Loading...
HomeMy WebLinkAbout20120073 Ver 4_Application_20140819: : : : : SR 1531 PROVIDENCE RD 6.3 BST X X X X X X X X X X X X X X X X X X X X X X X Y Y Y Y Y Y Y Y Y Y X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X B S T R R G R G R CONC300mm 12 0 0 m m W D C O N C CONC300mm R S S 3.0 B S T 2.7 BSTR 300mm CONC G R 6.3 BST SR 1531 PROVIDENCE RD W 1SBKD CONC GR S S 1SBKD S G POOL PORT CAR S DK 1SFD W STONE1200mm S 1SFD S W S ABAND 1SFD W D R AI L 1 2 0 0 m m BST CONC375mm 50 mm 5 0 m m b 50 mm n K K K BURLEY W. DUNN STEPHEN D. GARRETT BURLEY W. DUNN TROY L. CAMPBELL & ERNESTINE H. CAMPBELL MARIAN CLAYTON WHITT ALMEADE G. GARRETT et al NELLIE R PENTECOST DB 176 PG 86 DB 80 PG 469 DB 198 PG 594 DB 58 PG 464 BOM 7 PG 335 BOM 5 PG 141 BOM 1 PG 143BOM 1 PG 143 EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W 18. 2 8 8 R/ W 6 0’ R/ W 63 62 54 56 55 53 54 1200mm WOVEN WIRE FENCE 1200mm WOVEN WIRE FENCE 1200mm WOVEN WIRE FENCE 3 7 5 375 4 5 0 4 5 0 375 375 375 REMOVE 375 34+60.000 -RT- BERM GUTTER BEGIN SHOULDER REMOVE FS FS 2GI 2GI 2GI 2GI FS FS W/ ELBOW 375 W/ ELBOW 375 BDO STA 32+30 LT TO 34+10 LT -L- STD. BERM DITCH SEE DETAIL SHEET # 2J BASE=1.4M PREFORMED SCOUR HOLE BDO REMOVE REMOVE EST FF 26.7 SM EST=4.0 MTONS CLASS ’B’ RIPRAP TRANSITION STONE EST 25 M2 GEOTEXTILE EST 10 MTONS CLASS I RIP RAP ELEV 638.0’ (194.5m) TO TOP OF VANE W/ CLASS I RIP RAP BACKFILL CHANNEL GRAU 350 1 4 + 0 0 P C S ta . 13 + 13 .6 4 9 -Y9- 3 3 + 0 0 3 2 + 0 0 3 4 + 0 0 15 + 0 0 -L- SCSta. 31+29.209 -L- CSSta. 32+77.914 -L- STSta. 33+57.914 07 0 2 0 6 0 6 0 6 0 6 0 5 0 4 0 3 0 2 0 5 0 4 0 3 0 1 0 2 0 0 0 1 0 4 0 5 0 6 0 7 6 .25 TYP . D D + 2 8 .3 9 N 27 30’ 14.1" E US 501 -L- D 13.333 TYP. D + 3 1. 2 3 0 D TYP. 13.333 + 3 1. 2 3 0 D + 0 1.2 9 0 + 19 .0 9 8 SITE 7A SS $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ D G N $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ S Y S T IM E $ $ $ $ $ $ $ $ $ U S E R N A M E $ $ $ $ CONST.REV. R / W REV. ENGINEER ROADWAY DESIGN PROJECT REFERENCE NO. ENGINEER HYDRAULICS SHEET NO. R-2241A 05 10 R / W SHEET NO.METRIC 10 M A TC H LIN E S TA . 3 1+ 2 0 - L- S EE S H EET 9 M A T C H L I N E S T A . 3 4 + 8 0 - L - S E E S H E E T 1 1 S E E S H E E T 26 M A T C H LI N E S T A. 15 + 20 - Y9- PAVEMENT REMOVAL 125mm MONOLITHIC ISLAND FULL DEPTH PAVED SHOULDER C C C C C C C F C F C C C C C C C C C F C C C F C F C C C F C F C F F C F C F C C C F C F NAD 83 NC GRID ::: X O O O P P P K K K K K K K K K K K K K B O M 8 P G 72-3 D B 2 8 0 P G 838 JO E L D E A N S MITH D B 2 3 2 P G 3 8 9 BOM 1 PG 143 DB 176 PG 92 DB 143 PG 619 HOWARD T. SMITH BOM 8 PG 72-3 DB 232 PG 389 MARY P. SMITH SYBIL P. WOOTEN DB 232 PG 387 BOM 8 PG 72-3 BOM 8 PG 72-3 DB 232 PG 389 MARY P. SMITH BOM 21 PG 143 BOM 5 PG 607 DB 204 PG 850 DB 311 PG 448 BOM 21 PG 143 DB 311 PG 448 NELLIE R. PENTECOST DB 176 PG 86 DB 80 PG 469 DB 198 PG 594 DB 58 PG 464 BOM 7 PG 335 BOM 5 PG 141 BOM 1 PG 143 CHARLES E. PERKINS ALMEADE G. GARRETT et al ALMEADE G. GARRETT et al 29.962S0244’28"W 6. 7 7 0 S 8 5 3 3’ 0 4 " E 17.477 S2122’08"E 3 0 .7 5 0 S 4 4 0 8 ’4 2 "E 9 1.9 2 0 N 8 9 11’14" W 9 7.5 5 3 N 8 8 4 9’5 1" W 77.152N0353’15"E 54.232N0347’58"E 57.180N0353’15"E 84.789N0353’02"E 25.148N0353’02"E 150.382 S7957’59" W EIP EIP EIP EIP S 8 1 2 8 ’ 5 1" E 1 3 6. 0 1 2 N 8 1 3 7 ’ 2 7 " W 4 4. 7 9 8 18.288 A P P R O XI M A T E C L O F P I E D M O N T E M C A P P R O XI M A T E C L O F C P & L N8144’24"E 209.058 EIP 68 62 67 66 64 63 62 68 69 18.288 (60’) ACCESS EASEMENT N7957’59"E BEGIN FENCE +01.240 END FENCE +91.760 END FENCE +19.840 BEGIN FENCE +30.800 1200mm WOVEN WIRE FENCE 1200mm WOVEN WIRE FENCE 1200mm WOVEN WIRE FENCE { 3 7 5 4 5 0 4 5 0 1 0 5 0 3 7 5 4 5 0 450 375 375 W/ SILLS 1 @ 2.7m X 1.8m RCBC 375 3 7 5 R C P - I V 3 7 5 GRATE 2GI W/FLAT GRATE 2GI W/FLAT GRATE 2GI W/ FLAT SEE DETAIL #20 EST FF 70 SM EST 45.0 MTONS CLASS ’II’ RIPRAP SEE DETAIL #20 EST FF 95 SM EST 45 MTONS CLASS ’II’ RIPRAP 2GI 2GI FS FS GRATE 2GI W/FLAT FS 2GI FS 2GI 2GI 2GIFS FS 2GI ELBOW 375 W/ STA 36+80 RT -L- STA 36+20 RT TO STD BERM DITCH SEE DETAIL #8 STA 35+80 RT -L- STA 35+00 RT TO TOE PROTECTTION SEE DETAIL #9 DDE=5CM BASE DITCH 1.2M HEAD SEE DETAIL SHEET # 2J BASE=1.4M PREFORMED SCOUR HOLE BDO HW SEE DETAIL #20 FF=26 SM 3.0 MTONS ON BANKS ONLY CLASS ’II’ RIPRAP SEE DETAIL #8 STA 37+51 RT -L- STA 37+34 RT TO TOE PROTECTION STA 37+80 MED -L- STA 37+56 (SAG) TO SEE PROFILE FOR GRADE SPECIAL DITCH GRADE EST FF 8.4 SM EST 2.7 MTONS CLASS ’B’ RIPRAP EST FF 28.8 SM EST 3.0 MTONS CLASS ’B’ RIPRAP TRANSITION STONE SEE DETAIL #7 EST DDE=561.41 CM STA 36+17 LT -L- STA 35+20 LR TO EST FF 454.6 SM EST 133.5 MTONS CLASS ’B’ RIPRAP LINED W/ W/ 1.5M BERM LAT 0.6M BASE DITCH SEE DETAIL #7 EST DDE=33.25 CM STA 37+40 LT TO STA 37+60 LT -L- EST FF 93.72 EST 27.5 MTONS LINED W/ CLASS ’B’ RIPRAP W/ 1.5M BERM LAT ’0.6M’ BASE DITCH +81.01 RT BERM GUTTER END SHOULDER +60.00 LT END SHOULDER BERM GUTTER +40.00 LT BERM GUTTER BEGIN SHOULDER EST 16.7 M2 GEOTEXTILE EST 5 MTN CLASS A RIP RAP EST 5 MTN #57 STONE EST 18 MTN BOULDERS SEE DETAIL ROCK A VANE EST 25 M2 GEOTEXTILE EST 10 MTONS CLASS I RIP RAP ELEV 638.0’ (194.5m) TO TOP OF VANE W/ CLASS I RIP RAP BACKFILL CHANNEL CAT-1 CAT-1 GRAU 350 3 5 + 0 0 3 6 + 0 0 3 7 + 0 0 3 8 + 0 0 - L - P C S t a . 3 7 + 9 5 . 3 4 3 0 2 0 2 0 2 0 2 N 27 30’ 14.1" E US 501 -L- $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ D G N $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ S Y S T IM E $ $ $ $ $ $ $ $ $ U S E R N A M E $ $ $ $ CONST.REV. R / W REV. ENGINEER ROADWAY DESIGN PROJECT REFERENCE NO. ENGINEER HYDRAULICS SHEET NO. R-2241A 05 10 R / W SHEET NO.METRIC 11 M A T C H L I N E S T A . 3 4 + 8 0 - L - S E E S H E E T 1 0 M A T C H L I N E S T A . 3 8 + 4 0 - L - S E E S H E E T 1 2 P .S . 3 .0 DD PAVEMENT REMOVAL 125mm MONOLITHIC ISLAND FULL DEPTH PAVED SHOULDER REVIS IO N S 0 8 - 0 4 - 14 - 1 A D D E D R O C K V A N E A T + / - S T A . 3 4 + 8 5 R T . WETLAND DENOTES FILL INFF S S SURFACE WATER DENOTES IMPACTS IN E E IN WETLAND DENOTES EXCAVATION CLEARING DENOTES MECHANIZED* * * * ** * ** * * SITE 8 TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY TS TS TS TS TS TS TS S S S S S S S S S S S S S S S S S S S F F F FF F F F F S S S S S F SITE 7A SITE 7B 3 5 + 0 0 SS C C C F C F F F F C C C C C F F F F F F F F F C F C F C F F C C C C NAD 83 NC GRID Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No.(From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp.Design (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) 1 13+28/13+62 -L-3@3mx3m RCBC 0.03 <0.01 138 26 Stream Bank Stabilization 0.03 125 2 15+12/15+59 -L- LT 750mm CSP 0.11 0.01 0.06 3 *19+21/19+23 -L- RT Fill <0.01 23 4 20+84/20+89 -L-2@2.4mx2.4m RCBC 0.02 0.01 112 39 Stream Bank Stabilization 0.02 59 5 20+89/21+45 -L-Fill 0.22 0.06 6 *24+98/25+10 -L- RT 900mm RCP <0.01 <0.01 23 20 Stream Bank Stabilization <0.01 23 7A 34+93/36+38 -L-2.7mx1.8m RCBC 0.13 <0.01 0.03 0.01 518 69 Stream Bank Stabilization 0.02 121 7B *35+38/35+51 -L- LT Fill <0.01 59 8 37+33/37+55 -L-1050mm RCP 0.02 <0.01 0.03 0.01 <0.01 194 36 Stream Bank Stabilization <0.01 13 9 40+05/40+70 -L-1500mm RCP 0.04 <0.01 279 33 Stream Bank Stabilization <0.01 16 10 *11+55/11+82 -Y13- LT 900mm CSP 0.01 <0.01 92 43 Stream Bank Stabilization <0.01 20 11 50+41/51+25 -L-1200mm RCP <0.01 0.02 0.01 282 85 Stream Bank Stabilization 0.01 52 12 51+47/51+91 -L-750mm RCP 0.12 13 53+13/53+79 -L-900mm RCP 0.17 <0.01 0.07 0.01 <0.01 246 72 SUB TOTALS:0.77 0.01 0.21 0.26 0.03 2395 423 * Note: Stream Impacts are Non-Mitigatable. ATN Revised 3/31/05 SHEET 8/13/2014 WBS - 34406.1.1 (R-2241A) WETLAND PERMIT IMPACT SUMMARY SURFACE WATER IMPACTSWETLAND IMPACTS PERSON COUNTY NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No.(From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp.Design (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) 14 57+12/57+55 -L-1200mm RCP 0.09 <0.01 0.02 <0.01 262 23 Stream Bank Stabilization <0.01 13 15 63+41/66+32 -L-1350mm RCP 0.36 0.03 0.03 <0.01 653 75 Stream Bank Stabilization <0.01 13 16 64+72/64+99 -L- LT Pond Removal 0.10 17 67+35/69+11 -L-1350 RCP 0.47 0.15 0.18 0.01 <0.01 148 62 Stream Bank Stabilization 0.01 36 18 *76+03/76+90 -L-750mm/900mm RCP 0.02 0.01 364 203 Stream Bank Stabilization <0.01 10 19 77+72/79+54 -L-Fill 0.01 0.10 SUB TOTALS:0.92 0.15 0.31 0.20 0.01 1499 364 TOTALS:1.69 0.16 0.53 0.45 0.04 3894 787 * Note: Stream Impacts are Non-Mitigatable. ATN Revised 3/31/05 SHEET 8/13/2014 WBS - 34406.1.1 (R-2241A) WETLAND PERMIT IMPACT SUMMARY SURFACE WATER IMPACTSWETLAND IMPACTS PERSON COUNTY NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS WILLIAM ELWOOD GARRETT S R. 34+85 RT 4’ (1.2m)2’ (0.6m)3’ (0.9m) ELEV 638.0’ (194.5m) SEE PLAN SHEET HEADER ROCK ,TYP. ELEV 636.5’ (194.0m) SEE PLAN SHEET STEP DOWN ROCK,TYP. NOT TO SCALE { FLOW A A 30 20 TO B A N K F U L L B A N K F U L L WIDTH BANKFULL 1/3 WIDTH BANKFULL 1/3 WIDTH BANKFULL 1/3 B B DIRECTION OF ENGINEER POOL EXCAVATED PER ROCK HEADER ROCK FOOTER #57 STONE LOWER BANKFULL OR SLIGHTLY ELEVATION EQUAL TO MINIMUM OF AT AN KEY IN VANE TO BANK FLOW { BACKFILL, TYP. FOOTER ROCK, TYP. OF THE FOOTER ROCK A MINIMUM OF 1/3 WIDTH SET HEADER ROCK BACK #57 STONE, TYP. SECTION A-A SECTION B-B ROCKS FOOTER ROCKS HEADER SIGNIFICANT SPACES NOT BE GAPPED OR HAVE ANY ROCKS IN VANE ARM SHOULD BANKFULL ELEVATION TIE VANE ARM INTO 5. POOL DEPTH SHOULD BE 2 TO 3 TIMES BANKFULL DEPTH. DIRECTION OF THE ENGINEER. 4. COMPACT BANKFULL TO EXTENT POSSIBLE OR AT THE BETWEEN HEADERS AND FOOTERS. 3. CLASS "A" STONE CAN BE USED TO REDUCE VOIDS 2. DO NOT EXCAVATE POOL TOO CLOSE TO FOOTER BOULDERS. VANE ARM TIES INTO BANKFULL. 1. DEEPEST PART OF POOL TO BE IN LINE WITH WHERE NOTES: BED FLOW BANKFULL { #57 STONE TYP. BACKFILL, 4% TO 10% SLOPE HEIGHT LENGTH WIDTH PLAN VIEW POOL CONSTRUCTION FOR ROCK CROSS VANE EXCAVATED TRENCH EXCAVATED POOL BED 0.6m MINIMUM MINIMUM 0.6m SIGNIFICANT SPACES NOT BE GAPPED OR HAVE ANY ROCKS IN VANE ARM SHALL SITE ROCK A VANE DETAIL GEOTEXTILE GEOTEXTILE, TYP. GEOTEXTILE BOULDER DIMENSIONS