Loading...
HomeMy WebLinkAbout20061617 Ver 8_Modification Request_20220713 sy STAT Staff Review Form NORTH CAROLINA Envlronm¢ntcl Qvoray Updated September 4,2020 Staff Review Does this application have all the attachments needed to accept it into the review process?* Yes No ID#* Version* 8 20061617 Is this project a public transportation project?* Yes • No Reviewer List:* Colleen Cohn:eads\cmcohn Select Reviewing Office:* Raleigh Regional Office-(919)791-4200 Does this project require a request for payment to be sent?* Yes No How much is owed?* $240.00 $570.00 Project Submittal Form Please note:fields marked with a red asterisk *below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type:* For the Record Only(Courtesy Copy) New Project Modification/New Project with Existing ID More Information Response Other Agency Comments Pre-Application Submittal Re-Issuance\Renewal Request Stream or Buffer Appeal Pre-Filing Meeting Date Request was submitted on: 7/13/2022 Project Contact Information .................................................................................................................................. Name: Chris Huysman Who is submitting the information? Email Address: chrishuysman@wetland-waters.com Project Information ............................... Existing ID#: Existing Version: 20061617 7 20170001(no dashes) 1 Project Name: Wendell Falls Is this a public transportation project? Yes No Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No Unknown County(ies) Wake Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach document 211223 wendell final combined.pdf 8.31MB Only pdf or kmz files are accepted. Describe the attachments or comments: Minor modification to an existing permit. DWR contact Sue Homewood Sign and Submit ...................................................................................................................................................................................................................................................................................................................................................................................................... By checking the box and signing box below, I certify that: • I,the project proponent, hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief. • I,the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I agree that submission of this online form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the online form. Signature: Submittal Date: Is filled in automatically. WA/WETLANDS �y Sc WATERS, INC. December 23, 2021 Mr. Lyle Phillips US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Mr. Paul Wojoski NC DWR 401 Wetlands Unit 1617 Mail Service Center Raleigh, NC 27699 Re: Wendell Falls Development, Wendell, Wake County, NC Action ID: SAW-2006-210100 NC DWR: 06-1617 Messrs. Philips and Wojowski; The purpose of this letter is to request a modification to permit SAW-2006-20100 that is held by NASH Wendell Falls, LLC. The permit, issued to Mercury Development and transferred to Nash Wendell Falls, LLC on May 7, 2014, authorized impacts to 0.16 acres of open water, 2,354 linear feet of perennial stream, 581 linear feet of intermittent stream and 3.24 acres of wetlands. Temporary impacts were authorized to 0.2 acres of wetlands for mechanized land clearing, and an additional 2.39 acres of wetlands and 625 linear feet for utility line installation associated with the construction of the Wendell Falls Development. The project is located on the west side of Martin Pond Road (SR 2503), in Wendell, Wake County, North Carolina. The site is approximately 1300 acres and is found at Latitude 35.7694621'N and Longitude 78.4220719'W. The project contains unnamed tributaries to Marks Creek within the Neuse River Basin (HUC 03020201). In light of the December 31, 2022 permit expiration, the current modification request is necessary to reflect changes in the land plan, adjust sewer impacts to comply with current design standards and utilization needs, develop Americans with Disabilities Act (ADA)-accessible greenway trails, to construct roadways to access high ground not formerly utilized, and to extend the existing permit authorization. The modifications are necessary to account for planning, engineering, and market force oversights, and to refine assumptions that were made during the initial permit application process. The applicant hereby requests authorization for the changes described herein and requests that the permit expiration date be extended to December 31, 2027. A prior permit modification was approved on June 6, 2014 that eliminated two road crossings to re -habilitate a failing dam, which is currently used as a source of irrigation for 15 acres on the site. The June 6, 2014 modifications authorized impacts to 135 linear feet of stream channel below the dam embankment for the construction of a plunge pool, and authorized temporary construction activities. The modification also included permanent impacts associated with flooding of 45 linear feet of intermittent stream. Rather than providing monetary compensation for the unavoidable impacts to jurisdictional features proposed under the June 6, 2014 permit modification request, the applicant abandoned a proposal to construct two road crossings (R1 and R7) which proposed 135 linear feet of permanent stream impacts and 0.11 acres of permanent wetland impacts, respectively. Under the approved permit authorization, the project contemplated 4000 residential units and 450,000 square feet of retail and commercial uses. The current site plan maintains the number of residential units and more than doubles the proposed square footage of retail and commercial uses through vertical construction. The currently proposed permit modifications described in the attached tables and figures can be summarized as follows: total temporary impacts associated with sewer installation decrease by 58 linear feet of streams and 0.022 acres of wetlands; ADA greenways and a new pedestrian trail increase permanent stream impacts by 89.4 linear feet and wetland impacts by 0.002 acres; roadway stream impacts decreased by 63 linear feet. The current site plan shows the distribution of residential and commercial uses throughout the development. The current site plan maintains the commercial uses proximate to the intersection of Wendell Falls Blvd and Interstate 87. While the footprint of the commercial area has increased, the majority of the increases in the available square footage are associated with vertical development that will achieve five stories. The revised land development plan includes a comprehensive stormwater management plan that is administered by the developer in accordance with Wake County standards that achieve Phase II treatment standards. All stormwater basins discharge at the highest possible elevation within the drainage basins, and incorporate energy dissipation. This permit modification proposes the minimum necessary impacts to complete the construction of the sewer infrastructure sized for the build -out of the project. Temporary sewer installation impacts are necessary to connect the site with City of Raleigh Public Utility Department (CORPUD) facilities. With the exception of sewer impacts 18 and 21, all of the proposed sewer infrastructure is designed and constructed to serve the entirety of the resident drainage basin to its current zoned capacity. The overall length of stream impacts from sewers decreases by 58 linear feet through the use of aerial crossings at two separate locations, one of which requires the minimum necessary wetland impacts for the construction of support piers. The aerial crossing drawings specify that the lines will be encased and shows that they are over 4' above the existing channel. All areas that are temporarily impacted will be restored to pre-existing contours and stabilized in accordance with erosion control best management practices per CORPUD requirements. Permanent stream impacts associated with greenway and pedestrian trails have increased 89.4 linear feet due to planning oversights during the initial permitting of the project. Specifically, the design of a section of ADA-accessible greenway did not account for topographic constraints that exceed ADA slope design standards. Impacts associated with G9 are necessary to create pedestrian connectivity throughout the site and utilize an existing pedestrian underpass of Wetlands & Waters, Inc. WETLAND AND ENVIRONMENTAL CONSULTANTS Wendell Falls Parkway. The initial planning concepts placed the pedestrian underpass at its location but failed to account for slopes that rise into the development area. As a result, it is necessary to construct a long sloping switchback that complies with ADA requirements. Fortunately, the best alternative aligns with a 30 foot wide CORPUD utility ROW and does not require the removal of any trees or result in conditions that substantially differ from the current use. The impacts have been minimized as much as possible by designing a bulb out that minimizes the impacts while providing mandated slopes. The project includes additional buffer impacts at the proposed Neuse River Veterinary Hospital totaling 286 sqft. for stormwater outlet protection. The protection is necessary due to CORPUD restrictions that prohibit outlet discharges in their ROW. No other stabilization alternatives have been identified by the project engineer. The attached table enumerates the changes from the previously permitted length to the total impacts necessary to complete the project. The attached drawings depict each of the crossings in plan and profile. Project impacts for stream crossings remain essentially the same considering the reallocation of impacts amongst the permitted crossings. The project has already mitigated for the approved 2,354 linear feet of streams, 2.51 acres of wetland impacts and 405,031 square feet of buffer impacts based on a NC Ecosystem Enhancement Program receipt dated November 14, 2007. The applicant is proposing additional mitigation for the proposed additional 8 linear feet of impacts through either the state in -lieu fee program or a private mitigation bank at a 2:1 ratio (in accordance with the Mitigation Banking Rules and current applicable fees) 90 days prior to the construction of the crossing R16. The applicant proposes no additional mitigation for the additional 0.001 acres (398 sqft.) of wetland impacts that result from the project as the increases are associated with temporary sewer construction. Under the proposed permit modification, impacts to stream buffers increase by a total of 2,219 square feet. Permanent buffer impacts associated with road and greenway construction under this modification total 7,380 sqft. and temporary impacts associated with utility installation total 4704 sqft. Buffer mitigation for new impacts is assessed at 4,179 sqft. based on 283 sqft. of zone one impacts at a 3:1 ratio and 2,220 sqft. of zone two impacts at a 1.5:1 ratio. The total buffer mitigation requirement would be paid within 60 days of authorization of this modification. There are no known occurrences of federally protected species within the project area based on the attached Natural Heritage Program report. We do not believe it is necessary to conduct surveys for federally protected terrestrial plant or animal species to make a "no effect" determination since no new terrestrial species have been added to the list of Federally Protected Species within Wake County, NC since the initial permit was issued. A number of protected aquatic species have been listed as occurring in Wake County since the initial permit was issued; however, we do not believe it necessary to conduct surveys for aquatic species because there are no known occurrences of these species within Marks Creek, a tributary of the Neuse River, which has been the subject of many biological studies by both private and public entities Wetlands & Waters, Inc. WETLAND AND ENVIRONMENTAL CONSULTANTS including the Triangle Land Conservancy and the NC Ecosystem Enhancement Program. None of the studies identified populations of the recently listed species in Marks Creek. We believe that there is no need to conduct additional Cultural Resources reviews for the site since the boundaries of the project have not changed and no previously unidentified cultural resources have been discovered during construction of the project. The modification needs to be issued to: Tanya Matzen NASH Wendell Falls, LLC 4020 West Chase Blvd., Suite 150 Raleigh, NC 27607 Phone: (919) 521-2583 Email: Tanya.Matzen@brookfieldpropertiesdevelopment.com Thank you in advance for your consideration of this request and do not hesitate to call me at 336.406.0906 with any questions that you might have. Chris Huysman CC: Paul Wojoski (via email) Lyle Philips (via email) Wetlands & Waters, Inc. WETLAND AND ENVIRONMENTAL CONSULTANTS Permitted Zone 1 Proposed Zone 1 Permitted Zone 2 Proposed Zone 2 Permitted Stream Proposed Stream Permitted Wetland Proposed Wetland Buffer Impact Area Buffer Impact Area Buffer Impact Area Buffer Impact Area Phase Impact # Impact Length (LF) Impact Length (LF) Change Impact Area (sf) Impact Area (sf) Change (sf) (sf) Change (sf) (sf) Change NOTES Richardson Phase 11 Collective Phase 7 R12 (R) R13 (R) S11 P1 (NEW) R5 (R) R6 (R) R7 (R) S20 (NEW) 138.0 0.0 20.0 0.0 137.0 144.0 0.0 0.0 134.5 0.0 0.0 19.4 142.5 163.6 0.0 30.9 - 3.5 0.0 - 20.0 19.4 5.5 19.6 0.0 30.9 1,171.0 4,996.0 768.0 0.0 2,601.0 8,433.0 6,673.0 0.0 974.0 4,973.0 0.0 403.0 2,776.0 6,513.0 6,910.0 2,306.0 - 197.0 -23.0 - 768.0 403.0 175.0 -1,920.0 237.0 2,306.0 8,826.0 0.0 1,475.0 0.0 8,803.0 9,473.0 365.0 0.0 7,042.0 0.0 0.0 1,728.0 7,717.0 9,125.0 0.0 1,915.0 S21 (NEW) 0.0 0.0 0 0.0 257.0 257.0 0.0 2,059.0 S22 (NEW) 0.0 0.0 0 0.0 0.0 0.0 0.0 2,556.0 R15 (NEW) 0.0 0 0 0.0 1080.0 1,080.0 0.0 0.0 R11 157.0 157 0 0.0 0 0.0 9,545.0 9,545.0 S1 68.0 G1 15.0 S17 0.0 G11 0.0 S18 0.0 S19 0.0 Phase 8/Greenway G9 (R) Flex Neuse Vet 0.0 0.0 0.0 0.0 0.0 71.9 R8 (R) 175.0 212.2 R8A 134.0 0.0 R14 (R) 144.0 178.9 - 68.0 - 15.0 0.0 0.0 0.0 0.0 85.0 37.2 -134.0 34.9 - 8.0 0.0 0.0 566.0 323.0 1,067.0 821.0 0.0 0.0 0.0 0.0 1,602.0 0.0 0.0 23.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 - 566.0 - 323.0 535.0 - 821.0 23.0 0.0 0.0 0.0 398.0 2,341.0 1,095.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 - 1,784.0 0.0 - 1,475.0 1,728.0 - 1,086.0 - 348.0 - 365.0 1,915.0 2,059.0 2,556.0 0 0 - 2,341.0 - 1,095.0 0.0 0.0 0.0 0.0 5,001.0 1,530.0 962.0 0.0 5,351.0 5,882.0 1,691.0 0.0 3,443.0 1,538.0 0.0 993.0 4,971.0 5,339.0 0.0 1,279.0 - 1,558.0 8.0 - 962.0 993.0 - 380.0 - 543.0 - 1,691.0 1,279.0 REVISED SLIGHTLY SHIFTED CROSSING REVISED SLIGHTLY SHIFTED CROSSING NOT USED NEW PEDESTRIAN CROSSING REVISED SLIGHTLY SHIFTED CROSSING REVISED SLIGHTLY SHIFTED CROSSING REVISED SLIGHTLY SHIFTED CROSSING NEW OPEN CUT UTILITY CROSSING 0.0 1,743.0 1,743.0 NEW AERIAL UTILITY CROSSING 0.0 1,279.0 1,279.0 NEW AERIAL UTILITY CROSSING 0.0 0.0 0 NEW ROAD CROSSING 5,308.0 5,308.0 0 TO BE USED PER ORIGINAL PERMIT 1,349.0 659.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 - 1,349.0 - 659.0 0.0 0.0 0.0 0.0 NOT USED NOT USED NOT USED NOT USED CHANGE PERMITTED PREVIOUSLY CHANGE PERMITTED PREVIOUSLY 0.0 4,575.0 4,575.0 30.0 2,835.0 2,805.0 NEW GREENWAY PATH TO MEET ADA REQUIREMENTS 10,714.0 8,617.0 8,873.0 12,321.0 0.0 11, 261.0 1,607.0 - 8,617.0 2,388.0 - 283.0 6,426.0 5,225.0 5,080.0 0.0 7,316.0 0.0 6,514.0 286.0 890.0 - 5,225.0 1,434.0 - 286.0 - 2,222.0 REVISED SLIGHTLY SHIFTED CROSSING NOT USED REVISED SLIGHTLY SHIFTED CROSSING NEW OUTLET PROTECTION OUTSIDE OF SEWER ROW PHASE NUMBER X QUARTER AND YEAR WORK TO BE COMPLETED I 1 20' NEUSE RIVER RIPAR/AN d \BUFFER ZONE 2 1 • • /// I / / ,/// I I, I II 30' NEUSE RIVER RIPARIAN I I BUFFER ZONE 1 \ \ \ \ \ I \ \ \ \ I \ \ \ \ I \\\ \ I I / I \ -----1\\ 1 I 1/ I 1 / \ \ I I ' / l ;\ �\ �\\ \\\I\i\ i\ 1 ; 1 PUMP AROUND I 1 \ I\ \ 1 I / / / // I \ 1 I 1 // I// / / 1 11 I I I / / / WETLAND IMPACT 5 (REVISED) 1 / 2, 776 SF 1 I • • // / 1 11 l l'\d 1 I I \ N 1\ 1 I \ \ \ II \ C 5� \\ \\ \\ \\ \ I I I \ \ I 1 I \ I 1 I ZONE 2 BUFFER IMPACT 5 (REVISED) 2,285 SF -�1 v\I'' / / // / / \ \I/ / \\ I \ , / , / \I ZONE 1 BUFFER IMPAC / (REVISED) 7, 717 I \• l — \•\�\ / ,, /. - A \ \ 1 I •\ AI I , II I 1 I II • • \ \ 4 \ • 11 I ♦ / • ...7..•-_-___7_11,7, \ i J '-----',\ II I ♦ / I .. . //// I / ., // I / / /I/ I 1 / I 1 \ \` J1. / /// TO BE PROTECTED \ \ N \A \\ \ \ \A\\I \ \• �- A \ \ V A I 1 A\ �\ \�V O I 1 I \ v v�v0y1 1 I \ .7v \ 1 v I \ I 1 \• \ I♦ \ A 1 \ \ \\ \\ \ / TEMPORARY SILT FENCE r \\-`\ \\\ \ \I STREAM IMPACT wiRSe-� / l wwywir142.5 LF / j i/ �iflww/! w//V AV/ AMNIA/ Agr 1 I I A I II �` \ IV I I 11 / // 1 1 I I I I I 11 I / 1/ / // L .1 /1 , / / / j / / / I / '/ // i / / , / , ! 1 ! % EXISTING WETLAND AREA \ 1 IINNWIrfltrrAtAm Pr, 44007.1,4 , -Nil T 5� I\ / SF7 � ' • *AV Ad, 265 \72" RCP STORM 1 /1 1 I I I 1 I , i 1. • PIPE \ vv v 1 - V v. I v \ ! ' \- N. (\ PNEY A SDR E \ o\ 3' • P R/W \ Nall ----- - / 1 / • • \ • 1 till I Mir 4 A ir .Aar Awp-Adia I I IlllI �lll/ / / ..:ate i. ws�r�-���• yorammwmwarrarArnrAsgem lbw vArarArawar /0111I1n1 + \ Ik \ wwwon ► w1 �ww�iaA1/ 1 �%' 11 I 1 I 1`1 I I/ / 1 \\ I I •1 / O/ / // 1 I I i 1 /./ / cal, /% 1 I I 1 1 1 1 / j //*j / j j l 1 A 1 I; 1 I,/ 1 .1 1 1 1 1 \ \ I I I // 1 ■I 1 1 1 II I \ 1 1 11 1/ 111 I I 1 1 1 1 1 1 1 / 1 a1 1 1 I I / 1 1/ I( I l I I 1 / / / / / N / 1 • I I / / / / / / I I / : 1 I 1 1 / / / / / / / 1 111 III / / I l r // 1j 1 1 1 1 1,1 I I j I I l I I 1 I I I• 1 1 1111 \ 1 I I I 1 \ 1 1 A 1 I. I I A,\\ I I 1 I I I\ \\ 1\\\ 1 1 1 1 1 11 I A A \\ \ 1 I 11! 1 1 A V A I I I I 1 1, I 1 1 I A A A l l I I 1 1 111 'A I I I 1 1 1v v 1/ 1 Ii 1� AREA R5 (R) I ii • A rwwa.>.ii��—`iAlrfewa,/ 1;. 4._A*4 '� / I LO I U / in I 1 1. N 1 ♦ IA h1\\A\ \�� • \ - EXISTING WETLAND AREA 1\\ \� \ TO BE PROTECTED \ , \\ .'\\ 1 1 II . \ \ \ ' III] ` \ 1 \ ZONE 2 BUFFER IMPACT 5 (REVISED) 2,686 SF \ • \ t CLASSIFICA TION ROAD CROSSING WETLAND IMPACT 2,776 SF STREAM IMPACT 142.5 LF TOTAL 2,776 SF 142.5 LF 4,0,McKIM&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 0: 919.233.8091 F: 919.233.8031 WETLAND IMPACT y=AP IMPACT 5 (REVISED) Phase 11 at Wendell Falls 7,717 SF \ • • • v \ 0, ► \ \\ _ \ \ \ _ • • •I _ _ • • \ • ZONE 1 ZONE 2 AREA AREA 4,971 SF 7,717 SF Scale: 1"=30' 0 15 30 Date: Dec. 3, 2021 4,971 SF N 280 280 275 275 270 of 270 265 - I 265 - N - n- I PROPOSED GRADE N 260 I 260 HW-11-400 I KEYED —IN 255 CLASS TO EXTENTS B RIPRAP SHOWN HW-11-401 255 I i EXISTING GRADE I ` / 727 RCP® 1Ntr-r-- 0 54 250 INV. IN 252.85 .a;a.. 250 I 1 it rdi �� I INV. IN 252.35 it..vtv 245 EM:EDMENlI 1': LOW S REAMBED � 25' LINED RIPRAP L x WITH PLUNGE 22' W X NCDOT POOL 1.5' D CLASS 1 245 AT RIPRAP 24" PLACED DEPTH 254.15 254.52 o 1'0 6 N 00 N 6 N 267.30 256.05 267.23 256.72 253.94 253.51 9+50 10+00 10+50 11+00 11+50 12+00 12+50 4.MEOM&CREEDWETLANDIMPACTPROFILE Scale:1"50' 1730 Drive, Suite 500 IMPACT 5 (REVISED) 0 25 50 Varsity Raleigh, North Carolina 27606 0: 919.233.8091 F: 919.233.8031 Phase 11 at Wendell Falls Date: Dec. 3, 2021 N / / / e. , , //r 20' NEUSE RIVER RIPARIAN ' ' / BUFFER ZONE 2 Air 30' NEUSE RIVER RIPARIAN BUFFER ZONE 1 / ft 1( (/\ / 1 I / / I EXISTING WETLAND AREA / TO BE PROTECTED J. PUMP AROUND I ' ZONE 1 BUFFER IMPACT 6 (REVISED) 9,739 SF - • • / ZONE 2 BUFFER IMPACT 6 (REVISED) 2,548 SF / / / WETLAND IMPACT 6 (REVISED) 6,513 SF v � / •• .� ,�• ■!teammo; 1- 1 / /// J / / / 1• 4,0,McKIM&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 0: 919.233.8091 F: 919.233.8031 / 4■ ;/ on/// /N / / I I// / / / r/ // / / • / ,/ / / // '1•I I 25 I / 4/ / / / / / /1 // I/ / /,. --------- AREA R6 (R) 1 / / / 1 / / / /♦ / / CLASSIFICA TION ROAD CROSSING TOTAL 5 / TEMPORARY SILT FENCE J25i�5 96" RCP STORM PIPE STREAM IMPACT N163.6 LF b / r /■ 2� �1 /•�° / :/ /t///4, / I EXISTING WETLAND AREA 8 TO BE PROTECTED I / 1- I 270 ZONE 2 BUFFER IMPACT 6 (REVISED) 2,791 SF r r / 'I. WETLAND IMPACT 6,513 SF 6,513 SF WETLAND IMPACT y=AP IMPACT 6 (REVISED) STREAM IMPACT 163.6 LF 163.6 LF / / / ZONE 1 ZONE 2 AREA AREA / / / / 9,125 SF 5,339 SF 9,125 SF 5,339 SF Scale: 1"=30' 0 15 30 Phase 11 at Wendell Falls Date: Dec. 3, 2021 N 280 280 275 275 I 270 o 0 270 , 265 265 260 PROPOSED GRADE 8" SLAB THICKNESS 260 STANDARD WINGWALL—N HW-11-403 255 KEYED MITERED FOR FILL SLOPE HW-11-402 2:1 — 7- STANDARD MITERED FILL SLOPE WINGWALL FOR 2: 1 GR 56 +. —IN CLASS TO EXTENTS B RIPRAP SHOWN DOWNSTREAM INVERT 252.30 EXISTING 250 \ 32.0' — 250 i UPSTREAM INVERT 252.75 =% - - 245 WITH 8" SLAB THICKNESS I -EMBEDDED STREAMS RIPRAP 32' L x LINED PLUNGE 29.33' WITH NrfOT POOL W X 1.5' D CLASS 1 245 1' BELOW rD ELEVATION 87 LF 1' TALL 8'X6' END SILLS REINFORCED AT CONCRETE CULVERT INLET AND @ 0.52% OUPET BOX RIPRAP AT 24' PLACED DEPTH 255.02 254.64 254.00 0) 0) rei LC) N 254.01 268.76 254.00 269.03 253.97 0) 0) rei Ln N r) C7 rri LO N N r7 LC) N 9+50 10+00 10+50 11+00 11+50 12+00 12+50 4.MEOM&CREEDWETLANDIMPACTPROFILE Scale:1"50' 1730 Drive, Suite 500 IMPACT 6 (REVISED) 0 25 50 Varsity Raleigh, North Carolina 27606 0: 919.233.8091 F: 919.233.8031 Phase 11 at Wendell Falls Date: Dec. 3, 2021 N \ 20' NEUSE RIVER RIPARIAN BUFFER ZONE 2 \ N. \'\\ r-) CO \ \ 30' NEUSE RIVER RIPARIAN n • \ \ •. ` BUFFER ZONE 1 • /J1:\ • / I TO BE PROTECTED 40 \ \,-----\ 1 I • - -12 \\ „. _,_— ei—,,A_, ,. , . N ___ �_ ...,ii �\\\ , 48" RCP STORM PIPE , ,, 1 WETLAND IMPACT 7 (REVISED) 6,910 SF /� /. cz .' ' vM2K1M&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 0: 919.233.8091 F: 919.233.8031 EXISTING WETLAND AREA 280 P7===== :// UMP AROUND CLASSIFICA TION ROAD CROSSING \ \ \ \ \ `\ \ \� \ \ \ \ `\ \ EXISTING WETLAND AREA TO BE PROTECTED , TOTAL WETLAND IMPACT y=AP IMPACT 7 (REVISED) Phase 11 at Wendell Falls WETLAND IMPACT 6,910 SF 6,909 SF ZONE 1 AREA 0 SF Scale: 1"=30' 0 15 30 Date: Dec. 3, 2021 ZONE 2 AREA 300 300 295 295 o 290 ,K R, 290 285 csi 1>? 285 PROPOSED GRADE 280 EXISTWG GRADE 280 H W-11— 4C4 .-- / --- --- ---,.. --- H W— 11-405 KEYED —IN TO 275 CLASS B EXTENTS RIP R\,4-P SHOWN 1 „ Li- 275 77.777.777777.7.77-7:7„,...,„_ 4,2 RIPRAP OUTLET PROTECTION CDOT CLASS 1 UPSTREAM 270 INVERT 273. 0 RIPRAP AT 24" PLACED DEPTH 270 EMBEDDED STREAMBED DOWNSTREAM 1' ELEVATION BELOW INV—RT 272.50 265 265 CD oci C \ 1 275.35 279.14 288.34 278.51 288.12 277.55 273.85 9+50 10+00 10+50 11+00 11+50 12+00 4 WETLAND IMPACT PROFILE Scale: 1"=50' McK11\4& CREED 1730 Drive, Suite 500 IMPACT 7 (REVISED) 0 25 50 Varsity Raleigh, North Carolina 27606 0: 919.233.8091 F: 919.233.8031 Phase 11 at Wendell Falls Date: Dec. 3, 2021 -----2S5----- ZONE 1 BUFFER IMPACT 8--- (REVISED) 12,321 SF-- -- 30' NEUSE RIVER RIPARIAN BUFFER ZONE 1 777 • • \ 4,0,McKIM&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 0: 919.233.8091 F: 919.233.8031 \ • 93 ' R/W PROPOSED ROADWAY 72" RCP PIPE • • • . 7--, \ • \ • • • • \ • . • . \ \ \•\ • \ •\ —__ \ \ `• . . \ STORM ' \ \ . \ \ \ \ \ 'J \ c9 N. \ S N ▪ • r. . • • \ . • \\• \ ZONE 2 BUFFER IMPACT 8 • \ (REVISED) 3,642 SF . \ \ \ `,1���� \ • \ ZONE 2 BUFFER IMPACT 8 -- (REVISED) 3,674 SF \ R8 (R) CLASSIFICA TION ROAD CROSSING TOTAL WETLAND IMPACT y=AP IMPACT 8 (REVISED) • \ \ .• \ \ •\ \ • \\ \ • \• 1 \ '—z, .\\ \\ I \ • \----- fi3 \• \ - \\\ STREAM /MPACT `\ \\ \\ • • —\\..j \\\ 212.2 LF \ ��\ \ \ \ \ • �• \� RIPRAP \ '2iS''o. \ \ ` \ • • • • ma \ • • ___ • `\ `. •\\,*4 \ \ \ N. \N. •J\ 20' NEUSE RIVER RIPARIAN = BUFFER ZONE 2 — — — — — STREAM IMPACT 212.2 LF 212.2 LF Flex at Wendell Falls ZONE 1 AREA 12,321 SF 12,321 SF Scale: 1"=40' 0 20 Date: Dec. 3, 2021 40 ZONE 2 AREA 7,316 SF 7,316 SF 280 280 275 NO E ARA 1 EWD 1 o ,c o (' 275 ROADWAY ROSS SE ON ct 270 270 265 \i(6/ :92' 265 260 PROPOSED GRADE 260 HEADWALL CLASS KEYED —IN TO EXTENTS 255 HEADWALL 255 B RIPRAP SHOWN E STING L / N-. / x \ z GR — DE r I INV. IN TO MATCH OF ST 250 7 I :f±i.2-,.,„,., 1 I 250 CENTERLINE , . . !;':,•.1?:., t..•-; .nl.',:-.:i: .Ni.f,,*:i.i, .‘,1:;:-.!;:,:!;',; ,:,45,,,, Awe ,......e._ ,...1,_ INV. OUT OF STREAM TO MATCH ELEVATION CENTERLINE 1 245 PIPE LENGTH VARIES ir EMBEDMEN 1' BELOW STREAMBED -.. T RIPRAP LENGTH CULVERT PLUNGE VARIES DESIGN POOL. WITH 245 256.25 256.25 255.40 255.40 254.51 254.51 256.23 to CO CN1 (.0 6 6 in Lo C•1 cN 255.66 255.02 255.02 252.97 252.97 9+50 10+00 10+50 11+00 11+50 12+00 12+50 WETLAND IMPACT Scale: 1"=50' MoKIM&CREED 1730 Drive, Suite 500 TYPICAL PROFILE 0 25 50 Varsity Raleigh, North Carolina 27606 0: 919.233.8091 F: 919.233.8031 R8, R14, & R16 at Wendell Falls Date: Dec. 3, 2021 i1 ®' � . • 0. ZONE 1 BUFFER IMPACT 12 — (REVISED) 7,042 SF RIPRAP — .•-:._•••••••• ��' r.. ■ .—.. 30' NEUSE RIVER RIPARIAN BUFFER ZONE 1 AREA R12 (R) ZONE 2 BUFFER IMPACT 12 , (REVISED) 1, 653 SF '. .• •�■■ �' /• // 4.*4/ _N-N--- 1. ,���®_-- --- _ , i �, - nrLAFD IMPACT 12 (REVISED) S-- -. EX/STING WETLAND AREA _\ TO BE PROTECTED 2 ZONE 2 BUFFER IMPACT 12 ____----- ----__ (REVISED) 1,790 SF 295 --- CLASSIFICA TION ROAD CROSSING WETLAND IMPACT 974 SF TOTAL 974 SF STREAM IMPACT 134.5 LF v �M 2K1M&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 0: 919.233.8091 F: 919.233.8031 WETLAND IMPACT y=AP IMPACT 12 (REVISED) Richardson Tract at Wendell Falls 134.5 LF 7,042 SF ZONE 1 ZONE 2 AREA AREA 3,443 SF 7,042 SF Scale: 1"=30' 0 15 30 Date: Dec. 3, 2021 3,443 SF N 310 310 305 305 , 300 0,— ecl , 300 1 295 EXISTING GRADE PROPOSED GRADE 295 \ r 290 / 1 290 NCDOT STANDARD CLASS B HEADWALL RIPRAP KEYED —IN TO EXTENTS 285 SHOWN NCOOT STANDARD HEADWALL 285 INV. IN 283.05 24. 280 INV. IN 281.05 280 R p — 12 . i R/PRAP 24' PLUNGE L x 22' POOL W X 1.0' D LINED WITH NCDOT CLASS 1 275 — E 1' BEDMENT BELOW RIPRAP—PL-ACE-D A STREAMBED T 24" DEPTH 275 284.15 292.64 h. CC) L.C5 CD CN 295.34 294.80 o V) CN L.C5 c\i 0) 00 CN (.1 284.05 9+50 10+00 10+50 11+00 11+50 12+00 4 WETLAND IMPACT PROFILE Scale: 1" =50' McK11\4& CREED 1730 Drive, Suite 500 IMPACT 12 (REVISED) 0 25 50 Varsity Raleigh, North Carolina 27606 0: 919.233.8091 F: 919.233.8031 Richardson Tract at Wendell Falls Date: Dec. 3, 2021 EXISTING WETLAND AREA TO BE PROTECTED / / / 30' NEUSE RIVER RIPARIAN BUFFER ZONE 1 20NEUSE RIVER RIPARIAN BUFFER ZONE 2 M 2K1M&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 0: 919.233.8091 F: 919.233.8031 AREA CLASSIFICA TION ZONE 2 BUFFER IMPACT 13 (REVISED) 1,538 SF WETLAND IMPACT ZONE 1 AREA ZONE 2 AREA TOTAL 4,973 SF 0 SF 1,538 SF WETLAND IMPACT y=AP IMPACT 13 (REVISED) Richardson Tract at Wendell Falls Scale: 1"=30' 0 15 30 Date: Dec. 3, 2021 N 315 315 310 310 1 o 305 0 305 0 O N� i= rn N N- o W Z o 300 PROPOSED v)v)ct---zz 4.9 LF (1 7. U,S/ 300 GRADE I _ KC-) :I W-2- 06 295 7 RETAINING AT EDGE APPROVED WALL OF IMPACT 295 EXISTING GRADE 290 i 290 285 285 I 293.98 297.81 297.92 301.79 301.43-- 302.00 in cn V) 9+50 10+00 10+50 11+00 v�M K1M&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 0: 919.233.8091 F: 919.233.8031 WETLAND IMPACT PROFILE IMPACT 13 (REVISED) Richardson Tract at Wendell Falls 11+50 Scale: 1"=50' 0 25 50 Date: Dec. 3, 2021 / 4.• // / / / / / / / /' // �,-' RIPRAP ' II / -- - -/ / / / /',;_ / ,','/i7i-'--S`� / / //'/z,// / 1 / / ,// ,/ \ 1j /%/// \ / //// - „%,/ •./ / . , - - - / ./ ZONE 2 BUFFER IMPACT 14 (REVISED) 3,225 SF \\‘‘, \„;..f,k, *44 44, svt, ,re 4 4 A, 44 , 0 i e_:ir1 :Se4.-�iiiC/�' .�,♦iii♦�,iA♦ii♦h�1 � i• �♦S• ♦iO♦iii♦ .`.Q �♦s ♦ 114, t Ak ot, ,N<-,N . ..,,,4. , - Ns. ,,,,,,, ..:,.,..„:. .,,.. , /„.. ,›.-, ZONE 1 BUFFER IMPACT 14 `------ )' A t / / / , /' / / / / / ,- // / / / / 30' NEUSE RIVER RIPARIAN BUFFER ZONE 1 20' NEUSE RIVER RIPARIAN ., - BUFFER ZONE 2 1N 1 1 / // / / / 1 / / ,/ / / / / / / 4,0,McKIM&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 0: 919.233.8091 F: 919.233.8031 / / / R 14 (R) (REVISED) 11,261 SF co ROAD CROSSING TOTAL WETLAND IMPACT y=AP IMPACT 14 (REVISED) Flex at Wendell Falls 178.9 LF •I.•� • ••I ••- 7-1 • / ��,, _111// ///, / - )//// / //.�. j/ / /// �RIPRAP j -- f9�"�'/� i i/ - ZONE 2 BUFFER IMPACT 14 (REVISED) 3,289 SF / / 11,261 SF 6,514 SF 178.9 LF 11,261 SF 6,514 SF Scale: 1"=40' 0 20 40 Date: Dec. 3, 2021 EXISTING WETLAND AREA TO BE PROTECTED - \ \• •\ I \ \ •• \ •\• 30' NEUSE RIVER R/PARIAN� _ __ \\ _ BUFFER ZONE 1 _ _ — � ____ /./;; 20' NEUSE RIVER RIPARIAN _ \\ < BUFFER ZONE 2 ; 25 // t4-1.-_ — — _ .../ / � — s/ r ;,/' 7ij/ -----------7i / v�M 2K1M&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 0: 919.233.8091 F: 919.233.8031 TOTAL WETLAND IMPACT y IMPACT R15 AP Collective at Wendell Falls WETLAND IMPACT R15 1,080 SF 1,080 SF 0 SF Scale: 1"=30' 0 15 30 Date: Dec. 3, 2021 / _ ss • • \ • • • 270 270 265 265 260 260 PROPOSED GRADE OI(' eci 255 255 250 w 250 ` NCDOT STANDARD HEADWALL 245 \ 245 PROTECTION \ I RIPRAP OUTLET 240 EXISTING GRADE — — — 240 i 235 235 251.35 257.30 250.67 257.01 249.22 256.39 246.35 256.06 245.29 256.26 243.95 252.85 242.99 245.42 242.91 243.84 9+50 10+00 10+50 11+00 11+50 12+00 12+50 v WETLAND IMPACT PROFILE Scale: 1"=50' vNl<TQM�CREED 1730 Drive, Suite 500 IMPACT R15 0 25 50 Varsity Raleigh, North Carolina 27606 0: 919.233.8091 F: 919.233.8031 Collective at Wendell Falls Date: Dec. 3, 2021 N • 20' NEUSE RIVER RIPARIAN ,_- 30' CITY OF RALEIGH BUFFER ZONE 2 ��-- 230 SANITARY SEWER EASEMENTiiii1 • \'_�1------_/----__-- ------ / 0 30' NEUSE RIDER RIPARIAN c . / ---_ BUFFER ZONE 1 ,� rn '•- _ _--- �7 -- ZONE 2 BUFFER IMPACT S21 1,139 SF -------/ -- 225 WETLAND IMPACT S21 164 SF 09°4 EX/STING WETLAND AREA ,:�� TO BE PROTECTED• • 8" DI SEWER MAIN AERIAL CROSSING IN i 16" STEEL ENCASEMENT- -- .i•./ -_ 1 r___ -/ \�`\ - i �,,, „' ''- SEWER PIER r • Y -y j /; 2--- - -- - - - _ �t - - •••'b-- - ZONE 2 BUFFER IMPACT S21 I \ ZONE 1 BUFFER IMPACT S21 --2,059 SF ' !�� EXISTING WETLAND AREA T -I TO BE PROTECTED // /. // i - / ,- - - - ��• __ - `. \�\\ \ _ \\ \ \ \\ \ \ \ -i-�- '-� -/ / / - •- - . \ \1 . N \ \ \ \ .\ \ \ ��, 4: /' ,/.'., 30' NEUSE RIVER RIPARIAN `\ \�`\ \\ \ \ `\ \ \\ \ `\ { `\ \ \ >�' r•�-' BUFFER • ZONE 1 \ ` \ `\ \ `\ \ \\ \ \\ \ `\\ ` \ / - --- 225 / ////, - SEWER PIER / / / , fj1 / 11 / / / / I`1 1 / I/ / / / \�\ / / / / / jj % // / v ,�' / /.l l • l / / / \\-- / / / • - J/ / / / \ /' / / / / i / / ` \\ / / / / / / / I\ WETLAND IMPACT S21 1 1 1 i T 1 ;93SF 1 1 1 1 Ili \ 1 1 I ♦ \\- \ 11 I 1 1 I �♦\ ., \I \ \ 1 1 1 \ -225\ v1 1 1 .v IV j I \ ` _ -� I 1 I I A\ A \ 1 1 \ \ \ '- �; /'��,-- �' 20'-NEUSE RIVER RIPARIAN \\ \\I\` \\ \\\` \'\\\\``\\� \\\\\ \ \\�\ \\ \` - -♦ / / BUFFER ZONE 2 ^ \\ \ \ \\ \ \ ---_ \\\\ \ \ \ \ \ \ \ '' , `a� //' /,-' i,ii�� / /-� /1'- -/Sri \\`�\` \\\3� \\\_� `\ `\\ \\ \\ \\\ 1 \\\ / '� .� \ \ \ \ v \ T/ / / / / -� / ., \ V2 \ v \ \\ \ - \ \\\\ \\\ , . _ - / Nam/ .fig /' ,- -'- \ \ --� ' \ \ \` \ 7.-: O \ '� \ \ \ \ \\ \ ' /' /' / ,, O_,/ /'/ /-/ // S/' 7, w / � / /mD SS,' / / v, m - S21 SEWER CROSSING / / / c-\ AREA CLASSIFICA TION WETLAND IMPACT IMPACT AREA AREA 257 SF STREAM ZONE 1 ZONE 2 0 LF 2,059 SF 1,743 SF TOTAL 257 SF 0 LF 2,059 SF 1,743 SF v�M2K1M&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 0: 919.233.8091 F: 919.233.8031 WETLAND IMPACT y=AP IMPACT S21 Scale: 1"=30' 0 15 30 Collective at Wendell Falls Date: Dec. 3, 2021 N 0 0 �o •tn tod 1 + 245 ;o o NoN Na j -. 245 240 U. z cf) Lu�0 , , ? ? 1 1 EXISTING SANITARY SEWER PER MCKIM & CREED PLANS "WENDELL FALLS COLLECTIVE — INTERCEPTOR SOUTH" m•, 0 0 cm co ido UT=227.80" 0 A STATUS APPROVED 3/26/2021 PERMIT NO: S-4839 CORE AND BOOT CA o in + cy N 0 0,5 N 1 235 I I \ NEW EXISTING CONNECTION MANHOLE TO =I W z Z o Z 235 I I PIPE THICKNESS CORPUD SHALL BE IN 16"0, STEEL ENCASEMENT STANDARDS @ 43' 0.375" (A53 SUPPORT WALL Gr.B) SPACING PER / 230 PER CASEMENT SUPPORTS EITHER DETAIL S12/02.3 SHALL EXTEND OR 4'-0" INTO SIDE OF CROSSING. 4'— 0" EMBANKMENT PAST END ON 230 II II PROPOSED GRADE / 225 II II / 225 _ , r ' // / 7� _/W//7l//T - I I /////� " ( 258.5 LF — ' DIP j0.5iX 220 \ 43.0' EXISTING GRADE 220 — 0� CONCRETE PIERS (TYP) 215 CONCRETE P1 STA 10+71. PER DETAIL S-14/02. CONCRETE PIER REQUIRE CONCRETE PER DETAIL S-19/02. 3. SHALL NOSING 3. 215 STA N N N O N N 0 N N N 0 H N 0 0 N N 223.35 224.00 225.18 ' N 0 N 0 N N 230.52 228.40 231.00 230.88 0 H N N N N 9+7510+00 10+50 11+00 11+50 12+00 12+502+75 WETLAND IMPACT PROFILE Scale: 1"=50' 4McK11\4& CREED 1730 Drive, Suite 500 IMPACT S21 0 25 so Varsity Raleigh, North Carolina 27606 0: 919.233.8091 F: 919.233.8031 Collective at Wendell Falls Date: Dec. 3, 2021 N // 1 /1 I I�I / I /\ // /' ,/ /,/ /'--`� .\ -�� ,'� / j / / 1• / / \ _,'' // ,' 20' NEUSE RIVER RIPARIAN // 1 / / 1 l tss \ ---- ,' ,�' BUFFER ZONE 2 - / / / / / / \ 1 C \ ,' �� /' ,r' /' ----• \\ /// // / \\ i • \ \\\ E\GN Nf ,,-' �/ ,'� 30' NEUSE RIVER RIPARIAN i \ /// \\\ I \ \\-- Ri\L SEME-- ,' BUFFER ZONE 1 .\ \\ . `----- \ \ of EP \ --\ o\�� DER \ \ � ----\-- N\IP . ------, // \ --- 1 1 /' �� �' \ \ \ 1 1 /' /'� ���1 �•'� , �■ :ram_-- WI . ZONE 2 BUFFER IMPACT S22'� . Gj'J _ _ ____ • \ l /' / / / / / / / / /, / / / / /.// // �/ / / �� '� ♦ , , / / ,/ 8" DI SEWER MAIN AERIAL CROSSING. , / IN 16" STEEL ENCASEMENT ,J / /// // \ \ /' / // / : / ,/ • / // �,' ,/; • ,>' ,' ,' ♦ ,' / 41 1 1 `>y.',/ii1• / / /1 ti0 ,',.i • ///I• 1 / / /. /' ♦ /.// / / / /'/ I/ `. ,i' /'''// / ' / f '•' O ` . // / /- / / /,/ // ,, �.�/1/ / / / / / / / /' / /� / / / --i.e.- 7/ / / / / ' '' --� r�� / // ; / / / / / / / i//�_ '- --. 1 /1 / / / // / / f / •1 /, ✓1 / / / 1 / / / / // / / / / , 658 SF �. ,/ / /S / / /# / / / / �• //, , / \ / / \ / 1 /' • // / / / •'/ / //�♦/- / /,,1.�, \ -_7/ / -- ; /I / / /' , / i .' / . „ „„ „ ,._...„ „ „,„ . ..._..... , , .......„, , .... „ .... , , , . „ „ „ ..... ..... _______ ,,,,.....„ „ _ ... , „ , , , , „..... , ____ „ „...... . , , , , „ „ , , , ,, _ „ , . ____ „ „ ....., _____. ,�7_ ,, 7 , ,,/ -( / '' j • , `/ ^• y , v�M2K1M&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 0: 919.233.8091 F: 919.233.8031 S22 / ZONE 1 BUFFER IMPACT S22 `\ 2,556 SF `\ , , 255 ,' ��\ .\ "0�'''�`' • \y � SEWER PIER ,2 • �� . ., 6 \ 0, \ 1 \ 1 `� \ \ ♦t�..�..� `� `� \ \..._ \ 1 1• , i / 1 30' NEUSE RIDER RIPARIAN / ,/ / / BUFFER ZONE 1 , / ,/ ' 4' 20' NEUSE RIVER RIPARIAN ,' --. / \ I ZONE 2 BUFFER IMPACT S22 1 1 I 621 SF I 1 I / l .' \ I I I I ' / 1 I 1 BUFFER ZONE 2 CLASSIFICA TION SEWER CROSSING TOTAL WETLAND IMPACT O SF O SF WETLAND IMPACT y IMPACT S22 AP Collective at Wendell Falls STREAM IMPACT O LF O LF ZONE 1 AREA 2,556 SF 2,556 SF Scale: 1"=30' 0 15 Date: Dec. 3, 2021 30 , / • ZONE 2 AREA 1,279 SF 1,279 SF PIPE SHALL BE IN 16"0, 0.375" WALL THICKNESS STEEL ENCASEMENT (A 53 Gr. B) PER CORPUD STANDARDS ® 43' SUPPORT SPACING PER DETAIL S12/D2.3 CASEMENT SHALL EXTEND 4'— 0" PAST END SUPPORTS OR 4'-0" INTO EMBANKMENT ON 275 EITHER SIDE OF CROSSING. 275 270 o 0 `' 2 o "-, 0 270 MH-COL-17 (4 STA. 27+42.02 RIM EL V=262. INV IN 253.00 INV 0 T=252. OH -COL 18 (4' :Td 90 c,9 1d II N N II 265 W II I— d 2 aO EI ? ? 265 n 260 / 260 EXISTING GRADE / \ 255 \ 255 ," L%%" ' LF , ����������' / 210. -" • 0.62Z 250 PIPE SHALL BE \ ' 43.0' / / • 250 RESTRAINED JOINT DIP CONCRETE PIERS PER DETAIL 5-14/D2.3. 1 (TYP) ct 1- _/ `I W o PROPOSED GRADE CONCRETE PIER REQUIRE CONCRETE PER DETAIL S-19/D2.3. SHALL NOSING W o 0 N Li W 28+67. 1 245 ec N 240 240 O 0 N N jo N o 0 N 6 Ln N o-) o N Ln N co L N c 6 Ln N 256.00 258.30 261.22 N N o 0 N 27+227+50 28+00 28+50 29+00 29+589+75 WETLAND IMPACT PROFILE Scale: 1"=50' 4McKIM&CREED 1730 Drive, Suite 500 IMPACT S22 0 25 so Varsity Raleigh, North Carolina 27606 0: 919.233.8091 F: 919.233.8031 Collective at Wendell Falls Date: Dec. 3, 2021 N ♦ I 1 j I 1 I \ .. �\ \ \ \ \ �_ 1 1 1 1 , 1 —` •` I \\ ♦ \\\\ I /III / I I \ �� \ \\ ------ .� III\I \ ` i 1 \\ \\ I I 1.' 1 1 \ ` \\ \ \ / ■ 11 \ \ I I �� \ 1 `� `\ \ \ \ _, .., 0 j . \\ \\, \ \\\\\`\\ •/`/. I \,� \\\\; \\\ III i��' \\ \\.... \ \\_�,/ ,, • - - t A \ 1 / \ \ \ \--. ...-• ` , \ \ / / / �/ ZONE 2 BUFFER IMPACT G9 : \ 265 \ '.\`— • / , //'//' A I 1,403 SF ! — GRADE COMPLIES WITH MIN. I -��- 'ADA STANDARDS. SWITCHBACK I WETLAND IMPACT G9 i \ \ ' .� /S NECESSARY TO MEET 1\ 23 SF j- \� \\\ ♦ -___ `MIN. REQUIREMENTS. ZONE 1 BUFFER IMPACT G9 I ! 1 �r \ •�\\ \ \`� \ I.. \, \1\ \ 4,575 SF ■I RIPRAP OUTLET - PROTECTION \\\ ,mug c'� • ZONE 2 BUFFER IMPACT G9 „— \� 1,432 SF �\ �� v�M2K1M&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 0: 919.233.8091 F: 919.233.8031 EX. G9 STREAM IMPACT 71.9 LF • ` -- RIPRAP OUTLET �`... PROTECT/ON —♦` /s\ , \;;2 �� - _--- / \ Z . I —1 0 ---- / ----/ ss- -EX. 8" SEWER MAIN -- - 30" RCP STORM ,--- PIPE - - \ 30' NEUSE RIVER RIPARIAN ` \\ BUFFER ZONE 1 \ • 20' NEUSE RIVER RIPARIAN BUFFER ZONE 2 CLASSIFICA TION GREENWA Y CROSSING TOTAL WETLAND IMPACT y IMPACT EX. G9 WETLAND IMPACT 23 LF 23 LF AP STREAM IMPACT 85 LF • ZONE 1 ZONE 2 AREA AREA 4,575 SF 2,835 SF 85 LF 4,575 SF 2,835 SF Scale: 1"=30' 0 15 30 \,\ \,\-\\I \ \ `� Phase 8 at Wendell Falls Date: Dec. 3, 2021 N I \ 20' NEUSE RIVER RIPARIAN BUFFER ZONE 2• 11. 1 I / / , • 30' NEUSE RIVER RIPAR/AN BUFFER ZONE 1 I 1 I1 1 I I 1 / I I //I / // I / / I/ / // / / / I /// 1 / , 1 WETLAND IMPACT 20 \ \ \ 1 1 • • • \ / / / / I 1 1 / 1 1 I ,- 1 j \1 1 \ 2 \ \ \ /, \ \ \ 1 // V A \ I / \ \ \ \ \ \ \ \ V 1 1 \ 1 11 \ 1 1 1 1 I 1 1 1 V AN 1 1 1 1 \ \ 1 I 1 \ \\VAA V 1 \ \ 1 I \ V `\ \\ \\ \\ \\ I 1 1 I I \ \ \ \ \ \ 1 1 / \ \ \ \ \ \ 1 \ 1 \ \ \ \ \ \ 1 \ 11 1 \\\\ \\ 1 \1 I \ 1 \ 1 1 , , 11 1 1 \1 I I I / 1 1 1 1 1 I 1 1 1/ i/ / / 1 /I 1 / I • ' I- I 1 ' / / / 1 I \ r -/ j l / 1 A I '_/ /^/ J 11V / 1 JI I /�, I I/ , --/ ' �/ I r- / / / 1 I / I 1 / 1 1 1 1 I (REVISED) 2,306 SF I /. 11/I/ / / / • / 11I1/ 1 / / // 1l1 I/ •/ ' 1 11111 II r. 11 1 � IIII111 / • 1I011,1 • / 0 1 I 1. 111I I 1 • �� I • II'II1 I• 1 - I I II It r / / �11111 I / . ' a/. I 20 // 1i11// / . l 1 •� /r /i /ii i ' / I. II ZONE 1 BUFFER IMPACT 20 (REVISED) 1,279 SF I / 1 1 I I 1 it I \ ; / \ I 1, \ IIII1i1 / / • # / / / / 1 I• 1 // / / 1 i t\ I • II1 / / \III• / \III /\ ,,, I III / I \ `r'1Ill, !- AV AV v I I/u1\11 1 \ \ / 111V<I\• \ \ \ 1 / 1 /.....v / / - ( 1 -1VAV A 1 1 / 1/ / I.11111 11 1 V 1 1I / / //I//. I I I 1\II1.▪ 1 1y/�//, -/ 1 lA I 111 I ///�// // / 1 1 1 1 I • 1%1 // /iEXISTING WETLAND AREA 1I TO BE PROTECTED �1/II . 1 I / `\ I ZONE 2 BUFFER IMPACT 20 •� -'' i I ss • -3di/Jg----- ---z--------:___— - -3:1— - - -- \ (REVISED) 665 SF 1" jr/ \\ 'if- "." - . rgtik irearA t \\ ,,•\\ \ ,1 \ • ; / • • • \ \ 4,0,McKIM&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 0: 919.233.8091 F: 919.233.8031 AREA S20 / -/ / r / I 1\I\1 /1 1 \ 1 / I 1 \ 111 \� �__,` ♦'/,// 1 \ \\o\.\ii /r j .i 1 \ \ / \ \ \\\V-f /rr, / �� -' • , I • \ \ \ �/// / // ./ �\ 1 /%/// r/// / t! art! •.-_ • • \\- \. \ \\1\ 11 • • \• \ // /�---------- STREAM IMPACT / I \l i 1 / 1 i; i� 30.9 LF � / II\ • �V\®' `� z ZONE 2 BUFFER IMPACT 20 / \\ \\\ \\\ \\ \- (REVISED) 614 SF `\ I \ \ • Ir ;/ 1 / 1 11.I / i ' ---,, 255 \ __ 11 \ `. CLASSIFICA TION SEWER CROSSING WETLAND IMPACT 2,306 SF STREAM IMPACT 30.9 LF ZONE 1 ZONE 2 AREA AREA 7,915 SF 1,279 SF TOTAL 2,306 SF WETLAND IMPACT y IMPACT S20 AP 30.9 LF 1,915 SF Scale: 1"=30' 0 15 30 1,279 SF Phase 11 at Wendell Falls Date: Dec. 3, 2021 N 270 270 265 265 Q, 0 260� ��Nm-N `� 260 to O 0 0 O O pw N tO 10 to N m- m- u-) N N N 0 rtl J SMH-11 TA=11+ lM ELE /NV IN= /NV OUT 255 I O = II z � J II II W 2 2 � » o > 1' ABOVE GR 255 cncnE2222 Go \ F 250 P EXISTING GRADE 7 250 / 245 - 1. o7' 245 — — 240 — 8" DIP 0) 0.50Z 240 16"0 STEEL ENCASEMENT INSTALLED BY OPEN PIPE CUT 235 235 0 EN 0 EN GO Go CN G Go CN EN 0 EN EN 0 EN 0 EN 0 CN 0 EN 9+50 10+00 10+50 11+00 11+50 12+002+25 40,, WETLAND IMPACT PROFILE Scale:l"=50' M�IQM�CREED 1730 Drive, Suite 500 IMPACT S20 0 25 50 Varsity Raleigh, North Carolina 27606 0: 919.233.8091 F: 919.233.8031 Phase 11 at Wendell Falls Date: Dec. 3, 2021 ,N� / •1 / / / / EXISTING WETLAND AREA ♦' /I • /• TO BE PROTECTED , I ,! , l .//. ,I. / ,. /' ///i / I / 30' LUSE ::L' /' ♦ / / (% `--_- BUFFER ZONE 1 /, ,/' ♦ i �/ /i. /' /, / 1 / /// ) I /' •1 ♦ /, / ♦ 7 // / /' / /// / 20' NEUSE RIVER RIPARIAN // BUFFER ZONE 2 /' / I� f/r/// / I / 1 ZONE 2 BUFFER IMPACT MF 622 SF 4,0,IVIIKIIVI&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 0: 919.233.8091 F: 919.233.8031 // ♦ // 1/f 1 Ii 1/1x 1,1 //, ♦/ i // /t ZONE 1 BUFFER IMPACT MF 1,728 SF • ill J11 I � / i //'/ /;' /I N 00 0 / i 1 AREA P1 i / / / / �l / i / / / /r' // ,/ / / / / / /�/ // / ♦I �/ / // .//// •i / // _./ ZONE 2 BUFFER IMPACT MF / // �•/ • / / , 993 SF / // / / / / . / / / 0, (y� / / /• / ' / / 1 , /f / // // /.. // n / / / / /lr' I / //1 VV //IV/I I / f,/' 1 1 1. A r/-- "s", / I ��/ ,. 1 . V II •_ •'/ /��, I i ,/ ,/ k it WETLAND IMPACT MF // ! / \\ . 403 SF / • I / ♦/ // • / /,1 1 ' / / ♦/ // u / ,',' /d"/ I STREAM IMPACT ,� .!' , / • /,',f// 19.4 LF / lj / ,/ \y• / ./,. ,/ „N I / / ♦♦' / 0 pp / ' / // �J /// , //� // // .4'4V 1111110, / -��sl��illlNi� / / / /// Arillammift -/ ) i arl.Lq‘V.' / � / / /� , / / - / / / / / / 1/ I // // v )/ CLASSIFICATION PEDESTRIAN CROSSING TOTAL /' /' ///! //// / / / • ,// / /,/ /// // ///%,//i/ /// . // ///. // \ /III / // / / / ' / / // / / / / // / /. // / /� ! ,,' ,'I /,� //�� / �..//"1 /'♦ ��/ '/� /' 1 // / / / / / / J / /• / /a ( / / / / /( / / • : / / / / ,/ // // / / / / 1 / / / / EXISTING WETLAND AREA , / 1 TO BE PROTECTED 1 // / /, • /: / 1 1 �/ I / ii I . I I I' I I I 1 I ; : I 1 I I I , WETLAND IMPACT 403 SF 403 SF WETLAND IMPACT y IMPACT P1 AP STREAM IMPACT 19.4 LF 19.4 LF z ZONE 1 AREA 7,728 SF / / ZONE 2 AREA 1,615 SF 1,728 SF 1,615 SF Scale: 1"=30' 0 15 30 Richardson Tract at Wendell Falls Date: Dec. 3, 2021 N PERMIT DRA WINGS FOR NEUSE RIVER VETERINARY HOSPITA L \ NN WENDELL FALLS rn 70 0 o rri POOLE ROAD LOCH TION MAP Vl CSD ENGINEERING LICENSE / C-2710 P.O. BOX 1250 WENDELL, NC 27591 (910) 791-4441 1 PERMIT DRAWINGS FOR NEUSE RIVER VETERINARY HOSPITAL LOCATION MAP 1 DATE: 11/30/2021 SCALE: 1 " = 1000' DRAWN BY: JFO PROJECT NO. 21- 0559 Sheet PD-1 Sheet No. 1 OF 2 BUFFER ZONE 2 IMPACT - 286 SQ. FT. PROPERTY BOUNDARY 15" CORR. PIPE 12" SEWER M N 12" SEWER MAIN CORPUD SEWER ESMT. / / i ..-- / /// ,A <.(3-- > --`_/ , , PRE -FORMED SCOUR HOLE W/ LEVEL SPREADER SS RP ID SE CORP�S RETAINING WALL EX. 15' CMP EX. STORM DRAINAGE II II II 0 � i / Ste' //i PROPERT)-EOUNDARY # /• <� 1 PROPERTY BOUNDARY 1 Vl CSD ENGINEERING LICENSE / C-2710 P.O. BOX 1250 WENDELL, NC 27591 (910) 791-4441 1 PERMIT DRAWINGS FOR NEUSE RIVER VETERINARY HOSPITAL SITE PLAN DATE: 11/30/2021 SCALE: 1 " = 1000' DRAWN BY: JFO PROJECT NO. 21- 0559 (Sheet PD-1 Sheet No. 1 OF 2 ♦♦i����:;it* 1tII�`L9� PIPE OR OUTLET DITCH PREFORMED SCOUR HOLE (PSH) (STONE IN BASIN NOT SHOWN FOR CLARITY) PIPE OR OUTLET DITCH • LINER: CLASS B RIP RAP OR DELAWARE STONE PLANT SWITCH GRASS PLUGS IN STONE (NO FABRIC) 10' 2' ' 10 • i PLAN SECTION (PSRM) INSTALL LEVEL AND FLUSH WITH NATURAL GROUND. PRE -FORMED SCOUR HOLE NTS J NATURAL GROUND 1' TUCK Vl CSD ENGINEERING LICENSE / C-2710 P.O. BOX 1250 WENDELL, NC 27591 (910) 791-4441 1 PERMIT DRAWINGS FOR NEUSE RIVER VETERINARY HOSPITAL o co rn co to O Lt Z Z N N e N 0 0 0 W m C.) �7 Zt =�� WCI) Wm2W Zt CI en NI CI O N1 64 Z'0 p Z to 14.1 W 0 o m DETAIL DATE: 11/30/2021 SCALE: 1 " = 1000' DRAWN BY: JFO PROJECT NO. 21- 0559 Sheet PD-3 Sheet No. 3 OF 3