Loading...
HomeMy WebLinkAboutNCC222666_ESC Approval Submitted_20220725ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality July 21, 2022 LETTER OF APPROVAL WITH MODIFICATIONS The Brevard Hotel, LLC ATTN: Alan O'Neal 217 Country Club Park #422 Birmingham, AL 35213 RE: Project Name: Brevard Hotel - City Camper Acres Approved: 3.87 Project ID: TRANS-2022-018 County: Transylvania City: Brevard Address: N Broad Street River Basin: French Broad Stream Classification: B Submitted By: Bowman Date Received by LQS: June 17, 2022 Date Fee Received by LQS: June 17, 2022 Date Revision Received: July 11, 2022 Plan Type: Commercial Dear Mr. O'Neal, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the TM D Q .,- North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Reglonal Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 m� /'� 828.296.4500 Letter of Approval with Modifications The Brevard Hotel, LLC July 21, 2022 Page 2 of 3 COC prior to commencement of any land disturbing activity. The eN01 form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerel Isaiah Reed, El, CP Q, 4C Cl Assistant Regional Engineer Letter of Approval with Modifications The Brevard Hotel, LLC July 21, 2022 Page 3 of 3 Land Quality Section Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet Modifications cc: AGonzalez@bowman.com Regional Office file MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Brevard Hotel - City Camper Project ID: TRANS-2022-018 County: Transylvania For final plan approval, please provide to this office the requested documents listed below, 1) Provide a detailed description of Item 9 in the construction sequence on Sheet C 5.0 including but not limited to; Site conditions at the time of removal, method of removal, and duration of removal. 2) Provide an area for the storage of material that will be used for basin closure. 3) Provide a drainage area map showing all on site and offsite drainage areas contributing to basin storage volume (Conner, Lisa D-lot). Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities