHART ON THIS SHEET.
INSTALLED PRIOR TO DEMOLITION AND TREE REMOVAL OPERATIONS.
12.
STABILIZE SITE AS AREAS ARE BROUGHT UP TO FINISHED GRADE.
VTC
VEHICLE TRACKING CONTROL
7.
INITIAL PHASE SEDIMENT AND EROSION CONTROL MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH PLANS BEFORE STARTING WORK INCLUDING SILT FENCE, INLET PROTECTION, SKIMMER
BASIN, DIVERSION DITCHES, TREE PROTECTION, ETC., CLEARING ONLY AS NECESSARY FOR THE INSTALLATION OF THESE MEASURES.
13.
UPON COMPLETION OF THE INSTALLATION AND WITH APPROVAL OF NCDEQ, ALL EROSION CONTROL DEVICES SHALL BE REMOVED AND DISPOSED OF IN AN ACCEPTABLE MANNER. EACH
�L.W
LOD
LIMITS OF DISTURBANCE
SECTION SHALL BE SEEDED/MULCHED IMMEDIATELY AFTER INSTALLATION OF PIPE, STRUCTURE, OR ACCESS. COORDINATE WITH THE EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF
CONTRACTOR SHALL INCLUDE A RAIN GAUGE AND LOG BOOK CONTAINING THE INSPECTION RECORDS FOR THE SITE
EROSION CONTROL MEASURES.
TSD
TEMPORARY SLOPE DRAIN
INSTALL SKIMMER BASIN AND TEMPORARY DITCHES- STABILIZE EARTH BERMS AS WELL AS BASIN SLOPES & INSTALL EROSION CONTROL MATTING IN TEMPORARY DIVERSIONS PRIOR TO
WITH APPROVAL OF NCDEQ, THE SKIMMER BASIN SHALL BE DECOMMISSIONED, REMOVING AND DISPOSING OF ALL ACCUMULATED SEDIMENT IN A LAWFUL MANNER. USE SILT BAG/FILTER BAG
BEGINNING MASS GRADING OF THE SITE
FOR DEWATERING THE BASIN AND DIVERSION DITCHES. UPON SKIMMER BASIN REMOVAL, THE AREA SHALL BE CONVERTED INTO THE PERMANENT STORMWATER MANAGEMENT FACILITY - WET
DETENTION POND.
SB
SEDIMENT BASIN
ONCE THE BASIN/DIVERSION ARE INSTALLED SEED/MULCH IMMEDIATELY
DURING DE -WATERING OPERATIONS, WATER SHALL BE PUMPED INTO AN APPROVED FILTERING DEVICE PRIOR TO DISCHARGE TO RECEIVING OUTLET.
ALL DEMOLITION DEBRIS IS TO GO TO AN APPROVED LANDFILL OR RELATED FACILITY
❑
SM
SEEDING AND MULCHING
14.
ONCE ADEQUATE PERMANENT GROUND COVER IS ESTABLISHED, ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED WITH THE APPROVAL OF NCDEQ INSPECTOR.
REMOVE SKIMMER BASIN #1 AFTER ADJUSTING LOCATIONS OF TEMPORARY DITCHES TO DRAINAGE STRUCTURE (INTERMEDIATE PHASE) PRIOR TO INCLUDING FILL IN AND AROUND SKIMMER
BASIN #1 AREA. CONSTRUCT THE GRADE FOR THE BUILDING PAD AND THE PARKING AREAS THAT ARE DRAINING TO THE TEMPORARY SKIMMER BASIN, MAINTAINING STORMWATER RUNOFF
15.
ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. EROSION & SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, NCDOT, U.S. DEPT. OF
DD
O
DIVERSION DIKE
TOWARD THE BASIN. ADJUST THE LOCATION OF TEMPORARY DITCHES AS NECESSARY TO DIVERT RUNOFF FROM THE DRAINAGE SYSTEMS TO THE TEMPORARY SKIMMER BASIN. ONCE THESE
AGRICULTURE, AND STATE STANDARDS.
AREAS ARE UP TO GRADE AND STABILIZED WITH CONCRETE, PAVEMENT, OR VEGETATION THEN DIVERT STORMWATER RUNOFF TO THE PROPOSED STORM DRAINAGE DEVICES AND THE
TEMPORARY SKIMMER BASIN CAN BE REMOVED AND THE AREA CAN BE BROUGHT UP TO GRADE. ONCE THE AREA IS UP TO GRADE, STABILIZE WITH CONCRETE, PAVEMENT, OR VEGETATION
16.
WHEN THE PROJECT IS COMPLETE, THE PERMITTEES SHALL CONTACT DEMLR TO CLOSE OUT THE E&SC PLAN. AFTER DEMLR INFORMS THE PERMITTEE OF THE PROJECT CLOSE OUT, VIA
®
RS
ROCK SOCK
IMMEDIATELY.
INSPECTION REPORT, THE PERMITTEE SHALL VISIT deq.nc.gov/NCGO1 TO SUBMIT AN ELECTRONIC NOTICE OF TERMINATION (e-NOT). A 1100 ANNUAL GENERAL PERMIT FEE WILL BE CHARGED
STABILIZATION TIMEFRAME
SITE AREA
TIMEFRAME
STABILIZATION
DESCRIPTION
EXCEPTIONS
BASIN & TEMPORARY
IMMEDIATELY
NONE
DIVERSION DITCHES
PERIMETER DIKES,
SWALES, DITCHES AND
7 DAYS
NONE
SLOPES
HIGH QUALITY WATER
(HOW) ZONES
7 DAYS
NONE
IF SLOPES ARE 10' OR LESS
SLOPES STEEPER THAN
7 DAYS
IN LENGTH AND ARE NOT
J.I
STEEPER THAN 2:1, 14 DAYS
ARE ALLOWED
SOPES 3:1 OR FLATTER
14 DAYS
7 DAYS FOR SLOPES GREATER
THAN 50FT IN LENGTH
ALL OTHER AREAS IWTH
NONE, EXCEPT FOR
SLOPES fZATTER THAN
14 DAYS
PERIMETERS AND HQW ZONES
14.-1
GROUND COVER REQUIREMENTS:
THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE
ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE
EROSION -CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT
EXPOSED WILL, ACCORDING TO THE FOLLOWING CHART, BE PLANTED OR
OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER,
DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PROVISIONS FOR
PERMANENT GROUNDCOVER SUFFICIENT TO RETAIN EROSION MUST BE
ACCOMPLISHED FOR ALL DISTURBED AREAS ACCORDING TO THE FOLLOWING
CHART FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT.
t' y s s s fr4a,p+f
SEAL {
L-
r
r i
PLAN STATUS
/20/22
1ST SUBMISSION
5/16/22
2ND SUBMISSION
7/1/22
3RD SUBMISSION
7/12/22
4TH SUBMISSION
DATE
DESCRIPTION
MEL
DESIGN
XXX
DRAWN
XXX
CHKD
SCALE
H: 1 " = XXX'
V: 1 " = XXX'
OB No.
000000-00-000
DATE
JANUARY 20, 202
-ILE No.
000000-D-CP-000
SHEET
C2.3
Cad file name: P: \006-PaceCommercial\005-Flex-Office-JoCo\Engineering\Engineering Plans\Construction Documents\006-005-ESAwg