Loading...
HomeMy WebLinkAboutWQ0021632_CEI_20220725ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director NORTH CAROLINA Environmental Quality July 25, 2022 Mr. Shane Fletcher, Residuals Management Coordinator City of Burlington PO Box 1258 Burlington, NC 27215 SUBJECT: Compliance Evaluation Inspection City of Burlington, Class A Residuals Management Program Permit No. WQ0021632 Alamance County Dear Mr. Fletcher: On July 21, 2022, Division of Water Resources staff Caitlin Caudle conducted a compliance inspection. Staff person Seren Homer accompanied Ms. Caudle on the inspection. Shane Fletcher, Residuals Management Coordinator, was present during the entire inspection. A review of records, belt press, residuals storage, and water treatment plant storage ponds was completed. This review reflected compliance with the subject permit. Please refer to the enclosed inspection report for additional comments and observations. If you have any questions, please contact me or Ms. Caudle at the letterhead address or phone number, or by email at lon.snider@ncdenr.gov or caitlin.caudle@ncdenr.gov. Sincerely, LDocuSiiggned by:by� L-0,.. l . c%n.aCf 145B49E225C94EA... Lon T. Snider, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ-WSRO Enc: Inspection Report Cc: Alamance County Environmental Health Laserfiche File WQ0021632 WSRO Electronic Files GDE NORTH C AROLINA ' omm ep..orEMr n nt o�.iXks. North Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office 1450 W. Hanes Mill Rd, Suite 300 I Winston-Salem, North Carolina 27105 336.776.9800 Compliance Inspection Report Permit: WQ0021632 Effective: 01/01/18 Expiration: 12/31/22 Owner : City of Burlington SOC: Effective: Expiration: Facility: City of Burlington DCAR County: Alamance 2471 Boywood Rd Region: Winston-Salem Contact Person: Robert C Patterson Graham NC 27253 Title: Phone: 336-222-5130 Directions to Facility: Take NC Hw. 87 South off of 1-85 (Exit 147). Proceed on NC Hwy. 87 South, and bear left onto Swepsonville Road. At Boywood Road, bear right. The entrance to the WWTP is 0.25 miles on the right System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: NC0023876 City of Burlington - Southside WWTP NC0083828 City of Burlington - J.D. Mackintosh, Jr. WTP Inspection Date: 07/21/2022 Entry Time 10:05AM Exit Time: 12:30PM Primary Inspector: Caitlin Caudle Phone: 336-776-9699 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Distribution of Residual Solids (503) Facility Status: II Compliant Not Compliant Question Areas: ▪ Miscellaneous Questions Record Keeping Treatment ▪ Sampling (See attachment summary) Page 1 of 4 Permit: WQ0021632 Owner - Facility: City of Burlington Inspection Date: 07/21/2022 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On July 21, 2022, Division of Water Resources staff Caitlin Caudle conducted a compliance inspection. DWR staff Seren Homer accompanied Ms. Caudle on the inspection. Shane Fletcher, Residuals Management Coordinator, was present during the entire inspection. A review of records, belt press, residuals storage, and water treatment plant storage ponds was completed. This review reflected compliance with the subject permit. Compost was last made in May of 2020. All residuals from the belt press are shipped to McGill. There is no plan to make compost in the immediate future. Only one digestor at the South Plant is used on a regular basis. There are three round digestors and two square digestors, all other digestors remain empty. The WWTP ORC will waste into the digestor for a week and the belt press will be run for three days. Approximately 300,000 gallons of residuals are processed in a week. The pump that sends residuals from the digestor to the belt press is in the basement of Building I, where the digestor is.. The South plant sludge will be sampled once a year in case residuals have to be land applied under the Class B permit. Other observations: • Hauling records were available for the spring/summer hauling event. Mr. Fletcher stated that another hauling event will start in August. • Synagro manages all field loading records and nutrient and pollutant loading calculations. • Synagro will get a Utilization Agreement from each landowner. • Mr. Fletcher stated that he will collect fecal samples from the compost if any was made. • A static aerated pile method was used to make compost. Compost piles were built around corrugated pipes which sent forced air through the pile. Biofilters are present to remove the foul odors from the forced air. • There are approximately 500 loads of 6,200 gallons in each of the 2 storage ponds at the WTP. Each storage pond has approximately one year of storage. • There is a one acre covered concrete pad that all belt press material is stored on. The immediate dumping area has a concrete berm that keeps the residuals from flowing. There is also another area that has a berm for additional storage. • A composite grab sample is collected from the WTP storage ponds before hauling starts and during hauling. • Hauling and application was not occurring at the time of inspection. • Residuals from the WTP are now toploaded on a circle drive rather than beside the storage ponds. • The WTP produces an alum sludge. • The Ed Thomas WTP sludge is sent to the East plant and mixed with sludge to be land applied. • Mr. Fletcher stated that there are funds available to purchase another belt press. Page 2 of 4 Permit: WQ0021632 Owner - Facility: City of Burlington Inspection Date: 07/21/2022 Inspection Type : Compliance Evaluation Reason for Visit: Routine Type Land Application Distribution and Marketing Record Keeping Is GW monitoring being conducted, if required? Are GW samples from all MWs sampled for all required parameters? Are there any GW quality violations? Is GW-59A certification form completed for facility? Is a copy of current permit on -site? Are current metals and nutrient analysis available? Are nutrient and metal loading calculating most limiting parameters? a. TCLP analysis? b. SSFA (Standard Soil Fertility Analysis)? Are PAN balances being maintained? Are PAN balances within permit limits? Has land application equipment been calibrated? Are there pH records for alkaline stabilization? Are there pH records for the land application site? Are nutrient/crop removal practices in place? Do lab sheets support data reported on Residual Analysis Summary? Are hauling records available? Are hauling records maintained and up-to-date? # Has permittee been free of public complaints in last 12 months? Has application occurred during Seasonal Restriction window? Comment: Treatment Check all that apply Aerobic Digestion Anaerobic Digestion Alkaline Pasteurization (Class A) Alkaline Stabilization (Class B) Compost Drying Beds Other Comment: See comments. Yes No NA NE El • Yes No NA NE ❑ ❑ • ❑ DEED • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ • ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Yes No NA NE • • Page 3 of 4 Permit: WQ0021632 Owner - Facility: City of Burlington Inspection Date: 07/21/2022 Inspection Type : Compliance Evaluation Reason for Visit: Routine Sampling Describe sampling: Is sampling adequate? Is sampling representative? Comment: Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ Page 4 of 4