Loading...
HomeMy WebLinkAboutI-3306 A Stream Typo NotedLtd— Ia-3M A AreamayPONo[es mi Cm air8: _o,, Au at 8,-11:2—N Dave & Ryan - While working through the PBO payment summary, we noted a typo in the permit application that actually goes back to the NRTR and JD. in s SK and SJ were labeled "UT to New Hope Creek". They should actually be "UT to Stony Creek." This is a name change only. The HUC is correct, the impacts, and the mitigation values are correct. From page 7 cf 19 of the Permit Application Cover Letter: stream Imnacts In AIJC 3020201 fcmmmacdl Stream Permanent Temporary ACOE DWR Permit Site No. Name/ Status/Class C Impact Length Impact Mitigation Mitigation Impact Description/ Avoidance and Minimization JD ID Type (acres) Required Required Perm. Fill Bank 8 __ 8 (2:1) UC.eka[es Intermittent Extension of 30" RCP. Bank Stabilization for the new extension. 13 -- -- -- 8 3020201 Stabilization Embedded SE C; NSW Existing channel was utilized, and rip mp was limited to the banks only. Temporary <0.01 -- -- ll Fill UTto New Perm. Fill (loss) 40 -- 40 (2:1) -- A new channel needs to be constructed to tie the existing stream to the new 84" bore andjack. Rope Stony Perennial The charnel loss is due to the abandoned channel. There is embedded rip rap for the last section Bank __ _. ._ Creek oftie no. 9A 3020201 Stabilization Embedded 20 __ 20 (1.1) SK WS-V; NSW Rip rap will be embedded flush with the existing channel where it ties back to the existing Temporary <0.01 __ -- channel. Fill UT to New Penn. Fill foes 66 -- 65 (2:1) -- A newchannel needs to be constructed to tie the existing stream to the new 84" bore and jack Mope Stony Perennial The channel loss is due to the abandoned channel Impacts to stream SK and SJ were grouped 9B Creek 3020201 Stabilization -- -- -- -- together as the impact occurs at the confluence SK, SJ WS-V; NSW Embedded Steepened slopes were utilized to bring the slope stakes in and reduce impacts. Thanks, Michael