Loading...
HomeMy WebLinkAboutGW1-2022-06634_Well Construction - GW1_20220711 `V t3,CONSTRUCTION RECORD�+L4 J�-1� For Internal Use Only: 1.well Contractor Informntion: 14.WATER ZONES FROM TO DESC 110N Well ContractorN eo g 51� �� O, d ft. ft I Gli' NC Well Contractor Cedification Number 15.OUTER.CASING FROM To fornti-cased RTffiCKNESS acable DIMTwll MATE RAL YADKN WELL COMPANY,INC-. ft. ft. in. k Company Name Y Ar F ��- �� �g c® 16.11Y1sIFR CASING OR TUBING( eothermal closed-loop) 2.Well Construction Permit#: ��� Ns®�+ -�'��Z FROM TO DIAMETER THIcIOvrss 14 List all applicable well construction perrnjts(i,e.UIC,County"State,l-arirmce,air) 41 ft /C7 ft •;S , � r � 3.Well Use(checkwell use)' ft. ft. m. 7.SCREE,N Water Supply Well: FROM TO DIAMErL'R SLOT SIZE THICrilYL+5S MATERIAL ❑Agricultural ❑Municipal/Public ft. ft. in. ❑Geothermal(Heating/Cooling Supply) Vesidential Water Supply(single) ft. ft. ❑Industrial/Commercial ❑Residential Water Supply(shared) 18.GROUT ❑Irrigation ❑Wells>100,000 GPD FROM I TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: ft. s ft f�G�, e r!efe ❑Monitoring ❑Recovery ft. ft. Injection Well: ft % ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK d'a licaLle) ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL r PLAC1:=NThMrJ(OD []Aquifer Test ❑Stormwater Drainage ft ft. ❑Experimental Technology ❑Subsidence Control ft ft ❑Geothermal(Closed Loop) ❑Tracer 20.DRILLINGLOG attach additional sheets ifnemsa ❑Geothermal(Heating/Coolin/gRetum) []Other(explain undeer#221 Rematics) FROM TO 9, ft DcCTiOx color,hardness,s°svr°ctr ,G •= siu,etc- 4.Date WeU(s)Completed:( �'a�WeIIID#4 AP- 0-7 z ® ft ,./(Gam®• fL .�,5•l 5a.Well Location: Phone #J7 -- Q.-/ 7 -. �'3 ft /®g /71 ft I It sloa fill, Facility/OwnerName FaciUlyMA Cif applicable) �/ ( aj B �a f� fa"1�1;•i'�-- ^� ft. ft ft if. Physical Addrrss,City,and Zip 21.REMARKS t" ram° County Parcel Identification No.(FIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: JUL11 2022 (Twell field,one brt/longis sufficient) 22.Certification: �r:� :7ov130 Pi,0r,; i5, dZ 6.Is(are)the well(s): f3Permaneut or ❑Temporary Si re of Cmt&Ed Well Contractor Date _ By signing thUfarm,I hereby cert�that the wa11(s)was(were)constructed in accordance with 7.Is this a repair to an existing weII: ❑Yes or f"R`lo ISANCrIC 02C.0100 or I iA NCAC 02C.0200 Well Construction Standards and That a copy If this is a repair,fdl out]mown well construction information and erplain the nature of the of this record has been provided to the well owner. repair under-921 remarks section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well conshuction info construction,only 1 GVY-1 is needed. Indicate TOTAL NUMBER of wells (add See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: ( ' 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: r+�iLJ� (ft) Submit this GW-1 within 30 days dwell completion per the following: For multiple wells list all depths if different(example-3©200'and 2@100D 24a. For All Wells: Original form to Division of Water Resources (DWR), 10.Static water level below top of casing: �� (ft.) Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 If water level is above casing use"+" 11.Borehole diameter: Bum 4.0/0 24b.For Iniection Wells:Copy to DWR,Underground Injection Control(IUC) Program,1636 MSC,Raleigh,NC 27.699-1636 12.Well construction method: AIR ROTARY r e auger,rotary,cable,direct push,etc. 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i p ) county environmental health department of the county where installed FOR WATER SUPPLY WEIJA ONLY: i 24d.For Water We]Is producing over 100,000 GPD: Copy to DWI;,CCPCUA 13a.Yield(gpm) / Method of test: i ried.t49 Permit Program,1611 MSC,Raleigh;NC 27699-1611 70%HTH .� 13b.Disinfection type: � Amount: r Z DATE SITE VISITED: _I� - VISITED BY: