Loading...
HomeMy WebLinkAboutSW6220201_Plansheet C6.0 - Misc. Detail_2022051029' BC -BC 3: o 3.5 FINISH GRADE SF9.5B 7 10.5' 14.5' 14.5' 7' , 2.5' 12' 12' 2.5' See Plans 1111 IIII N �'•� o 1.5% I Pars 1.5� 2% 2„ S9.5B 2% 00 3000 PSI See CONCRETE 8" CABC Of NOTES 8" COMPACTED � z Z ABC 6" 1. SECTION SHOWN TO DEPICT TYPICAL CUT & FILL CONDITIONS ONLY. GRADING PLAN SHOWS WHETHER SECTION IS IN CUT, COMPACTED 2'-6" FILL OR BOTH SUBGRADE 2. A 4' SIDEWALK IS REQUIRED ON ONE SIDE OF EACH STREET. CARRY BASE COURSE 6" SEE PLANS FOR LOCATION OF SIDEWALK. BEYOND SURFACE COURSE 3. STREET TREES REQUIRED AT RATE OF 1 TREE FOR EVERY 50 LF AT LOCATIONS WITHOUT OF STREET, TO BE PLANTED STAGGERED ON BOTH SIDES OF CURB AND GUTTER CURB AND GUTTER TO BE POURED THE STREET. IN 10' SECTIONS WITH EXPANSION JOINTS EVERY 50' (90' IF MACHINE PLACED) NTS NTS NTS 1 ROADWAY TYPICAL SECTION 2 PAVEMENT SECTION 3 30" STANDARD ROLL CURB NOTES: 1. REMOVE ALL TREATED OR PLASTIC COATED 1. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT BURLAP FROM PLANT BALL. STRUCTURAL EROSION AND SEDIMENT CONTROL MEASURES SHALL CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING 2. INSTALL TOP OF PLANT BALL UP TO BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL 3"-4" ABOVE EXISTING GRADE, MINIMUM STANDARDS AND SPECIFICATIONS OF THE NORTH STABILIZATION IS ACHIEVED. 3. SOAK PLANT BALL AND PIT IMMEDIATELY CAROLINA EROSION AND SEDIMENT CONTROL HANDBOOK. AFTER INSTALLATION. 8. ALL AREAS DISTURBED BY CONSTRUCTION UNLESS OTHERWISE SEEDING SPECIFICATIONS 2. THE CONTRACTOR SHALL NOTIFY PLAN APPROVING AUTHORITY IMPROVED SHALL BE SODDED OR SEEDED AS INDICATED AND 4. REMOVE ALL STRING OR WIRE FROM ONE WEEK PRIOR TO THE PRECONSTRUCTION CONFERENCE, ONE STABILIZED. BASE OF TREE TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR LATE WINTER AND EARLY SPRING) SEEDING MIXTURES: WEEK PRIOR TO THE COMMENCEMENT LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO FINALAL INSPECTION. 9. DURING DEWATERING OPERATIONS, WATER SHALL BE PUMPED 5. KEEP MULCH 2" AWAY FROM TREE SEEDING MIXTURE: INTO AN APPROVED FILTERING DEVICE PRIOR TO DISCHARGE TO TRUNK BASE. SPECIES RATE (LB./ACRE) SPECIES RATE (LBS./ACRE) 3. IF POSSIBLE ALL EROSION AND SEDIMENT CONTROL MEASURES RECEIVING OUTLET. ARE TO BE PLACED PRIOR TO CLEARING AND/OR LAND DISTURBANCE. 3" LAYER OF MULCH RYE (GRAIN) 120 TALL FESCUE 80 10. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL 4" SAUCER BERM TO ANNUAL KOBE LESPEDEZA 50 PENSACOLA BAHIAGRASS 50 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL MEASURES WEEKLY AND AFTER EACH RUNOFF -PRODUCING EVENT. PLAN AND PERMIT SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE FINISHED GRADE RETAIN WATER. OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT EXTEND BEYOND JUNE. SERICEA LESPEDEZA 30 KOBE LESPEDEZA 10 EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE 4" SAUCER BERM SEEDING DATES: 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS MADE IMMEDIATELY. OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LLil REMOVE TOP 1 /3 OF JANUARY 1 - MAY 1 SEEDING NOTES: LIMITED TO OFF -SITE BORROW OR WASTE AREAS, STAGING OR 11. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE g 1 1 Z BURLAP FROM BALL 1. FROM SEPT. 1 TO MAR. 1 USE UNSCARIFIED SERICEA SEED. STORAGE AREAS), THE CONTRACTOR SHALL PREPARE AND SUBMIT REMOVED BY CONTRACTOR ONCE STABILIZATION OR A SUFFICIENT Q TOPSOIL REMOVED FROM HOLE SOIL AMENDMENTS: 2. ON POORLY DRAINED SITES OMIT SERICEA AND INCREASE KOBE TO 30 LB./ACRE. A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR GROUND COVER HAS BEEN ESTABLISHED OR AS DIRECTED BY THE 0 FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND 750 3. WHERE A NEAT APPEARANCE IS DESIRED, OMIT SERICEA AND INCREASE KOBE TO 40 LB./ACRE. REVIEW AND TO NCDENR REGIONAL OFFICE FOR APPROVAL. ENGINEER. NCDENR'S FINAL APPROVAL IS REQUIRED. _J nl LB./ACRE 10-10-10 FERTILIZER. CONTRACTOR SHALL PAY ALL FEES REQUIRED AND SHALL INSTALL Q UNDISTURBED GROUND k& NURSE PLANTS: NECESSARY MEASURES AT NO SEPARATE PAYMENT. THE 12. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SHALL BE DO UNDER BALL TO MINIMIZE MULCH: BETWEEN APRIL 15 AND AUG. 15, ADD 10 LB./ACRE OF GERMAN MILLET OR 15 LB./ACRE SUDANGRASS. PRIOR TO MAY 1 CONTRACTOR SHALL PROVIDE THE OWNER AND THE ENGINEER A REQUIRED AT ALL CONSTRUCTION STAGING AREA ENTRANCES AND o SETTLEMENT APPLY 4,000 LB./ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. OR AFTER AUG. 15, ADD 25 LB./ACRE RYE (GRAIN). COPY OF THE AMENDED PERMIT. ALL CONSTRUCTION ACCESS LOCATIONS INTO NON -PAVED AREA. O CK MINIMUM LIMIT OF MULCH A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY 13. WHEN CROSSING CREEK OR DRAINAGE -WAY, THE CONTRACTOR x TOPSOIL REMOVED FROM HOLE SEEDING DATES: ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT SHALL RIP -RAP WITH FABRIC DISTURBED BANKS AND CHANNEL AND N MAINTENANCE: BEST POSSIBLE EROSION AND SEDIMENTATION AS DETERMINED BY EITHER NCDENR RESTORE SLOPES TO ORIGINAL CONTOURS, BUT NOT STEEPER THAN REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EARLY SPRING: FEB. 15 - MAR. 20 FEB. 15 - APR. 30 OR THE ENGINEER. 2:1 MAXIMUM. DISTURBED CREEK AREA SHALL BE STABILIZED EROSION OR OTHER DAMAGE. FALL: SEPT. 1 - SEPT. 30 SEPT. 1 - OCT. 31 IMMEDIATELY. TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR SUMMER) SOIL AMENDMENTS: SEEDING MIXTURE: APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR APPLY 3,000 - 5,000 LB./ACRE GROUND AGRICULTURAL SPECIES RATE (LB./ACRE) LIMESTONE (USE THE LOWER RATE ON SANDY SOILS) AND 1,000 LB./ACRE 10-10-10 FERTILIZER. NTS GERMAN MILLET 40 MULCH: APPLY 4,000 LB./ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BY A SMALL -STEMMED SUDANGRASS MAY BE SUBSTITUTED AT A RATE OF 50 LB./ACRE. TACKING WITH ASPHALT, NETTING, OR ROVING OR BY CRIMPING WITH A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. 6 GENERAL EROSION AND SEDIMENT CONTROL NOTES 7 TREE PLANTING SEEDING DATES: MAY 1 - AUGUST 15 MAINTENANCE: IF GROWTH IS LESS THAN FULLY ADEQUATE, REFERTILIZE IN THE SECOND YEAR, ACCORDING TO THE SOIL TESTS OR SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB./ACRE 10-10-10 FERTILIZER. TOP DRESS WITH 500 LBJACRE 10-10-10 FERTILIZER. MOW AS NEEDED WHEN SERICEA IS OMITTED FROM THE MIXTURE. RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. RAMP WIDTH AREA IS VARIABLE NOTES' W 1. TRUNCATED DOMES SHALL PI0,j RE 0 Oo OO OO OO Oo Oo BASE DIAMETER COVER 2'-0" LENGTH AND DESIGN CRITERIA AGGREGATE SIZE - USE 2-3 INCH WASHED STONE OR�� 45'R TO 0.70'R FULL WIDTH OF THE RAMP DIMENSION OF GRAVEL PAD MULCH: SEEDING SPECIFICATIONS S l O O O O O a FLOOR AS SHOWN ON THE A IW q4C DETAILS K TOP DIAMETER OF NO LESS GRAVEL ENTRANCE SHALL BE 50 FEET THICKNESS - 6 INCHES MINIMUM IN LENGTH AND 12 FEET IN WIDTH APPLY 4,000 LB./ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. SEEDING MIXTURE: pF S 2 OBTAIN 70% CONTRAST V p�P • o OO OO OO OO OO THAN 50% TO NO MORE VISIBILITY WITH ADJOINING WITH 20 FOOT RADIUS AT EXISTING WIDTH - 12 FT. MINIMUM OR FULL WIDTH AT ACCESS A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. 9 a o 0 0 0 0 o DI AN ER OF THE BASE DIAMETER SURFACE, EITHER LIGHT -ON- ROADWAY POINTS HI THE VEHICULAR ENTRANCE AND EXIT AREA, WHICHEVER IS GREATER SPECIES RATE (LB./ACRE) 3'� 0.9" TO 0.65' 1.6' TO DARK, OR DARK-ON-UGHT 1 4 SEQUENCE COVERING THE 36'-0" MIN 4'-0" 10'-0" LENGTH - 50 FT. MINIMUM. 6� MAINTENANCE: M//y, 1.4' IP.a N ENTIRE RAMP. REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. COMMON BERMUDAGRASS 40-80(1-2 LB./1,000 FTC) 0 �/ N PRECAST CLASS "B' o LOCATION - LOCATE CONSTRUCTION ENTRANCES AND TO LIMIT SEDIMENT FROM SITE HALL CONCRETE ILITY BYING AND TO PROVIDE FOR MAXIMUM UTEXITS SEEDING DATES: A TRUNCATED DOMES FILTER FABRIC CONSTRUCTION VEHICLES. AVOID STEEP GRADES 2-3" WASHED STONE AND ENTRANCES AT CURVES IN PUBLIC ROADS. TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR FALL) COASTAL PLAIN: APR. - JULY W SIDEWALK (5' STD) CONTRACTOR SHALL INSTALL ADDITIONAL GRAVEL GRAVEL CONSTRUCTION ENTRANCE CONSTRUCTION ENTRANCES NOT INDICATED ON THE PLANS SEEDING MIXTURE: SOIL AMENDMENTS: YR 6" A B REQUIRED FOR STAGING AND/OR BORROW AREAS AND SPECIES RATE (LB./ACRE) APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR APPLY 3,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE UTILITY STRIP 0.01 (MIN.) MAINTAIN AT NO ADDITIONAL EXPENSE TO THE OWNER. RYE (GRAIN) 120 AND 500 LB./ACRE 10-10-10 FERTILIZER. 0.02 MIN.) 0.04 4. 0.08 ) CONTRACTOR SHALL SUPPLEMENT AND MAINTAIN GRAVEL CONSTRUCTION ENTRANCES AT HIS EXPENSE UNTIL FINAL SEEDING DATES: MULCH: USE JUTE, EXCELSIOR MATTING, OR OTHER EFFECTIVE CHANNEL LINING MATERIAL TO COVER THE BOTTOM OF ((MAX.)) DROP CURB 0.02 NORM ISOMETRIC VIEW (STD 2'-6" CURB 0.04 (NORM) GUTTER SHOWN)�P� ACCEPTANCE. / AUGUST 15 - DECEMBER 30 CHANNELS AND DITCHES. THE LINING SHOULD EXTEND ABOVE THE HIGHEST CALCULATED DEPTH OF FLOW. ON SOIL AMENDMENTS: CHANNEL SIDE SLOPES ABOVE THIS HEIGHT, AND IN DRAINAGES NOT REQUIRING TEMPORARY LININGS, APPLY 4,000 SIDEWALK \G� MAINTENANCE FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND LB./ACRE GRAIN STRAW AND ANCHOR STRAW BY STAPLING NETTING OVER THE TOP. 9, 12J MAX RAMP �I QJ� / MAINTAIN THE GRAVEL PAD INBA CONDITION TO PREVENT MUD OR 1,000 LBJACRE 10-10-10 FERTILIZER. MULCH AND ANCHORING MATERIALS MUST NOT BE ALLOWED TO WASH DOWN SLOPES WHERE THEY CAN CLOG I` X SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY 50' REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EACH DRAINAGE DEVICE$. /h. RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND MULCH; SECTION B-B CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL APPLY 4,000 LB./ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. MAINTENANCE: o� OBJECTIONABLE MATERIALS SPILLED, WASHED OR TRACKED ONTO A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. A MINIMUM OF 3 WEEKS IS REQUIRED FOR ESTABLISHMENT. INSPECTION AND REPAIR MULCH FREQUENTLY. EXPANSION ; JOINT y 6'-0' S-a" 6'-0" PUBLIC ROADWAYS. MAINTENANCE: REFERTILIZE THE FOLLOWING APR. WITH 50 LB./ACRE NITROGEN. SIDEWALK CURB MIN. CURB TOP OF REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOP DRESS WITH 50 LB./ACRE OF NITROGEN IN MARCH. IF TRANSITION DROP TRANSITION CURB CU O IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB./ACRE KOBE LESPEDEZA IN LATE OR EARLY MARCH. '4 GUTTER AGGREGATE ^`L� VARIABLE SLOPE 6" MIN. THICKNESS %EXPMSIONRB TO EXCEED 12:1 (8.33%) SECTION A -A 2-3 COURSE PLAN VIEW NOS' 1. HANDICAP RAMPS SHALL BE PLACED AT ALL HANDICAP PARKING STALLS. DIAGONAL RAMP 2. HANDICAP RAMPS SHALL BE INSTALLED FOR THE NEW SIDEWALK MAX. 25' RADII ALONG THE EXISTING ROAD AT Al NEW ROAD CONNECTIONS. NTS (60" MIN. FLOOR WIDTH) NTS [NOT PERMISSIBLE FOR NEW CONSTRUCTION] 4 TEMPORARY SEEDING SPECIFICATIONS 5 PERMANENT SEEDING SPECIFICATIONS 8 HANDICAP RAMP WITH TRUNCATED DOMES 9 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE DRIVE STEEL POSTS 18" INTO THE GROUND MAXIMUM 8' O.C. AND EXCAVATE A 4" X 8" ATTACH WIRE FENCE TO POSTS AND EXTEND THE BOTTOM OF THE FENCE 8" INTO THE NOTES: TRENCH UPHILL ALONG THE LINE OF POSTS. EXCAVATED TRENCH AND TURNED OUT 4" IN THE TRENCH. 1. WIRE SHALL BE A MINIMUM OF 32 INCHES IN WIDTH AND NATURAL GROUND STANDARD METAL POSTS 2'-0" IN GROUND TOP & BOTTOM STRAND MIN. 10 GA. WIRE STAY WIRES SHALL HAVE A MINIMUM OF 6 WIRES WITH 12" STAY SPACING. 2. FILTER FABRIC SHALL BE A MINIMUM OF 36" IN WIDTH AND SHALL BE FASTENED ADEQUATELY TO THE WIRE WITH a9 WIRE L =THE DISTANCE SUCH THAT POINTS MAX. SLOPE (TYP) 19 GAUGE HARDWARE CLOTH 1 4 (� MESH OPENINGS) STEEL POSTS MIN. 12-1/2 GA STAPLES 1-1/2" LONG. FABRIC THAT DETERIORATES TO SUCH EXTENT THAT ITS EFFECTIVENESS IS REDUCED SHALL BE A AND B ARE OF EQUAL ELEVATION LINE WIRES MIN. 12-1/2 GA. REPLACED BY CONTRACTOR AT CONTRACTOR'S EXPENSE. 3. STEEL POSTS SHALL BE A MIN. OF 5' HEIGHT AND SHALL BE - am b E LTHE SELF FASTENER ANGLE STEEL TYPE. _-SEDIMENTCONSTRUCTION tA I -III -III -III -III-__ STORAGE 2.5 2.5 SPECIFlCATIONS ARE,IN. 1. UNIFORMLY GRADE A SHALLOW DEPRESSION 4. CONTRACTOR SHALL REVIEW SILT FENCE ONCE PER WEEK AND AFTER EACH RAINFALL OCCURRENCE. ANY NECESSARY _I -III -III -III -I I -I I -I I -I I-� -III-III NATURAL GROUND I APPROACHING THE INLET. I _ \' REPAIRS OR CLEAN-UP TO MAINTAIN THE EFFECTIVENESS OF THE DEVICE SHALL BE MADE IMMEDIATELY. =III= - - - - -_ - III III -III -I I I I I I I I II I I I I I -III -I I =- -III-III-1 I I -III, -III -III -III -I $ 2. DRIVE 5-FOOT STEEL POSTS 2 FEET INTO THE GROUND S 11p SURROUNDING THE INLET. SPACES POSTS EVENLY AROUND 'Ro THE PERIMETER OF THE INLET, A MAXIMUM OF 4 FEET - - -' 7r.i j' 7� ; /`' --.--'_ 5. REMOVE DEPOSITED SEDIMENT ALONG THE FENCE TO PROVIDE ADEQUATE STORAGE VOLUME AND TO REDUCE PRESSURE ON THE FENCE AS NEEDED. II= III=1 I I=I I I CENTER OF THE DAM IS TO BE 9" LOWER THAN 0O - P' Q Qp _ 3. SURROUND THE POSTS WITH WIRE MESH HARDWARE 0 pp� CLOTH. SECURE THE WIRE MESH TO THE STEEL POSTS AT STEP 1 STEP 2 5. TEMPORARY MEASURE SHALL NOT BE REMOVED THE CONTRACTOR UNTIL THIS ACTION IS APPROVED BY ANN NCDENR REPRESENTATIVE. THE ACTION WILL BE APPROVED WHEN THE THE EDGES (MIN) A 15' TO FORM A WEIR MIN. \ \ \ I \ ATTACH THE FILTER FABRIC TO THE WIRE FENCE, BACKFILL THE TRENCH AND COMPACT THE SOIL / Vo THE TOP, MIDDLE AND BOTTOM. PLACING A 2 FOOT FLAP EXTENDTHE BOTTOMOF EFABRIC8" INTO THE ANCHORTHC BOTTOM OF CONTRIBUTING DRAINAGE AREA IS STABLE. COMPACTED SOIL �_ V e OF THE WIRE MESH UNDER THE GRAVEL FOR ANCHORING TRENCH N THE FENCE. BOOR BE VISIBLE. 9" MIN. IS RECOMMENDED. A GRAVEL DIVERSION BERM IS REQUIRED, THE NEIGH - -� SHALLWHEN SHALL BE REDUCED TO 12 INCHES AND THE TOP WIDTH TO 6", ALL OTHER REQUIREMENTS SHALL REMAIN THE SAME. 4. PLACE CLEAN GRAVEL (NCDOT #5 OR #57 STONE) ON �� A 2:1 SLOPE WITH A HEIGHT OF 16 INCHES AROUND THE 72.1 POSTS MAX 8' O.C. CENTER OF THE DAM IS � TO BE 9" LOWER THAN SLOPE GRAVEL FILTER # 57 WASHED STONE PLACED TO A HEIGHT OF 16' WIRE AND SMOTH TO AN EVEN GRADE. WIRE FENCE "HOG wlRe' FILTER FABRIC THE EDGES (MIN) TEMPORARY DIVERSION KEY NOTES: MINIMUM ABOVE TOP OF BOX 5. ONCE THE CONTRIBUTING DRAINAGE AREA HAS BEEN _ A _ FILTER FABRIC TO FORM A WEIR 1. CLEAR THE ARE UNDER THE BERM AND STRIP THE ROOTS/OTHER ORGANICS. STABIUZED, REMOVE ACCUMULATED SEDIMENT AND ESTABLISH FINAL GRADING ELEVATIONS. _ \ T _ __ I \ -� x u9 WIRE STAPLES 1-112" LONG ¢ CLASS A OR B EROSION CHANNEL OR DITCH CONTROL STONE 2. COMPACT THE SIDE SLOPES, PREFERABLY WITH A TRACKED VEHICLE TO SLOW RUNOFF VELOCITIES. 3. VEGITATE THE RIDGE OF THE BERM IMMEDIATELY AFTER CONSTRUCTION UNLESS THE BERM WILL REMAIN IN PLACE 6. COMPACT THE AREA PROPERLY AND STABILIZE IT WITH TIIC ` BOTTOM OF WIRE FENCE AND = " FILTER FABRIC BURIED 8IN EXCAVATED TRENCH & TURNED ?. APPLICATION A 7 �Zj 24" MAX. GROUNDCOVER. w x OUT 4" IN THE TRENCH % FOR LESS THAN 30 DAYS. AT CENTER _FLOW MAINTENANCE STEEL 24"INTOOGROUST ND EN 1. INSPECT THE CHECK DAMS AFTER EACH RAINFALL BUT IN NO MAINTENANCE: a� CASE LESS THAN ONCE PER WEEK FILTER FABRIC STEP 3 STEP a secTloN A -A 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE MAINTENANCE MAINTENANCE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN. TAKE CARE SECTION A -A SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. TO AVOID UNDERMINING THE DAM DURING CLEANOUT. AND MAKE TIMELY REPAIRS AS NEEDED. INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT(1/2 INCH OR GREATER) 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. CLEAN OR REPLACE THE STONE WHEN IT SHOWS SIGNS OF RAINFALL EVENT. CLEAR THE MESH WIRE OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE CLOGGING OR OTHERWISE DOES NOT PERFORM CORRECTLY NTS ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE WIRE MESH DURING THE SEDIMENT REMOVAL. REPLACE STONE AS NEEDED. ■Tw NTS4. 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY PRESSURE ON THE FENCE. TAKE CARE TO TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE AVOID UNDERMINING THE FENCE DURING CLEANOUT. NEXT RAIN AND TO REDUCE ■T/� NTS 4. WEIR SECTION MUST BE 9" LOWER THAN ABUTMENTS NTS 5. DOWNSTREAM APRON LENGTH SHOULD BE 3 TIMES THE REMOVEALL FENCING MATERIALSAND UNSTABLE SEDIMENT DEPOSITSAND BRING THEAREATO GRADE AND STABILIZEAFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED AND NCDENR APPROVES REMOVAL. HEIGHT OF THE WEIR. 10 TEMPORARY DIVERSION BERM 11 HARDWARE CLOTH & GRAVEL INLET PROTECTION 12 SILT FENCE 13 CHECK DAM WITH WEIR 4Dsite solutions 04 civil engineering I land surveying 409 Chicago Drive, Suite.U2, Fayetteville, NC 28306 office 1 910-426-6777 fax 1910-426-5777 license number I C-2354 www.4Dsitesotutions.com �CARO �Z// 2 .0F SS ..-L SEA • 02 _ IN z 1fiO I I111\� U3-30-22 REVISIONS PROJECT NAME WOODSHIRE SUBDIVISION PHASE 8 SITE & EROSION CONTROL DETAILS CLIENT WOODSHIRE HUFF, LLC 2919 Breezewood Avenue - Suite 100 Fayetteville, North Carolina 28303 Phone: (910) 486-4864 PROJECT INFORMATION DESIGNED BY: BRETT DRAWN BY: BRETT CHECKED BY: SCOTT PROJECT NUMBER: 1775 DRAWING SCALE NOT TO SCALE DATE RELEASED MARCH 30, 2022 SHEET NUMBER C-6nO