Johnson, Alan
To:Thomas Blackwell (tom@cws-inc.net) (tom@cws-inc.net)
Subject:Mt holly greenway
Things I need to know:
What is width of the construction corridor through the buffer area. And what is the linear ft of the corridor through the
buffer (zone 1 and zone 2, and total)
What is the proposed maintained width through the buffer. You are allowed up to 10 ft of trail and 2 ft of “green” on
each side. Is it greater than this.
How close is the greenway to the lake. Or what is the closest point (distance) to the full pond.
Is the green way going to divert around trees or is it a “straight line” through Zone 1 and 2. The trail should work
between the trees to the max extent.
How many linear ft of the greenway is located within the sewer easement.
Are the temporary impacts going to be restored/planted and the area that is not permanently impacted (construction
corridor) going to be restored?
Thanks