From: Turchy, Michael A
Sent: Tuesday, August 9, 2022 3:02 PM
To: Conchilla, Ryan
Subject: Re: 1-3306 A - Mitigation Confirmation
Hi Ryan,
Your numbers are correct... however, could you hold on to this for another couple of days? David Bailey sent me a
mitigation question, but I could not get his numbers to work, so I'd like to talk though it with him to verify there's no
error on the mitigation numbers.
I'll reach back out to you in a day or two when Dave and I have a chance to verify everything.
Thanks,
Michael
Michael Turchy
Environmental Coordination and Permitting [ECAP] Group Leader
Environmental Analysis Unit
919 818 7427 mobile
919 707 6157 office
maturchy@ncdot.gov
https://connect.ncdot.gov/resources/Environmental/EAU/ECAP
From: Conchilla, Ryan <ryan.conchiIla@ncdenr.gov>
Sent: Tuesday, August 9, 2022 1:32 PM
To: Turchy, Michael A <maturchy@ncdot.gov>
Subject: 1-3306 A - Mitigation Confirmation
Hi Michael,
Thanks for the update below.
I'm finalizing the Permitting Conditions for this project and writing for confirmation regarding the wetland and buffer
impacts and the corresponding mitigation.
Can you confirm the credits and impact totals secured through DMS and private banks listed below are accurate?
Compensatory mitigation for impacts to 0.20 acres of wetlands is required. We understand that you have chosen to
perform compensatory mitigation for impacts to wetlands through the North Carolina Division of Mitigation Services
(DMS) (formerly NCEEP), and that the DMS has agreed to implement the mitigation for the project. DMS has indicated
in a letter dated June 21, 2022 that they will assume responsibility for satisfying the federal Clean Water Act
compensatory mitigation requirements for the above -referenced project, in accordance with DMS's Mitigation
Banking Instrument signed July 28, 2010.
Compensatory mitigation of 0.33 acres for the approved wetland impacts shall be required. We understand that you
have chosen to perform compensatory mitigation for impacts to protected wetlands through purchase of 0.33
Mitigation credits from the Pancho Wetland Mitigation Bank, operated by EBX. Mitigation for unavoidable impacts
to wetlands shall be provided in the Cape Fear River Basin and done in accordance with [15A NCAC 2H.0506(h)]. The
mitigation bank has indicated in a letter dated February 21, 2018 that they have available credits for satisfying the
compensatory mitigation requirements for the above -referenced project. No impacts to wetlands can occur until NC
Division of Water Resources receives a copy of payment receipt for these credits purchased from the wetland
Mitigation Bank.
Compensatory mitigation for impacts to 571 square feet of protected riparian buffers in Zone 1 shall be required. We
understand that you have chosen to perform compensatory mitigation for impacts to protected buffers through use
of the North Carolina Division of Mitigation Services (DMS) (formerly NCEEP). Mitigation for unavoidable impacts to
Neuse River Riparian Buffers shall be provided in the Neuse (Upper Falls Lake) River Basin and done in accordance
with 15A NCAC .02B .0714. The DIMS has indicated in a letter dated June 22, 2022 that they will assume responsibility
for satisfying the compensatory mitigation requirements for the above -referenced project, in accordance with DMS's
Mitigation Banking Instrument signed June 14, 2016.
Ryan Conchilla, PWS
Environmental Specialist II
401 and Buffer Transportation Permitting Branch (DOT Divisions 7+8)
Division of Water Resources, INC Department of Environmental Quality
Ryan.Conchilla@ncdenr.gov
From: Turchy, Michael A <maturchy@ncdot.gov>
Sent: Monday, August 8, 2022 11:26 PM
To: David. E.Bailey2@usace.army.mil; Conchilla, Ryan <ryan.conchilla@ncdenr.gov>
Subject: 1-3306 A Stream Typo Noted
Dave & Ryan -
While working through the PBO payment summary, we noted a typo in the permit application that actually goes back to
the NRTR and JD.
Streams SK and SJ were labeled "UT to New Hope Creek". They should actually be "UT to Stony Creek."
This is a name change only. The HUC is correct, the impacts, and the mitigation values are correct.
From page 7 of 19 of the Permit Application Cover Letter:
Stream Impacts in HUC 3020201 (continued)
Stream
Permanent
Temporary
Permit Site No.
Name/
Status/Class
HUC
Impact Type
Length
Impact (acres)
Mitiga io i
JD ID
Required
UT to
Perm. Fill (loss)
8
--
8 (2:1)
Cates
Intermittent
Bank
Creek
Stabilization
13
--
--
8
3020201
Embedded
SE
C; NSW
rip -rap
Temporary Fill
<0.01
--
UT to New
Perm. Fill (loss)
40
--
40 (2:1)
Hope
Perennial
BankStony
--
--
--
9A
Creek
3020201
Stabilization
Embedded
20
--
20 (1:1)
WS-V;
SK
NSW
Temporary Fill
<0.01
--
UT to New
HHon
Perennial
Perm. Fill (loss)
65
Bank
--
9B
Creek
3020201
Stabilization
Embedded
SK, SJ
WS-V;
NSW
rip -rap
Thanks,
Michael