HomeMy WebLinkAboutSW1220701_Supplement-EZ Form_20220805SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name All About Plumbing Building Addition 2 Project Area (ac) 3.15 3 Coastal Wetland Area (ac) 0 4 Surface Water Area (ac) 0 5 Is this project High or Low Density? High 6 1 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided (feet) 0 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 1 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting (RWH) 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS) 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: J. David McCutchen, P.E. 28 Organization: McCutchen Engineering Associates, PC 29 Street address: 898 West Saint John Street 30 City, State, Zip: Spartanburg, SC 29301 31 Phone number(s): 864-582-0585 32 1 Email: dmccutchen@mcc-ea.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. er CAR9 2p .0FSss/o :Q a SEAL 025335 S' at of esig er ,It �.�!GINE� G��� 1` . .,,,,70f„MI�ICv �� Date nRAINAGE AREAS 1 IIs this a high density project? Yes 2 If so, number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 1 Type of SCM Bio-Retention Cell i 5 JTotal drainage area (sq ft 137,214 6 Onsite drainage area (sq ft 137,214 7 Offsite drainage area(sq ft) 0 8 Total BUA in project (sq ft 57935 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft N/A 10 New BUA not on subdivided lots (subject to permitting) s 14375 sf 11 Offsite BUA (sq ft N/A 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft 25700 sf Sidewalk (sq ft N/A Roof (sq ft 6534 sf Roadway (sq ft) N/A _ Future (sq ft) N/A Other, please specify in the comment box below (sq ft) N/A 13 New infiltrating permeable pavement on subdivided lots (sq ft N/A 14 New infiltrating permeable pavement not on subdivided lots (sq ft) N/A 15permitting) Existing BUA that will remain (not subject to s ft 43560 sf 16 Existing BUA that is already permitted (sq ft 43560 sf 17 Existing BUA that will be removed (sq ft N/A 18 Percent BUA 42% 19 Design storm inches 1.0 in 20 Design volume of SCM (cu ft) 3751 cf 21 Calculation method for design volume ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the drainage area(s): Bio-retention pond was utilized for stormwater runoff and pollutant control BIORETENTION CELL 1 Drainage area number 1 2 Minimum re wired treatment volume cu ft) 3413 c GENERAL MDC FROM 0214 .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 lWhat is the method for dewatering the SCM for maintenance? Drawdown Orifice 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the 6UM designedy an NC licensedprofessional? Yes BIORETENTION CELL MDC FROM 02H .1052 18 SHWT elevation (fmsl) N/A 19 Bottom of the bioretention cell (fmsi) 999.00 20 Pending depth of the design storm (inches) 12 in 21 Surface area of the bioretention cell (square feet) 3890 sf 22 Design volume of SCM (cu ft) 3751 cf 23 Is the bioretention cell used for peak attenuation? No 24 Depth of peak attenuation over planting surface (in) in 25 Height of peak attenuation outlet above the planting surface (in) in 26 Infiltration rate of the in situ soil (inch/hour) 3 in/hr 27 Diameter of the underdrain pipes (if applicable) 4 in 28 Does the design include Internal Water Storage (IWS)? Yes 29 if so, elevation of the top of the IWS (fmsl) 1001.5 30 Elevation of the planting surface (fmsl) 1003 31 What type of vegetation will be planted? (grass, trees/shrubs, other)? Grass 32 Media depth (inches) 36 in 33 Percentage of medium to coarse washed sand by volume 80% 34 Percentage of fines (silt and clay) by volume 10% 35 Percentage of organic matter by volume 10% 36 Type of organic material Pine Bark Fines 37 Phosphorus Index (P-Index) of media (unitless) <50 38 Will compaction be avoided during construction? Yes 39 Will cell be maintained to a one inch/hour standard? Yes 40 Depth of mulch, if applicable (inches) N/A 41 Type of mulch, if applicable N/A 42 How many clean out pipes are being installed? 4 43 ADDITIONAL 44 Type of pretreatment that will e used: INFORMATION Please use this space to provide any additional information about the bioretention cell(s): FORrB77 Bioretention 1 5:31 PM 7/19/2022