Loading...
HomeMy WebLinkAbout20120773 Ver 1_Other Agency Correspondence_20140725Strickland, Bev From: Kulz, Eric Sent: Friday, July 25, 2014 1:37 PM To: Strickland, Bev Subject: FW: Jacobs Ladder and Jacobs Landing Credit Modificaiton Request Letters (UNCLASSIFIED) Attachments: Ladder - Credit Request.pdf; Landing - Credit Request.pdf Bev: For 12 -0773 (Jacobs Landing) and 12 -0774 (Jacobs Landing) - - - -- Original Message---- - From: Tugwell, Todd SAW [ mailto :Todd.Tugwell @usace.army.mil] Sent: Friday, July 25, 2014 12:54 PM To: Kulz, Eric Subject: FW: Jacobs Ladder and Jacobs Landing Credit Modificaiton Request Letters (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE - - - -- Original Message---- - From: Tugwell, Todd SAW Sent: Thursday, May 22, 2014 2:41 PM To: Fritz Rohde (Fritz. Rohde @noaa.gov); Amy Chapman (amy.chapman @ncdenr.gov); Baker, Virginia; Beter, Dale E SAW; Biddlecome, William J SAW; bowers.todd @epa.gov; Crumbley, Tyler SAW; Cyndi Karoly (cyndi.karoly @ncdenr.gov); David Cox (david.cox @ncwildlife.org); Emily Jernigan @fws.gov; eric.kulz @ncdenr.gov; Gibby, Jean B SAW; Greer, Emily C SAW; Jones, Scott SAW; Karen Higgins (Karen. Higgins @ncdenr.gov); Kathryn Matthews @fws.gov; Marella Buncick ( Marella Buncick@fws.gov); McLendon, Scott C SAW; 'Steve Sollod'; Travis Wilson (travis.wilson @ncwildlife.org); Wheeler, Tracey L SAW; Wicker, Henry M JR SAW Cc: 'Baumgartner, Tim'; 'Tim Morris' Subject: Jacobs Ladder and Jacobs Landing Credit Modificaiton Request Letters (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE All, Pursuant to our discussions during the last IRT meeting on May 13th, please see the attached letters from Tim Morris with KCI. The letters are requesting a modification to the amount of credit proposed for two of the tributaries that were constructed as part of the project. The presentation that was provided to the IRT during the meeting is also available on the IRT portion of the RI BITS website. As we discussed during the meeting, the attached letters have been prepared to provide justification for the requested credit modification. Please review the attached letters and provide any comments to me within 30 days of this emails (June 20th). Thanks, Todd TugwelI Special Projects Manager Wilmington District, US Army Corps of Engineers 11405 Falls of the Neuse Road Wake Forest, NC 27587 Office: 919 - 846 -2564 Mobile: 919 - 710 -0240 Classification: UNCLASSIFIED Caveats: NONE Classification: UNCLASSIFIED Caveats: NONE KCIENGINEERS • SCIENTISTS • SURVEYORS • CONSTRUCTION MANAGERS ASSOCIATES OF NORTH CAROLINA, PA Landmark Center 11, Suite 220 4601 Six Forks Road Raleigh, NC 27609 (919) 783 -9214 (919) 783 -9266 Fax May 22, 2014 Mr. Todd Tugwell Regulatory Division Wilmington District U.S. Army Corps of Engineers 11405 Falls of Neuse Road Wake Forest, NC 27587 And: Mr. Tim Baumgartner Deputy Director NC DENR Ecosystem Enhancement Program 1652 Mail Service Center Raleigh, NC 27699 Subject: Jacob's Landing (95024) Stream Restoration Project Request for Mitigation Plan Amendment Dear Mr. Tugwell and Mr. McDonald, This letter is in response to the discussions at an Interagency Review Team (IRT) meeting attended by KCI on May 13, 2014. During this meeting KCI presented a request to modify the allocation of stream mitigation credits on the Jacob's Landing stream restoration project. Citing procedural reasons, the IRT requested that KCI submit a formal request to reallocate credits. This letter will serve as that request. Request KCI requests the following changes to the credit table provided in the Jacob's Landing Stream Restoration Site - Final Mitigation Plan dated September 2012 (requested changes shown in red). KCI ASSOCIATES OF NORTH CAROLINA, P.A. www.kci.com Employee -Owned Since 1988 Reach Mitigation Type Priority Approach Existing Linear Footage Designed Linear Footage Mitigation units TI -1 Restoration P2 326 303 303 TI -2 Enhancement II - 158 109* 44 TI -3 Restoration P2 846 893 893 TIA Restoration P2 294 178 178 T2 -1 Restoration P2 1,800 1,581* 1,581 T2 -2 Restoration P2 1,135 1,060* 1,060 T2A Restoration 112 465 465 465 Total Stream Enhancement I 0 0 0 Total Stream Enhancement 11 158 109 44 Total Stream Restoration' 4,866 4,015 4,480 Total Mitigation Units 4,524 Justification The 465 linear feet of stream channel associated with reach T2 -A was identified during the Proposal Stage (including an IRT site walk) as Enhancement Level 1 at a 1.5:1 ratio. As a matter of practice, KCI attempts to be consistent with the credit -types requested in the Proposal during the assessment and the design stages of the project. During the assessment and design stage for Reach T2 -A, a more aggressive restoration approach was determined to be needed. This was primary due to the confinement of the valley, the difficulty of access, the absence of a functional floodplain and the poor condition of the valley walls leading down to the stream. These reasons and others resulted in ultimate decision to completely change the stream type from a G -type channel to a C/B -type channel. This approach was in fact a restoration approach, although it never was properly identified as such in the Mitigation Plan. The approach included the following restoration initiatives: Channel type changed from a G4 channel to a C4 /134 channel by installing a typical riffle cross section with a 3.6' bankfull bench and a 0.9' bank height. Adjusted thalweg and centerline (planform) slightly throughout the reach to allow for the incorporation of the bankfull bench. Bench location and width varied from cross section depending on condition of valley and the ability to accommodate the full bankfull width given the valley condition. Installed significant number of structures (5 step pools, 8 riffle grade controls, 8 riffle enhancements) to stabilize the profile and create in- stream habitat. Added bedform diversity and stabilized the planform. Stabilized the valley walls and contributing drainage features. All of the items mentioned above support the reallocation of credit type to restoration (or enhancement at a higher ratio). KCI requests that the IRT support the correction of the 1.5:1 Enhancement I ratio KCI ASSOCIATES OF NORTH CAROLINA, P.A. www.kci.com Employee -Owned Since 1988 proposed for Reach 2A in the Final Mitigation Plan to 1:1 ratio. KCI can provide amended copies of the Mitigation Plan, if desired. We hope you find this information appropriate in order to move forward with your decision. If you have further questions or comments, feel free to contact me at 919 - 278 -2511 or tim.morris(a�kci.com . Sincerely, Timothy J. Morris Senior Environmental Scientist cc: Joe Pfeiffer, KCI (email) Adam Spiller (email) Tim Baumgartner, EEP (email) KCI ASSOCIATES OF NORTH CAROLINA, P.A. www.kci.com Employee -Owned Since 1988