Loading...
HomeMy WebLinkAboutNC0023337_Response to CEI_20220727TOWN OF SCOTLAND NECK P.O. Box 537 1310 MAIN STREET SCOTLAND NECK, NC 27874 July 18, 2022 Vanessa E. Manuel Assistant Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources, NCDEQ Subject: Compliance Evaluation Inspection Scotland Neck WWTP NPDES Permit No. NC0023337 Halifax County Dear Mrs. Manuel, I am writing in response to the Compliance Evaluation Inspection Report received by the Town of Scotland Neck and dated June 10, 2022. I would like to address the bolded issues that were pointed out by the inspector. The Town of Scotland Neck has been awarded two grants (Phase 5 & Phase 6) totaling $2,000,000.00. The grants call for repair/replacement of much of the headworks, including the step screen and grit removal system. In the mean time we have a manual bar screen that is being used and is monitored and cleaned multiple times daily. These grants also provide for two (2) new brush rotor assemblies and additional jet pumps in the digester to help with the vegetation growth that was noted. The Phase 6 grant also includes repairing and/or replacing the tertiary filter pumps and media. I would also like to note that the Town Board has approved the purchase of a new replacement rotor which is due to be received and installed around the end of September of 2022. The total cost of the brush rotor, including installation, is $112,000.00. Engineering Services, who is handling the grant for the Town, has informed me that the Phase 5 Project should be under construction during the first three quarters of 2023. The Phase 6 Project will be under construction from the third quarter of 2023 to the second quarter of 2024. Sincerely, ddie Braxton, Mayor Town of Scotland Neck