HomeMy WebLinkAbout20140379 Ver 1_Inspection_20140818Wetland Inspection Report
Project Num• 20140379 Version 1 Status Issued
Project Name: Cardinal Gas Pipeline @ Haw R Project Type Bank Stabilization & Shoreline
County Alamance Stabilization (sills, rip rap)
tY Region: Winston -Salem
Location Cardinal Gas Pipeline @ Haw River- Stream Bank Stabilization
Latitude +36° 05' Longitude- -79° 58' 11"
SW Plan Location
Site Owner Name Cardinal Pipeline Company
Inspection Date 8/18/2014
Reason for Inspection Routine
Inspection Type- Site Inspection (non -DOT)
Inspection Contact Person: Title Phone:
On -Site Representative(s)
Primary Inspector Sue L Homewood Phone: 336- 771 -4964
Secondary Inspector(s)
Facility Compliance Status 0 Compliant ❑ Not Compliant
Program Areas 401 (includes isolated /non -404)
Question Areas.
0 Permit (401 WQC)
Inspection Summary
page 1
Site Number: 20140379 Owner Sylvester, Ashley
Inspection Date 8/18/2014 Inspection Type. Site Inspection (non -DOT) Reason for Visit- Routine
Permit (401 WQC)
Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
0
❑
❑
❑
Are the culverts and /or filled areas installed properly?
M
❑
❑
❑
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
M
❑
❑
❑
Comment Haw River stabilization complete and is compliant Stabilization along tributary
has not been conducted at
this time
page 2