HomeMy WebLinkAbout20130732 Ver 1_EEP Receipt_20140528Ode
MCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
Jack McLain
Norfolk Southern Railway Co
1200 Peachtree St, NE
Atlanta, GA 30309
Project: Norfolk Southern intermodal Facility
County: Mecklenburg
USACE #: 2013 -00433
WQ permit #: 13 -07'_
EEP #: 21032
Amount Paid: $690,404 00
Check Number: 9052212
Michael Ellison, Director
Ecosystem Enhancement Program
RECEIPT
May 28, 2014
John E Skvarla, III
Secretary
The North Carolina Ecosystem Enhancement Program (NCEEP) has received a check as indicated above as payment for the
compensatory mitigation requirements of the 401 Water Quality Certification /Section 404 /CAMA Permrt(s) Issued for the above -
referenced project This receipt serves as notification that your compensatory mitigation requirements assigned to NCEEP associated
with the authorized activity as specified below have been Satisfied You must also comply with all other conditions of this
certification and any other state, federal or local government permits or author ization associated with this activity Including SL 2009-
337, An Act to Piomote the Use of Compensatory Mitigation Banks, as amended by S L 201 1 -343
The NCEEP, by acceptance of this payment, acknowledges that the NCEEP is responsible for the compensatory mitigation
requirements indicated below associated with the project permit and agrees to provide the compensatory mitigation as specified in the
permit Mitigation responsibility assigned to the NCEEP is nontransferable The mitigation will be performed in accoidance with the
N C Department of Envnonment and Natural Resources' Ecosystem Enhancement Program In -Lieu Fee Instrument dated July 28,
2010
River Basin
HUC
Stream Ciedits
(linear feet)
Wetland Ciedits
(acres)
Buffer 1& 11
(Sq. Ft )
Cold
Cool
Warm
Riparian
Non -RI ai ran
Coastal Marsh
Catawba
03050101
0
0
1,768
0
0
0
0
03050103 ESA
0
0
78
Refunds of payments made to NCEEP are only approved under certain conditions All refund requests must be submitted In
accordance with EEP's iefund policy at www nceep net if you have any questions of need additional information, please contact
Kelly Williams at (919)'707 -8915
Sincerely, •
ae r o
Director
CC. Karen Higgins, NCDWR Wetlands /401 Unit
Steve Kichefski, USACE- Asheville, Todd Tugwell, USACE - Raleigh
Clement Riddle, agent
File
1652 Mail Service Center, Raleigh, North Carolina 27699 -1652
Phone 919 - 707 -89761 Internet www ncdenr gov
An Equal Opportunity 1 Affirmative Action Employer — Made in part by recycled paper
U.S. ARMY CORPS OF ENGINEERS
Wilmington District
Compensatory Mitigation Responsibility Transfer Form
Permittee: Norfolk Southern Railway Company
Project Name: Intermodal Facility
Action ID. SAW- 2013 -00433
County: Mecklenburg
Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved
Mitigation Bank or the North Carolina Ecosystem Enhancement Program (NCEEP), who will then sign the form to verify the
transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to
ensure that to the U S Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed
copy of this form before conducting authorized impacts, unless otherwise specified below If more than one mitigation
Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and /or the mitigation will occur
in more than one 8 -digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms
for each Sponsor and /or HUC must be provided to the appropriate mitigation Sponsors
Instructions to Sponsor: The Sponsor must verify that the mitigation requirements shown below are available at the
identified site By signing below, the Sponsor is accepting full responsibility for the identified' mitigation, regardless of
whether or not they have received payment from the Permittee Once the form is signed, the Sponsor must update the
appropriate ledger and provide a copy of the signed form to the Permittee and to the USACE Bank /In -Lieu Fee Program
Manager The Sponsor must also comply with all reporting requirements established in their authorizing instrument
Permitted Impacts and Compensatory Mitigation Requirements:
Permitted Impacts Requiring Mitigation* 8 -digit HUC and Basin: 03050101, Catawba River Basin
Stream Impacts (linear feet)
Wetland Impacts
(acres)
Warm
Cool
Cold
Riparian
Riparian
Non - Riparian
Coastal
Rivenne
Riverine
Non- riverine
1,768
1,768
*If more than one mitigation sponsor will be used for the permit, only include impacts'to be mitigated by this sponsor
Compensatory Mitigation Requirements: 8 -digit HUC and Basin: 03050101, Catawba River Basin
Stream Mitigation (credits)
Wetland Mitigation (credits)
Warm
Cool
Cold
Riparian
Riparian
Non - Riparian
Coastal
Rivenne
Non- riverine
1,768
Mitigation Site Debited: NCEEP
(List the name of the bank to be debited. For umbrella banks, also list the specific site For NCEEP, list NCEEP. If the NCEEP
acceptance letter identifies a specific site, also list the specific site to be debited)
Section to be completed by the Mitigation Sponsor
Statement of Mitigation Liability Acceptance I, the undersigned, verify that I am authorized to approve mitigation
transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for
providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action
ID number shown I also verify that released credits (and /or advance credits for NCEEP), as approved by the USACE, are
currently available at the mitigation site identified above Further, I understand that if the Sponsor fails to provide the
required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to
ensure compliance associated with the mitigation requirements.
N 10
Mitigation Sponsor Name-
-�
Name of Spons 's Afflithoriz d ReFtr t ive: ll ` in
Signature of pon is Auirrorized Representative — �Date of Sign
Page 1 of 2 Form Updated 2 October, 2012
USACE Wilmington District
Compensatory Mitigation Responsibility Transfer Form, Page 2
Conditions for Transfer of Compensatory Mitigation Credit:
• Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the
Permlttee is no longer responsible for providing the mitigation Identified in this form, though the Permittee remains
responsible for any other mitigation requirements stated In the permit conditions.
• Construction within jurisdictional areas authorized by the permit Identified on page one of this form can begin only
after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has
accepted responsibility for providing the mitigation requirements listed herein For authorized Impacts conducted by
the North Carolina Department of Transportation ( NCDOT), construction within jurisdictional areas may proceed upon
permit Issuance, however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of
permit Issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming
that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein
• Signed copies of this document must be retained by the Permlttee, Mitigation Sponsor, and In the USACE
administrative records for both the permit and the Bank /ILF Instrument It is the Permittee's responsibility to ensure
that the USACE Project Manager (address below) is provided with a signed copy of this form
• If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to
the USACE, the Sponsor must obtain case -by -case approval from the USACE Project Manager and /or North Carolina
Interagency Review Team (NCIRT) If approved, higher mitigation ratios may be applied, as per current District
guidance and a new version of this form must be completed and Included in the USACE administrative records for both
the permit and the Bank /ILF Instrument
Comments /Additional Conditions:
This form is not valid unless signed by the mitigation Sponsor and USACE Project Manager For questions regarding this
form or any of the conditions of the permit authorization, contact the Project Manager at the address below.
USACE Project Manager: Amanda Jones
USACE Field Office: Asheville Regulatory Field Office
US Army Corps of Engineers
151 Patton Avenue, Room 208
Asheville, North Carolina 28801 -5006
Email: amanda.fuemmeler @usace army.mll
Diguelly signed by
FUEMMELER.AMAND' ONEC ELERAMAN
GOD eES.124 DoD ou =PKl
AJONES.1242835090 FIEMMELEA AMANDAJONE51242835090
Date 2014 01 10 1014 32 0500
USACE Project Manager Signature
November 27, 2013
Date of Signature
Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and
mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is
available at http //ribits usace.army.mil
Page 2 of 2
The Wilmington District Is committed to providing the highest level of support to the public To help us ensure we continue to do so, please complete the
Customer Satisfaction Survey located at our webslte at http / /regulatory usacesurvey com/ to complete the survey online
U.S. ARMY CORPS OF ENGINEERS
Wilmington District
Compensatory Mitigation Responsibility Transfer Form
Permittee: Norfolk Southern Railway Company Action ID: SAW- 2013 -00433
Project Name: Intermodal Facility County: Mecklenburg
Instructions to Permittee: The Permittee must provide a, copy of this form to the Mitigation Sponsor, either an approved
Mitigation Bank or the North Carolina Ecosystem Enhancement Program (NCEEP), who will then sign the form to verify the
transfer of the mitigation responsibility Once the Sponsor has signed this form, it is the Permittee's responsibility to
ensure that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed
copy of this form before conducting authorized impacts, unless otherwise specified below If more than one mitigation
Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and /or the mitigation will occur
in more,than one 8 -digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms
for each Sponsor and /or HUC must be provided to the appropriate mitigation Sponsors.
Instructions to Sponsor: The Sponsor must verify that the mitigation requirements shown below are available at the
identified site By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of
whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the
appropriate ledger and provide a copy of the signed form to the Permittee and to the USACE Bank /In -Lieu Fee Program
Manager The Sponsor must also comply with all reporting requirements established in their authorizing instrument
Permitted Impacts and Compensatory Mitigation Requirements:
Permitted Impacts Requiring Mitigation* 8 -digit HUC and Basin: 03050103, Catawba River Basin
Stream Impacts (linear feet)
Wetland Impacts (acres)
Warm
Cool
Cold
Riparian
Riparian
Non - Riparian
Coastal
Warm
Cool
Cold
Rivenne
Non- riverine
Non - Riparian
Coastal
78
Riverine
Non- riverme
39
*If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor
Compensatory Mitigation Requirements: 8 -digit HUC and Basin: 03050101, ,Catawba River Basin
Stream Mitigation (credits)
Wetland Mitigation (credits)
Warm
Cool
Cold
Riparian
Riparian
Non - Riparian
Coastal
Rivenne
Non- riverine
78
Mitigation Site Debited: NCEEP
(List the name of the bank to be debited For umbrella banks, also list the specific site. For NCEEP, list NCEEP. If the NCEEP
acceptance letter identifies a specific site, also list the specific site to be debited)
Section to be completed by the Mitigation Sponsor
Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation
transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for
providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action
ID number shown I also verify that released credits (and /or advance credits for NCEEP), as approved by the USACE, are
currently available at the mitigation site identified above Further, I understand that if the Sponsor fails to provide the
required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to
ensure compliance associated with the mitigation requirements.
Mitigation Sponsor Name: wee
Name of Sponsor' Authorized epr entative: VJl W N GI I ca
d/0 I A A � U:�� ZE Aa�q A
Signature p sor' Authorized Representative Date of Sign —
Page 1 of 2 Form Updated 2 October, 2012
USACE Wilmington District
Compensatory Mitigation Responsibility Transfer Form, Page 2
Conditions for Transfer of Compensatory Mitigation Credit:
• Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the
Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains
responsible for any other mitigation requirements stated in the permit conditions.
• Construction within Jurisdictional areas authorized by the permit identified on page one of this form can begin only
after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has
accepted responsibility for providing the mitigation requirements listed herein For authorized impacts conducted by
the North, Carolina Department of Transportation ( NCDOT), construction within Jurisdictional areas may proceed upon
permit issuance, however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of
permit issuance NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming
that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein
• Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE
administrative records for both the permit and the Bank /ILF Instrument It is the Permittee's responsibility to ensure
that the USACE Project Manager (address below) is provided with a signed copy of this form
• If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to
the USACE, the Sponsor must obtain case -by -case approval from the USACE Project Manager and /or North Carolina
Interagency Review Team (NCIRT) If approved, higher mitigation ratios may be applied, as per current District
guidance and a new version of this form must be completed and included in the USACE administrative records for both
the permit and the Bank /ILF Instrument
Comments /Additional Conditions:
This form is not valid unless signed by the mitigation Sponsor and USACE Project Manager. For questions regarding this
form or any of the conditions of the permit authorization, contact the Project Manager at the address below
USACE Project Manager:
USACE Field Office:
Email-
Amanda Jones
Asheville Regulatory Field Office
US Army Corps of Engineers
151 Patton Avenue, Room 208
Asheville, North Carolina 28801 -5006
amanda fuemmeler @usace army mil
DlgOally signed by
FUEMMELER.AMAND ohs "_AMAN JONFS 22835,90
AJONES.1242835090 vKPUEMMELER AMANDAJONES 1242835090
Dace 2014 01 10 10 14 47 05'00'
November 27, 2013
USACE Project Manager Signature Date of Signature
Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and
mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is
available at http. / /ribits usace army.mll
Page 2 of 2
The Wilmington District is committed to providing the highest level of support to the public To help us ensure we continue to do so, please complete the
Customer Satisfaction Survey located at our website at http / /regulatory usacesurvey com/ to complete the survey online