Loading...
HomeMy WebLinkAbout20140659 Ver 1_Approval Letter_20140723July 23, 2014 Moses H. Cone memorial Hospital Attn: Mr. Ronald Galloway 1200 North Elm St Greensboro NC 27401 -1020 DWR # 14 -0659 Guilford County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS Moses Cone Healing Gardens Dear Mr. Galloway: You have our approval for the impacts listed below for the purpose described in your application dated June 23, 2014, received by the Division of Water Resources (Division) June 25, 2014, with subsequent information on July 21, 2014. These impacts are covered by the attached Water Quality General Certification Number 3885 and the conditions listed below. This certification is associated with the use of Nationwide Permit Number 13 or 27 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non - Discharge, and Water Supply Watershed regulations This approval requires you to follow the conditions listed in the enclosed certification (s) or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. Impact Area Temporary /Permanent Impact Amount 404/401 Wetlands Permanent 0.01 acres Streams Permanent 75 linear feet Winston -Salem Regional Office Location 585 Waughtown St Winston- Salem, North Carolina 27107 Phone 336-771-5000\ FAX 336 - 771 -4630 \ Customer Service 1-877-623-6748 Inteinet http llportal ncdenr orghveblwglws An Equal Opportunity � Affirmative Action Employer Moses H Cone Memorial Hospital DWR# 14 -0659 401 APPROVAL Page 2 of 3 2. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification(s) /Permit /Authorization and is responsible for complying with all conditions. 3. Visual monitoring of the stabilization project shall be conducted at a minimum of quarterly for the first year or two bankfull events (whichever is longer), and then annually until the site is stable (particularly after storm events) and vegetation is successful. Any failures of structures, stream banks, or vegetation may require future repairs or replacement, which requires coordination with the Winston Salem Regional Office to ensure the stability and water quality of the stream and downstream waters. 4. The permittee shall ensure that mature trees within the buffer areas will be protected as much as feasible during the construction of this project. 5. The proposed project must comply with the Greensboro Jordan Buffer Authorization issued July 14, 2014 per the Jordan Lake Water Supply Watershed: Protection and Maintenance of Riparian Areas Jordan Buffer Rule) 15A NCAC 02B .0267. This approval and its conditions are final and binding unless contested. This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at http: / /www ncoah.com/ or by calling the OAH Clerk's Office at (919) 431 -3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8.00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431 -3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: ' If sending via US Postal Service. Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699 -6714 If sending via delivery service (UPS, FedEx, etc) Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609 -6285 Moses H Cone Memorial Hospital DWR# 14 -0659 401 APPROVAL Page 3 of 3 One (1) copy of the petition must also be served to DENR: Lacy Presnell, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699 -1601 This letter completes the review of the Division under section 401 of the Clean Water Act. Please contact Sue Homewood at 336 - 771 -4964 or sue,homewood @ncdenr.gov if you have any questions or concerns. Sincerely, 6-1" W. Corey Basinger Regional Supervisor Water Quality Regional Operations Division of Water Resources Enclosures: GC 3885 cc: Virginia Spillman, City of Greensboro Stormwater Dept. (via email) Craig Brown, USACE Raleigh Regulatory Field Office (via email) DWR WSRO 401 files DWR 401 & Buffer Permitting Unit