Loading...
HomeMy WebLinkAbout20220953 Ver 1_ePCN Application_20220714 DWR Division of Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) April 13,2022 Ver 4.3 Initial Review Has this project met the requirements for acceptance in to the review process?* Yes No Is this project a public transportation project?* Yes No Change only if needed. Pre-Filing Meeting Date Request was submitted on: 4/16/2022 BIMS#Assigned* Version#* 20220953 1 Is a payment required for this project?* No payment required Fee received Reviewing Office* Fee needed-send electronic notification Central Office-(919)707-9000 Select Project Reviewer* Ryan Conchilla:eads\rjconchilla Information for Initial Review 1a.Name of project: Richmond County Bridge 140 1a.Who is the Primary Contact?* Art C.King 1 b.Primary Contact Email:* lc.Primary Contact Phone:* acking@ncdot.gov (910)773-8015 Date Submitted 7/14/2022 Nearest Body of Water Solomons Creek Basin Yadkin-PeeDee Water Classification Class:C Site Coordinates Latitude: Longitude: 34.884230 -79.805031 A. Processing Information County(or Counties)where the project is located: Richmond Is this a NCDMS Project Yes No Is this project a public transportation project?* Yes No Is this a NCDOT Project?* Yes No (NCDOT only)T.I.P.or state project number: BP8.R013 WBS#(H) BP8.R013 1a.Type(s)of approval sought from the Corps: Section 404 Permit(wetlands,streams and waters,Clean Water Act) Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No lb.What type(s)of permit(s)do you wish to seek authorization? Nationwide Permit(NWP) Regional General Permit(RGP) Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit(NWP)Number: 03-Maintenance NWP Numbers(for multiple NWPS): 13-Bank Stabilization Id.Type(s)of approval sought from the DWR: 401 Water Quality Certification-Regular 401 Water Quality Certification-Express Non-404 Jurisdictional General Permit Riparian Buffer Authorization Individual 401 Water Quality Certification le.Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f.Is this an after-the-fact permit application?* Yes No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? Yes No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? Yes No lh.Is the project located in any of NC's twenty coastal counties? Yes No 1j.Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d.Who is applying for the permit? Owner Applicant(other than owner) 1e.Is there an Agent/Consultant for this project?* Yes No 2.Owner Information 2a.Name(s)on recorded deed: NCDOT Highway Division 8 2b.Deed book and page no.: 2c.Contact Person: Art C.King 2d.Address Street Address 121 DOT Drive Address Line 2 City State/Province/Region Carthage NC Postal/Zip Code Country 28327 Moore 2e.Telephone Number: 2f.Fax Number: (910)773-8000 (910)947-3873 2g.Email Address:* acking@ncdot.gov 3.Applicant Information(if different from owner) 3a.Name: NCDOT 3b.Business Name: NCDOT 3c.Address Street Address 121 DOT Dr. Address Line 2 City State/Province/Region Carthage NC Postal/Zip Code Country 28327 Moore 3d.Telephone Number: 3e.Fax Number: (910)773-8000 3f.Email Address:* acking@ncdot.gov C. Project Information and Prior Project History 1.Project Information 1b.Subdivision name: (if appropriate) lc.Nearest municipality/town: Rockingham 2.Project Identification 2a.Property Identification Number: 2b.Property size: 1.5 ac 2c.Project Address Street Address Sandhi!!Rd. Address Line 2 City State/Province/Region Rockingham NC Postal/Zip Code Country 3. Surface Waters 3a.Name of the nearest body of water to proposed project:* Solomons Creek 3b.Water Resources Classification of nearest receiving water:* Class:C 3c. What river basin(s)is your project located in?* Yadkin-PeeDee 3d.Please provide the 12-digit HUC in which the project is located. 030402010302 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Replacing a deficient,outdated bridge with a new modern structure. Rural,agricultural,residential,roadway. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* Yes No Unknown 4f.List the total estimated acreage of all existing wetlands on the property: lac. 4g.List the total estimated linear feet of all existing streams on the property: 200 ft 4h.Explain the purpose of the proposed project:* Replacement of a deficient,outdated bridge with a safe modern structure. 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:* Remove the existing bride and replace in place with a new structure. Anticipated equipment used:Track Hoe,Dump Truck,Crane,Motor Grader,Compactor,Paving Equipment. 5.Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No Unknown Comments: 5b.If the Corps made a jurisdictional determination,what type of determination was made?* Preliminary Approved Not Verified Unknown N/A Corps AID Number: 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): W.Sullivan Agency/Consultant Company: Kimley-Horn Other: 6.Future Project Plans 6a.Is this a phased project?* Yes No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? No D. Proposed Impacts Inventory 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): Wetlands Streams-tributaries Buffers Open Waters Pond Construction 2.Wetland Impacts 2a.Site#*(?) 2a1 Reason(?) 2b.Impact type*(?) 2c.Type of W.* 2d.W.name 2e.Forested* 2f.Type of Jurisdicition*2g.Impact (?) area* 1 construction P Bottomland Hardwood Forest Solomons Crk. Yes Both 0.070 (acres) 1 Mech.clearing P Bottomland Hardwood Forest Solomons Crk. Yes Both 0.110 (acres) 2 Hand clearing T Bottomland Hardwood Forest Solomons Crk. Yes Both 0.140 (acres) 2g.Total Temporary Wetland Impact 2g.Total Permanent Wetland Impact 0.140 0.180 2g.Total Wetland Impact 0.320 2i.Comments: 3.Stream Impacts 3a.Reason for impact(?) 3b.Impact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width 3h.Impact (?) Jurisdiction* length* S1 construction Permanent Stabilization Solomons Crk. Perennial Both 25 15 Average(feet) (linear feet) S2 construction/dewatering Temporary Dewatering Solomon Crk. Perennial Both 25 15 Average(feet) (linear feet) 3i.Total jurisdictional ditch impact in square feet: 0 3i.Total permanent stream impacts: 3i.Total temporary stream impacts: 15 15 3i.Total stream and ditch impacts: 30 3j.Comments: E. Impact Justification and Mitigation 1.Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Minimum wetland and stream disturbance to effectively construct the new bridge structure and,provide safe roadway and approaches. lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Current NCDOT Best Management Practices will be utilized during all phases of construction. 2.Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? Yes No 2c.If yes,mitigation is required by(check all that apply): DWR Corps 2d.If yes,which mitigation option(s)will be used for this project? Mitigation bank Payment to in-lieu fee program Permittee Responsible Mitigation 4. Complete if Making a Payment to In-lieu Fee Program 4a.Approval letter from in-lieu fee program is attached. Yes No 4b.Stream mitigation requested: (linear feet) 4c.If using stream mitigation,what is the stream temperature: 15 warm 4d.Buffer mitigation requested(DWR only): 4e.Riparian wetland mitigation requested: (square feet) (acres) NA 0.18 4f.Non-riparian wetland mitigation requested: 4g.Coastal(tidal)wetland mitigation requested: (acres) (acres) NA NA 4h.Comments 6. Buffer mitigation (State Regulated Riparian Buffer Rules)- required by DWR 6a.Will the project result in an impact within a protected riparian buffer that requires buffer mitigation?If yes,you must fill out this entire form-please contact DWR for more information. Yes No F. Stormwater Management and Diffuse Flow Plan (required by DWR) u 1. Diffuse Flow Plan 1a.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No If no,explain why: Yadkin Pee Dee River basin 2. Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* Yes No Comments: Stormwater management plan attached to the included permit drawings. G. Supplementary Information 1. Environmental Documentation la.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* Yes No lb.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPA/SEPA)?* Yes No 1c.If you answered"yes"to the above,has the document review been finalized by the State Clearing House?* Yes No Comments:* State Minimum Criteria Checklist 2.Violations (DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* Yes No 3. Cumulative Impacts (DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality?* Yes No 3b.If you answered"no,"provide a short narrative description. The new structure is a minor deviation from the existing structure and is not anticipated to change the roadway usage. 4. Sewage Disposal (DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* Yes No N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5d.Is another Federal agency involved?* Yes No Unknown 5e.Is this a DOT project located within Division's 1-8? Yes No 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USF&W website Onsite survey by NCDOT environmental staff. 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* USF&W website 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* Yes No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* NCDOT Cultural Resources staff review SHPO screening 8. Flood Zone Designation (Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-year floodplain?* Yes No 8c.What source(s)did you use to make the floodplain determination?* FEMA Flood Map Service Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review.Documents should be combined into one file when possible,with a Cover Letter,Table of Contents,and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document WA-WB-UP.pdf 244.16KB WA-W B-W ET.pdf 253.45KB WD-UP.pdf 30.13KB WD-WET.pdf 110.45KB 21-06-0007_NoSurvey.pdf 5.69MB ILF Accept_SR 1971_Bridge 140_Div 8.pdf 278.51KB PA 21-06-0007 Richmond(NSR).pdf 9.46MB Richmond 140 NRTR final.pdf 4.04MB StreamForm_SC.pdf 20.52KB BP8.R013_Permit Drawings_(2022-04-28).pdf 2.81MB File must be PDF or KMZ Comments Signature By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief';and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: Art C.King Signature Date 7/14/2022