HomeMy WebLinkAboutNCC222547_ESC Approval Submitted_20220726ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director NORTH CAROLINA nvironmentalQaaiefy June 20, 2022 LETTER OF APPROVAL WITH MODIFICATIONS Carolina Cleaning and Restoration, LLC Georgia Bell, Member -Manager 105 Turner Run Drive Greenville, NC 27858 RE: Project Name: Sally Hills Farm Tree Clearing — Phase 2 Acres Approved: 14.5 Project ID: CUMBE-2022-181 County: Cumberland City: Hope Mills Address: Gillespie Street River Basin: Cape Fear Stream Classification: Other Submitted by: Luke Baker Date Received by LQS: May 26, 2021 Plan Type: Utility Dear Mrs. Bell: The subject erosion and sedimentation control plan has been approved by default. The Sedimentation Pollution Control Act (hereinafter "Act") states that this plan must be filed a minimum of 30 days (15 days for revised plans) prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days (15 days for revised plans) of receipt of G.S. l I3A-54.1. The Act further states that if the approving authority fails to approve or disapprove the submitted plan within the 30-day (15 days for revised plans) period, the plan will be deemed approved. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette. lucas cr,ncdenr.gov or Paul Clark at Paul.clark ncdenr. ov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after June 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR dash-+'�, North Carolina ilelaartment of nvironni.eatat Quality !, Division of Energy. Mineral and Land Resources Fayateville Regional Office 1219 Green Streer, Sukke'7141 Fayetteville, North Carolina 2&301 n� �e 'nwmnrr �a� 910.4133300 Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG0I permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. I I3A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. Any addition in impervious surface, over that already noted on the approved plan, would also require a revised plan to verify the appropriateness of the erosion control measures and the sormwater retention measures. (GS 113A-54.I(b)). In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, G Chris Baker Assistant Regional Engineer DEMLR - Fayetteville Regional Office Enclosures: Certificate of Approval cc: Luke Baker, P. G., Draper Aden Associates email copy Michael Naylor, Cumberland County Inspections Office -- email copy Fayetteville Regional Office Letter of Approval with Modifications Date: June 20, 2022 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Sally Hills Farm Tree Clearing —Phase 2 Project ID: Cumbe-2022-181 Counties: Cumberland The modifications required for the project approval are as follows: 1. Show/label the location of the 7-day groundcover for the diversion ditches. 2. Place silt fence around the stockpile shown on plans. 3. Provide specifications and maintenance requirements for the temporary groundcover. 4. Add temporary seeding to the key map. These modifications must be received at the Fayetteville Regional office no later than July 11, 2022. The permit is not approved and active until the required modifications are received by this office.