HomeMy WebLinkAbout20140775 Ver 1_Application_20140725Corps Submittal Cover Sheet
Please provide the following info:
1. Project Name: Brid e 560314 SR 1332
2. Name of Property Owner/Applicant: NC DOT
3. Name of Consultant/Agent:
*Agent authorization needs to be attached.
4. Related/Previous Action ID number(s):
5. Site Address: N/A
6. Subdivision Name:
7. City: Burnsville
8. County: Yancey
9. Lat: 35.95865 Long: -82.63686 (Decimal Degrees Please )
10. Quadrangle Name: White Rock
1 I. Waterway: Calvin Creek
12. Watershed: French Broad
13. Requested Action:
X Nationwide Pennit # 3
General Permit #
_ Jurisdictional Determination Request
Pre-Application Request
The following information will be completed by Corps office:
AID:
Prepare File Folder Assign number in ORM Begin Date
Authorization: Section 10 Section 404
Project Description/ Nature of Activity/ Project Purpose:
Site/Waters Name:
Keywords:
� e���
���....��
STATE OF NORTH CAROLINA
DEPARTMENT OF 'I'RANSPORTATION
PAT MCCRORY
GOVF.RNOR
July 24, 2014
Ms. Lori Beckwith
US Army Corps of Engineers
I51 Patton Avenue, Room 208
Asheville, NC 28801-5006
ANTHONY J. TA'I'A
$ECRETARY
Subject: Nationwide Permit #3
Bridge 560314, SR 1332 Calvin Creek Road
State Project No. 17BP.13.R.110 (DWQ Minor Permit Fee $240)
Madison County, NC
Dear Ms. Beckwith:
I have enclosed a set of plans, a PCN application for N WP #3, and a vicinity map relative
to the proposed bridge replacement project on SR 1332 Calvin Creek Road, Madison
County, NC.
We propose to replace the existing 22' single-span bridge with a 45' x 20' bottomless box
culvert. A permanent impact to 53 linear feet of Calvin Creek will be necessary for rip
rap bank stabilization. Temporary impacts to 871inear feet of Calvin Creek will be
necessary for an impe�vious dike for footer construction. Calvin Creek is an
approximately 12 Foot wide stream with boulder, cobble, and gravel substrate. Calvin
Creek is classified as Class C, trout, ORW.
Existing channel morphology will be maintained upstream and downstream of the
bottomless culvert. Riparian vegetation will be reestablished along disturbed areas
associated with the project. Stormwater will be diverted through grass-lined ditches or
vegetated buffers whenever possible prior to entering streams.
No effect on federally listed species (threatened or endangered) or their habitats will
occur.
As a part of the 401 Certification process, the project was processed through the DOT
Programmatic Agreement for Minor Project as required by Section 106 of the National
Historic Preservation Act of 1966 and GS 121-12(a). No Histaric Resources will be
affected.
Division Thirteen Office Post Office Box 3279 Asheville, NC 28802
Phone:828/251-6171 Office ofthe Division Engineer Fax:828/251-6709
ww w.ncdot. gov/doh/operations/d ivision 13
Ms. Lori Beckwith
Page —2 Bridge 560314, Madison County
July 24, 2014
By copy of this letter, we request Marla Chambers, North Carolina Wildlife Resources
Commission Western Region Coordinator, to comment directly to the Corps concerning
the permit request.
By copy of this letter, we are asking the Area Roadside Field Operations Engineer, to
comment on the above project. Calvin Creek is classified as C, trout, ORW. The project
will not require a trout buffer variance.
By copy of this letter, I am forwarding one electronic copy of the application package to
Sonia Carillo, NC Division of Water Quality, Transportation Permitting Unit with cc to
Kevin Bamett, NC DWQ Transportation Permitting Unit for review and comment.
Please charge the application fee of $240.00 to WBS element #17BP.13.R.110. Please
forward comments directly to the Corps with copy to Division 13 Environmental Officer.
Your earliest consideration for this request would be greatly appreciated. If you have any
questions or information needs, please contact me at (828) 251-6171.
Sincerely,
��'� �,.�
Roge D. Bryan
Division 13 Environmental Officer
Enclosures
cc: J.J. Swain, Jr., P.E.
Ben DeWit, CPESC
Marla Chambers
Sonia Carillo
Kevin Barnett
Tom Bacon, P.E.
Michael Clark
r � � :�;
��� ��,��.
�h
at�d� � � � �. �
Y�
E.m•.as��a.>a,:u+:�t�si°-
��� ,R A 7�n
��� �� � ',.. O.
� �
Office Use Only:
Corps action ID no.
DWQ project no.
Farm Version 1.3 Dec 10 2008
Pre-Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the X Section 404 Permit ❑ Section 10 Permit
Corps:
1b. Specify Nationwide Permit (NWP) number: 3 or General Permit (GP) number:
1 c. Has the NWP or GP number been verified by the Corps? X Yes ❑ No
1 d. Type(s) of approval sought from the DWQ (check all that apply):
X 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit:
because written approval is not required? Certification:
❑ Yes X No ❑ Yes X No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � yes X No
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program.
1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes X No
below.
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes X No
2. Project Information
2a. Name of project: Bridge314, SR 1332
2b. County: Madison
2c. Nearest municipality / town: Hot Springs
2d. Subdivision name: N/A
2e. NCDOT only, T.I.P. or state 176P.13.R.110
project no:
3. Owner Information
3a. Name(s) on Recorded Deed: North Carolina Department of Transportation
3b. Deed Book and Page No. N/A
3c. Responsible Party (for LLC if N/A
applicable):
3d. Streetaddress: N/A
3e. City, state, zip: N/A
3f. Telephone no.: N/A
3g. Fax no.: N/A
3h. Email address: N/A
Page 1 of 10
PCN Form — Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner)
4a. Applicant is: North Carolina Department of Transportation
4b. Name: J.J. Swain, Jr., P.E., Division Engineer
4c. Business name N.C. Department of Transportation
(if applicable):
4d. Street address: 55 Orange Street, P.O. Box 3279
4e. City, state, zip: Asheville, NC 28802
4f. Telephone no.: 825-251-6171
4g. Fax no.: 828-251-6394
4h. Email address: rdbryan ncdot.qov
5. AgenUConsultant Information (if applicable)
5a. Name: N/A
5b. Business name N/A
(if applicable):
5c. Streetaddress: N/A
5d. City, state, zip: N/A
Se. Telephone no.: N/A
5f. Fax no.: N/A
5g. Email address: N/A
Page 2 of 10
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): N/A
1 b. Site coordinates (in decimal degrees): Latitude: 35.95865° N Longitude: - 82.63686° W
1c. Property size: 0.1 acres
2. Surtace Waters
2a. Name of nearest body of water (stream, river, etc.) to Calvin Creek
proposed project:
2b. Water Quality Classification of nearest receiving water: C, Trout, ORW
2c. River basin: French Broad
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Existing bridge on SR 1332 surrounded by low density residential area and forested land.
3b. List the total estimated acreage of all existing wetlands on the property:
0
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
100
3d. Explain the purpose of the proposed project:
Replace existing 22' bridge with a 45'x20'bottomless box culvert.
3e. Describe the overall project in detail, including the type of equipment to be used:
A permanent impact to 53 linear feet of Calvin Creek will be necessary for rip rap bank stabilization. A temporary
impact of 87 linear feet will be necessary for an impervious dike to dewater the work area for footer installation.
Equipment used will include excavator, crane, and trucks.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property / � Yes X No ❑ Unknown
project (including all prior phases) in the past?
Comments:
4b. If the Corps made the jurisdictional determination, what type � preliminary ❑ Final
of determination was made?
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company:
Name (if known): N/A Other: N/A
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for � Yes X No ❑ Unknown
this project (including all prior phases) in the past?
Sb. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project? ❑ Yes X No
6b. If yes, explain.
Page 3 of 10
PCN Form — Version 1.3 December 10, 2008 Version
Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
❑ Wetlands X Streams - tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ — non-404, other) (acres)
Tem orar T
W� � P� T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W2 � P� T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W3 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W4 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W5 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W6 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
2g. Yotal wetland impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3 b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ — non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
S1 ❑ P X T Impervious Dike Calvin Creek X PER X Corps 12 $�
❑ INT ❑ DWQ
S1 X P❑ T Rip Rap Calvin Creek X PER X Corps 12 53
❑ INT ❑ DWQ
S2 ❑ P 0 T ❑ PER ❑ Corps
❑ INT ❑ DWQ
S2 ❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
S3 � P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
S5 ❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
3h. Total stream and tributary impacts 140
3i. Comments:53 feet of permanent impacts for rip rap, 87 feet of temporary impacts.
Page 4 of 10
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individuall list all o en water im acts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number — (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Tem orar T
01 ❑P❑T
02 ❑P❑T
03 ❑P❑T
04 ❑P❑T
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If ond or lake construction ro osed, then com lete the chart below.
5a. 5b. 5c. Sd. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or purpose (acres)
number of pond
Flooded Filled Excavated Flooded Filled Excavated Flooded
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
Sk. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an im acts re uire miti ation, then ou MUST fill out Section D of this form.
6a.
❑ Neuse ❑ Tar-Pamlico ❑ Other:
Project is in which protected basin? ❑ Catawba ❑ Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number— Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Tem ora T im act re uired?
B1 ❑P�T ❑Yes
❑ No
62 ❑P❑T ❑Yes
❑ No
B3 ❑P❑T ❑Yes
❑ No
6h. Total buffer impacts
6i. Comments:
Page 5 of 10
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Replacement of bridge with bottomless culvert to maintain natural stream channel under the structure.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
N/A
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for ❑ Yes X No
impacts to Waters of the U.S. or Waters of the State?
2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps
❑ Mitigation bank
2c. If yes, which mitigation option will be used for this
project? ❑ Payment to in-lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ❑ Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form — Version 1.3 December 10, 2008 Version
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified � Yes X No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
Comments: ❑ Yes ❑ No
2. Stormwater Mana ement Plan
2a. What is the overall percent imperviousness of this project? N/A
2b. Does this project require a Stormwater Management Plan? X Yes ❑ No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
The project will use BMP's to the Maximum Extent Practicable (MEP) in compliance with NCDOT's NPDES Permit No.
000250 Post Construction Stormwater Program
❑ Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? X DWQ Stormwater Program
❑ DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project? N/A
❑ Phase II
3b. Which of the following locally-implemented stormwater management programs ❑ NSW
apply (check all that apply): ❑ USMP
❑ Water Supply Watershed
X Other: N/A
3c. Has the approved Stormwater Management Plan with proof of approval been N/A
attached?
4. DWQ Stormwater Pro ram Review
❑ Coastal counties
❑ HQW
4a. Which of the following state-implemented stormwater management programs apply � ORW
(check all that apply): ❑ Session Law 2006-246
X Other: N/A
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? N�A
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? N/A
5b. Have all of the 401 Unit submittal requirements been met? N�q
Page 8 of 10
PCN Form — Version 1.3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the � yes ❑ No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ❑ Yes � No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) ❑ Yes ❑ No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No
or Riparian Buffer Rules (15A NCAC 26 .0200)?
2b. Is this an after-the-fact permit application? ❑ Yes � No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in � Yes � No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
N/A
Page 9 of 10
PCN Form — Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or � Yes � No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act � Yes ❑ No
impacts?
❑ Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
� Asheville
Sd. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
Field survey of the project area and evaluation of current distribution data.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
Current Maps/Database
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation � Yes � No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
Current Maps/Database
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? � Yes ❑ No
8b. If yes, explain how project meets FEMA requirements: Project will not impact water passage or flood zone beyond existing
conditions
8c. What source(s) did you use to make the floodplain determination? Current FEMA Maps
Roger D. Bryan n/� 7/24/2014
�i �S
ApplicanUAgenPs Printed Name ApplicanUAge 's Signature Date
(AgenPs signatu is valid only if an authorization letter from fhe applicant
is provided.)
Page 10 of 10
Figure 1. Bridge 560314, SR 1332, Calvin Creek, Madison County, NC.
2 @ 8’ X 8’
BOX CULVERT
REINFORCED CONCRETE
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
LOCATION:
4
-L-
CLEVELAND COUNTY
17BP.12.R.102 PE, R/W, UTLITY & CONST.
SR 1207
WOOD RD.
ON SR 1207
STRUCTURE NO. 255 OVER ASHWORTH CREEK TRIBUTARY 5
Prepared in the Office of:
2012 STANDARD SPECIFICATIONS
F-1084
Professional Corporation License Number:
Cary, NC 27518
8000 Regency Parkway, Suite 600
Michael Baker Engineering, Inc.
LEVEL IIIA NAME
NCDOT Contact:
NCDOT DIVISION 12
LEVEL IIIA CERTIFICATION NO.
345
MANAGEMENT UNIT
TRANSPORTATION PROGRAM
KAREN MCCAULEY, PE
TODD H. BUCKNER, PE
GRAPHIC SCALE
PLANS
PROFILE (HORIZONTAL)
PROFILE (VERTICAL)
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
DIVISION OF HIGHWAYS
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
STATE OF NORTH CAROLINA
7
/
2
3
/
2
0
14
3
:
3
4
:
12
P
M
R
:
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
2
2
-
0
2
5
5
_
E
C
_
T
S
H
_
0
1
.
d
g
n
U
S
E
R
:
t
o
d
d
.
b
u
c
k
n
e
r
030 60
030 60
06 12
ROADSIDE ENVIRONMENTAL UNIT
PLAN FOR PROPOSED
HIGHWAY EROSION CONTROL
EROSION AND SEDIMENT CONTROL MEASURES
CONSTRUCTION.
GRUBBING PHASE OF
FOR CLEARING AND
EROSION CONTROL PLANS
THIS PROJECT CONTAINS
Temporary Silt Ditch
Temporary Silt Fence
Silt Basin Type B
Stilling Basin
TDTemporary Diversion
Temporary Rock Silt Check Type-B
Temporary Rock Silt Check Type-A
Temporary Rock Sediment Dam Type-A
Temporary Rock Sediment Dam Type-B
Type A
Type B
Type C
A
B
C
Temporary Silt Fence
TSD
Std. #Description Symbol
Temporary Berms and Slope Drains
Rock Inlet Sediment Trap:
1630.03
1630.05
1605.01
1622.01
1633.01
1634.01
1634.02
1635.01
1635.02
1630.04
1632.01
1632.02
1632.03
Rock Pipe Inlet Sediment Trap Type-A
Rock Pipe Inlet Sediment Trap Type-B
Temporary Rock Sediment Dam Type A
Temporary Rock Sediment Dam Type B
Temporary Silt Fence
Roadway Standard Drawings
The following roadway english standards as appear in "Roadway Standard Drawings"- Roadway Design
revison thereto are applicable to this project and by reference hereby are considered a part of
these plans.
Rock Pipe Inlet Sediment Trap Type A
EC-1
1606.01 Special Sediment Control Fence
1634.01
1634.02
1635.01
1605.01
1630.01
Temporary Berms and Slope Drains
1606.01
1622.01
Special Sediment Control Fence
Riser Basin
T
I
P
P
R
O
J
E
C
T
:
1
7
B
P
.
1
2
.
R
.
1
0
2 DB12-220255
1635.02 Rock Pipe Inlet Sediment Trap Type B
1604.01 Railroad Erosion Control Detail
1607.01 Gravel Construction Entrance
Skimmer Basin
Tiered Skimmer Basin
Infiltration Basin
Special Stilling Basin1630.06
Temporary Rock Silt Check Type-A with
Matting and Polyacrylamide (PAM)
Wattle/Coir Fiber Wattle
Wattle/Coir Fiber Wattle
with Polyacrylamide (PAM)
1630.02
1633.02
NATURAL RESOURCES DIVISION OF WATER QUALITY.
ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND
NCG-010000 GENERAL CONSTRUCTION PERMIT EFFECTIVE AUGUST 3, 2011
WITH THE REGULATIONS SET FORTH BY THE
THESE EROSION AND SEDIMENT CONTROL PLANS COMPLY
Unit - N. C. Department of Transportation - Raleigh, N. C., dated January 2012 and the latest
1630.05 Temporary Diversion
1630.04 Stilling Basin
1630.03 Temporary Silt Ditch
1630.02 Silt Basin Type B
1630.06 Special Stilling Basin
1631.01 Matting Installation
1632.02
1632.01
Rock Inlet Sediment Trap Type B
Rock Inlet Sediment Trap Type A
1632.03 Rock Inlet Sediment Trap Type C
1633.01
1633.02 Temporary Rock Silt Check Type B
Temporary Rock Silt Check Type A
1640.01 Coir Fiber Baffle
1645.01 Temporary Stream Crossing
EW
CFW
-L- PC Sta. 10+00.00
BEGIN CONSTRUCTION
BEGIN PROJECT DB12- 220255
-L- POT Sta. 14+85.00
END CONSTRUCTION
END PROJECT DB12- 220255
TYPE OF WORK:GRADING, DRAINAGE, PAVING, & STRUCTURE
N C G R ID
N A D 83/N S R S 2007
EC-2
FLOW
A A
*T = 12" MIN., 18" MAX.
WIDTH
*T
PLAN
SECTION A-A
SECTION B-B
B
B
2/3 CHANNEL
STRUCTURAL STONE
SEDIMENT CONTROL STONE
2’ MIN
2’ MIN
L=3xH
12"
H = 12" MIN
MATTING
EXCELSIOR
MATTING
EXCELSIOR
CLASS B STONE
PAM
INSET A
See Inset A
USE EXCELSIOR FOR MATTING MATERIAL AND ANCHOR
MATTING SECTION AT TOP AND BOTTOM WITH CLASS B STONE.
TO TOP OF MATTING SECTION AND AFTER EVERY RAINFALL
EVENT THAT EQUALS OR EXCEEDS 0.50 INCHES.
MATTING
EXCELSIOR
CLASS B STONE
NOT TO SCALE
TEMPORARY ROCK SILT CHECK TYPE ’A’ WITH
EXCELSIOR MATTING AND POLYACRYLAMIDE (PAM)
TO BE APPLIED TO EACH ROCK SILT CHECK.
MATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT
A SOIL SAMPLE FROM PROJECT LOCATION, AND FROM OFFSITE
PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION, OBTAIN
NOTES
INITIALLY APPLY 4 OUNCES OF POLYACRYLAMIDE (PAM)
(4 OZ.)
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
Michael Baker Engineering, Inc.
NC License: F-1084
Cary, NC 27518
Suite 600
8000 Regency Parkway
DB12-220255
7
/
2
3
/
2
0
14
3
:
3
4
:
15
P
M
R
:
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
2
2
-
0
2
5
5
_
E
C
_
P
S
H
_
0
2
.
d
g
n
U
S
E
R
:
t
o
d
d
.
b
u
c
k
n
e
r
R/W SHEET NO.5
/
1
4
/
9
9 SHEET NO.PROJECT REFERENCE NO.
LEVEL IIIA CERTIFICATION NO.
345
LEVEL IIIA NAME
TODD H. BUCKNER, PE
EC-3
4
SUBTOTAL
MISCELLANEOUS MATTING TO BE INSTALLED AS DIRECTED BY THE ENGINEER
TOTAL
SAY
SIDESTATION
TO
STATION
FROM
LINESHEET NO.
CONST
ESTIMATE (SY)STATION
TO
SIDESTATION
FROM
LINE
SHEET NO.
CONST
ESTIMATE (SY)
PERMANENT SOIL REINFORCEMENT MAT
4
SUBTOTAL
TOTAL
SAY
ADDITIONAL PSRM TO BE INSTALLED
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
SOIL STABILIZATION SUMMARY SHEET
MATTING FOR EROSION CONTROL
L 11+00 13+05 RT 135
185LT13+5011+25L4
320
320
320
R
E
V
I
S
I
O
N
S
Michael Baker Engineering, Inc.
NC License: F-1084
Cary, NC 27518
Suite 600
8000 Regency Parkway
DB12-220255
7
/
2
3
/
2
0
14
3
:
3
4
:
17
P
M
R
:
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
2
2
-
0
2
5
5
_
E
C
_
P
S
H
_
0
3
.
d
g
n
U
S
E
R
:
t
o
d
d
.
b
u
c
k
n
e
r
R/W SHEET NO.5
/
1
4
/
9
9 SHEET NO.PROJECT REFERENCE NO.
LEVEL IIIA CERTIFICATION NO.
345
LEVEL IIIA NAME
TODD H. BUCKNER, PE
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
SITE DESCRIPTION
SOIL STABILIZATION TIMEFRAMES
STABILIZATION TIME
7 DAYS
TIMEFRAME EXCEPTIONS
PERIMETER DIKES, SWALES, DITCHES AND SLOPES
HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE
SLOPES STEEPER THAN 3:1 7 DAYS
IF SLOPES ARE 10’ OR LESS IN LENGTH AND ARE
NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED.
NONE
SLOPES 3:1 OR FLATTER 14 DAYS
14 DAYS
7 DAYS FOR SLOPES GREATER THAN 50’ IN
LENGTH.
ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 NONE, EXCEPT FOR PERIMETERS AND HQW ZONES.
EC-3A
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
Michael Baker Engineering, Inc.
NC License: F-1084
Cary, NC 27518
Suite 600
8000 Regency Parkway
DB12-220255
7
/
2
3
/
2
0
14
3
:
3
4
:
19
P
M
R
:
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
2
2
-
0
2
5
5
_
E
C
_
P
S
H
_
0
3
A
.
d
g
n
U
S
E
R
:
t
o
d
d
.
b
u
c
k
n
e
r
R/W SHEET NO.5
/
1
4
/
9
9 SHEET NO.PROJECT REFERENCE NO.
LEVEL IIIA CERTIFICATION NO.
345
LEVEL IIIA NAME
TODD H. BUCKNER, PE
BRIDGE #255
WW(TYP.)
WOOD
N C G R ID
N A D 83/N S R S 2007
A/G
A
S
H
W
O
R
T
H
C
R
K
T
5
P
O
T
S
t
a
. 14
+
9
8
.
8
0
GRAU 350 TL-3 CAT-1
GRAU 350 TL-3
-L- PC STA 10+00.00
-L- POT STA 14+85.00
BEGIN CONSTRUCTION
BEGIN PROJECT DB12-220255
END CONSTRUCTION
END PROJECT DB12-220255
PT Sta. 11+90.68
GRAU 350 TL-3
EXIST. R/W
54.00’ RT
+11.50
EXIST.
45.00’ LT
+75.00
EXIST.
35.00’ LT
+40.00220255-1
220255-2220255-1
EXIST. R/W
45.00’ RT
+67.50
F
F
F
F
7
7
0
7
7
0
770
7
7
0
7
7
0
770
7
7
5
775
7
7
5
7
7
5
7
7
5
7
7
5
775
775
780
780
780
7
8
0
780
785
785
7
8
5
7
9
0
795
7
9
5
7
7
0
770
7
7
0
7
7
0
7
7
5
775
7
7
5
7
7
5
775
775
7
7
0
770
7
7
0
7
7
0
7
7
5
775
7
7
5
7
7
5
775
775
EC. 4/CONST. 4CLEARING AND GRUBBING PLAN
CONSTRUCTION SHEET 4
EROSION CONTROL FOR
CLEARING AND GRUBBING
STAGE 1:STAGE 2:
CLASS ’I’ RIPRAP
CLASS ’I’ RIPRAP
OF EXCAVATION LIMITS (TYP.)
PLACE SILT FENCE AT TOP
B
A
R
R
E
L
#
2
B
A
R
R
E
L
#
2
B
A
R
R
E
L
#
1
ASHWORTH CREEK TRIB. 5
TEMPORARY CHANNEL
CHANGE WITH LINER
CHANNEL (TYP.)
AT TOP OF TEMP.
PLACE SILT FENCE
DIKE #1
IMPERVIOUS
DIKE #2
IMPERVIOUS
B
A
R
R
E
L
#
1
CONSTRUCT ROADWAY.
REMOVE SPECIAL STILLING BASIN.
LIMITS.
MAINTAIN SILT FENCE AT TOP OF EXCAVATION
DIVERT FLOW TO CULVERT.
REMOVE IMPERVIOUS DIKE #1 AND #2 AND
WITH CLASS ’I’ RIPRAP.
CONSTRUCT CULVERT AND STABILIZE BANKS
BASIN.
EFFLUENT WATER USING A SPECIAL STILLING
DEWATER CONSTRUCTION AREA AND TREAT
WATER TO TEMPORARY CHANNEL.
INSTALL IMPERVIOUS DIKES #1 & #2 AND DIVERT
2’ DEEP WITH 2:1 SIDESLOPES.
CONSTRUCT TEMPORARY 3’ BASE CHANNEL,
INSTALL SPECIAL STILLING BASIN.
INSTALL SILT FENCE AT TOP OF EXCAVATION LIMITS.
REMOVE EXISTING BRIDGE STRUCTURE.
NOTE:
PLACE TEMPORARY ROCK SEDIMENT DAMS TYPE - B
DRAINAGE OUTLETS.
AND TEMPORARY ROCK SILT CHECKS TYPE - A AT
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
Michael Baker Engineering, Inc.
NC License: F-1084
Cary, NC 27518
Suite 600
8000 Regency Parkway
DB12-220255
7
/
2
3
/
2
0
14
3
:
3
4
:
2
3
P
M
R
:
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
2
2
-
0
2
5
5
_
E
C
_
P
S
H
_
0
4
.
d
g
n
U
S
E
R
:
t
o
d
d
.
b
u
c
k
n
e
r
R/W SHEET NO.5
/
1
4
/
9
9 SHEET NO.PROJECT REFERENCE NO.
LEVEL IIIA CERTIFICATION NO.
345
LEVEL IIIA NAME
TODD H. BUCKNER, PE
770
7
7
0
775
775
7
7
5
7
7
5
775
770
7
7
0
775
775
7
7
5
7
7
5
775
STAGE 1:STAGE 2:
UNNAMED ASHWORTH CREEK TRIB.
DIKE
IMPERVIOUS DIKE
IMPERVIOUS
STABILIZE CHANNEL WITH COIR FIBER MATTING.
BASIN AS NEEDED.
EFFLUENT WATER USING A SPECIAL STILLING
DEWATER CONSTRUCTION AREA AND TREAT
CONSTRUCT 2’ BASE CHANNEL.
INSTALL IMPERVIOUS DIKES.
INSTALL SPECIAL STILLING BASIN AS NEEDED.
GRUBBING PHASE.
ACCORDING TO THE CLEARING AND
INSTALL EROSION CONTROL MEASURES
FILL EXISTING CHANNEL AND STABILIZE.
IN THE FINAL GRADING PLAN.
MAINTAIN EROSION CONTROL DEVICES AS SHOWN
REMOVE IMPERVIOUS AND DIVERT FLOW.
AFTER STABILIZATION OF CHANNEL HAS OCCURED
EC. 5
CHANNEL
FILL EXISTING
CHANNEL WITH RIP RAP
RELOCATED JURISDICTIONAL
CHANNEL WITH RIP RAP
RELOCATED JURISDICTIONAL
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
Michael Baker Engineering, Inc.
NC License: F-1084
Cary, NC 27518
Suite 600
8000 Regency Parkway
DB12-220255
7
/
2
4
/
2
0
1
4
7
:
4
3
:
3
6
A
M
R
:
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
2
2
-
0
2
5
5
_
E
C
_
P
S
H
_
0
5
.
d
g
n
U
S
E
R
:
t
o
d
d
.
b
u
c
k
n
e
r
R/W SHEET NO.5
/
1
4
/
9
9 SHEET NO.PROJECT REFERENCE NO.
LEVEL IIIA CERTIFICATION NO.
345
LEVEL IIIA NAME
TODD H. BUCKNER, PE
BRIDGE #255
WW(TYP.)
WOOD
N C G R ID
N A D 83/N S R S 2007
A/G
A
S
H
W
O
R
T
H
C
R
K
T
5
P
O
T
S
t
a
. 14
+
9
8
.8
0
GRAU 350 TL-3 CAT-1
GRAU 350 TL-3
-L- PC STA 10+00.00
-L- POT STA 14+85.00
BEGIN CONSTRUCTION
BEGIN PROJECT DB12-220255
END CONSTRUCTION
END PROJECT DB12-220255
PT Sta. 11+90.68
GRAU 350 TL-3
EXIST. R/W
54.00’ RT
+11.50
EXIST.
45.00’ LT
+75.00
EXIST.
35.00’ LT
+40.00220255-1
220255-2220255-1
EXIST. R/W
45.00’ RT
+67.50
F
F
F
F
EST 43 TONS
CLASS I RIP RAP
EST DDE=15 CY
OUTLET CHANNEL
CLASS I RIP RAP EST 23 TONS
INLET CHANNEL EST DDE=50 CY
EC. 6/CONST. 4
EROSION CONTROL FOR FINAL GRADING PLAN
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
Michael Baker Engineering, Inc.
NC License: F-1084
Cary, NC 27518
Suite 600
8000 Regency Parkway
DB12-220255
7
/
2
3
/
2
0
14
3
:
3
5
:
18
P
M
R
:
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
2
2
-
0
2
5
5
_
E
C
_
P
S
H
_
0
6
.
d
g
n
U
S
E
R
:
t
o
d
d
.
b
u
c
k
n
e
r
R/W SHEET NO.5
/
1
4
/
9
9 SHEET NO.PROJECT REFERENCE NO.
LEVEL IIIA CERTIFICATION NO.
345
LEVEL IIIA NAME
TODD H. BUCKNER, PE
on Slope as Work Allows.
Place Matting for Erosion Control
STA. 10+68 TO 12+12
PROPOSED DITCH LINE.
EROSION CONTROL IN THE
INSTALL RIPRAP FOR
N
C
G
RI
D
N
A
D
8
3/
N
S
R
S
2
0
0
7
T
O
B
TOB
NO BED MATERIAL REQUIRED
T
O
B
TOB
(NOT TO SCALE)
AND FLOOD PLAIN
LOW FLOW CHANNEL,SILLS
SKEWED MULTI-BARREL CULVERT
ENGINEER.
5) NUMBER OF SILL/BAFFLES DETERMINED BY THE
ABOVE BANK FULL.
4) DO NOT SET ELEVATION OF HIGH SILL/BAFFLES
FLOW CHANNEL OF STREAM. (THALWEG)
MATCH STREAM BED ELEVATION IN LOW
3) TOP OF LOW FLOW SILLS/BAFFLES SHOULD
SEPARATELY AND ATTACHED BY DOWELS.
2) SILLS/BAFFLES ARE TO BE 1.0 FT. WIDE, CAST
BE SUBJECT TO PERMIT CONDITIONS.
TO APPROVAL BY THE ENGINEER AND MAY
PASSAGE. NATIVE MATERIAL IS SUBJECT
PROVIDE A FLAT SURFACE FOR ANIMAL
PLACED ON TOP TO FILL VOIDS AND
BARREL(S), NATIVE MATERIAL SHOULD BE
IS USED TO LINE THE HIGH FLOW CULVERT
HIGH FLOW CULVERT BARREL(S). IF RIP-RAP
SUPPLEMENT THE NATIVE MATERIAL IN THE
BARREL. RIP-RAP MAY BE USED TO
BE USED TO LINE THE LOW FLOW CULVERT
EXCAVATED FROM THE STREAM BED MAY
CONSTRUCTION. ONLY MATERIAL THAT IS
FLOODPLAIN AT THE PROJECT SITE DURING
EXCAVATED FROM THE THE STREAM OR
MATERIAL CONSISTS OF MATERIAL THAT IS
CONTINUOUS LOW FLOW CHANNEL. NATIVE
IN THE CULVERT SHALL PROVIDE A
1) NATIVE MATERIAL BETWEEN SILLS/BAFFLES
*NOTES:
1.5
:1
1.
5
:
1
(NOT TO SCALE)
INLET CHANNEL
18.25’
1.
5
:
1
1.5
:1
18.25’
CULVERT #2
2@8’X8’ RCBC
NATURAL BED MATERIAL
CULVERT #1
PROP FLOODPLAIN BENCH
STREAMBED
CLASS I RIP RAP
2’ SILL 1’
NG
SUPPLEMENT WITH CLASS ’B’ RIP RAP IF NECESSARY.
BACKFILL BARRELS WITH NATIVE BED MATERIAL AND
PLACE SILLS AT INLET AND OUTLET OF CULVERT ONLY.
(NOT TO SCALE)
OUTLET CHANNEL
(WESTERNMOST)
BARREL #1
(EASTERNMOST)
BARREL #1
NG
1’
2’ SILL
CLASS I RIP RAP
EXCAVATE
DETAIL
(WESTERNMOST)
BARREL #1
(EASTERNMOST)
BARREL #1
RIP RAP
CLASS ’I’
RIP RAP
CLASS ’I’
RIP RAP
CLASS ’I’
BENCH
FLOODPLAIN
PROP
EC-7
R
E
V
IS
IO
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
Michael Baker Engineering, Inc.
NC License: F-1084
Cary, NC 27518
Suite 600
8000 Regency Parkway
DB12-220255
7
/
2
3
/
2
0
14
3
:
3
5
:
2
1
P
M
R
:
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
2
2
-
0
2
5
5
_
E
C
_
P
S
H
_
0
7
.
d
g
n
U
S
E
R
:
t
o
d
d
.
b
u
c
k
n
e
r
R/W SHEET NO.5
/
1
4
/
9
9 SHEET NO.PROJECT REFERENCE NO.
LEVEL IIIA CERTIFICATION NO.
345
LEVEL IIIA NAME
TODD H. BUCKNER, PE
r
,i
i¢
�
ai
�
�
�
�
l�
U
W
O
�1
�
�
`� J
�
�
N
�
�
U
�
�
(O,
V
; izii izo�
� 1209
eEGIN
PROJECT
END PROJFCT �
_— =
_.. __...r.___
\ � l
�zo8
_ ._..� -
soux� cnao�cvA "-. • -.. � .. _ , „
�z�o
�12�6
VICINITY MAP
DETOUR ROUTE � -� -�FF�-�-
— �
vl s� �D
i5r Iz-
5'I' -1 1�I � C�IE` s�� C>R'!C']E'I C`.-=41; OLT ���14:
lDl[ ti'll5l[,��� �l� l�[lIC alI�I1��' �,_ �r'�
CLEVELAI�D COUI�TY
� DB12-220255
,�.re ..d.o o AP.d �o o��.�,�
LOCATIOIV: STRUCTURE 11i0.255 OVER ASHWORTH CREEK TRIBUTARY 5
ox sx izo�
� �� � ���� �
TYPE OF WORK GRADIIVG, DRA7IVAGE, PAVIIVG, f�' STR UCTURE ����� ��� �
___.___ '_____i
.� � �
-L- PC Sta.10+00.00
?E>NFCP.CGD CCNl;:kETE
?OA CUL4EFi
�- '",C S' X 3`
BEGIN RCBC
..=L- Sta.T�T
CLEARING ON THIS PROJECT SHALL 9E PERPORMED
TO THE LIMITS ESTABLISHED BY METHOD 11.
THIS PROIECT IS NOT WITHIN ANY MUNICIPA�
BOUNDARIES � �� . � � �� .
GRAPffiC SCALES DESIGN DATA PROJECT LENGTH
30 l5 0 30 6a ADT 2073 = 510
�I J"�� J V= 55 MPH LENGTH ROADWAY PROJECT D872-220255 = 0.092 MI
1
PLANS FUNC CLASS = R. LOCAL LENGTH STRUCTURE PROJECT DB12-220255 = 0.000 MI
3L0 �5 0`� 30 60 SUBREGIONAL TIER
Il�rr_I—� TOTAL IENGTH OF PROJECT DB72-220255 = 0.092 MI
PROFILE (HORIZONTAL)
NCDOT CONTACT.� K. ZAK HAMIDI, PE
DESIGN BUILII PAO/SC]'£NG)NEEA
�\
�``� �`
�
�
MlcM1aelBakerEnglneetlng,lnc.
8�00 Regency Parkway, Sulle 600
Cary,NC 2]51B
Pmfesslonal Coryo�a�ion Llcense Numbec
F-1004
2011 STANDARD SPECIFICATfONS
RIGHT OF WAY DATE: I TODD H. BUCKNER PE
APRIL 23.2013 PRn»creHCava�e
LETTING DATE: I pxoS�cEnssi��HCm�s�re
APRIL 23.2013
' t::.4W;-�lu;
~ C 5.
-L- POT Sta.14+85.00
HYDRAUITCS ENGINEER
ROADWAY DESZGN
ENGINEER
...__._.___.—�
I
_ - - . . - _ _ - --_
- PROIECf 0.EFERENCE NO, $HEEi NO.
_ _______.__ _._ FLOODPLAIN BENCH �NLET CHANNEL OUTLET CHANNEL� °�„_�'°"'
������ ��q'.��t����� (NOTTO SCALE) NOTTO SCALE (NOTTO SCALEI ' a^'+snErrrvo.
DENOTE$ TEMPORARY �,`�,,,q `;'` :�'§ / � 1 Ronownr oESi�H xvonauucs
� IMPACTS IN SURFACE WATER J€ fl�� i � +a,l� L3 _ PROP BARREL #i BARREL #2 BARREL #1 BARREL #2 . eHCweea ervcweea
L +-? BENCH , (WESTERNMOST) �EAAERNMOST� nNESTERNMOST) (�STERNMOSn '"
i - � -�� /� FRELIMINARY PLA.YS!
DENOTES IMPACTS W .CU.ss � RIP 2nP �, /�NG ,'� [ -�' � ' N � v n �a m�ro �
� '�. , ' ^ i 'NG �'' .j y.' NG �
` �� J�\ . FI l � � �.
SURFACE WATER �� i r,
. i /
itF.%f�'!E cXI57. iiftiL`.GE -, " � �CLA55 IRIP RAP J�. �" EXGAVATE . ��..
INC�MPLETE PLA NS
. � � VA � ., ' . .
Ar s e
� � �� QASS I RIP RAP�Y" �/ '�
ftf€"#rL;RCEU CG�3C�2FFF. .,, ;r
uiJX <:Ut�l'EF.1� � '.. mmnaeie a e i„ m� mi n is e e e�==�� m
RIES � STREAMBED I 2,51Lt s 5 e
� r" �' X f3' ' ` Y SILL �� �, STREAMBFD " 8 Powq•hP�o-••r
" • � ,o`- ' — _ — 182Y .
� �� t- \ � 30' 0' 30' 60' 90' Puce sn�s n� w�er nHO ounrr or cmverzr oHn. ''� 18.25'
, i �,:,n �. ,�a,n.
�,����• �����5•'_�\\ `,'�' �A eAC�WIiHACV55 B?RIPNPAPIFBN�ECESSARYIALANO SUPPIfMENT i ��
�-�ST �DF-ia �Y � . .. . ... .:
c��SS t P.IF R:�P � A3I '� --x-- 3�'r� ,�_ GRAPHIC SCALE _..- .
- i ,� E5� d3 TCtNS V �� i z) � � � �
ZZOZS$, ` , �`, „o.o0 00 150 100 _ 5,0 _ CL �0 100 1�0 20
� � � EXIST LT r "'' . k�
� � _ ��1�T��lQ ���i�4� �.�. �� i���0�.{�
\
'� -- � _ = I - 45 00 �T , � �- � G'�NTE#�Ll�'E STA.j� �25 PD � � NW
�_ «�5 0o F
v � cn, �:�-� � .
` /, �E�����, s �� � ��----- �" � ------ �� Ea�_r�� 6R�10E F'Qffi+7` ��2C8 8�R �� S�L=7b8.2 �
� � vr k 3
� r- __���-5,n� _� � � ��a � �- : � s�� -� �o° �� P�oP ?� �Y�_����� � �
--- ----
�I -'` ��� �- � � i a�;• o�,� �PhOP iQU YR�Y75 36'
p __ s_- - _-- -_... — _... -- - _
--- - - S 40 /0 / .3"
i �o �� s, L=5'' - -- � T$ t€FT � � , T
i - - " ` & RIGHT,
�— - ,� _ � � - - - -
_ -- _-_ -. - -
�
'--, --- - -
- �� f 5 --- - -
�n_r � �� = �__ . ,�=� �'� _ - � � f � , , �T$ LfFT
� � '- r ,
770.
� �� � .����� �� ' °P� � �i i�iE�] �TB RI�H7 � ��� .
� � Y 'vr�>, - 0 : �� ' � _ : �-_
°` l� _ ., - �: � 'Z r �'- �-,, � ���� ST�;�A�v1 BEb
F � �� ° C.L INV° ��EV -� 7b6 3�i
�-- "" �so �a�\> as.00-ar � �� � �: C-ULi�EffT f`JL �
r:��s� cx��w�� esr �cs�-�o c�-� � ` ��TDE Ezisr�ww \,,���_., EX�sT.ww �, '�,_� �EOP ��.43°l0 � -
CL455 i RIP RAF EST T3 ?+JNS „ . . . � � - _
3 � � >, "
�. , _� ... ��� CULVERT HYORNJLIC DATA ; . I � ` ` °� i =*� E7 �' � rn a ��..
.. ( .� OESIGN OISCHPRGE = 6Cd CFS �. t ..:. .. � � % ..� ��` 7 : ..a �33 iu an .�. ..�..
� : �� � � ! . OESIGN FREWENLY = 25 YRS '� ����
BEGIN GRADE ; oesicx rnv e�varro,v = naz Fr � 'DESIGN EXCEPTION REQUIRED FOR �y "
BASE 05CHAaGE = 960 cvs � �� SAG VERTICAL CURVE K FACTOR �. �SSi
L BASE FREWENC/ - 100 YRS . i 7
".���.` �""" ��"a'���� ��' BASE NW ECEVATION = 77536 FT . """"" i ° .".�""""'� � "�
LL � �S� /�� � �ERTOPPING 0/SCHPRGE= N/A CFS � I i�� �,�m�.�� �� 4j>� _ �
� �
� 3 ;
' . P/ERTOPPING FREWENCY= 500 YRS � � '� ' '
' - 0✓ERTOPPING E[EVA7ION = N/A FT . - i � € � � � : � , 3 ��. F��oPUin -J[ � .
BEWLH
� Pl = 12t70.00 � �
EL = 770.94'
,
790,... .. � _ � _ , , ,, , . „ :_ . � . , .e. , VC = 430' �� .� ;. , Zii,Q .. . --L___—' � ---
r �. . � _. . . e e
: K=26 � � ° � 10 11
� , i DS 25 /11ph' " � NRISDICTIONAL STREAM PROFILE
, . , ' �XISTING BRIDGE , - t EN ..G..
>
; To eE�R�nav�� � � � � � : D � RADE � t ;
780_. r- ' � �
,,
�' LlMIT S �
' , .�.. � .. ..�. . . � � . ��.
t
. . �4���Q� i : , f- -
��0 �° � ;
� L Sfa l4 f85 D0:
�� o � -- ----- -� ----= _
, o -,. , ,- � � E'L 1 %96 6/'
_ � _ _ � � , � _�, k��49 , e .. � . � �
_ _ _ : �
� ,�i € � i� l : � ; I , ' �
,,,,� .. . MI U G � + --I �509/4� � : ... . . . �. . � Ncoor �
,� � � . � I LIMf S . � _ . ._ . _ _ ..
_7_7__4 _� �,m. , . :..: _..__._w _____w� �__�. � �_ , >__�_ _--- — -- - ------
, _ _ ;_
�,_y� ., __LL° � EpUEN Y
, � - REINfORCED CONCRETE�
w_ �� _�__--.-_
l0yr. 15Yr. FR 50Yr. C 100yr. 500Yr
; � � ; � ��. NANRAL ]]34 ]J4.1 ]]4.t T/d.]I ]J53 „ • ' �
BEri LA%ERfIL AT R� �/ �/�'CH BOX CULYERT � Exisrwc nas ns.a nse nssi ne�
�., ...... . V ITCH �j ' � ST/ll2fil8 R� _ - -. 2 @ 8'_X 8' �'.,. =._ 1 ' . . rreoPOSeo naa n.z na� neos m.i .. � . _ ._... .
'STA10+70'RT � - -� � � , �sernoH vav .
� EL - 77Z.60 EC-- 76 .8B - - � � BENCHMARKS (NAVD68) �� .
, . . . . . ............. ........ ............... ...
, �. ..� <�.�..
L/� €
p . ._�. . .. ._._
�.y. ,._..,..,._ t ..._....�., . ....
��`_'lL.....'"`""°.."" .""""""""."""""`�.�� ' � � � � ' BM•1 ELEVATION • 780.96' ...
. ��Z��-S�ILr����1VTC����R�I'��....,. ._._.. ... . .. ... .. . .... ...•.•,.,_.,.,. PERFORMANCE TABLE
? (V�{ESTERNMOST) CUL�/ERT #2 N 535nse e �i�9nas • �ao,. �
�w;i .� . E ���iSTERNiV1�.5�� EL STATION 13•79.00 32' RIGHT ` G�F�fFrn�F ne<z .
i t
��� � � �� j 2@$ XH� RCBC.� RR SPIKE IN NORTH SIDE OF 24° SWEET GUM ' �EFFErn�E 1651 , . ..... ..
. �
ti� � � T/6.05 �
; CL INV '766:26 =,. ..{ ............... ................ . 2 �,Fa�a,E�.�aN za,�
= 6M US FACE OP BRI GE
10 11 12 13 14
- _ - -
. _ . -
— -- _ _ — . _ — _ -- —_ _ _ .
_----
� �---- --- ---- FLOODPLAIN BENCH INLET CHANNEL OUTLET CHANNEL
', DENOTES TEMPORARY ����'�`�� ��'������ (NOrTO scn�E) (NOTTO SCALE) INOrro sca�EJ
�`^'ry" gy'?t,� PROP BARREL #i rBARREL #2 BARREL #1 8AR2EL #2
'� � IMPACTS IN $URfACE WATER �G.A,..i a3 C.JF � I __ BENCH ___ _ I EASTERNMOST IWESTEftNMOSTI (EASTERNMOSTj
3 y� � IW�TERNMOS� �( ' I " �. �
� , i ) � ��
DENOTES IMPACTS W ��.c�nss i xir uap �- i N� 1 -a 3I ,. � � �
n
SURFACE WATER i i �� 1 rST-N� � g ���N�
i 9 t
� �r
�', erE a£3�i€ c"`K. Itt '�sR#tJ�?II-� I � ti. � ' cinss i aie w� -���. r r excnvnte 'e
n �
� t'CINFORCE€7 C.�,�t(��E7C ���� I�il � �� i � I ,� cuss ixiv anrf; � '
� �, /
,
� —{vnaies � }
I ' k3OR rLt�V�RT � A1I �1 + STREAMBED
' ` i x� 8,�'. b .`A �d . 2' SILI �� 2' SILL � yTREAM6ED
� YM\ \ \\� � l /� PIALE $ItlS A1' MtEf AN�'OUREf OF CULVlki ONIY � �8.25� .
� r,�,��. ,,..,.tiE� . .� i, _%� �� i� 30' 0' 30' FO' 90' I
�
0
�
_
a
_ _;—% '
; i;%
—
.���� ��,� ���
��� �� ���,�� ¢
i
�
'i, .
_ `
r J4
�20Q%
I W
RAPHIC SCALE
l� ��_
i ��I�i�ll ��l Wun��i
�,�, �w�s�r, _ ,,,,.,, �,,,�.
�
CULVERT HYDRAUUC DATA i
I
� OESiGN 0/SCHpRGE - 6Lb CFS '
� OESIGN FREWENCY = 25 YRS `
+ � OESi6N hW ELEVATION = 7742 FT � �� DESI�
ease oiscnar�ce = veo cas SAG V
�(1 BASE FREIN/ENLY > l00 YRS
`�� BASE hW ECEVATION = �"/536 FT """
�� OVERTOPPING OISCNMGE = N/A CFS
; OVERTOPPING FREOUENCY 5W YRS = .�
-� � OVERTOPPING ELEVATION N/A FT r- ' -
i Pl = 12f70.00
j � EL = 770.94'
� --�--- ; ° VC = 430'
; � �� K = 26 �
, ; ; i ' Ds = 25 mphx ,;
EXI511N�� BRIDGE ` ��
TO BE:REMQYED �
�.
BAIXFlLL BARRELS WIiX NATIVE BEO MARRIAL ANO SIIPPLEMEM i
. WItH CUSS'B' RIP AAP If NECESSARY ...
oaia-azazss �
w++ meei Ho.
ownr oFSicN nroanuuc
ENGINEER ENGMEER
(
l (
; �
�
�
,
. n. i�«�3 m� an � s 'a:,w ..
����� nn+ooed�,_
...... � � . � an ,� :
�
.'' �� �555i �.
�
� E _ r�
�
, . :
. � oaH
i. ..... 7 Q ��arn ' ' .
3 �
7_b.0 , 3 _
i,. �.a
10 11
NRISDICTIONAL STREAM PROFILE
�RADE , • � �
>ffl; F�fBJ� ��� � ',. ?
� ---
; -- ,. ---- -- „,--- g��- � ; t [. — 796,6/'
_ o } � �,, , k�a�� � � ���
"' M/ / G . � .+ �.� � � 5p�� € �` � i. :� ( l � Ncoor � . .
Z7,/�1 : � � UM/ S �: �: ' [ i . : i .: � _ �:. ' .
,.I.,.M,...,.. ..�,�._ __ ,,. I «.,.,.,..,.. . . J,._..,_,_ ,_._ �_ � ' FREQl1ENCY __
_' �__ . „ _..-'_ � — — . - iar�. zsrr. sow. ioMc may� � � j
� i Y �I =. - REINPORCED CONCRECE� � , �
� BErJ Liil'El�{� ,� ' � I F%IAI GL ]]d5 A5.3 JJ56 ]I651 A6]
. END ' ATERAL V IT,CH � BoX CU�VeRT 3 , . -
� _..... � ._ t �/ �ITCH ��: @ STAl2+l81RT ..: ?@ 8'_..X g, ��,._ '... i _,.._ i_i � PzoPOSeo naa
� ,�_ . �SfiAlOf7p RT �[ EL - 7b 88 - -�� BENCHMaRKS (NAV088) -
_' [(� . .�. EL 777.60 `: : , ... �'� � .. . ........................................ � �. �:::
'. �C�,..lL.:__ ....__ .._._....,..�,._.�:. --�_�"�ZR�--SIL�L��N"CYJL'�I�R��� '—'�."-'._..,z,._._.._......... BM�1 ELEVATiON • 7B0.96' PHtF(
_. _...,_ ._ . _. _. .
` ; (Vy'EST�RNMO�T) CU.L�/ERi� #2 N 5a5ns0 E 1179446
, . , ,3 � (EF�STERNMOS�) EL S7ATION 13 79 00 32 RIGHT FF'
� i t ` � RR SPIKE IN NORTH SIDE OF 24 SWEET GUM fof
, 2@8'X8' RCBC ° =E�
€ CL INV 766.26 ... ........ ...... ............... z�FRt
E
� 10 11 12 13 14
_
_ _— -- — _ — _
�z �
;, _
)5 �
IDGE �
�..� �. . .. . . . � . . . ..
—
7
7
7
WETLAND PERMIT IMPACT SUMMARY
WETLANDIMPACTS SURFACE WATERIMPACTS
an Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fill in Fill In in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
� -L- 12+z5 LT Dewaterin
14
Floodplain
1 -L- 12+Z5 LT Bench/Streambank 35
Stabilization
1 -L- 12+Z5 2- 8' x 8' RCBC 5P
Floodplain
1 ' -L- 12+p5 RT Bench/Streambank Z5
Stabilization
1 -L- 12+25 RT Dewaterin q�
2 -L-11+33 TO 12+34 RT ChannelChange �pg
TOTALS: 220 31
������ �������
����� � �� �