LETTER OF APPROVAL WITH MODIFICATIONS
Carolina Cleaning and Restoration, LLC
Georgia Bell, Member -Manager
105 Turner Run Drive
Greenville, NC 27858
RE: Project Name: Sally Hills Farm Tree Clearing — Phase 2
Acres Approved: 14.5
Project ID: CUMBE-2022-181
County: Cumberland City: Hope Mills
Address: Gillespie Street
River Basin: Cape Fear
Stream Classification: Other
Submitted by: Luke Baker
Date Received by LQS: May 26, 2021
Plan Type: Utility
Dear Mrs. Bell:
The subject erosion and sedimentation control plan has been approved by default. The
Sedimentation Pollution Control Act (hereinafter "Act") states that this plan must be filed a
minimum of 30 days (15 days for revised plans) prior to the activity and the approving authority
must approve or disapprove the submitted plan within 30 days (15 days for revised plans) of
receipt of G.S. l I3A-54.1. The Act further states that if the approving authority fails to approve
or disapprove the submitted plan within the 30-day (15 days for revised plans) period, the plan
will be deemed approved. The enclosed Certificate of Approval must be posted at the job site.
This plan approval shall expire three (3) years following the date of approval, if no land -
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit
an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC)
under the NCG010000 Construction Stormwater General Permit. This form MUST be
submitted and COC issued prior to the commencement of any land disturbing activity on
the above -named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please
direct questions about the NOI form to Annette Lucas at Annette. lucas cr,ncdenr.gov or
Paul Clark at Paul.clark ncdenr. ov. After you submit a complete and correct NOI
Form, a COC will be emailed to you within three business days. Initially, DEMLR will
not charge a fee for coverage under the NCGO1 permit. However, on or after June 1,
2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR
dash-+'�, North Carolina ilelaartment of nvironni.eatat Quality !, Division of Energy. Mineral and Land Resources
Fayateville Regional Office 1219 Green Streer, Sukke'7141 Fayetteville, North Carolina 2&301
n� �e 'nwmnrr �a� 910.4133300
Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the
NCGO1 permit require that the following documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG0I permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. I I3A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, the erosion and sedimentation control plan is inadequate
to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North
Carolina General Statute 113A-51 through 66), this office may require revisions to the
plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal
and State water quality laws, regulations, and rules. In addition, local city or county
ordinances or rules may also apply to this land -disturbing activity. This approval does
not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the
information provided in the Financial Responsibility Form, which you provided. You
are requested to file an amended form if there is any change in the information
included on the form. This permit allows for a land -disturbance, as called for on the
application plan, not to exceed the approved acres. Exceeding the acreage will be a
violation of this permit and would require a revised plan and additional application
fee. Any addition in impervious surface, over that already noted on the approved
plan, would also require a revised plan to verify the appropriateness of the erosion
control measures and the sormwater retention measures. (GS 113A-54.I(b)). In
addition, it would be helpful if you notify this office of the proposed starting date for
this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
G
Chris Baker
Assistant Regional Engineer
DEMLR - Fayetteville Regional Office
Enclosures: Certificate of Approval
cc: Luke Baker, P. G., Draper Aden Associates email copy
Michael Naylor, Cumberland County Inspections Office -- email copy
Fayetteville Regional Office
Letter of Approval with Modifications
Date: June 20, 2022
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Sally Hills Farm Tree Clearing —Phase 2
Project ID: Cumbe-2022-181
Counties: Cumberland
The modifications required for the project approval are as follows:
1. Show/label the location of the 7-day groundcover for the diversion ditches.
2. Place silt fence around the stockpile shown on plans.
3. Provide specifications and maintenance requirements for the temporary groundcover.
4. Add temporary seeding to the key map.
These modifications must be received at the Fayetteville Regional office no later than July 11,
2022. The permit is not approved and active until the required modifications are received by this
office.