Loading...
HomeMy WebLinkAboutSAW-2022-01545 signed NWP verification (2).pdfU.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2022-01545 County: Richmond U.S.G.S. Quad: NC -Rockingham GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Address: Telephone Number: E-mail: NCDOT Division 8 Art King 121 DOT Drive Carthage, NC 28327 910-773-8000 acking(&ncdot.gov Size (acres) N/A Nearest Town Rockingham Nearest Waterway Solomons Creek River Basin Lower Pee Dee USGS HUC 03040201 Coordinates Latitude: 34.8842 Longitude:-79.8050 Location description: The proiect site is existing Bridge 140 over Solomons Creek, on Sandhill Road, near the town of Rockingham, Richmond County, North Carolina. Description of projects area and activity: This verification authorizes impacts to 0.320 acre of wetlands and 30 LF of stream channel for the replacement of Bridge 140 in the same location. Mitigation is required for this proposal. Applicable Law(s): ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Nationwide Permits 13 and 3 SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached Conditions, your application signed and dated 7/14/2022, and the enclosed plans entitled `BP8.R013" dated 4/29/2022. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide and/or regional general permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide and/or regional general permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide and/or regional general permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management Morehead City, NC, at (252) 808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact James Lastinger at 919- 54-4884 ext 32or James.C.Lastinger(&usace.armv.mil. Corps Regulatory Official: u'rnao .✓ Date: 07/27/2022 Expiration Date of Verification: 3/14/2026 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/Pp=13 6:4:0 Copy furnished: SAW-2022-01545 SPECIAL CONDITIONS a. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit authorization. b. The U.S. Fish and Wildlife Service's (USFWS's) Programmatic Biological Opinion (PBO) titled, "NCDOT Program Effects on the Northern Long-eared Bat in Divisions 1-8", dated November 6, 2020, contains agreed upon conservation measures for the NLEB. As noted in the PBO, applicability of these conservation measures varies depending on the location of the project. Your authorization under this Department of the Army permit is conditional upon your compliance with all applicable conservation measures in the PBO, which are incorporated by reference in this permit. Failure to comply with the applicable conservation measures would constitute non-compliance with your Department of the Army permit. The USFWS is the appropriate authority to determine compliance with the terms and conditions of its PBO, and with the ESA. Action ID Number: SAW-2022-01545 Permittee: NCDOT Division 8, Art King Project Name: NCDOT / BP8.R013 / County / Div 8 Date Verification Issued: 07/27/2022 Project Manager: James Lastinger County: Richmond 140 SR 1971 / Sandhill Road / Solomon's Creek / Richmond Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: James Lastinger Raleigh Regulatory Office U.S Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 or James.C.Lastinger@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date M O ai00 g\ Eat +W yyy RoAingha n i tin C-' \ mw \ �P\ M. P M.e ' \ _ 74 P \ L�. Q ius /P' /"� Il'n Rd �:w[�giaepei / 3:3§ IRIS uu La /P — — 11- J 1971 P Ra i 1145 / Name'MBl Rd PROD SITE P''l LOCA 1971 p c> 1los VICINITY MAP AVAVAV-0- OFF -SITE DETOUR ROUTE N.T.S. WETLAND AND SURFACE WA TER IMPACTS PERMIT APRIL 28, 2022 CLEARING ON THIS PROJECT SHALL BE PERFORMED TO 541� i LIMITS ESTABLISHED BY METHOD III. STATE OF NORTH CAROI INA DIVISION OF HIGHWAYS RICHMOND COUNTY LOCATION: BRIDGE 760140 OVER SOLOMANS CREEK ON SR 1971 (SANDHILL ROAD) 41'AT6 A'1'ATS PROIREI' ReARR6NOR NQ SH BP8.R013 OAW PqO M P.A.PIW.NY aR$6RIP19oN BP8.R013.1 P.E. RW & Utilities Construction PERMIT DRAWING SHEET 1 OF 8 TYPE OF WORK: GRADING, DRAINAGE, PAVING & STRUCTURES /-- SITE I �o 2z BEGIN PROJECT BP8.R013 0 -L- Sta. 15 + 40.00 END PROJECT BP8.R013 z -L- Sta. 24 +25.00 x Y Y F Y x y SR 1108 TOZpAff -L- a --- _ _ i Y ----ti : - SR 1971 SANDHILL ROAD x I Y x � r 0 BEGIN BRIDGE -L- POc Sta. 19+38 U, END BRIDGE n I— POC Sta. 20+08 x IN('OMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PLANS PREPARED BY: PLANS PREPARED FOR: HYDRAULICS ENGINEER ENGINEERING DIVISION OF HIGHWAYS GRAPHIC SCALES DESIGN DATA PROJECT LENGTH a Eaa aEERH 50 0 50 100 ADT 2015 = 140 3220 GLEN ROYAL RD. RALEIGH, NC 27617 TELE919.788.0221FAX 919.788.0232 DIVISION 8 121 DOT Drive NOR ADT 2025 = 280 K = % LENGTH ROADWAY PROJECT BP8.R013 = 0.154 mi NCLICENSE »P.)189 Carthage, NC 28327 ®F % !_ 2018 STANDARD SPECIFICATIONS PLANS D = % LENGTH STRUCTURE PROJECT BP8.R013 = 0.014 mi P.E. SIGNATURE: m 50 0 50 100 T = 6 % V = 50 MPH * TTST = DUAL TOTAL LENGTH OF PROJECT BP8.R013 = 0.168 mi RIGHT OF WAY DATE: FEBRUARY 2022 BRIAN A. WILES, PE _ y� �Q ®� ROADWAY DESIGN ENGINEER PROJECT ENGINEER PROFILE (HORIZONTAL) 5 0 5 10 FUNC CLASS = LETTING DATE: 1���8 LOCAL OCTOBER 2022 TIM WELCH, PE CONTACT NCDPROFILE (VERTICAL) SUBREGIONAL TIER P PROGRAM MANAGER DIV 8 BRIDGE PBRIDGE P.E. SIGNATURE: G� G� DETAIL 1 SPECIAL LATERAL'V' DITCH INmto Scole) N.—I A.\�� Fill Ground 3;7 D FdK Slope Min. D- 1 Ft. FROM STA. 15+75 TO STA. 16+50 -L-(LTJ FROM STA. 21+75 TO STA. 22+50 -L- R DETAIL 2 SPECIAL LATERAL BASE DITCH I Not to Scale) Noturol Fill Ground Slope d D F\e e Geotmdile B Min. D= 1.0 Ft. Muz d= 1.0 Ft. Type of Li. CL-A Rip-Rop B- 2.0 Ft. FROM STA.16+25 TO STA.17+20 -I- (R FROM STA. 21+50 TO STA. 23+25 -L- (L DETAIL 3 TOE PROTECTION I.— Smlel Natural Ground b d= 1F 6= 2 FL Geolexlile Type of Liner- CL B Rip-Rop FROM STA. 21+00 TO STA. 21+50 A i SITE I / CLASS B RIP RAP EST 3 TONS EST 20 S.Y. GFD O SPECIAL LATERAL 'V' DITCH / SEE DETAIL 1 Z I DAV4 PG COTE, SR. D 13 DB 134G 546 CO -L- POC Sta. 15+40.00 BEGIN CONSTRUCTION N I Q TOE PROTECTION SEE DETAIL 3 + EST. 13 TONS CL-B RIPRAP EST. 28 S.Y. GFD O U 11 Y sr \\ E E ** ** )OUS F i F TC" — 15" RCP p0r � P 5� Cp / 4`1 ✓ V./ fNG 19 P j. SPECIAL LATERAL BASE DITCH SEE DETAIL 2 35 TON CL-A RIP RAP 65 S.Y. GFD 15" PIPE RETAIN CECIL A. WILSONNy� AND 'WIFE, KATHY SON DB 765 pWI I PB 615 PG \ A. WILSOI� AND WIFE .ATHY P. VfILSON DB 765 P 1 01 v m PB 615 PIS a Njl NL o Nm SITE / / -k Dk I ( y 15.jHDPE K6" H PD E W�LBO`A�S RIP P* PAD AT OUTLET ( W/ELBOWS 1 TON CL-B RIP RAP 1 IP RAP PAD AT OUTLET 5 S.Y. GFD 1 TON CL-B RIP RAP 5 S.Y. GFD CLASS II RIP RAP (STRUCTURES PAY ITEM( INSTALL SBG J -L- STA 17+50.1 TO 19+25.6 RT CECIL A. AND WIFE. KATLSON J7651 DB 2 PB SPECIAL LATERAL BASE DITCH SEE DETAIL 2 67 TONS CL-A RIP RAP 120 S.Y. GFD F F \ d PUE - F � I � � I m � I � � I INSTALL SBG -I- STA 20+20.4 TO 21+52.2 RT ECIAL LATERAL 'V' DITCH — S DETAIL 1 0 THE NICHOLAS W DOCKERY TRUST DB 1005 PG 469 PB 641 PG B WOODS CENGINEERING 3220 GLEN ROYAL RD. RALEIGH, NC 27617 TELE 919.788.0224 FAX 919.788.0232 NC LICENSE #P-0189 Kimley >> Horn 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, IN 27601 N PROJECT REFERENCE NO. SHEET NO. BPB.R015 4 RICHMOND COUNTY BRIDGE #140 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INQOMPUTE PLAN$ IX) NOT USE FO Rf W ACOUISMON _ C _ _ _ _ _ ��if� XSTiI R, 48' MTL STAKE A p 35B — _ F0 B57 SR 1971 SNi-U RA 22' BST o — R , XIS n Ril ARF-axT1--�£B� 7 P E PUE PUE PUE PUE PUE 15" PIPE 0 THE NICHOLAS W. DOCKERY TRUST -I- POC Sta. 24+25.00 DB 1005 PG END CONSTRUCTION B PB 641 PG B LEGEND SURFACE WATER IMPACTS HAND CLEARING (NON -GRUBBING) FILL IN WETLAND TEMPORARY SURFACE WATER IMPACTS F_* MECHANIZED CLEARING (GRUBBING) PERMIT DRAWING SHEET 2 OF 8 FOR PROFILE, SEE SHEET 5 BEGIN BRIDGE END BRIDGE -L- POC 19+38 -L- POC 20+08 �$ (TYPJ TYPE III TYPE III $m 6 10 10, TYPE III BEGIN APPROACH SLAB -L- POC 19+2599 END APPROACH SLAB BRIDGE SKETCH -L- POC 20+20.00 G� G� DETAIL 1 SPECIAL LATERAL'V' DITCH I Natto Scole) N.—I N "a, Fill Ground 3;7 D FdK Slope Min. D- 1 Ft. FROM STA. 15+75 TO STA. 16+50 -L-(LTJ FROM STA. 21+75 TO STA. 22+50 -L- R DETAIL 2 SPECIAL LATERAL BASE DITCH I NoF to Scale) Nolurol Fill Ground 3.7 A h < ope d D F\e Sl e Geoleaiile B Min. D= 1.0 Ft. Moz d= 1.0 Ft. Type of U. CL-A Rip-Rop B- 2.0 Ft. FROM STA.16+25 TO STA.17+20 -I- (R FROM STA. 21+50 TO STA. 23+25 -L- (L DETAIL 3 TOE PROTECTION I Not to Smlel C' e< Natural .y�r°`�5� Ground b �� d d= 1 R. 6= 2 FL Geotextile Type of Liner- CL B Rip -Rap FROM STA. 21+00 TO STA. 21+50 A i SITE I / N 0 / + CLASS B RIP RAP 1= EST 3 TONS p EST 20 S.Y. GFD O SPECIAL LATERAL 'V' DITCH / SEE DETAIL 1 Z I DAV4 PG COTE, SR. D 13 DB 134G 546 CO -L- POC Sta. 15+40.00 BEGIN CONSTRUCTION r I '� '� _k 1 C ENGINEERING PROJECT REFERENCE NO. SHEET NO. BP8.R0/3 4 RICHMOND COUNTY BRIDGE #140 ROADWAY DESIGN HYDRAULICS 3220 GLEN ROYAL RD. RALEIGH, NC 27617 ENGINEER ENGINEER TELE 919.788.0224 FAX 919.788.0232 NC LICENSE #P-0189 INoOMPL TE PLAN$ " Ki m I ey >> H o r n � NOT USE FO Rf W ACUUISITLON 421 FAYETTEVILLE STREET,SUITE 600 RALEIGH, IN 27601 2 PERMIT OF DRAWING SHEET 3 SPECIAL LATERAL BASE DITCH SEE DETAIL 2 O 67 TONS CL-A RIP RAP N 120 S.Y. GFD OTOE PROTECTION SEE DETAIL 3 t7' EST. 13 TONS CL-B RIPRAP THE NICHOLAS �' DOCKERY TRUST LY EST. 28 S.Y. GFD DB 1005 PG 469 h N PB 641 PG B o rh � N Q.TI h jr �-T75;� SR I l SANDN L RA 22' BST _ � ��--ij--� \\ \ \ICI —�I I'� ur` �� / / /� A \ \ I /// • / / \ \ \ \ 1 \ ( 1 " HDPE W/ELBOA )151 HDPE W/EL OVPS RIP t ,AD AT Q�1T&T ` Z'- \ r $PECIAS. LATERAL BASE DITCH \ n \ 1 1 �y 1 �UI� CLLB SKIP RAP C'd rn, '`°'�' $EE�DETAIL 2 \\\ \\ \ \ IF dAP PAP 5F 6UT 5 S.Y. GFD 35 TON CL-A RIP RAP \\ \ \ 11'GFD RIP RAP 65 S.Y. GFD 15" PIPE � \\ ` � ' S S.Y.$.Y. GFD RETAIN \\ ` CLASS II RIP RAP (STRUCTURES PAY ITEM( O � CECIL A. �'ILSO AND WIFE. KATHY P ILSON DB / 751 f AND 'NIFE. \ SIT P11 615 G 1) CECIL A 1ILSO EE 2 KATHY P. ILSON DB 765 P I \ PB 615 PG c A WILSOI� AND j�IFE -o .ATHY P. V1ILSON o PB 6155 PIS D m a Njl NL o� Nm F 5 _ a PUE 000s )P (E WE P — -d� ,y _ __ GE 1111�`,��/�� INSTALL -I- STA 20+20.4 ) TO 21+52.2 RT L THE NICHOLAS W. DOCKERY TRUST DB 1005 PG 469 PB 641 PG B ECIAL LATERAL 'V' DITCH S DETAIL 1 LEGEND SURFACE WATER IMPACTS HAND CLEARING (NON -GRUBBING) FILL IN WETLAND TEMPORARY SURFACE WATER IMPACTS F_* MECHANIZED CLEARING (GRUBBING) -I- POC Sta. 24+25.00 END CONSTRUCTION FOR PROFILE, SEE SHEET 5 BEGIN BRIDGE E D BRIDGE -L- POC 19+38 -L $ - POC 20+08 � (TyPJ m TYPE III TYPE III 10, g 10 N 10, ni $ ro 10, PE III TYPE III BEGIN APPROACH SLAB -L- POC 19+2599 END APPROACH SLAB BRIDGE SKETCH -L- POC 20+20.00 WETLAND AND SURFACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 16+52 TO 21+04 -L- 70' BRIDGE 0.07 0.11 < 0.01 < 0.01 15 15 2 17+89 TO 21+18 -L- UTILITY RELOCATION 0.14 TOTALS*: 0.07 0.11 1 0.14 1 < 0.01 1 < 0.01 15 15 0 *Rounded totals are sum of actual impacts ►[01111* i Revised 2018 Feb