Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SAW-2022-01426permitverification_forms1x
U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2022-01426 County: Stokes U.S.G.S. Quad: NC -Walnut Cove GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Amy Euliss NCDOT Division 9 Address: 375 Silas Creek Parkway Winston Salem, North Carolina 27127 Telephone Number: (336)747-7802 E-mail: aeulissAncdot.gov Size (acres) 35.09 (approximately) Nearest Town Walnut Cove Nearest Waterway Town Fork Creek River Basin Roanoke USGS HUC 03010103 Coordinates Latitude: 36.287528 Longitude:-80.142246 Location description: The site is located at the intersection of US 311 (S. Main Street), NC 65, and Stokesburg Road (SR 1928) and at the at -grade Norfolk Southern single-track crossing, in Walnut Cove, Stokes County, North Carolina. The proiect is identified by NCDOT as R-5768 (see attached plans). Description of projects area and activity: This verification authorizes the temporary and permanent impacts to a tributary stream and wetland associated with the re -alignment of intersections at US 311, NC 65, Stokesburg Road and at the NC 65 Rail Crossing as follows: Site 1: Stream SA -14 linear feet of permanent impact associated with culvert extension and 10 linear feet of temporary impact associate with dewatering activities. Site 2: Wetland WD 0.01 acre of permanent impacts associates with mechanized land clearing. Compensatory mitigation of 14 linear feet of stream impacts at a 2:1 ratio. Applicable Law(s): ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: GP 50 - NCDOT - Bridge, Road Widenings and Interchanges SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached Conditions, your application signed and dated 6/27/2022, and the enclosed plans labelled as R-5768 (Sheets 8 of 8) received on 6/27/2022. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. Special Conditions: 1. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit authorization. Project Commitments from ESA consultations: New permanent lighting and temporary light associated with night work be at least 800 feet from Lick Creek and Town Fork Creek Tree clearing will occur at least 70 feet from Town Fork Creek and Lick Creek and 25 feet from the UT to Town Fork Creek 3. Tree clearing will take place from October 16 to March 31, outside of the active season for tricolored bats and northern long-eared bats. 4. NCDOT will survey the 36-inch culvert in the 2022 survey season for the presence of bats. 5. Ensure all operators, employees, and contractors working the areas of known or presumed bat habitat area aware of all FHWA environmental commitments, including all applicable avoidance and minimization measures. 6. Modify all phases/aspects of the project (e.g., temporary work areas, alignments) to avoid tree removal. 7. Apply time of year restrictions for tree removal when bats are not likely to be resent, or limit tree removal to 10 or fewer trees per project at any time of year within 100 feet of existing road/ rail surface and outside of documented roosting/ foraging habitat or travel corridors; visual emergence survey must be conducted with no bats observed. 8. Ensure tree removal is limited to that specified in project plans and ensure that contractors understand clearing limits and how they are marked in the field (e.g., install bright colored flagging / fencing prior to any tree clearing to ensure contractors stay within clearing limits). 9. Do not remove documented northern long-eared bat roosts that are still suitable for roosting, or trees within 0.25 miles of roosts, or documented foraging habitat any time of year. 10. Direct temporary lighting away from suitable habitat during the active season. 11. When installing new or replacing existing permanent lights, use downward -facing, full cut off lens lights (with same intensity or less for replacement lighting). This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide and/or regional general permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide and/or regional general permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide and/or regional general permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management Morehead City, NC, at (252) 808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Andrew Williams at (919) 554-4884, ex. 26 or andrew.e.williams2(&usace.army.mil. Date: 2022.08.05 Corps Regulatory Official: 10:50:26-04'00' Expiration Date of Verification: 5/25/2025 Date: 8/5/2022 0- 0- 1-100 Ln / L 0 0 T E 0 L o> C w i w / U) U ti h V O v See Sheet 9 -A For Index of Sheets /- L 1 A F-1 r_ /l _ _ 1 9 I h _ I_ _ I -D J / /CC/ / -O /-Ul U u/ /VCI II I UI JylllUUl L) 0 311 ��l 0'0 0\ �N0 Me.Fewa,00k AL UT ate CO E F t D 0\0 PR E s eeK ;rDDk Bro k Cove BEGIN (SR 1941) PROJECT Martin L the a t gt King Jr Rd. SR 1 21) FFSITE�-n DETOUR � coN �' �' BoyScautPandDam Nrn �� Y � o 65 c 65 311 /*O�N ....... ........ L VICINITY MAP (NTS) WETLAND AND STREAM PERMIT DRAWING SHEET 1 OF 8 Ceramic I STOKES COUNTY LOCATION.- US 311 INC 65 IN VICINITY OF SR 1928 (STOKESBURG RD.) IN WALNUT COVE TYPE OF WORK: GRADING, DRAINAGE, PAVING, WIDENING, 0 & RESURFACING o `- O IMPACTS SITE 2 SITE 1 NOTES: 1. THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARY OF WALNUT COVE. 2. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. STATE STATE PROJECT REFERENCE NO. SHEET NO. TOTAL SHEETS N.C. R-5768 I STATE PROJ. NO. F. A. PROJ. NO. DESCRIPTION 44670.1.1 STP-0311(035) PE 44670.2.1 STP-0311(035) RAW/ 44670.3.1 STP-0311(035) CONST. *SIGNALIZED INTERSECTION GLI INCOMPLETE PLANS DO NOT USH FOR R/ W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SCALES 50 25 0 50 100 DESIGN DATA ADT 2020 — 12 92 0 ADT 2040 = 141200 K = 9% D = 60% T = 5%* V = 40 MPH FUNC CLASS = ARTERIAL STATEWIDE TIER TTST = 2% + DUALS = 3% PROJECT LENGTH LENGTH ROADWAY TIP PROJECT R-5768............ 0.286 mile LENGTH STRUCTURE TIP PROJECT R-5768........... 0.000 miles TOTAL LENGTH OF PROJECT R-5768................... 0.286 mile PLANS PREPARED BY: RUMMEL, KLEPPER & KAHL, LLP C8601 SIX FORKS ROAD, FORUM 1, SUITE 700 RALEIGH, NORTH CAROLINA 27615-3960 NC LICENSE NO. F-0112 FOR NORTH CAROLINA DEPARTMENT OF TRANSPORTATION1111— HYDRAULICS ENGINEER P.E. SIGNATURE: 7 �� ��Q�/'� Cog o a 1 0 ��, a Q ©� �f G3Q��QoO 2018 STANDARD SPECIFICATIONS � Scott D.Blevins P.E.RIGHT PLANS 50 25 0 50 100 OF WAY DATE: JANUARY 18 2019 PROJECT ENGINEER Carter Mull P.E. ROADWAY DESIGN ENGINEER P.E. SIGNATURE: LETTING DATE: OCTOBER 26, 2022 PROFILE (HORIZONTAL) 10 5 0 10 20 PROJECT DESIGN ENGINEER NCDOT CONTACT: Al Blanton, P.E., PLS PROJECT ENGINEER - DIVISION 9 PROFILE (VERTICAL) ■■NTwrmm■■■■■■■ MI CZS-IUY/U114010����� ■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■w7■■■■■■■■■■■■■■■■■■■I■■■■■■■■■■■■■■■■■■!7/■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■\�■■■■■■RS■■■!■■r�■■■�1■■■■■■■■■I!Gii■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■ ■■■■■ ■■■■■ ■■■■■ ■■■■■■■■■■ ■■■■■ ■■■■■ ■■■■■ ■■■■■ ■■■■■■■■■■ ■■■■■ ■■■■■ ■■■■■►\■rTT,11': rT��1A■■ ■■■r'1 ^ � � ;'/S ■■■■It �11.In! ��� � D■■■■■■ ■■■■■ ■■■■■ ■■■■■ ■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■ ■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■ ■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■ ■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■\\LILIl JLrLT1.1Jri■■ ■;1n.1 t✓G/'�i■ ■■■■■■I��L LJ�i �■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■■■■■■■►\■,111rT�■■■/I■n:7111G/7%I■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■���/■Tit,C6r■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■r��i�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■p9ir■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■ : NONE ■■■■■■■■■■/qii■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■ NONE ■■■■■■■l!:i/■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■ • ••• mom ■■■■/Gii■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■ mom ■IIIIIIIIr`1111111■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ MENNEENEEN EMENEENIONE ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■■■■■ Engineers I Construction ■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■ www.rkk.com ■■■■■■■■■■■■■■ I I ■■■■■■■■■■■■■■ i ResponsivePeople ■■■■■■■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ MINI■■■ MINI■■■ MINI■■■ MINI■■■ ■■■■■■■■■■ MINI■■■ MINI■■■ MINI■■■ MINI■■■ ■■■■■■■■■■ MINI■■■ MINI■■■ MINI■■■ MINI■■■ ■■■■■■■■■■ MINI■■■ MINI■■■ MINI■■■ MINI■■■ ■■■■■II��JT I-a�� L.�7�7 � ��7.Jr MINI■■■ MINI■■■ MINI■■■ MINI■■■ MINI■■■ MINI■■■ MINI■■■ MINI■■■ MINI■■■ MINI■■■ MINI■■■ MINI■■■ MINI■■■ MINI■■■ MINI■■■ MINI■■■ MINI■■■ MINI■■■ MINI■■■ MINI■■■ MINI■■■ MINI■■■ MINI■■■ MINI■■■ MINI■■■ MINI■■■ MINI■■■ Ilri��l I iris■►11II_.' 11/i% f �Z'Jrl\ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�!Lr1�i'111J■ �LIiL:!�'!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■Ia■!�■I:T:�L'!':fi■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■f��7:'■■l��i\11�1rT7►"►.'7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■MINI■■■■//■rir■■■I�r■llil■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ir_�■i■■�T��n■�i�■■■■i■■■1■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■MINI■■■■■■I,■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I�Ii■tom■f�i•/Iri7�i!r■■■■■■■MINI■■■■\■■■■■■■■■■■■■■■■■■■■■■■■ MINI■■■II■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■MINI■■ ■■■■■■MINI■■ ■■■■■■MINI■■ ■■■■■■MINI■■ MOMMISIMMINIMMI MOMMISIMMINIME MOMMISIMMINIME MOMMISIMMINIME ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■MINI■■ iiiiiiiiii ■■■■■■MINI■■ ■■■■■■MINI■■ ■■■■■■MINI■■ ■■■■■■MINI■■ ■■■■■■MINI■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■MINI■■ ■■■■■■MINI■■ ■■■■■■MINI■■ ■■■■■■MINI■■ MOMMISIMMINIMMI MOMMISIMMINIME MOMMISIMMINIME MOMMISIMMINIME ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■MINI■■ MOMMISIMMINIME MOMMISIMMINIME ■■■■■■MINI■■ MOMMISIMMINIMMI MOMMISIMMINIME ■■■■■■MINI■■ ■■■■■■MINI■■ ■■■■■■■■■■ ENEENEEMEN MOMMISIMMINIME ■■■■■■MINI■■ ■■■■■■MINI■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■MINI■■MINI■■ ■■MINI■■MINI■■ ■■MINI■■MINI■■ ■■MINI■■MINI■■ MEMMISIMMINIMMI MEMMISIMMINIME MEMMISIMMINIME MEMMISIMMINIME ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■MINI■■ iiiiiiiiii ■■MINI■■MINI■■ ■■MINI■■MINI■■ ■■■■■■MINI■■ ■■MINI■■MINI■■ ■■MINI■■MINI■■ ■■■■■■■■■■ ■F'!ii■■■■■ id■■■■■■■■ ■■■■■MINIM■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■MINI■■MINI■■ MEMMISIMMINIME MEMMISIMMINIME ■■MINI■■MINI■■ MEMMISIMMINIMMI MEMMISIMMINIME ■■MINI■■MINI■■ ■■MINI■■MINI■■ ■■■■■■■■■■ NEENNEEMEN MEMMISIMMINIME ■■MINI■■MINI■■ ■■MINI■■MINI■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■MINI■■MINIM■ ■■MINI■■MINIM■ ■■MINI■■MINIM■ ■■MINI■■MINIM■ MEMMISIMMINIME MEMMISIMMINIME MEMMISIMMINIME MEMMISIMMINIME ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■MINIM■ iiiiiiiiii ■■MINI■■MINIM■ ■■MINI■■MINIM■ ■■■■■■MINIM■ ■■MINI■■MINIM■ ■■MINI■■MINIM■ ■■■■■■■■■■ ■■■■■■■■■■ ■■MINI■■MINIM■ ■■MINI■■MINIM■ ■■MINI■■MINIM■ ■■MINI■■MINIM■ MEMMISIMMINIME MEMMISIMMINIME MEMMISIMMINIME MEMMISIMMINIME ■■■■■■■■■■ ■■■■■■■■■■ ■■MINI■■MINIM■ MEMMISIMMINIME MEMMISIMMINIME ■■MINI■■MINIM■ MEMMISIMMINIME MEMMISIMMINIME ■■MINI■■MINIM■ ■■MINI■■MINIM■ ■■■■■■■■■■ NEENIMENEEN MEMMISIMMINIME ■■MINI■■MINIM■ ■■MINI■■MINIM■ ■■■■■■■■■■ ■■I•U■■ I MINI■■II■■■■■■■■■■■■■■■■■■■■■■■rJ�.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ MINI■►\■■■■■■■■■■■■■■■■■■■■■I■■■■■■■■■■■■■■■■■■■I�GJ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ MINI■\`■■■■■■■■■■■■■■■■■■■■I■■■■■■■■■■■■■■■■�■!7/■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ MINI■■\�■ 'MINI■■■RS■■■!■■r�■■■�1■■■■■■■■■r!lCii■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ MINI■■■\■■■q:]:IL7!■■h.r►...:=':==iG�:ri■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■MINI►\■rTT,11':rTi�1A■■■■■r'1^�� /SIN■■■It�1/.In!,���D■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■NINE■■■LILISil.1Lr11WAME ■;"nit✓G/'�i■■■■■■■I��LLJ�i�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ���irr-air,:.�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■ MINI■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ Engineers I Construction Managers I Planners I Scientists It www.rkk.com ommoom mom, INEMEMMEEMEMEN MMMMMMl IMMEMEMEM 1001 1001 mmmlMMMMMMI 10000000000000 on on on AL- Mma MENEM PROJECT REFERENCE NO. 25 0 25 50 -Yl - -Y2 - -YIA- R -5768 PERMIT DRAWING I N G P/ Sto 28 +12.06 PI Sto 14 +25°91 PI Sta 15 +34.47 PI Sto /5 +19.67 PI Sto /5 +95.8/ PI Sto 16 +68.25 SHEET 6 OF 8 LT) p = 8° 1/' 38.0" (LT) p = 50° 22' 00.7" (LT) p = 49° 36' 20.7" (RT) p = 24° 18' 49.0" (LT) p = 14° 46' 28.4" (LT) p = 12° 32' 34.3" (LT) ' W SHEET NO. DENOTES IMPACTS IN D = 3° 59' 33.9" D = /0° 42' 34.2" D = 63° 39' 43.1" D = 28° 38' 52.4" D = 21° 37' 15.8" D = 16° 22' 12.8" ROADWAY DESIGN SCALE FOR INSET 50 25 0 50 100 SCALE SURFACE WATER L = 205.22" L = 470.30" L = 77.92' L = 84.87' L = 68.33' L = 76.62' ENGINEER T = 102.79' T = 25/.56' T = 41.59' T = 43.08' T = 34°36' T = 38.46' R = 1,435.00" R = 535.00' R = 90.00' R = 200.00' R = 265.00' R = o41 350.00' 00 V = 40 MPH V = 40 MPH V = 20 MPH V = 40 MPH V = 40 MPH V = 40 MPH r,Pa ®DENOTES TEMPORARY SE = .03 SE = .04 SE = .04 SE = .03 SE = .03 SE = .03 IMPACTS IN SURFACE WATER RO = 80' RO = /00' RO = 60' RO = 70' RO = 70' RO = 70' -YIA- >y� Pl Sto 17 +42.31 PI Sta /8 +62.78 p = /5 25 45.2 (LT) p = /9 4/ 04.4 (LT) f D = 2/° 37' 15.8" D = //* 4/' 34.9" / = 7/ 36' L - l68 34' SHEET NO. 4 HYDRAULICS ENGINEER 15 RED FINAL /-SEE INSET A I T = 35.90' T = 85.01' UNOLESS OL'L SIGNOTT NOT OUR SECOMPLETED R = 265.00R = 490.00' SITE 2 ° q�l',FF �S E E 20 TO S CL I RIPRAP----------- SS 8 DI SS W Y GEO FAB BAR- - WD p°S N---------------- ---- E ON LY T 3 33 Soil 't Cqg/ 0. g°��qR 72- WD WELL ------ qNS F oe�tiF v' F DS� WOODS SS\ cA�i Z EiP WO ?3 33 OWELL� li °Ds SA \ s F WOOD >\ _ S / F c�� ENERGY DISSIPATOR °�° I t esT- z� F ;� SEE DETAIL F F �\ / /S-\ M \ \T F / T _ %� F eon` PUE PDE16 o o \ \ = D PUE CZQ2yW l o \ \ OD E DI _ F P 9 D LYE - a ^ ' � \ \ VqR vG R� \ o \ \ 6ST 7�F'&B • 84 3 TONS CL B RIP \ r PIKE INS �+ WD W /� TO P TEC�flO Z� \ qgq ., F \\ �KgUs -_-- F S "_� NO NDO D /B �\\ W/10 SY GEO FA�oo��-c I I SE D G 2G1�� \ lvD \ 2F�. <'ti \ \ISFg�s -- ----- pO�E • UE \ F ° ?F \F 5 %``• I WOODS \\ � CONS '- `- -- 28.8 ,- � r'� ��� F � , �� yam, T ml I 0°DS \ \ `' l2"- W 2 CgM,r� �` A4'' � V/ � �i r �� � � -�� , o�G v W°0 �I I I UT D\ �� \\ / T\ D WA o OPy c __-- SP/O r PVE Pl1 X EMOV�1�iW \ \ / \ \ ,00 ��� I SEED \ \ \ -- ISFgV \ �� // \ r°\�� �� - F �� / �i' ���� T STEELm // _k. INTO +' I --1� '�� \ S 3� S / �___ i \ // tiFo��F - ����` �\ � / %� , S 3 .5' +70.00 +74.76---_�/ \V/ LATER�-Y ITCH \\ �l 90.14' 15" RCPiV VOSS K sot/ z---- \ WOODS TNFRN RR\ °� - - _ N • CB 0-0 INSET A\� ��Q EX I\ Dp � ? // �T Fo_3 iSTiNG F . �� E V /T F0� V\ - / ° Iw REy`�4`IN DI'\\ 00 - Ri R F \\ ` EXISTING R/W RE/ _ Fo- -/ -F - - / MOVE' C`B* ° 33, 0 TO I's \ qR p --- -- - --- 5 i , �a F�,Q RETAIN DI N co RORF°RK SOOT SERVI R OR\ \ 8„ VC SS G SIGN / r \\\ \ � S CL PRAP I O�i N� l � o,��A� � i •' 8°AC 5 �'_` GONG \ W/10 EO �o 109 EXISTING / SE ETAIL°�E ST C0 r t \ gUV�'RAII o? R�, ~� q P\T F0 LT , B9 351 J \ �0� H & fhav, � Woo P� F° E FILL �,� ISPgUS o� CD .C'NC - �\ / % / i• \ F �� - ` ` F` T G NORF° T` 1p \, 0 POJ�S / //, CB / \,ST \ \ T °RK S LITHE J\C �• \\\ F \ \ " O / \ (��S J�\ \Q,B NC 65 T G Riw �� _ R� .RR RiW S�Q \-� S I � OO S \\ \S�\ NG - �\°N v F �� ��l �` _ lli \ e \ �,�-- Vqr,' R - - WOO S Fi �G \ WOODS \ �\0 (qPp q VED �W BLK VEU. Q31, 'KrP%J�U 08\ R0k �O-qT/� lVJ- Illo \\ V°SS I°�E CBS ' \ , •• j • x�ST��G \SS FrA o \ - - Qom/ ly 0 rn \ \ F o o' NATE� S \ \ �q x�ST,NG , \- w I p�jt f A 111 \SF �J'� / / wl C IU ��- SEE DETAIL E T\ ��' \ \T ro° °RK S°UTHE � 11 D ��N� / � G 'C(Q O I,S ' � \ + \\ c'6 � \ RN RR � �' Q P� �\,~/�• i RS" ' GI Cl- \SFo 1 0� A $, '� R l4' l4' I \SF� �• os ���y 2a �+ \S \ ti��o R �/ BACK OF CURB I�ITC"'H' 2°eO �eG �bcti \ x � �QI `� , SEE DETAIL B - I V �'�� P� \ \ �� �� 5°J /.; . A� 8 TO`�,CL B RIPRAP-- G _ 0 5 W/21 SY GEO,--FAB l R ��tio ` \ P �- n i �p1� lay OV CONC C ° 00 �/?� rn � �� tiT w°° � I ► ° c�``' Q � \ i ,� /� � .�� S�� \Soso ,rr�� ° Q CONCR DITCH t� 36 / v / \ Z < BEHIND ETAINING E DETAIL H j I OOS o��Fo 05� /°SS\0\ON /V/ II 0\ 0���� w �\ 11�\� _ A ti �� •���RO \OOP A 0 w ✓ I ` �J%, BOYD HOLE 0 <\N�RI /KE B /'/-•\c E BETTY D. HOLE t R 192�0205'%\2 �OV \ 1 �� SA 0� \ S ► DB 271 PG 936 s I DB 322 PG 35 � 311 FSV �f \\ 1 \�S �� v 2SF0 �, \ eJ� I q DB 443 PG 1662 E S r�' s�% �2 s� P� \ �\ o oNO I i TO RE S moo\ �YTEMi N OONG °WN \ \ < �O� \ ZA� Q Z /r S� A • ��� ti, r� �-w �.' \� �,N B-1390 cH`�N NEED o GE EASEMENT � / / ��\S G \ O � \ << '6� P I PN�S w � A E F�e� \ �• O 37 \ �2 LLI II S PROPOSED SIGNAL \\ << P: (919) 878-9560 8601 Six Forks Road, Forum 1,Suite 700 \Zo Raleigh, North Carolina 27615-3960 N ro NC License No. F-0112 (\j ° \Sg�O FOR -L- PROFILE, SEE SHT. 6 ngineers I Construction Managers I Planners Scientists M? 0 FOR -Y1- PROFILE, SEE SHT. 7 WWW.rkk.com AL �� / FOR -Y2- PROFILE, SEE SHT. 7 Responsive People I Creative Solutions WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 -EY6- 14+00 RT ROADWAY FILL - WD < 0.01 2 -L- 12+75 42" RCP - SA < 0.01 < 0.01 14 10 TOTALS*: < 0.01 < 0.01 < 0.01 14 10 0 *Rounded totals are sum of actual impacts NOTES: 2018 Feb Action ID Number: SAW-2022-01426 County: Stokes Permittee: NCDOT, Amy Euliss Project Name: NCDOT/R-5768/Proposed Improvements at U.S. 311/N.C.65 Railroad Crossing/Stokes County/Div 9 Date Verification Issued: 8/5/2022 Project Manager: Andrew Williams Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Andrew Williams Washington Regulatory Office U.S Army Corps of Engineers 2407 West Fifth Street Washington, North Carolina 27889 or andrew.e.williams2@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date U.S. ARMY CORPS OF ENGINEERS Wilmington District Compensatory Mitigation Responsibility Transfer Form Permittee: NCDOT, Amy Euliss Action ID: SAW-2022-01426 Project Name: NCDOT/R-5768/Proposed Improvements at U.S. 311/N.C.65 Railroad Crossing/Stokes County/Div 9 County: Stokes Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that Wilmington District Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one Mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate Mitigation Sponsors. Instructions to Sponsor: The Sponsor verifies that the mitigation requirements (credits) shown below have been released and are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank ledger and provide a copy of the signed form and the updated ledger to the Permittee, the Project Manager who issued the permit, the Bank Project Manager, and the District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements: Permitted Impacts Requiring Mitigation* 8-digit HUC and Basin: 03010103, Roanoke River Basin Stream Impacts (linear feet) Wetland Impacts (acres) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 14 *If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8-digit HUC and Basin: 03010103, Roanoke River Basin Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 28 Mitigation Site Debited: NCDMS (List the name of the bank to be debited. For umbrella banks, also list the specific site. acceptance letter identifies a specific site, also list the specific site to be debited). For NCDMS, list NCDMS. If the NCDMS Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the Wilmington District, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor Name: Name of Sponsor's Authorized Representative: Page 1 of 2 Form Version 10 June 2020 updated CESAW-RG (File Number, SAW-2022-01426) Signature of Sponsor's Authorized Representative Date of Signature Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the District is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the District is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. When NCDMS provides mitigation for authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by NCDMS must be provided to the District within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the District has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the District Project Manager (address below) is provided with a signed copy of this form. • If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the District, the Sponsor must obtain case -by -case approval from the District Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance and a new version of this form must be completed and included in the District administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions: A letter from NCDMS, confirming they are willing and able to accept the applicant's compensatory mitigation responsibility, dated 6/14/2022 was included with the preconstruction notification. Mitigation for 14 linear feet of impacts at a 2:1 ratio. This form is not valid unless signed below by the District Project Manager and by the Mitigation Sponsor on Page 1. Once signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1) the Permittee, 2) the District Project Manager at the address below, 3) the Bank Manager listed in RIBITS, and 4) the Wilmington District Mitigation Office, 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 (or by email to SAWMIT@usace.army. mil). Questions regarding this form or any of the permit conditions may be directed to the District Mitigation Office. USACE Project Manager: Andrew Williams USACE Field Office: Washington Regulatory Office US Army Corps of Engineers 2407 West Fifth Street Washington, North Carolina 27889 Email: andrew.e.williams2@usace.army.mil Date: 2022.08.05 10:51:02-04'00' 8/5/2022 USACE Project Manager Signature Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at http://ribits.usace.army.mil. NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: NCDOT, Amy Euliss File Number: SAW-2022-01426 Date: 08/03/2022 Attached is: See Section below ❑ INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A PROFFERED PERMIT (Standard Permit or Letter of permission) B PERMIT DENIAL C ❑ APPROVED JURISDICTIONAL DETERMINATION D ❑ PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at or http://www.usace.g.M.mil/Missions/CivilWorks/Re ugulatoryProgramandPennits.aspx or the Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division, MR. PHILIP A. SHANNIN Attn: Andrew Williams ADMINISTRATIVE APPEAL REVIEW OFFICER 3331 Heritage Trade Drive, Suite 105 CESAD-PDS-O Wake Forest, North Carolina 27587 60 FORSYTH STREET SOUTHWEST, FLOOR M9 Andrew.e.williams2@usace.army.mil ATLANTA, GEORGIA 30303-8803 PHONE: (404) 562-5136; FAX (404) 562-5138 EMAIL: PHILIP.A.SHANNINgUSACE.ARMY.MIL RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15-day notice of any site investigation, and will have the opportuni to participate in all site investi ations. Date: Telephone number: Signature of appellant or agent. For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Philip Shannin, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, FLOOR M9, Atlanta, Georgia 30303-8803 Phone: (404) 562-5136 EMAIL: PHILIP.A.SHANNIN(&USACE.ARMY.MIL