Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0043600_Application_20220713
DWR Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: W(-X43t31dbb (to be completed by DWR) RECEIVED/NCDEQ/DWR All items must be completed or the application will be returned I. APPLICANT INFORMATION: JUL 13 2022 1. Applicant's name: TOWN OF DALLAS (company, municipality, HOA, utility, etc.) SWOEGS �,Q®ORE�VILLE REGIONAL OFFICE 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ® Municipal ❑ Other 3. Signature authority's name: MARIA STROUPE per 15A NCAC 02T .0106(b) Title: TOWN MANAGER 4. Applicant's mailing address: 210 N HOLLAND STREET City: DALLAS State: NC Zip: 28034- 5. Applicant's contact information: Phone number: (704) 922-3176 Email Address: MSTROUPE@DALLASNC.NET II. PROJECT INFORMATION: 1. Project name: ROSEWOOD DEVELOPMENT 2. Application/Project status: Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number:+WQ00 3. County where project is located: GASTON 4. Approximate Coordinates (Decimal Degrees): Latitude: ° Longitude: - . 5. Parcel ID (if applicable): 171850 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: WILLIAM S. CLAYTON License Number: 040758 Firm: CLAYTON ENGINEERING & DESIGN, PLLC Mailing address: PO BOX 2351 City: HICKORY State: NC Zip: 28603- Phone number: (828) 455-3456 Email Address: WCLAYTONaCLAYTON-ENGINEERING.NET IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: TOWN OF DALLAS WWTP Permit Number: 0068888 Owner Name: TOWN OF DALLAS V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ Downstream (Receiving) Sewer Size: 8 inch System Wide Collection System Permit Number(s) (if applicable): WQCS Owner Name(s): TOWN OF DALLAS FORM: FTA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑No ®N/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ® Residential Owned ❑ Residential Leased El School / preschool / day care ❑ Food and drink facilities ❑ Businesses / offices / factories ❑ Retail (stores, centers, malls) ❑ Retail with food preparation/service 0 Medical / dental / veterinary facilities 0 Church ❑ Nursing Home 5. Nature of wastewater : 100 % Domestic/Commercial % Commercial Industrial (See 15A NCAC 02T .0103(20)) �Is there a Pretreatment Program in effect? 6. Has a flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes > If ves, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: ❑ Car Wash 0 Hotel and/or Motels ❑ Swimming Pool /Clubhouse 0 Swimming Pool/Filter Backwash ❑ Other (Explain in Attachment) ❑ Yes ❑ No ® No Establishment Type (see 02T.0114(f)) Daily Design Flow a,b No. of Units Flow SINGLE FAMILY HOMES 360 gal/DAY 56 20,160 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 20,160 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 20,160 GPD (per 15A NCAC 02T .0114) > Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line O Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 2,140 DIP/PVC > Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria > Section III contains information related to minimum slopes for gravity sewer(s) > Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: . Longitude: - 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at 5. Summarize the force main to be permitted (for this Pump Station): feet total dynamic head (TDH) Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B): > Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day > Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): > It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. > If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(0): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (g) ➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: ® Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(fl cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage ➢ If noncompliance with 02T.0305(f) or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes ❑ No ® N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ® N/A ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch ❑Yes ®No 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes 0 No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ®Yes ❑No ❑N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version). and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes El No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supportine documents. 2. Professional Engineer's Certification: I, LIIILI,*M J 404' uA (Professional Engineer's name from Application Item III.1.) attest that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. k%t i 11 !tit, �, f ,f t s ••yr SEA :r North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per 15A NCAC 02T .0106(b): (Signature Authority's name & title from Application Item I.3.) /,ti41 • ••S . CVO.\ s g• attest that this application for has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: C� 4.cc2 it-G-ctP Date: 6-ago ,7 FORM: FTA 04-16 Page 5 of 5 RECEIVED/NCDEQIDWR CLAYTON ENGINEERING & DESIGN March 31, 2022 NCDEQ - DWR 610 East Center Avenue Mooresville, NC 28115 Re: Rosewood Village Project Narrative Permit number: Dear Sir or Madam, WOROS ILLE REGIONAL OFFICE RE/DWR MOOSVILLE R . • AL OFFICE Clayton Engineering & Design has been selected by Moore & Seagie to prepare plans and specifications for the proposed Rosewood Village development on a vacant parcel of land on Rosewood Drive in Gaston County, NC. Site development will require the construction of 8" gravity sewer line to serve the residences. Approximately 2,140 LF of 8" gravity sewer is to be constructed. If you have any questions or need additional information, please feel free to call me at (828) 455-3456 or email wclavton(a.clayton-engineerinq.net. Sincerely, Clayton Engineering & Design, PLLC Mthm s C6agtoi William S. Clayton, PE President 304 15th Street SE/P0 Box 2351 Hickory, NC 28603 [828] 455-3456 P-1463 Page I1 Division of Water Resources RECEIVED/NODE r'` /DWFe OS Division of Water Resources (MOORESVIL R IONAL OFFICE Flow Tracking for Sewer Extension Applications (FTSE 10-18) 022 State of North Carolina Department of Environmental Quality Entity Requesting Allocation: TOWN OF DALLAS Project Name for which flow is being requested: ROSEWOOD DEVELOPMENT More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: DALLAS WWTP b. WWTP Facility Permit #: NC0068888 All flows are in MGD c. WWTP faciIity's permitted flow 0.600MGD d. Estimated obligated flow not yet tributary to the WWTP 0 e. WWTP facility's actual avg. flow 0.3585MGD f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used 0.02016 0.40996 68% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Plow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not Less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Downstream Permit Number: Page I of 6 FTSE 10-18 III. Certification Statement: I e:y1 , , j ; }� l il' C certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing-fficial Signature Date / Cu?A'' /t ,'=IN.I C" c'-. Title of Signing Official Page 2 of 6 FTSE 10-18 NOT TO SCALE CLAYTON ENGINEERING & DESIGN Owner JERRY CAMPBELL Project 71tle ROSEWOOD VILLAGE Date 01/11/22 Jab No. 21040 Drawing Title USGS MAP Protect Location DALLAS TOWNSHIP, GASTON CO., NC C-001 sht. 1 at 1 E Trade St sty Ru d W Country hitch n E Mam S! 9 Salon 5 Co Sr 9 dutch of God 9 9Ellefre Tech E Wakms Sr E Trade St E Maxi S1 Family Doilar9 Adams Auto Group Coleman Auto Body Repair Cityo9 E Trade St 219 • LedrordS Tue & Aute 9 z Fatbacks Tire 9 9 Starry Johnny Lower hapa; Fr wY J rMand it a O' Venttoe Church 9 3 ii w r 4 E Church St E Chwch Sl caru6na brothers SS ernaa,s, 4. <3 iz a3a` R a'w tf g q H 0 DM S E Peachtree St r RU E IIMIY st 1A ▪ E Wgitp RI Jagger Park© 9 clectncal Warehouse 9 CLAYTON ENGINEERING & DESIGN Owner JERRY CAMPBELL Country Hardware & Supply 4 �44 +rf 9Southeastern Booth Service & Supply Pita Wheel Project Title ROSEWOOD VILLAGE Da UMW NOT TO SCALE Date 01/11/22 Job No. 21040 Drawing Tttle STREET VIEW Project Location DALLAS TOWNSHIP, GASTON CO., NC C-002 Sht. 1 of 1