Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW3220304_Plansheet - Misc. Detail_20220323
O 8" ADS N-12 COMPATIBLE PAVEMENT W SLABRETE BASIN W ADAPTOR W/ SCREW TYPE BUILDING PER PLAN SIZE (MIN.) CLEANOUT PLUG FACE ____ 8" MIN. _"_"- 15" 4' -0" PVC OR HDPE DRAIN 16" MIN. 18" 4'-6" 3"X4" PIPE; SIZE AND 24" 5'-0" DOWNSPOUT MATERIAL AS SPECIFIED 30" 6'-0" 2'-6" CURB AND 8" ADS N-12 PIPE SEAL AROUND ON SCHEDULE 8" MIN. - - GUTTER WITH (LENGTH AS REQUIRED TO JOINT DRAIN BASIN WITH H-25 RATED CURB OPENINGS SECTION AT CURB MATCH FINISH GRADE BACKFILL MATERIAL SHALL BE CRUSHED STONE PER PLAN ) CAST-IRON STD. PATTERN DUCTILE IRON OR GRAVEL MATERIAL MEETING CLASS 1 OR 2 SECTION AT DOWNSPOUT GRATE OR SOLID LID; SIZE AND AS SPECIFIED IN ASTM D2321. B LASS 1 CONC. PAVING CURB CUT ADAPTER PER DETAIL 11/C-801 2� 4.5' MIN 4.5' MIN TYPE AS SPECIFIED ON SCHEDULE MATERIALFTS SHALL AND BE PLACED UNIFORMLY IN SHOULDE (SEE PLAN) 2' (MIN.) (SEE PLAN) 2' (MIN.) �f CLEANOUT TYPICAL INSTALLATION IN PAVEMENT AREAS DRAIN BASIN WITH DUCTILE MIN. 6" WIDE BY 4" THK. •s;;,;;,; •- - ••"•••�'.�;::•: «''' `' ^'-- - ---- - t° 1-3/8" IRON GRATE OR SOLID LID; CONC. PAD TO BE "' : •• �•'•,':x°':::'-''.::•�::: ; : •::..`'. Fi-: r.:;.•:: �_`..:�•:: ADS N-12 SIZE AND TYPE AS FINISHED GRADE FORMED AROUND DRAIN X/�X//�/NN /N//X//�/�//�//� \, • /��/��%�%//� /� 45' BEND BASIN FRAME. SPECIFIED ON SCHEDULE z z 3 1 1 11 MAX ADS N-12 "D" x 8" 3 3 REDUCING WYE COMPACTED ABC PVC BODY 1 PERMANENT GRASS LINING PER SEEDING WATERTIGHT ADAPTORS SPECIFICATIONS, FOR USE WITH ALL SHEET C-700, TYP. ADS N-12 90• BEND PVC OR HDPE DRAIN PLASTIC PIPING SYSTEMS o END CAP PIPE; SIZE AND ELEVATION PLAN MATERIAL AS SPECIFIED ON SCHEDULE CROSS SECTION TYPICAL INSTALLATION IN YARD OR SIDEWALK AREAS 8" PVC NOTES: NOTES: HEADER PIPE 1. GRATES WITHIN LAWN AREAS TO BE 12" STANDARD PATTERN DUCTILE IRON. SIZE PER PLAN 1. THE DIAMETER OF THE PIPE "D" MAY VARY FROM 8" - 15" 2. GRATES WITHIN MULCHED PLANTING BEDS TO BE 12" DUCTILE IRON, ATRIUM STYLE. 3. GRATES WITHIN SIDEWALK AND PEDESTRIAN AREAS TO BE 12" ADA-COMPLIANT 2. ALL JOINTS SHALL BE WATER TIGHT DUCTILE IRON. 3. ADS N-12 PIPE AND APPURTENANCES MAY BE SUBSTITUTED 4. AREA DRAINS SHALL BE FURNISHED WITHOUT SUMP, ELSE SUMP SHALL BE FILLED WITH LIKE HIGH DENSITY POLYETHLENE PIPE OR PVC PRODUCTS WITH LEAN CONCRETE. TYPICAL SECTION AT DRIVEWAY N.T.S. 720 STORM DRAIN CLEANOUT N.T.S. 12 ROOF DRAIN DETAIL W/ CLEANOUT N.T.S. $ AREA DRAIN N.T.S. (41 DF CURB TOP OF CURB END OF CURB FLARE GUTTER L-UkJL \JI I /"7 VLIVILIV 1 3.0' 3.0' SANS. 2 W 1 2/3Do La 0.00% SLOPE --- x v NON -WOVEN FILTER PROFILE E SECTION A -A FABRIC UNDER STONE LO La NOTES: 1. SEE TABLE BELOW FOR RIPRAP SIZE, LENGTH, WIDTH AND DEPTH OF APRON. 2. RIPRAP SHOULD EXTEND UP BOTH SIDES OF THE APRON AND AROUND THE END OF THE PIPE OR CULVERT AT THE DISCHARGE OUTLET AT A MAXIMUM SLOPE OF 2:1 AND A HEIGHT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER OR CULVERT HEIGHT. 3. THERE SHALL BE NO OVERFLOW FROM THE END OF THE APRON TO THE SURFACE OF THE RECEIVING CHANNEL. THE AREA TO BE PAVED OR RIPRAPPED SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL. 4. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING CHANNEL. MAXIMUM TAPER TO TO RECEIVING CHANNEL 5:1 5. ALL SUBGRADE FOR STRUCTURE TO BE COMPACTED TO 95% OR GREATER. 6. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED IN THE RECEIVING CHANNEL SHALL NOT BE ALLOWED. 7. NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT OF THE APRON WILL BE PERMITTED. Do - PIPE STRUCTURE DIAMETER Q10 TAILWATER LENGTH WIDTH d50/dmax DEPTH NCDOT (IN) (CFS) (FT.) (FT.) (FT.) (IN.) (IN.) CLASS HW-1 36 34 - 20 23 8/12 18 B HW-2 10 3.2 - 5 5 4/6 18 A STANDARD RIP RAP APRON SIDESSIDES F-PERLOPE OSHA TRENCH REQUIREMENTS F-P RL ENCH OSHA OPE RREQUIREMENTS FILL SELECT SELECT FILL INITIAL BACKFILL 12" rD 12" D rD D MIN. 4" iD HAUNCHING L i BEDDING REQUIRED IF ww&%O�w TRENCHING ROCK NOTES: 1. A STABILIZED ENTRANCE PAD OF 2"-3" WASHED STONE OR RAIL ROAD BALLAST SHALL BE LOCATED WHERE TRAFFIC WILL ENTER OR LEAVE THE CONSTRUCTION SITE ONTO A PUBLIC STREET. 2. FILTER FABRIC OR COMPACTED CRUSHER RUN STONE SHALL BE USED AS A BASE FOR THE CONSTRUCTION ENTRANCE. 3. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS WARRANT AND REPAIR OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 4. ANY SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY. 5. WHEN APPROPRIATE, WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. WHEN WASHING IS REQUIRED, IT SHALL BE DONE IN AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN SEE STD. NO. 30.11B. 12 i &.11I? [eXd 3i1oP I o] N.T.S. 19 STABILIZED CONSTRUCTION ENTRANCE GRATE 1 REBAR FOR BAG REMOVAL FROM INLET DEFLECTOR PUBLIC STREET SOIL STABILIZATION FABRIC UNDER WASHED STONE HOOD GRATE ---i I- w w In U J m FILTER BAG A EXPANSION DUMP LOOPS RESTRAINT a.. ;• 4. a' CATCH BASIN A .: r OUTLET °.> ..a . a °, .a. '. a,° : • a . . \ ^ P ° a � a• INSTALLATION SECTION VIEW NOTES: 1. INLET MAINTENANCE SHALL BE DOCUMENTED IN PROJECT LOG BOOK. 2. FILTER TYPES SHALL BE APPROVED BY THE SITE INSPECTOR PRIOR TO INSTALLATION. 3. FILTER BAGS MAY BE REMOVED WHEN SITE IS STABILIZED AT THE DIRECTION OF THE EROSION CONTROL INSPECTOR. 4. FILTER BAGS SHALL BE REMOVED PRIOR TO STREET ACCEPTANCE. 5. FILTER BAGS SHALL BE CLEANED OR REPLACED ON A REGULAR BASIS (NOT BE MORE THAN HALF FULL AT ANY TIME). 6. FILTER BAGS SHALL NOT BE ALLOWED IN EXISTING CITY OR STATE ROADS UNLESS PRIOR APPROVAL IS GRANTED. N.T.S. 18 CATCH BASIN INLET PROTECTION 2' MIN. TOP RIM OF DITCH ,�IIr-Il�llr STEEP CUT OR �0 FILL SLOPE - 2:1 SLOPE MAX NOTE: CROSS SECTION A -A STABILIZE DIVERSION DITCH WITH TEMPORARY SEEDING AND EROSION CONTROL NETTING. CLEANOUT COVER ASSEMBLY, 4" THK., 3000 PSI CAST IRON FRAME WITH BOLTED CONC. PAD TO BE OR THREADED, SOLID LID SET AROUND CLEANOUI FLUSH IN A CONCRETE BORDER. CLEANOUT RISE THREADED PLU WYE FITTING LATERAL DRAIN LINE SIZE AND SLOPE PER PLAN FLOWS CONCRETE OR CONCRETE BLOCK N.T.S. ( 11 l TYPICAL CLEANOUT - SANITARY SEWER #5 WASHED STONE \ °° ° v / �0 00� �- 0 o 0 A �0 0 A o. 00 ° - STORAGE AREA �/ ° 00 0 00 \ / T CATCH BASIN � / \ � I 1 #5 WASHED STONE PLAN VIEW 12" MI NOTES: SECTION A -A 1. SEDIMENT SHALL BE REMOVED AND TRAP RESTORED TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO 1/2 THE DESIGN DEPTH OF THE TRAP. 2. REMOVED SEDIMENT SHALL BE DEPOSITED IN A SUITABLE AREA AND IN SUCH A MANNER THAT IT WILL NOT ERODE. 3. THE STRUCTURE SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS/HER AGENT AFTER EACH STORM EVENT AND REPAIRS MADE AS NECESSARY. 4. CONSTRUCTION OPERATIONS SHALL BE CARRIED OUT IN A SUCH A MANNER THAT EROSION AND WATER POLLUTION ARE MINIMIZED. 5. THE SEDIMENT TRAP SHALL BE REMOVED AND THE AREA STABILIZED WHEN THE DRAINAGE BASIN HAS BEEN PROPERLY STABILIZED. 6. ON LARGER DRAINAGE AREAS RIP RAP MAY BE REQUIRED UNDER THE WASHED STONE. N.T.S. 10 STONE INLET SEDIMENT TRAP 8.00' MAX. VARIABLE AS DIRECTED BY THE ENGINEER 10 ga MIN. LINE WIRES WARNING SIGN PLASTIC OR ` STEEL POST WIRE TIES I TREE PROTECTION AREA - WARNING SIGN Z- '1-� WOVEN WIRE FABRIC DO NOT ENTER MIN. 12-1 ga � - INTERMEDIATE WIRES GRADE ORANGE, UV RESISTANT, HIGH - TENSILE STRENGTH POLY BARRICADE FABRIC, TYP. N.T.S. ( 3 N.T.S. ( 2 "_""_"" " L-- ORANGE, UV RESISTANT, 1 } RIGID PIPE FLEXIBLE PIPE O POLY BARRICADE FABRIC, TYP. HIGH - TENSILE STRENGTH N INCLUDES REINFORCED INCLUDES CORRUGATED METAL, HDPE, UPSLOPE TOE POSITIVE GRADE 1.0% MAXIMUM II I CONCRETE AND PVC PIPE 3'-4- NOTES: 1. BEDDING SHALL BE CLASSI-A WORKED / FRONT ELEVATION VIEW FRONT SIDE VIEW BY HAND. IF GROUNDWATER IS 6. SELECT BACKFILL NOT UNDER PAVED -- TREE PROTECTION AREA ANTICIPATED, THEN BEDDING SHALL BE AREAS CAN BE CLASS IV -A COMPACTED CLASS-B COMPACTED TO 95% STD. TO 95% STD. PROCTOR. SIDE SLOPES TOP RIM OF DITCH I N NOTES: PROCTOR. 7. ALL MATERIALS ARE CLASSIFIED IN 2:1 MAX -- 1. TREE PROTECTION FENCING MUST BE INSTALLED AT A MINIMUM RADIUS OF THE CRITICAL ROOT ZONE. DO NOT ENTER 2. HAUNCHING SHALL BE WORKED AROUND ACCORDANCE WITH THE LATEST EDITION THE PIPE BY HAND TO ELIMINATE VOIDS OF ASTM D 2321. AND SHALL BE CLASS 1-1 OR CLASS 8. ALL MATERIALS SHALL BE INSTALLED IN \ 2. THE TREE PROTECTION FENCING MUST REMAIN IN PLACE FOR THE DURATION OF THE PROJECT. - I-B OR CLASS II COMPACTED TO 95% MAXIMUM 8" LOOSE LIFTS IN - ZONA DE PROTECCION PROCTOR. ACCORDANCE WITH ASTM D 698. CLASS 3. APPROVED IMPACT PROTECTION DEVICES MUST BE REMOVED AFTER CONSTRUCTION WHEN APPLICABLE. �n 3. INITIAL BACKFILL SHALL BE CLASS I -A III AND IV -A MATERIALS SHALL BE STEEP CUT OR FILL SLOPE WORKED BY HAND, OR CLASS I-B OR COMPACTED NEAR OPTIMUM MOISTURE 4. SIGNS SHALL BE PLACED AT 50' MAXIMUM INTERVALS. PLACE A SIGN AT EACH END OF LINEAR TREE PARA ARBOLES - NO ENTRE CLASS 11 COMPACTED TO 95% STD. CONTENT. PROTECTION AND 50' ON CENTER FOR THE REMAINDER. PROCTOR. 9. FILL SALVAGED FROM EXCAVATION m m 4. INIITIAL BACKFILL NOT UNDER PAVED SHALL BE FREE OF DEBRIS, ORGANICS 5. FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER AREAS CAN BE CLASS 11 COMPACTED TO AND ROCKS LARGER THAN 3". PROTECTED AREA. WARNING SIGN DETAIL 90% STANDARD PROCTOR. 10. ALL TRENCH EXCAVATIONS SHALL BE 5. SELECT BACKFILL SHALL BE CLASS I, 11, SLOPED, SHORED, SHEETED, BRACED OR O 6. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. PROVIDE WARNING LANGUAGE IN BOTH OR III COMPACTED TO 95% STD. OTHERWISE SUPPORTED IN COMPLIANCE PLAN VIEW ENGLISH AND SPANISH AS SHOWN PROCTOR WITH TOP 24" COMPACTED TO WITH OSHA REGULATIONS AND LOCAL 7. SIGNS ARE TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL WITH LETTERS A MINIMUM OF 3" HIGH, 100% STD. PROCTOR. ORDINANCES. CLEARLY LEGIBLE AND SPACED AS SHOWN. TRENCH DETAIL FOR STORM PIPES N•T•S• 17 TEMPORARY DIVERSION DITCH N.T.S. 9 TREE PROTECTION FENCE N.T.S. 1 ColeJenest & Stone Shaping the Environment Realizing the Possibilities Land Planning Landscape Architecture Civil Engineering Urban Design 200 South Tryon Street, Suite 1400 Charlotte, North Carolina 28202 p+ 704 376 1555 f+ 704 376 7851 url+ www.colejeneststone.com A.M. KING 1610 EAST MOREHEAD SUITE 200 CHARLOTTE, NC 28207 ALDI EAST SPENCER IN -BOUND TRAFFIC IMPROVEMENTS 1985 OLD UNION CHURCH ROAD EAST SPENCER, NC 28146 SITE DETAILS I-1VJV L ivu. A 77'2 IJJuVU 12/10/21 Revised 02/11 /22 my SEAL n F-1409 p C-596 =Q;' •� .pTN CAROB ```%"J%J111 11 'F • 5 '11In11 ►►P`%02/11/2022 CM800 The drawings, the project manual and the design shown theron are instruments of Bolton & Menk Southeast, LLC.. The reproduction or unauthorized use of the documents without consent of Bolton & Menk Southeast, LLC. is prohibited. OBolton & Menk Southeast, LLC. 2021 C VARIABLE cc 1/g" RADIUS 40d SPIKE g„ - �} O O O O N /6" +6" +6" > _ 0.02 SLOPE Q Q O O O O N ZOC=U H =I H rr r n rr n - 2" RADIUS 0 J a H z r, 6 2 -0 6 2'-0 1.60 2.40 p = 1 2 RA I S to 0o DU / H -•• :_ - ::_:-:•::_r LU U zQ o = 3 RADIUS 1 /gn RADIUS 1 /8" RADIUS O O 2% MAX eN•�N JOINT SEALER BASE COURSE VAR. � _ °C z H ' O O ° JOINT FILLER 13/q" RADIUS : SURFACE COURSE w cV O SHOWING EXPANSION JOINT p ~ LL o _J e 5" MONOLITHIC CONCRETE ISLAND (SURFACE MOUNTED) 0 U) io r I• I I i4 MAX % 1i " RADIUS ON ASPHALT CONCRETE PAVEMENT EL' H H O O � -4)- cO j $ (USE ON ISLAND 4' WIDE OR GREATER) T LLI L 2'-6" L L 2'-6" L VARIABLE T STANDARD 2'-6" CURB AND GUTTER CURB AND GUTTER OPENING 0.02 SLOPE 9„ 000000000 o00000000 c� o 80.,0 O O O O 04 O O O O 0 0 0 0 0 0 0 6" N O O O O O SEE TYPICAL SECTIONS O O O O JOINT SEALER FOR PAVEMENT DEPTH. ->0000000 00000 KEY IN ON THE MODIFY STANDARD n H LAST LAYER OF T +0 +0 SHOWING GROOVED JOINT PAVEMENT SURFACE I '. `. •. ". .._.'•. SE e : .a ,:e e DETAIL TO USE 6" VARIES WITH WIDTH OF RAMP COURSE SURFACE COURSE 2" RADIUS CURB TAPER (TYP) TRUNCATED DOME PLAN VIEW >; J" LIP IN CONCRETE PARTIAL LONGITUDINAL SECTIONS BASE COURSE BINDER COURSE 13/4" RADIUS p c� EXPANSION "EXPANSION OR EXISTING PAVEMENT LL 507o-60% BASES, o JOINT, TYP. JOINT, TYP. OF PAVED ISLANDS 5" MONOLITHIC CONCRETE ISLAND (KEYED IN) N DIAMETER NOTE: ON ASPHALT CONCRETE PAVEMENT Z NOTES: 0 90H 6'-0" 4'-0" USE ON ISLAND LESS THAN 4' WIDE 8.3% MAX. ALLOWABLE MIN. WIDTH WHEN MONOLITHIC CONCRETE ISLAND IS ON TOP OF SURFACE r m m m� M M M M M M M M M < J TRUNCATED DOME SECTION 1. CONTRACTION JOINTS SHALL BE SPACED AT 10-FOOT INTERVALS. �� SLOPE, TYP. COURSE, DRIVE 40d SPIKES INTO SURFACE UNDER MONOLITHIC ' 11 " x 6" LONG DIA. DEFORM _ ' p N NOTES: PLAN VIEW I --I BARS ON 24' C STAGGERED _ p CONCRETE ISLAND. STAGGER SPIKES ON 2' CENTERS EACH WAY. N cc 2. CONTRACTION JOINTS MAY BE INSTALLED BY THE USE OF TEMPLATES OR FORMED SCALE: 1„ =3 -0" 0.02 SLOPE Q W 1. THE CURB -CUT RAMPS SHALL COMPLY WITH CHAPTERS 10 o BY OTHER METHODS. WHERE SUCH JOINTS ARE NOT FORMED BY TEMPLATES, IN THE CONCRETE PAVEMENT (ISLAND) AND CONCRETE ISLAND a :e e Z H AND 11 OF THE NORTH CAROLINA BUILDING CODE 2018 AND ' ; A MINIMUM DEPTH OF 1 1/2" SHALL BE OBTAINED. THE ICC-2003/ANSI A117.7-2003. W (MONOLITHIC) PLACE %2" EXPANSION JOINTS AT 30' INTERVALS H AND GROOVED JOINTS 1" DEEP AT 10' INTERVALS BETWEEN ' 13/4"' RADIUS 2" RADIUS ' } Z 3. ALL EXPANSION JOINTS SHALL BE SPACED AT 90-FOOT INTERVALS, AND 2. THE SLOPE OF ALL NEW RAMPS INCLUDING SIDE FLARES 2''8' 6'-0" 4'-0" MIN. EXPANSION JOINTS. 5 MONOLITHIC CONCRETE ISLAND Q O ADJACENT TO ALL RIGID OBJECTS. JOINTS SHALL MATCH LOCATIONS WITH JOINTS SHALL BE 8.33% (1 RISE PER 12 RUN) OR LESS UNLESS CURB & CONCRETE RAMP LANDING ® 2% MAX. SLOPE � 0 IN ABUTTING SIDEWALK. GUTTER 8.33% MAX SLOPE, 2% MAX CROSS SLOPE SURFACE MOUNTED ON CONCRETE PAVEMENT o OTHERWISE NOTED. CARE MUST BE TAKEN TO CAREFULLY ( ) EXPANSION JOINT " LINE UP THE JOINTS IN THE CONCRETE PAVEMENT (ISLAND) VARIABLE 4CONCRETE COMPRESSIVE STRENGTH SHALL BE 3600 N 28 DAYSMEASURE THE GRADE CHANGE AT THE CURB (USUALLY 6") TRUNCATED DOME WITH THE JOINTS IN THE CURB OR CURB AND GUTTER. JOINT SEALER . P.S.I. . . COMBINED WITH THE SLOPE OF THE SIDEWALK TO ENSURE "LIP BOTH PAVERS, TYP. JOINT FILLER THE SLOPE DOES NOT EXCEED THE MAXIMUM 8.33%. N FILL AND SEAL THE TOP 1/2" OF THE EXPANSION JOINTS AND 5. CURB SHALL BE DEPRESSED AT INTERSECTIONS TO PROVIDE FOR FUTURE SIDES OF RAMP CURB AND GUTTER 4" CONC. COVER THE ENTIRE DEPTH OF GROOVED JOINTS WITH JOINT SEALER. AS CALLED FOR ON 0.02 SLOPE ACCESSIBLE RAMPS. 3. ALL CONCRETE RAMPS SHALL HAVE A FINE BROOM FINISH. PLANS. 6. TOP 6" OF SUBGRADE BENEATH THE CURB AND GUTTER SHALL BE COMPACTED FOR JOINTS IN THE CURB AND/OR CURB AND GUTTER SEE SURFACING a'o 'oeo+ .d a !.o 4. CONCRETE SHALL BE 3,000 PSI ® 28 DAYS " " p o.:..a . . o.:.•a..o...,a..o o. TO 100% STANDARD PROCTOR DENSITY. a:ticy;? 4" BASE COURSE :c �'c. o:ad':? _oQp'.o.:' ,..: • IL 8 4 STANDARD N0. 846.01 SHEET 1 of 1 5. ALL CONCRETE EXPANSION JOINTS SHALL BE 1/2", ASPHALT SECTION A PAVED CONCRETE ISLAND 1852.011 52 . 01 IMPREGNATED FIBERBOARD EXPANSION JOINT MATERIAL IN SCALE: "=1'-0" LOCATIONS SHOWN ON DRAWINGS. CONCRETE MEDIAN N.T.S. r201 2'-611 CURB AND GUTTER N.T.S. r121 ACCESSIBLE CURB RAMP N.T.S. r4l 3/8"0 GALV. STEEL ROD LOOP WELDED TO END CAP 1/2" 1. LEFT RIGHT WELDED END CAP I-3 �T 1/4" GALVANIZED STEEL CHAIN 18" LONG MIN. LATCH DETAIL VARIES (SEE SITE PLAN) TYP. 6" VARIES (SEE SITE PLAN) TYP. 6" 4' o/c MAX. 2'-0" SEE LATCH - o DETAIL ABOVE I `t 2" NOM. SCH.40 STEEL PIPE lime S: O M PNP�70MPACTED SUBGRADE IF 18" NOTES 1. PROVIDE 3" O.D. KEEPER POST (2 REQUIRED). SET IN 3' DEEP X 18" DIA. CONC. FOOTING. PROVIDE 180' HINGE SWING ADAPTER TO OPEN POSITION. 2. GATES SHALL INCLUDE KEEPER POSTS TO SECURE ACCESS. KEEPER POST SHALL BE 6" SCH. 40 STEEL POST INSTALLED WITH 18"X24" FOOTING AND SHALL INCLUDE CHAIN TO SECURE GATE ARM.(ONE KEEPER POST PER ARM). KEEPER POST SHALL HAVE STEEL BALL CAP. METAL SWING GATE NON-ABSORBANT BACKER LOW MODULUS SILICONE ROD 25% LARGER THAN JOINT SEALANT JOINT WIDTH PNA DIAMOND PLATE " JOINT AND FILLER; DOWEL, SEE TABLE INSTALL FULL DEPTH OF CONCRETE PAVING CONCRETE 44. PREFORMED JOINT FILLER 1H TYPICAL CONSTRUCTION JOINT 2" NOM. SCH. 40 STEEL PIPE CONCRETE FOOTING ® 3600 PSI SLAB DOWEL DOWEL LOAD PLATE LOAD PLATE THICKNESS DIMENSIONS (IN) CENTER -TO -CENTER BASKET CENTER -TO -CENTER (IN) SPACING (IN) DIMENSIONS (IN) SPACING (IN) 6 Y4X4-JX4-4 18 1X2X12 18 9.25 %X4-4X4-4 18 JX2-4X12 18 LOW MODULUS SILICONE JOINT SEALANT o NON-ABSORBANT BACKER ROD 25% LARGER THAN JOINT WIDTH Y4" MIN. / 3Y4" MAX. 4 PNA LOAD PLATE BASKET SEE TABLE TYPICAL SAW CUT CONTROL JOINT TYPICAL CONCRETE JOINT STEEL BALL CAP 6", SCH. 40 STEEL POSTS BOX HINGE STEEL WITH 180' ADAPTER FINE BROOM FINISH, TYP. AGGREGATE BASE COURSE COMPACTED TO 100% MOD. PROCTOR DENSITY COMPACTED SUBGRADE (TOP 12" COMPACTED TO 100% STD. PROCTOR DENSITY I, TYPICAL HD CONCRETE PAVING I, APPLICATION T (IN) NOTES LIGHT DUTY 6 AUTOMOBILE PARKING & CIRCULATION HEAVY DUTY 9.25 TRUCK PARKING & CIRCULATION NOTES: 1. ALL CONCRETE TO BE 4000 PSI, AIR ENTRAINED (6% t1.5% FOR J" MAX. AGGREGATE). 2. REFER TO DETAIL 18/C-801 FOR TYPICAL JOINT CONSTRUCTION. 3. THICKEN ALL FREE SLAB EDGES BY 50% (3" MIN.) WITH A 4' MIN. TAPER, TYPICAL. 4. EXTEND AGGREGATE BASE 12" BEYOND EDGE OF PAVEMENT OR 12" BEYOND BACK OF CURB WHERE CURB & GUTTER IS INCLUDED. N.T.S. 19 VEHICULAR CONCRETE PAVING WALL OR RIGID OBJECT SET ROOT COLLAR AT LOW MODULUS SILICONE JOINT SLOPE LINE SEALANT REMOVE BURLAP FROM JOINT AND FILLER; INSTALL EXISTING SLOPE 12" TOP J OF BALL. REMOVE \ FULL DEPTH OF CONCRETE CONTAINERIZED PLANTS SHRUB ON SLOPE NOTE: FROM THEIR CONTAINERS CONCRETE PAVING SHRUB SHALL BEAR SAME RELATION TO FINISHED GRADE 3" MULCH AS SPECIFIED - °• 4 °•'' °4: AS IT BORE TO PREVIOUS - y • '° a „a '� ' 4. ° GRADE EXCEPT IN AREAS OF ��� PLANTING SOIL AS SPECIFIED y q ,� • • d COMPACETD FILL, SHRUB TO \/ '• • • _ jolBE PLANTED 4" - 6" ABOVE NON- ABSORBANT BACKER FINISHED GRADE. '�, ` \ MOUND TOPSOIL 4" TO ROD 25% LARGER THAN FORM SAUCER, KEEP JOINT WIDTH -' - - - - SAUCER LEVEL PREFORMED JOINT FILLER ' SLOPES SCARIFY TO 12" DEPTH TYPICAL ISOLATION JOINT i NOTES: NOTES: 1. SCARIFY ROOT MASS OF STAGGERED 1. THICKNESS OF SEALANT TO BE Y2 OF JOINT WIDTH. CONTAINERIZED PLANT MATERIAL. ROWS, TYP. 2. IF JOINTS ARE FORMED OR TOOLED; THE EDGES SHALL BE 2. INSTALL CONTAINERIZED PLANTS FINISHED WITH NO MORE THAN A J" RADIUS. AT FINISHED GRADE, NO HIGHER THAN 2" ABOVE GRADE, AND CROWN HEIGHT IN INCHES EQUALS 3. JOINT FILLER STRIPS TO BE ASTM 1751 NEVER BELOW GRADE. SHRUB / \ ASPHALT -SATURATED CELLULOSIC FIBER. SHALL BE SET PLUMB. I 1 STAGGERED MEDIAN WIDTH IN EXISTING ROWS, TYP. FEET TO 12" MAX. GRADE 3. TAMP PLANTING MIX FIRMLY AS 4. CONCRETE TO BE CURED 28 DAYS, DRY, AND JOINT BLOWN PIT IS FILLED AROUND EACH � �, ,�, FINAL CLEAN OF ALL DEBRIS WITH HIGH-PRESSURE AIR BEFORE PLANT BALL. 10" (EX) GRADE INSTALLATION OF JOINT SEALANT MATERIAL. 5. PROVIDE ISOLATION JOINTS AT INTERSECTION OF PAVEMENT 4. OMIT COLLAR AROUND EACH EQUAL SPACING EDGE OF 10' AND ALL STRUCTURES AND RIGID OBJECTS. SHRUB WHEN IRRIGATION SYSTEM BETWEEN ALL PLANTS PLANTING BED EXAMPLE IS PRESENT. 6. SAW CUT CONTROL JOINTS SHALL BE SPACED AT MAXIMUM 5. MULCH TO BE 2"-3" AWAY FROM TYPICAL PLANTING BED PLAN TYPICAL BED MOUNDING 30 TIMES THE PAVEMENT THICKNESS, D, TYPICAL, NOT TO STEM. EXCEED A 15' X 15' GRID. THE GRID PATTERN SHALL BE UNIFORM THROUGHOUT THE PROPOSED PAVEMENT AREA. 6. SOAK EACH PLANT BALL AND PIT REFER TO SITE PLAN FOR PROPOSED JOINT PATTERN. IMMEDIATELY AFTER INSTALLATION. s W d I F °A 4 1/8" FINE BROOM FINISH CONCRETE, TYP. COMPACTED SUBGRADE (95% STD. PROCTOR), TYP. JOINT SEALER JOINT FILLER SAW -CUT JOINT ISOLATION/EXPANSION JOINT NOTES: 1. A GROOVE JOINT 1" DEEP WITH 1/8" RADII SHALL BE REQUIRED AT 5' INTERVALS OR AS INDICATED ON PLANS. A SEALED 1/2" ISOLATION/EXPANSION JOINT WILL BE REQUIRED AT 90' INTERVALS AND WHERE THE SIDEWALK JOINS ANY RIGID STRUCTURE. 2. CONCRETE COMPRESSIVE STRENGTH SHALL BE 3000 PSI, IN 28 DAYS. 3. CONCRETE THICKNESS SHALL BE INCREASED TO 6" MINIMUM AT DRIVEWAYS, TYPICAL. 4. SIDEWALK WIDTH SHALL BE A MINIMUM OF 5' AND SHALL MATCH SURROUNDING SIDEWALK PATTERNS AND WIDTHS IF GREATER THAN 5'. 5. SIDEWALK CROSS SLOPE (PERPENDICULAR TO DIRECTION OF TRAVEL) SHALL BE 2% MAXIMUM IN ALL AREAS. 6. ZIP STRIPS SHALL BE USED DURING POUR AT EXPANSION JOINTS. AFTER STRIP IS REMOVED A SELF -LEVELING URETHANE CAULK SHALL BE USED TO FILL THE VOID. N.T.S. 11 CONCRETE SIDEWALK AND MOW STRIP VAN CONDITION 1: PEDESTRIAN PATH ACCESSIBLE DOES NOT PASS UNDER OR AROUND SIGN CONDITION 2: PEDESTRIAN PATH RESERVED GOES BY, UNDER, PARKING OR AROUND SIGN BUILDING WALL LINE FINISHED FLOOR 24" ELEVATION ¢. BUILDING; •• FOUNDATION A ° ,• II�II�II: CONCRETE MOW STRIP 12"X6" ONLY REQ'D ® VAN ACCESSIBLE SPACES MUTCD R7-8 12"X27" mmm N r37.6 UM 0 0 TY F F O 0 WIrrfflAfflar 00 CID FINISH GRADE a N.T.S. 181 SHRUB PLANTING N.T.S. ( 101 ACCESSIBLE SIGN DETAIL 2% CROSS SLOPE (TYP) FINISHED GRADE SCALE: 11101 ( 31 N.T.S. ( 21 SIGNAGE ® © © ACCESSIBLE ROUTE ACCESSIBLE RAMP (2% MAX ,XSCROSS EE SITE BACK OF CURB TOP OF CONCRETE CURB OR FLUSH WALK VARIES PLAN FOR WIDTH. DETECTABLE WARNING 0 TO 6" 1/2" EXPANSION JOINT NOTES: SEE DETAIL 10.358 .•.W WWW.WW•.W.W. 1 + FACE OF CURB R6" . • . W . W . W . W . MAx. 1. SEE SITE PLAN FOR 1 LOCATION OF ALL ...,. A 2% o0 12.1 1 A VARIES I� 12 ACCESSIBLE PARKING 4" PAINTED oo MATCH 6" TO 5.5' 6" 2' AX SIDEWALK WIDTH SPACES R6" DETECTABLE WARNING" NYLON STRAP LINES, TYP. SEE CURB 2. 2% MAX. SLOPE IN ,RADIUS W DETAIL BELOW , , , , , ., VARIES.. . ROOT FLARE TO BE AT FINISH s� „ ANY DIRECTION 9 9 9 5 9 CONCRETE SECTION A -A GRADE. NO HIGHER THAN 2" ABOVE 6 SLIP KNOT WITH WITHIN PARKING SIDEWALK GRADE, AND NEVER BELOW GRADE. STOP KNOT. 6" LARGER SPACES OR ACCESS VAN TREE SHALL BE SET PLUMB THAN TREE DIAMETER. AISLES. ACCESSIBLE SPACE 1'-9" 9" 3/4 4" HIGH/6" WIDE MAX. BERM KEEP MULCH AWAY PLAN �I~ OUTSIDE OF ROOTBALL FROM TRUNK 2" TO 3" 1/2" EXPANSION JOINT (TYP,) 3" MAX. LAYER OF PARKING SPACE PAVEMENT MARKINGS CONSTRUCTION JOINT (TYP.) 6" (3) - 1 "X2"X18" WOOD MULCH. 12:1 SLOPE (INCLUDES STAKES WITH CENTERED 8 O O O DETECTABLE WARNING) R6" NOTES: HOLE DRIVEN IN LINE WITH FINISH GRADE STRAP EQUALLY SPACED CURB DETAIL 1. 3/4" NYLON STRAP IS USED (GUYING OF AROUND TREE VAN RESERVED VARIES o 000000 00000o NOTES TREES NOT REQUIRED UNLESS SPECIFIED). ACCESSIBLE 1 PARKING PARKING R6" 0-5'� �00oo�2%vMAX.a000 1 MUTCD 1. USE THIS DETAIL ONLY UNDER THE FOLLOWING CIRCUMSTANCES: 2. REMOVE WIRE OR NYLON TWINE FROM BALL. DISABLED R7-8 5-FOOT SIDEWALKS WITH CURB RADII OF 35 FEET OR GREATER REMOVE TYPICAL EXCESS RESERVED } 6-FOOT SIDEWALKS WITH CURB RADII BETWEEN 35 FT. AND 30 FT. SOIL FROM ROOT CROWN PARKING PASSENGER MUTCD 8-FOOT SIDEWALKS WITH CURB RADII OF 30 FEET OR LESS 3. INSTALL TOP OF BALL 2" ABOVE FINISH __ R7-1 VARIES �- -II, PLANTING SOIL, MUTCD LOADING o-s'• GRADE (ADJACENT UPHILL GRADE). _� �=1 � I -I I I- 2. DIRECTIONAL RAMPS MAY BE USED WHEN AN 8-FOOT PLANTING STRIP IS R7-8 PROVIDED. DO NOT USE THIS DETAIL IF THERE IS HARDSCAPE INSTEAD REMOVE TOP BURLAP _ -III-III-I BACKFILL AS SPECIFIED ONLY OF A PLANTING STRIP. 4. SOAK ROOT BALL AND PLANT PIT AND ANY NAILS, PINS, ETC. -III-III II III III-III=III- .. I . I - I - I- UNDISTURBED SOIL IMMEDIATELY AFTER INSTALLATION. III- -III-I - 3. ALL CONCRETE SHALL BE AT LEAST 3600 PSI. REMOVE TOP 3 OF WIRE -I ITI-ITI„ REQUIRED ACCESSIBLE MAXIMUM R7-8D 5. PLACE TWO(2) WOOD STAKES PARALLEL TO BASKET WHERE PRESENT ROOT BALL 12 RESERVED PARKING SIGN PN25TDY PERSPECTIVE STREET. DIA. NOT TO SCALE RAISE PIT BOTTOM TO SET MAXIMUM VARIES PENALTY R7-8D 6. 4" SAUCER WILL BE OUTSIDE OF BACKFILL. ROOT CROWN AT THE $ z5o MECKLENBURG COUNTY- CORRECT HEIGHT. FIRM CONDITION 1 60" LAND DEVELOPMENT `� �P! DIRECTIONAL ACCESSIBLE RAMP SOIL UNDER ROOT BALL. ALL TREES SHALL CONFORM WITH THE CURRENT ADDITION OF THE AMERICAN CONDITION 2 84" sTD. No. REV. 7. SEE SPECIFICATIONS FOR OTHER PLANTING STANDARD FOR NURSERY STOCK (ANSI Z60.1) FOR EXAMPLE: # STANDARDS �"% 10.40 REQUIREMENTS. SEE DETAIL 2/C-801 FOR CALIPER HEIGHT (RANGE) MAX. HEIGHT MIN. ROOT BALL DIA. MIN. ROOT BALL DEPTH MOUNTING REQUIREMENTS 8. SET TREE IN VERTICAL POSITION PRIOR TO 2" 12-14' 16' 24" 16" FINISHED GRADE STAKING. 3" 14-16' 18' 32" 21" DIRECTIONAL ACCESSIBLE RAMP N.T.S. 17 TREE PLANTING N.T.S. 9 ADA PARKING SPACE DETAIL N.T.S. 1 ColeJenest & Stone Shaping the Environment Realizing the Possibilities Land Planning Landscape Architecture Civil Engineering Urban Design 200 South Tryon Street, Suite 1400 Charlotte, North Carolina 28202 p+ 704 376 1555 f+ 704 376 7851 url+ www.colejeneststone.com A.M. KING 1610 EAST MOREHEAD SUITE 200 CHARLOTTE, NC 28207 ALDI EAST SPENCER IN -BOUND TRAFFIC IMPROVEMENTS 1985 OLD UNION CHURCH ROAD EAST SPENCER, NC 28146 SITE DETAILS r I VJGVL 11V. A777 11a*.7uI9u 12/10/21 Revised 02/11 /22 v RPORq SEAL n m F-1409 p C-596 CM801 o � F nnn►P� H ``. n 02/11 /2022 The drawings, the project manual and the design shown theron are instruments of Bolton & Menk Southeast, LLC.. The reproduction or unauthorized use of the documents without consent of Bolton & Menk Southeast, LLC. is prohibited. OBolton & Menk Southeast, LLC. 2021 C EXISTING CONCRETE PAVING LUBRICATED SMOOTH DOWEL BAR, SEE TABLE C4 11� PROPOSED CONCRETE 0 PAVING ° . ° • a . e ° A. ♦ ` :a • 4•< SLAB THICKNESS (IN) DOWEL DIMENSIONS (IN) DOWEL CENTER -TO -CENTER SPACING (IN) 5-6 3/4X14 12 7-8 1 X16 12 9 - 12 1-J X 18 12 CONCRETE PAVEMENT CONSTRUCTION JOINT AT EXISTING PAVING SAW CUT, Tvr' EXISTING PAVEMENT, TYP. NOTES: 1. THE PAVEMENT EDGE SHALL BE DEFINED BY A STRAIGHT EDGE FORMED BY A MACHINE SAWCUT. 2. THE TRENCH SUBGRADE MATERIAL SHALL BE BACKFILLED WITH SUITABLE MATERIAL AND COMPACTED TO A DENSITY OF AT LEAST 95% OF STANDARD PROCTOR MAXIMUM DENSITY. 3. THE FINAL 12" OF FILL SHALL BE COMPACTED TO 100% OF STANDARD PROCTOR MAXIMUM DENSITY. 4. THE SAME DEPTH OF PAVEMENT MATERIAL WHICH EXISTS SHALL BE REINSTALLED BUT IN NO CASE SHALL THE CONCRETE BE LESS THAN 6" THICK. CONCRETE PAVEMENT PATCH AT UTILITY TRENCH NESS ;ONSTRUCTION JOINT _ 20/C-802, TYP. AGGREGATE BASE COURSE COMPACTED TO 100% MOD. PROCTOR DENSITY ;KFILL, SEE NOTES SPECIFICATION CLAUSE co E E POWERDRAIN S200K - LOAD CLASS F - EXPANSION JOINT TO PAVEMENT PER SEE NOTE 4 ENGINEER'S DETAILS DESIGN GENERAL SEE NOTE 3 DOCUMENTS THE SURFACE DRAINAGE SYSTEM SHALL BE d� POLYMER CONCRETE S200K CHANNEL SYSTEM WITH DUCTILE IRON EDGE RAILS AS MANUFACTURED BY ACO POLYMER PRODUCTS, INC. 4 d MATERIALS 4 Q CHANNELS SHALL BE MANUFACTURED FROM d POLYESTER RESIN POLYMER CONCRETE WITH AN d INTEGRALLY CAST -IN DUCTILE IRON EDGE RAIL. 4 MINIMUM PROPERTIES OF POLYMER CONCRETE WILL BE AS FOLLOWS: / 4 / COMPRESSIVE STRENGTH: 14,000 PSI FLEXURAL STRENGTH: 4,000 PSI 4Q TENSILE STRENGTH: 1,500 PSI WATER ABSORPTION: 0.07 / / FROSTPROOF YES DILUTE ACID AND ALKALI RESISTANT YES d p - Q 6117 SALT SPRAY TEST COMPLIANT YES THE SYSTEM SHALL BE 8" (200mm) NOMINAL 10" (250mm) INTERNAL WIDTH WITH A 10.2" (260mm) OVERALL d d 4 WIDTH AND A BUILT-IN SLOPE OF 0.5%. CHANNEL INVERT SHALL HAVE DEVELOPED'I SHAPE. ALL CHANNELS SHALL BE INTERLOCKING WITH A MALE/FEMALE JOINT. / / I / THE COMPLETE DRAINAGE SYSTEM SHALL BE BY ACO POLYMER PRODUCTS, INC. ANY DEVIATION OR IX PARTIAL SYSTEM DESIGN AND/OR IMPROPER INSTALLATION WILL VOID ANY AND ALL WARRANTIES PROVIDED BY ACID POLYMER PRODUCTS, INC. 10" (250mm) 10" (250mm) NOTES: CHANNEL SHALL WITHSTAND LOADING TO PROPER 1. IT IS NECESSARY TO ENSURE MINIMUM DIMENSIONS SHOWN ARE SUITABLE FOR EXISTING GROUND CONDITIONS. LOAD CLASS AS OUTLINED BY EN 1433. GRATE TYPE ENGINEERING ADVICE MAYBE REQUIRED. SHALL BE APPROPRIATE TO MEET THE SYSTEM LOAD 2. MINIMUM CONCRETE STRENGTH OF 4,000 PSI IS RECOMMENDED. CONCRETE SHOULD BE VIBRATED TO ELIMINATE CLASS SPECIFIED AND INTENDED APPLICATION. AIR POCKETS. GRATES SHALL BE SECURED USING EITHER THE 3. EXPANSION AND CONTRACTION CONTROL JOINTS AND REINFORCEMENT ARE RECOMMENDED TO PROTECT CHANNEL 'POWERLOK' BOLTLESS LOCKING SYSTEM OR THE 4 AND CONCRETE SURROUND. ENGINEERING ADVICE MAYBE REQUIRED. BOLT LOCKING OPTION. CHANNEL AND GRATE SHALL 4. THE FINISHED LEVEL OF THE CONCRETE SURROUND MUST BE APPROX. 1/8" [3mm] ABOVE THE TOP OF THE CHANNEL EDGE. BE CERTIFIED TO MEET THE SPECIFIED EN 1433 LOAD 5. CONCRETE BASE THICKNESS SHOULD MATCH SLAB THICKNESS. ENGINEERING ADVICE MAY BE REQUIRED TO CLASS. THE SYSTEM SHALL BE INSTALLED IN DETERMINE PROPER LOAD CLASS. ACCORDANCE WITH THE MANUFACTURER'S 6. REFER TO ACO'S LATEST INSTALLATION INSTRUCTIONS FOR FURTHER DETAILS. INSTRUCTIONS AND RECOMMENDATIONS. SK2-F-ECP POWERDRAIN - S200K - LOAD CLASS: F ACO Polymer Products, Inc. 825 W. Beechc:raft St 9470 Pinecone Dr. 4211 Pleasant Rd. Exposed Concrete Pavement • Casa Grande, ,1Z 85122 Mentor, OH 44060 Fort Mill, SC 29708 INSTALLATION DRAWING - ACO DRAIN Tel: 520421-9988 Fax:520-421-9899 Tel: Fax: �06397235 Fax: 038021063 DATE:12/12/16 Arizona Tel: 888-490-9552 e-mail: sales(a)acousa.com Ohio Tel: 800-543-4764 www.acousa.com South Carolina Tel: 800-543-4764 ACO POWERDRAIN Pavement or Impervious Surface WORK AREA SECTION NTS SiltSoxxTM (18", 12", or 18" TYPICAL) Concrete blocks or sand bags sized as needed (10' O.C.) AREA TO BE PROTECTED Concrete blocks or sand bags sized as needed (10' O.C.) AREA TO BE PROTECTED SiltSoxxTM (8", 12", 18" TYPICAL) WATER FLOW WORK AREA NOTES: 1. ALL MATERIAL TO MEET SPECIFICATIONS. 2. FILTER MEDIA TO MEET APPLICATION REQUIREMENTS. 3. FILTER MEDIA TO BE DISPERSED ON SITE, AS DETERMINED BY ENGINEER. PLAN NTS SiltSoxxTM for Sediment Control on Pavement NTS N.T.S. 20 SILTSOXX SEDIMENT CONTROL UNDISTURBED AREA p 5' AT HIGH END OF DEVICE POINTED UPHILL TO PREVENT END -AROUND FLOW N 18" DIAMETER FILTREXX® SOXXM O r (ALSO AVAILABLE IN 8", 12" AND 24" DIAMETERS) 0 2" X 2" X 36"; WOODEN STAKES PLACED 10' O.C. AREA OF EXCAVATION / DISTURBANCE NOTES: 1. REMOVE SEDIMENT FROM THE ® 'AT LOW END OF DEVICE UPSLOPE SIDE OF THE SOXXM WHEN STABILIZED POINTED DOWNHILL ,ACCUMULATION HAS REACHED Y2 OF TO PREVENT PONDING (EFFECTIVE HEIGHT OF SOXXM DISCHARGE AREA 2. SLOPES GREATER THAN 5% MAY (REQUIRE ADDITIONAL STABILIZATION (PRACTICES 3. SOXXM MAY BE SEEDED AT THE TIME OF INSTALLATION FILTREXX(DR RUNO N.T.S. 19 FILTREXX RUNOFF DIVERSION PLAN FF DIVERSION MAX. WATER LEVEL 4" MINIMUM FREEBOARD 2:1 MAX. SLOPE 18" DIAMETER FILTREXX® SOXX- (ALSO AVAILABLE IN 8", 12" AND 24" DIAMETERS) 2" X 2" X 36" WOODEN STAKES PLACED 10' O.C. SINGLE INSTALLATION SECTION MAX. WATER LEVEL 4" MINIMUM FREEBOARD 2:1 MAX. SLOPE J 18" DIAMETER FILTREXX® SOXX- ----- (ALSO AVAILABLE IN 8", 12" AND 24" DIAMETERS) 2" X 2" X 36" WOODEN STAKES PLACED 10' O.C. PYRAMID INSTALLATION SECTION NTS FILTREXX® RUNOFF DIVERSION SECTIONS NTS N.T.S. ( 181 FILTREXX RUNOFF DIVERSION SECTIONS NOTES: 1. REMOVE SEDIMENT FROM THE UPSLOPE SIDE OF ALWAYS USE IN CONJUNCTION WITH THE SOXXTM WHEN ACCUMULATION HAS REACHED Y2 NnNIn nro cnurnl n r FILTREXX® SLOPE PROTECTION, PIPE DIA. PER PLAN OF EFFECTIVE HEIGHT OFSOXXTM ROLLED EROSION CONTROL 2. LOOSE FILTER MEDIA MAY BE BACKFILLED ON THE 6" 6" BLANKET, BONDED FIBER MATTRESS UPSLOPE SIDE OF THE SOXX TM TO ENHANCE ARID OR SOIL STABILIZERS 2" X 2" X 36" WOODEN PERFORMANCE .° .a STAKES PLACED 10, O.C. ♦ ♦' DISTURBED AREA EXCESS SOCK MATERIAL TO BE DRAWN IN AND TIED cO = PIPE DIA• Od' a_ = OFF TO STAKE AT BOTH ENDS PER PLAN e . ♦ G - - 12 MII C III - /' 1M 8" DIAMETER FILTREXX®SOXXT" op ° 11 II III r � (ALSO AVAILABLE IN 12", 18" AND 24" DIAMETERS) c I I � S� a : ° - PROTECTED AREA .; I1. FILTREXX® CHECK DAM d• n �LL� WI_ II II °II111 EI -Mill _ ♦ ♦ =W- -1L II Ill 0, _ m, ID ID- ILf�JI-L SIZED TO SUIT CONDITIONS m- _ IID m-J- m m -uI 8" TO 18" TYPICAL m n 2" X 2" X 36" WOODEN STAKES PLACED 5'': �W BOTTOM WIDTH, B SECTION LOOKING UPSTREAM N.T.S. ( 12 WORK AREA I T1Ti1 -III=i 1=1 1=1 11= _ 111111111111111111 - __ SECTION NTS 1.5" X 1.5" WOODEN STAKES PLACED 10' O.C. - COMPOST SOCK (18" TYPICAL) EA TO BE PROTECTED 1.5" X 1.5" WOODEN STAKES PLACED 10' O.C. COMPOST SOCK (18" TYPICAL) WATER FLOW WORK AREA PLAN NTS AREA TO BE PROTECTED Compost Socks for Sediment Control NTS N.T.S. ( 111 COMPOST SOCKS FOR SEDIMENT CONTROL WIRE TIES, (TYP.) STORM GRA FII TRFYY(R' r I L I MtAAW 6" DRAIN INLET PLAN DRAIN INLET SECTION EXCESS SOXX T" MATERIAL T^ BE DRAWN IN AND TIED OR 2x2 WOODEN STAKE, (TYP.) CURB STORM GRATE FILTREXX® 8" SOXXT" CURBSIDE OPTION "A" PLAN EXCESS SOI MATERIAL TO BE DRAWN IN AND TIED OFF TO CURBSIDE OPTION "B" PLAN 2x2 WOODEN STAKE CURB FILTREXX® 8" SOXX- SECURE SOXXTM TO GRATE WITH RUBBER TIE DOWNS y - IDWfli CATCH ID=ID-II BASIN Ililil it CURBSIDE SECTION 1. ALL MATERIAL TO MEET FILTREXX® SPECIFICATIONS. 2. FILTER MEDIAT" FILL TO MEET APPLICATION REQUIREMENTS. 3. COMPOST MATERIAL TO BE DISPERSED ON SITE, AS DETERMINED BY ENGINEER. FILTREXXO INLET PROTECTION NTS N.T.S. 10 FILTEREXX INLET PROTECTION DITCH LONG. SLOPE (FT/FT) BOTTOM WIDTH B (FT) SIDE SLOPE MIN. DEPTH OF LINING, D (FT) MIN. TOP WIDTH, W (FT) LINING TYPE LINING THICKNESS, T (IN) ZL ZR A PER PLAN 2 3 3 1.5 11 North American Green SC150 - B 1 PER PLAN 2 3 3 1.5 11 North American Green SC150 - B2 PER PLAN 3 3 3 1.5 12 North American Green SC150 - TYPICAL DITCH SECTION PIPE OU' PIPE PER PLAN N.T.S. �21) PIPE OUTLET " "SI CONC. COLLAR 18/C-800 SECTION NTS ALWAYS USE IN CONJUNCTION WITH FILTREXX® SLOPE PROTECTION, ROLLED EROSION CONTROL BLANKET, BONDED FIBER MATTRESS OR SOIL STABILIZERS DISTURBED AREA------- 10 L.F. PER END PLACED AT A 30" ANGLE EL.120------_----_ �TO PREVENT END -AROUND FLOW �10' EL. 115 .:., 30' �- SPACING VARIES EL. 110-` REFER TO FILTREXXO DESIGN TOOL - EL. 105- EL. 100 ALWAYS INSTALL SOXX TM -- ---------- PERPENDICULAR TO SLOPE ----------------------- 2" X 2" X 36" WOODEN STAKES PLACED 10' O.C. PROTECTED AREA PLAN NTS FILTREXX® SLOPE INTERUPTION NTS N.T.S. 17 FILTREXX SLOPE INTERRUPTION N.T.S. �9j FILTEREXX CHECK DAM NOTES: 1. ALL MATERIAL TO MEET FILTREXXO SPECIFICATIONS. 2. CHECK DAM SHOULD BE USED IN AREAS THAT DRAIN 10 ACRES OR LESS. 3. SEDIMENT SHOULD BE REMOVED FROM BEHIND CHECK DAM ONCE THE ACCUMULATED HEIGHT HAS REACHED Y2 THE HEIGHT OF THE CHECK DAM. 4. CHECK DAM CAN BE DIRECT SEEDED AT THE TIME OF INSTALLATION. 5. CONTRACTOR IS REQUIRED TO BE A FILTREXX CERTIFIEDT" INSTALLER. FILTREXXO CHECK DAM NTS N.T.S. ( 31 N.T.S. ( 21 N.T.S. ( 111111111J ColeJenest & Stone Shaping the Environment Realizing the Possibilities Land Planning + Landscape Architecture Civil Engineering + Urban Design 200 South Tryon Street, Suite 1400 Charlotte, North Carolina 28202 p+ 704 376 1555 f+ 704 376 7851 url+ www.colejeneststone.com A.M. KING 1610 EAST MOREHEAD SUITE 200 CHARLOTTE, NC 28207 ALDI EAST SPENCER IN -BOUND TRAFFIC IMPROVEMENTS 1985 OLD UNION CHURCH ROAD EAST SPENCER, NC 28146 SITE DETAILS i rroject ivo. A77'1 issueu 12/10/21 Revised 02/11 /22 ��ON ............ Fti 'I�� SEAL n m F-1409 p C-596 6 -c/e Je n esi'--d110. / `,``II�1 C 11 S - n►����02/11 /2022 Cm802 The drawings, the project manual and the design shown theron are instruments of Bolton & Menk Southeast, LLC.. The reproduction or unauthorized use of the documents without consent of Bolton & Menk Southeast, LLC. is prohibited. OBolton & Menk Southeast, LLC. 2021 C GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. r✓anti NORTH CAROLI NA Environmental Quality ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER aOrm SC SEGnI1 A -A �EVIUEO. EM. ROD 13146L LOCATION DETEHIIMED IN rm.A a M METE VALORT tIM1CTMES SHALL ISHASITAHES WHEN M LIQUID AH M Sa12 REACHES M Or M SIPUCInal CAPACITY. ELAL SL9nETE VAaOR STRUCTPE HEEDS TO t o EAm HHwE7 vlTx SmWE RHTLIE DEVEE nn� APLES L secuor�a=ate -� cTYN i AL LOCATION DETERMINED a CLEARLYRMIOE• IQTNdSEi !VIES O/'St{@10W ' WO THE CONCRETE WASHOUTSTRUCTURES SHALL E NED WHO ES LIQUIDAlSOLID SMAINTAI PEACES ITX OF ME CAPACY O PROVIDEASpAT HOLDING CITY VrTH A HIM" a INCHES OF FREE6AI6 MONC ETE WASHOUT STRUCTURE ABOVE GRADE WASHOUT HEFSZ TO X CLEAPY HANDOD WITH SUPMTi NOTING DEVICL STRUCTURE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good workin; holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (anc this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event > 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDCs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event > 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours S. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event > 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event > 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. Item to Document Documentation Requirements (a) Each E&SC measure has been installed Initial and date each E&SC measure on a copy and does not significantly deviate from the of the approved E&SC plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC plan. E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC plan or complete, date and sign an inspection plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC measures. plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three Years All data used to complete the a-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. EFFECTIVE: 04/01 / 19 PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment • Within 24 hours, an oral or electronic notification. deposition in a • Within 7 calendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and • Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill cr release. substances per Item 1(b)-(c) above (c) Anticipated • A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notification. bypasses [40 CFR • Within 7 calendar days, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance • Within 24 hours, an oral or electronic notification. with the conditions • Within 7 calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(1)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING NORTH CAROLINA _f Environmental Quality ti EFFECTIVE: 04/01/19 ColeJenest & Stone Shaping the Environment Realizing the Possibilities Land Planning Landscape Architecture Civil Engineering Urban Design 200 South Tryon Street, Suite 1400 Charlotte, North Carolina 28202 p+ 704 376 1555 f+ 704 376 7851 url+ www.colejeneststone.com A.M. KING 1610 EAST MOREHEAD SUITE 200 CHARLOTTE, NC 28207 ALDI EAST SPENCER IN -BOUND TRAFFIC IMPROVEMENTS 1985 OLD UNION CHURCH ROAD EAST SPENCER, NC 28146 SITE DETAILS Project No. 4773 Issued 12/10/21 Revised 02/11 /22 v ,.RPof? ' 0 SEAL n m F-1409 p C-596 /11 /2022 O Cm803 The drawings, the project manual and the design shown theron are instruments of Bolton & Menk Southeast, LLC.. The reproduction or unauthorized use of the documents without consent of Bolton & Menk Southeast, LLC. is prohibited. OBolton & Menk Southeast, LLC. 2021 C *� pG pG pG Q Q Q 100\! (1.6" TO 2.4") O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O (1.6" TO 2.4") O O O O O O O O O O O O O O O O O O O O O O O o O O O O O O O O O O O O O O O O O O O O O O O N O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O @ @ @ @ �� � �� � O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O P� o� �� o� O O O O �AN 4'-0" MIN. (VARIES WITH WIDTH OF RAMP) TRUNCATED DOME PLAN VIEW G G NOTES: TRUNCATED DOME SPACING 1. ALL DETECTABLE WARNING DEVICES USED IN NEW CONSTRUCTION SHALL BE OF A RIDGID PRECAST OR EMBEDDED - PRODUCT APPROVED BY THE COUNTY ENGINEER. RETRO FIT MATS WILL ONLY BE ALLOWED ON EXISTING RAMPS WITH PRIOR APPROVAL OF THE COUNTY ENGINEER- FOR MATERIAL_TYPEEAND-INSTALLATION (IE- RESURFACING). 2. WIDTH OF DETECTABLE WARNING AREA- SHALL- BE -A -MINIMUM IOF-4-FEET-AND-VARY `WITH -WIDTH -OF RAMP. 3. LENGTH OF DETECTABLE WARNING;AREA-SHALL_BE-2-FEET REGARDLESS -OF -SECTION WIDTH.-. 0.4" 4. DETECTABLE WARNING AREA CAN BE -SQUARE -WHERE _USEQ-IN A -CURB RADIUS. - 5. DETECTABLE WARNING DOMES- SHALL- BE -ALIGNED 'ON IA-SQUARE_GRID -IN THEIPREQOMINAUTI(DIRECTION- OF OFTRAVEL TO PERMIT WHEELS TO ROLL BETWEEN DOMES. 6. DECTECTABLEWARNING -AREA- SHALL- BE_COLORED-BLACK IN ALL -LOCATIONS. - 7. IF PAVERS ARE TO BE USED, PAVERS SHALL BE- 6""THICK AND -CAST- FROM 5000 psi CONCRETE - 0 9 8. MATS ARE TO BE RIGID WITH- TURN DOWN EDGES- EMBEDDED- IN CONCRETE TO ELIMINATE TRIP HAZARD._ . TRUNCATED DOME SECTION TRUNCATED DOMES N.T.S. 3 NOTES: 1. CONTRACTION JOINTS SHALL BE SPACED AT 10—FOOT INTERVALS. JOINT SPACING MAY BE ALTERED BY THE ENGINEER TO PREVENT UNCONTROLLED CRACKING. 2. CONTRACTION JOINTS MAY BE INSTALLED BY THE USE OF TEMPLATES OR FORMED BY OTHER APPROVED METHODS. WHERE SUCH JOINTS ARE NOT FORMED BY TEMPLATES, A MINIMUM DEPTH OF 1 1/2" SHALL BE OBTAINED. 3. ALL EXPANSION JOINTS SHALL BE SPACED AT 90—FOOT INTERVALS, AND ADJACENT TO ALL RIGID OBJECTS. JOINTS SHALL MATCH LOCATIONS WITH JOINTS IN ABUTTING SIDEWALK. `` 4. CONCRETE COMPRESSIVE STRENGTH SHALL BE 3600 P.S.I. IN 28 DAYS. 5. CURB SHALL BE DEPRESSED AT INTERSECTIONS TO PROVIDE FOR FUTURE ACCESSIBLE RAMPS. xov Pvv 6. TOP 6" OF SUBGRADE BENEATH THE CURB SHALL BE COMPACTED TO 100% STANDARD PROCTOR DENSITY. `00 7. DETAIL MAY BE USED FOR PRIVATE DRIVES, PARKING LOTS, AND INTERIOR CIRCULATION DRIVE. 3" RADIUS 1/8" RADIUS -I I I -I I I -III -III -I I I i i i `,P`� `,P`� , � � .•. �:. =III=III=III=III=� • -I I I -I I I -I I I -I I I -I I I_ -I I I -I I I -I I I -I I I -I PAVEMENT I - a -III - a.. VERTICAL CURB ISLAND N.T.S. 2 KEY/ANCHOR MATERIAL AT TOP OF SLOPE. 12" MIN. //__7'/SPACING TYP.* e e e �r GENERAL NOTES: 36" MIN. SPACING TYP.* 1. LAY BLANKETS LOOSELY AND � STAKE OR STAPLE TO MAINTAIN DIRECT CONTACT WITH THE SOIL. - DO NOT STRETCH. t/ 2. * DIMENSIONS SHOWN ARE MINIMUM, MANUFACTURED PRODUCTS MAY HAVE ADDITIONAL REQUIREMENTS THAT MUST BE �� P � MET. 6" OVERLAP O AN ` o � IN SLICE 3. SLOPE SURFACE SHALL BE FREE OF ROCKS, SOIL CLODS, STICKS, GRASS. MAT/BLANKETS SHALL HAVE GOOD SOIL CONTACT. G* Coto4. THE DETAIL SHOWN IS FOR SLOPE MATTING. FOR CHANNEL OR PIPE OUTFALL MATTING SPECIFICATIONS, S ow! PLEASE REFER TO NCESCPDM — WATER TABLE STANDARD #6.17 AND MANUFACTURER'S GUIDELINES. NON —WOVEN GEOTEXTILE FILTER CLOTH FABRIC 4' ABOVE SOURCE WATER. KEY/ANCHOR MATERIAL TO TOE OF SLOPE. EMBANKMENT MATTING DETAIL CJS DTL. #30.20 KTR 1 ColeJenest & Stone Shaping the Environment Realizing the Possibilities Land Planning + Landscape Architecture Civil Engineering Urban Design 200 South Tryon Street, Suite 1400 Charlotte, North Carolina 28202 p+ 704 376 1555 f+ 704 376 7851 url+ www.colejeneststone.com A.M. KING 1610 EAST MOREHEAD SUITE 200 CHARLOTTE, NC 28207 ALDI EAST SPENCER IN -BOUND TRAFFIC IMPROVEMENTS 1985 OLD UNION CHURCH ROAD EAST SPENCER, NC 28146 SITE DETAILS Project No. 4773 Issued 12/10/21 Revised 02/11 /22 SEAL n m F-1409 p C-596 :At /11 /2022 O Cm804 The drawings, the project manual and the design shown theron are instruments of Bolton & Menk Southeast, LLC.. The reproduction or unauthorized use of the documents without consent of Bolton & Menk Southeast, LLC. is prohibited. OBolton & Menk Southeast, LLC. 2021 C