Loading...
HomeMy WebLinkAboutSW6190102_Email_20220728 Farkas, Jim J From:Farkas, Jim J Sent:Thursday, July 28, 2022 12:10 PM To:david.a.heins.civ@mail.mil; lee.p.ward.civ@mail.mil; brian.fisher@aecom.com Cc:Lawyer, Mike Subject:RE: SW6190102; FB-SOF Special Tactics Facility, Phase 3 PN 76514 - Major Modification Good Afternoon, The Division of Energy, Mineral, and Land Resources (DEMLR), received a complete Stormwater Management Permit Modification Application for the subject project on July 20, 2022. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 - 1062 rules. We are forwarding modified and reissued Permit No. SW6190102, dated July 28, 2022, for the construction, operation and maintenance of the subject project and the stormwater system. This permit shall be effective from the date of issuance and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permits that may be required. The original signed permit package and plans are being mailed to the permittee, David Heins, at the following address (NOTE: An electronic version of this permit can be found in our online repository: https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources): Directorate of Public Works (DPW) Environmental Division Attn: David Heins, Environmental Division Chief 2175 Reilly Road Stop A Fort Bragg, NC 28310-5000 I will hold onto our hard copies of these projects for 30 days (in case any issues/typos with the permit are noticed and corrections need to be made) after which point, they will be kept on file at the Fayetteville Regional Office. If you have any questions, or need additional information concerning this matter, please contact me at jim.farkas@ncdenr.gov. Thank you, Jim Farkas Environmental Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, & Land Resources – Stormwater Program 512 N. Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 (919) 707-3646 Jim.Farkas@ncdenr.gov 1 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Farkas, Jim J Sent: Monday, December 6, 2021 2:41 PM To: 'david.a.heins.civ@mail.mil' <david.a.heins.civ@mail.mil>; 'lee.p.ward.civ@mail.mil' <lee.p.ward.civ@mail.mil>; 'brian.fisher@aecom.com' <brian.fisher@aecom.com> Cc: Lawyer, Mike <mike.lawyer@ncdenr.gov> Subject: RE: SW6190102; FB-SOF Special Tactics Facility, Phase 3 PN 76514 - Major Modification Good Afternoon, We received your applications for the above mentioned projects on 12/6/2021. Reviews under the standard permitting process generally take 30 – 45 calendar days, but can take up to 90 calendar days per statute (our other reviewer, Corey Anen, no longer works for the State, so this review will probably be closer to 45 days than 30). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly below the “State Stormwater Information Uploads” section of the form. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. Please type in permit #: SW6190102 If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646. Thank you, Thanks, Jim Farkas Environmental Engineer North Carolina Department of Environmental Quality 2 Division of Energy, Mineral, & Land Resources – Stormwater Program 512 N. Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 (919) 707-3646 Jim.Farkas@ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Farkas, Jim J Sent: Wednesday, December 1, 2021 1:14 PM To: david.a.heins.civ@mail.mil; lee.p.ward.civ@mail.mil; brian.fisher@aecom.com Subject: SW6190102; FB-SOF Special Tactics Facility, Phase 3 PN 76514 - Major Modification Good Afternoon, We received your application for a new post-construction stormwater permit on 12/1/2021. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 12/31/2021) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete. - 1x original signed (in pen) & sealed hard copy of the Application. This item is required per Section VI, 1 of the Application and 15A NCAC 02H .1042(2)(a). The provided hard copy appears to be a photocopy (not an original). - 2x hard copies of a full-sized plan sheet showing the following (NOTE: Only updated plan sheets need to be provided, we do not require brand new sets of plans): o A vicinity map showing the location of the project. This item is required per Section VI, 8c of the Application. NOTE: This is an administrative completeness review, not a detailed engineering review. The detailed engineering review will be performed once the submission is administratively complete. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process generally take 30 – 45 calendar days, but can take up to 3 90 calendar days per statute (one of our two reviewer positions is currently vacant so this review will probably be closer to 45 days than 30). Hard copies should be mailed to the following address: For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646. Thank you, Jim Farkas Environmental Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, & Land Resources – Stormwater Program 512 N. Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 (919) 707-3646 Jim.Farkas@ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. 4