HomeMy WebLinkAboutNCC192557_NOT Closeout Documents_20220718North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481
County: Pitt Project: Bethel Family Dollar River basin: Tar -Pamlico
Person financially responsible: Cedar Run Capital, LLC - G. Barnes Boykin Project #: PITT-2020-004
Address: 2405-F Nash St, Wilson, NC 27896
1. Project Location: Washington St., Bethel
Pictures: Yes - Digital
2. Weather and soil conditions: sunny, hot, dry
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
Initial inspection: No
If no, check violations below:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): No one. Title:
Inspection report: Sent Report Date given/sent: September 23, 2021
9. Corrective action needed:
Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring
or self -inspections are required. Project is in compliance and released under the SPCA. Termination of
10. Comments: coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be
requested by the permittee via a Notice of Termination (NOT). The NOT is available at:
https://edocs.deci.nc.aov/Forms/NCGO1-Termination. Please note that this correspondence must be
u o d rc as part of completing the NOT process.
Reported by: Jame war s Others present:
Date of inspection: September 14, 2021 Time arriving on site: 11:00 AM Time leaving site: 11:10 AM
cc: