Loading...
HomeMy WebLinkAbout27_Example Approved Design Plans with Maintenance RequirementsBIOCELL #2 PLAN VIEW (GRASS) SCALE: 1" = 10' STORMWATER CONTROL MEASURE BIOCELL #2 (GRASS) DRAINAGE AREA: 1.2 AC. (t) IMPERVIOUS AREA (FOR BASIN DESIGN): 0.72 ACS. (60% OF DRAINAGE AREA) R v: 0.05 + 0.009(60.0) = 0.59 REQUIRED: VOLUME = 3630 X RDX RVXA VOLUME = 3630 X 1 IN. X 0.59 X 1.2 ACS. = 2,570 CF. PROVIDED: SURFACE AREA (@ ELEV. 821.0) = 2,178 S.F. SURFACE AREA (@ ELEV. 822.0) = 3,126 S.F. VOLUME = 2,652 CF. @ 12" PONDING STORMWATER MANAGEMENT CALCULATIONS (SEE ROUTING INFORMATION) PRE -DEVELOPMENT FLOW POST -DEVELOPMENT FLOW INTO BASIN: INTO BASIN: Q(l) = 0.4 CFS Q(l) = 2 CFS Q(:) = 0.83 CFS Q(Z) = 3 CFS Q(,o) = 2.33 CFS Q(,o) = 6 CFS POST -DEVELOPMENT DISCHARGE: Qm = 0 CFS, ELEV.: 822.20 (OK) Q(Z) = 0 CFS, ELEV: 822.31(OK) Q)1o) = 1.34 CFS, ELEV: 823.06 (OK) Q(,.) = 7.77, ELEV: 823.35 (OK) BIOCELL DRAWDOWN CALCULATIONS Q=(2.315x10-5)XKXAX nH/AL K = I IN. / HR. (PERMEABILITY COEFFICIENT) e H = 3.75 A = 2,178 S.F. (SURFACE AREA) n L = 2.75 Qt=(17i?liWib--I))k $ IN./"R. X 2,178 S.F.X 3.75/2.75 = 0.0688 CFS FIND TIME TO REMOVE VOLUME AT FLOW RATE: VOLUME = 2,652 CF T = 2,652 CF / 0.0688 CFS X 1 HR. / 3,600 S = 10.71 HRS. UNDERDRAIN SIZING CALCULATIONS Q = 0.0688 CFS (FLOW RATE THROUGH SOIL MEDIA) Q (DESIGN) = FLOW RATE X SAFETY FACTOR = 0.0688 CFS X 10 = 0.7 CFS D = 16 (Q * n/So.$)0.375 n = 0.011, S = 0.50% N X D = 16 (0.7 X 0.011 / 0.005 0.10.375 NXD=6.97IN. USE 6" DIA. PIPE N REQ'D = 6.97 IN. / 6 IN. = 1.16, USE MIN. 2 - 6" DIAMETER UNDERDRAINS (OK) SOIL & TESTING SPECIFICATIONS THE SOIL MEDIA SHALL MEET THE FOLLOWING CHARACTERISTICS AND SHALL BE UNIFORM, FREE OF STUMPS, STONES, ROOTS, OR OTHER DELETERIOUS MATERIAL GREATER THAN 1" DIAMETER AND SHALL BE FREE OF ANY NOXIOUS WEEDS. SOIL SHALL BE PLACED IN 12" TO 18" LIFTS LOOSELY COMPACTED TO FACILITATE INFILTRATION. MEDIA MAY NOT BE COMPACTED MECHANICALLY. CONTRACTOR SHALL PROVIDE CERTIFICATION FROM THE MEDIA SUPPLIERTHATTHE FOLLOWING PARAMETERS HAVE BEEN MET: MEDIA PARAMETERS VALUE MAX. P-INDEX 50 MEDIUM TO COARSE WASHED SAND* 75 - 85% FINES (SILT & CLAY) 8 -15% ORGANIC MATTER (PINE BARK FINES) 5 -10% MINIMUM INFILTRATION RATE 1 IN. / HR. (*ASTM C33, C330 OR EQUIVALENT) *PROVIDE SOIL MEDIA REPORT FOR DRAINAGE TO ENGINEER AFTER MEDIA IS IN PLACE.* 1. CONTRACTOR TO PERFORM A PERMEABILITY TEST OF IN -PLACE SOIL MEDIA AND PROVIDE RESULTS OF TEST TO ENGINEER FOR SUBMISSION FOR APPROVAL (SEE NOTE ABOVE). 2. TEST SOIL MEDIA TO DETERMINE AN ACTUAL DRAINAGE RATE AFTER PLACEMENT. 3. PERMEABILITY SHOULD FALL BETWEEN 1.0 AND 6 INCHES PER HOUR (1-2 INCHES PER HOUR PREFERRED). 4. THE SEASONAL HIGH WATER TABLE IS A MINIMUM OF 2 FEET BELOW THE BOTTOM OF THE CELL 5. MEDIA SHALL NOT BE MECHANICALLY COMPACTED (WATER IT OR WALK ON IT AS PLACED). CONSTRUCTION SEQUENCE THE BIORETENTION AREA SHALL NOT BE CONSTRUCTED UNTIL AFTER ALL SITE GRADING IS COMPLETE AND STABILIZED. INSTALLATION OF ANY PART OF THE BIOCELLSHALL NOT OCCUR UNTIL ALL CONTRIBUTING DRAINAGE AREAS HAVE BEEN PERMANENTLY STABILIZED TO ELIMINATE SEDIMENT TRANSPORT TO THE SYSTEM. REMOVE ALL SEDIMENT ACCUMULATIONS FROM BIORETENTION AREA EXCAVATION PRIOR TO INSTALLATION. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. MATERIAL SPECIFICATIONS TABLE A: PARAMETERS SPECIFICATIONS SIZE NOTES PLANTING SOIL REFER TO TABLE UNIFORM AND FREE OF STONES, STUMPS, ROOTS OR SIMILAR MATERIAL MEDIA SHALL NOT BE MECHANICALLY COMPACTED SAND ASTM C-33 USE WASHED SAND UNDERDRAIN STONE ASTM #57 1/2" TO 1-1/2" #57 WASHED STONE AGGREGATE PVC PIPING AASHTO M-278 6" - RIGID 3/8" PER. @ 6" CENTERS, 4 ROWS SCHEDULE 40 OF HOLES (MIN.) AROUND DIAMETER. FILTER FABRIC TENCATE MIRAFI 140N NON -WOVEN, INSTALL PER MANUFACTURER'S SPECIFICATIONS SOD PLANTING SPECIFICATIONS HARVEST, DELIVER, STORE, AND HANDLE SOD ACCORDING TO REQUIREMENTS IN "SPECIFICATIONS FOR TURFGRASS SOD MATERIALS" AND "SPECIFICATIONS FOR TURFGRASS SOD TRANSPLANTING AND INSTALLATION" IN TPI'S "GUIDELINE SPECIFICATIONS TO TURFGRASS SODDING." DELIVER SOD IN TIME FOR PLANTING WITHIN 24 HOURS OF HARVESTING. PROTECT SOD FROM BREAKAGE AND DRYING. FURNISH VIABLE SOD OF UNIFORM DENSITY, COLOR AND DEVELOPMENT WHEN PLANTED. SOD SHALL BE GROWN IN PERMEABLE (I.E. SANDY LOAMY) SOILS AND NOT IN IMPERMEABLE (I.E. CLAY) SOILS. TURFGRASS SPECIES: HYBRID BERMUDAGRASS (TIFWAY, TIFWAY II, MIDWAY OR OTHER APPROVED HYBRID) PROVIDE FULL MAINTENANCE BY SKILLED EMPLOYEES OF LANDSCAPE INSTALLER. BEGIN MAINTENANCE IMMEDIATELY AFTER EACH AREA IS PLANTED AND CONTINUE UNTIL ACCEPTABLE TURF IS ESTABLISHED BUT NOT LESS THAN 30 DAYS FROM DATE OF PLANTING COMPLETION. DO NOT LAY SOD IF DORMANT OR GROUND IS FROZEN OR MUDDY. LAY SOD TO FORM A SOLID MASS WITH TIGHTLY FITTED JOINTS. BUTT ENDS AND SIDES OF SOD. DO NOT STRETCH OR OVERLAP. STAGGER SOD STRIPS OR PADS TO OFFSET JOINTS IN ADJACENT COURSES. AVOID DAMAGE TO SUBGRADE OR SOD DURING INSTALLATION. TAMP AND ROLL TO ENSURE CONTACT WITH SOIL MEDIA, ELIMINATE AIR POCKETS AND FORM A SMOOTH SURFACE. WORK SIFTED MEDIA INTO MINOR CRACKS BETWEEN PIECES OF SOD, REMOVE EXCESS TO AVOID SMOTHERING SOD AND ADJACENT GRASS. SATURATE SOD WITH FINE WATER SPRAY WITHIN TWO HOURS OF PLANTING. DURING FIRST WEEK OF PLANTING, WATER DAILY OR MORE FREQUENTLY AS NECESSARY TO MAINTAIN MOIST SOILTO A MINIMUM DEPTH OF Ti INCHES BELOW SOD. ENGINEER'S CERTIFICATION OF STORMWATER QUANTITY CONTROL THE STORMWATER CONTROL STRUCTURE SHOWN ON THIS PLAN IS DESIGNED TO REDUCE THE PEAK FLOW RATES IN THE POST -DEVELOPMENT 1-YEAR 24 HOUR STORM EVENT, THE 2-YEAR 24 HOUR STORM EVENT AND THE 10-YEAR 24 HOUR STORM EVENTTO PRE -DEVELOPMENT PEAK FLOW RATES. ENGINEER'S CERTIFICATION OF QUALITY CONTROL I CERTIFY THATTHIS PLAN HAS BEEN DESIGNED TO CONTROL RUNOFF FROM THE AREAS REQUIRED IN SECTION 30-12-3.12 OF THE GREENSBORO DEVELOPMENT ORDINANCE FROM THE FIRST INCH OF RAINFALL AND THAT THE RUNOFF CONTROL MEASURES SHOWN ON THIS PLAN HAS BEEN DESIGNED TO MEET OR EXCEED THE GUIDELINES IN THE GREENSBORO WATERSHED MANUAL 10 P.E. SEAL ..�FesSIO, SIGNATURE 7DATEZ61W 10771 �NOINE�P R S STORM WATER NOTES: 1. THE STORM WATER CONTROL MEASURE (S.C.M.) MUST BE INSPECTED, CERTIFIED AND AS-BUILTED PRIOR TO FINAL APPROVAL OF THE PROJECT. 2. CONTRACTOR MUST NOTIFY THE ENGINEER 2 WORKING DAYS PRIOR TO BEGINNING CONSTRUCTION OF THE S.C.M. THE ENGINEER MUST PERFORM NECESSARY INTERMEDIATE INSPECTIONS IN ORDER TO CERTIFY ADEQUATE CONSTRUCTION OF THE S.C.M. CONTRACTOR MUST NOTIFY THE ENGINEER 2 WORKING DAYS PRIOR TO ANY REQUIRED INSPECTIONS OF THE S.C.M. DEVICE. FAILURE TO NOTIFY THE ENGINEER FOR ANY/ALL REQUIRED INSPECTIONS AND TESTING MAY RESULT IN THE CONTRACTOR HAVING TO PROVIDE ADDITOINAL TESTING AT THE CONTRACTOR'S EXPENSE. 3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE ENGINEER PRIOR TO BEGINNING CONSTRUCTION OF THE S.C.M. IN ORDER TO ESTABLISH AN INSPECTION SCHEDULE THAT MUST BE ADHREREDTO IN ORDER TO GAIN FINAL CERTIFICATION AND APPROVAL OF EACH S.C.M. LOCATED ON THE PROJECT: A. INITIAL BERM CONSTRUCTION, INVERT ELEVATIONS, AND DIMENSIONS OF THE CELL BOTTOM MUST BE VERIFIED PRIOR TO PROCEEDING WITH THE CONSTRUCTION OF THE CELL B. VERIFY PLACEMENT OF THE UNDERDRAIN CONSTRUCTION INCLUDING BUT NOT LIMITED TO THE STONE PLACEMENT, PIPE TYPE/PLACEMENT, AND CLEAN -OUT PLACEMENT. C. VERIFY PLACEMENT AND ELEVATION OF THE SAND LAYER. D. ENGINEER MUST BE PROVIDED WITH AND APPROVE THE CONTRACTOR SUBMITTAL FOR THE CELL SOIL MIX PRIOR TO PLACEMENT. E. TOP ELEVATION AND DIMENSIONS OF THE SOIL MIX MUST BE VERIFIED PRIOR TO SOD/MULCH PLACEMENT. F. PLANT TYPES, NUMBERS AND PLACEMENT MUST BE VERIFIED BY THE ENGINEER IF APPLICABLE. 4. ANY NOTED DEFICIENCIES IN THE REQUIRED HEIGHTS, DEPTHS, WIDTHS, SURFACE AREAS, VOLUMES AND CONSTRUCTION PRACTICES IN THE CONSTRUCTION OF THE SCM MUST BE ADDRESSED AT THE CONSTRACTOR'S EXPENSE PRIOR TO FINAL APPROVAL INSTALLATION, INSPECTION AND MAINTENANCE REQUIREMENTS FOR 1310-RETENTION S.C.M. MINIMUM INSPECTION / MAINTENANCE REQUIREMENTS (OWNER) AFTER INSTALLATION AND THE BIOCELL IS ESTABLISHED, THE BIOCELL MUST BE INSPECTED ONCE A MONTH AND WITHIN 24 HOURS AFTER EVERY STORM EVENT GREATER THAN 1.0 INCHES IN ACCORDANCE WITH THE NCDEQ M.D.C.. RECORDS OF INSPECTION AND MAINTENANCE WILL BE KEPT IN A KNOWN SET LOCATION AND WILL BE AVAILABLE UPON REQUEST. A LOG BOOK IS RECOMMENDED. DRAINAGE AREA TO BIORETENTION CELL ENSURE VEGETATION IS WELL ESTABLISHED ON ALL PERVIOUS AREAS DRAINING TO THE BIORETENTION CELL PERVIOUS AREAS THAT ARE NOT WELL VEGETATED SHOULD BE RESEEDED OR REVEGETATED TO PREVENT ERODED SEDIMENT FROM ENTERING THE CELL OVERALL BIORETENTION AREA (A) ACCUMULATED PAPER, TRASH, AND DEBRIS SHALL BE REMOVED FROM THE BIORETENETION AREA. (B) OBSERVE THE FILTER PERFORMANCE OF THE CELL (MONTHLY). IF THE DRAW DOWN TIME (MAXIMUM DRAW DOWN TIME IS 72 HOURS) CANNOT BE ACHIEVED, CORRECTIVE MAINTENANCE IS NEEDED. CORRECTIVE MAINTENANCE TO RESTORE PROPER DRAWDOWN TIME AND STORMWATER TREATMENT PERFORMANCE OF THE FILTER BED INCLUDES: 1. CLEANOUT THE U N DERDRAIN SYSTEM. 2. REPLACING SOD AND TOP FEW INCHES OF PLANTING SOIL 3. IF APPROPRIATE DRAW DOWN TIME CANNOT BE RESTORED, THE OWNER WILL BE REQUIRED TO REMOVE AND REPLACE THE FILTER BED AND UNDER DRAIN SYSTEM. PRE-TREATMENT (A) INSPECT ENERGY DISSIPATERS FOR PROPER FUNCTIONALITY. SEDIMENTATION BUILD-UP SHOULD BE REMOVED ONCE THE VOIDS BECOME SUBSTANTIALLY FILLED WITH SEDIMENT. THE ROCK MUST BE REMOVED, CLEANED (AWAY FROM THE BIORETENTION AREA) AND PLACED BACK IN ITS ORIGINAL LOCATION. LARGER ROCK OR OTHER MEASURES MAY BE REQUIRED IF THE ROCK IS BEING CARRIED AWAY BY HIGH WATER FLOWS. SOIL MEDIA (A) TEST THE pH OF THE SOIL (ANNUALLY). TO KEEP PLANTINGS HEALTHY, THE PLANTING SOIL SHALL BE TESTED ONCE A YEAR TO DETERMINE IF THE pH IS IN THE ACCEPTABLE RANGE. (B) TEST THE TOXICITY OF THE SOIL. (AS NEEDED, APPROXIMATELY ONCE EVERY 3 YEARS) (C) SEE TABLE FOR PLANTING SOIL CHARACTERISTICS. PLANTING (A) REPLACE PLANTINGS THAT ARE DEAD, DISEASED OR OTHERWISE HAVE FAILED TO ESTABLISH. (B) PRUNING AND WEEDING THE BIORETENTION CELL MAY BE AESTHETICALLY DESIRED. MULCH LAYER (A) INSPECT THE CELL FOR PROPER MULCH COVER. MULCH NEEDS TO BE REAPPLIED IN AREAS WHERE EROSION HAS DISPLACED THE MULCH. IT WILL BE NECESSARY TO REPLACE THE MULCH EVERY YEAR WHEN THE MULCH DECAYS. THE THICKNESS OF MULCH SHOULD BE APPROXIMATELY 3 INCHES. (B) MULCH LAYER SHOULD BE STANDARD LANDSCAPED STYLE, SINGLE OR DOUBLE, SHREDDED HARDWOOD MULCH OR CHIPS. THE MULCH LAYER SHOULD BE WELL AGED (STOCKPILED OR STORED FOR AT LEAST 12 MONTHS), UNIFORM IN COLOR, AND FREE OF OTHER MATERIALS, SUCH AS WEED SEEDS, SOIL, ROOTS, ETC. GRASS CLIPPINGS SHOULD NEVER BE USED AS MULCH MATERIAL OUTLET (A) VERIFY THAT THERE IS DISCHARGE FROM THE UNDERDRAIN WHEN WATER IS PONDED IN THE CELL IF THERE IS NO DISCHARGE FROM THE OUTLET, THE SYSTEM IS NONFUNCTIONAL AND CORRECTIVE MAINTENANCE IS NEEDED IMMEDIATELY TO RESTORE DRAW DOWN. (B) THE OVERFLOW WEIR SHOULD BE INSPECTED TO ENSURE IT IS NOT BLOCKED WITH DEBRIS AND IS FUNCTIONING PROPERLY. (C) INSPECT FOR EROSION AT THE OUTLET AREAS. ERODED AREAS SHOULD BE REVEGETATED IF EROSION CONTINUES TO OCCUR. MATERIAL SPECIFICATIONS (A) SEE TABLE MOWING ACTIVITIES MOWING ACTIVITIES ON THE PROPERTY SHOULD BE CONDUCTED IN SUCH A WAY TO PREVENT LAWN AND CLIPPINGS AS WELL AS ERODED SEDIMENT FROM ENTERING THE BIORETENTION AREA. ONE WAY TO PREVENT CLIPPINGS FROM ENTERING THE AREA IS TO USE MULCHING MOWERS OR BAG AND REMOVE CLIPPINGS FROM SITE. HEAVY EQUIPMENT SHOULD NEVER BE DRIVEN OVER THE BIOCELL PAVED SWEEPING PROGRAM A PAVED SWEEPING PROGRAM SHOULD BE IMPLEMENTED FOR ALL PROPERTIES THAT UTILIZE THE BIORETENTION AREA. SWEEPING PAVED AREAS ON A PERIODIC BASIS WILL HELP EXTEND THE FUNCTIONALITY OF THE BIORETENTION DEVICE BY REDUCING THE POLLUTANT LOAD AND DEBRIS THAT ENTERS IT. DEBRIS SHOULD BE SWEPT AWAY FROM THE PRETREATMENT COMPONENT, THE SWEEPING PROGRAM IS THE RESPONSIBILITY OF THE OWNER. Borum, Wade and Associates, P.A. 621 Eugene Court, Suite 100, Greensboro, NC 27401-2711 PO Box 21882 Greensboro, NC 27420-1882 Phone:336-275-0471 Fax:336-27S-3719 Web: www1m m-wade.00m N.C. License #: C-0868 O . oFEssio ,�/2 = =•¢QSEAL�9<•�'= 1077-1 �ru T.R.C. APPROVAL SET PROJECT: ~ O <LU v > klD LU E"- ^U 1..L 0� z ON&WDEVELOPER: z ks) J LU Z O < � Z � O O � 1L < lY - O IZ Z, � O Z � X O O m A Z < LU U-1 LL_I w = LU QL O 4100 HELL5PRI% DRIVE 6REEN5BORO, NORTH ( AROLINA 21410 036) 545-5400 PRANN BY: KLM DATE: 0CT0ff R 31, 201a REVISIONS: 5HEET TITLE: S.G.M. PLAN B106ELL #(6 R A 551 FILE NO: F:\WdlSpring\sitepIan_SCAdwg DRAWING 5GALE: I'= 20' OVERFLOW WEIR CALCULATIONS Q (ELEV. 823.5) = 11.0 C.F.S. (WEIR CONTROL) Q (ELEV. 824.0) = 18.54 C.F.S. (OUTLET PIPE ORIFICE CONTROL) G-5A EX. SIDEWALK I L = 1.8' 825.0 L = 7.81' L = 7.5' L��Tiy *REMOVE EX. INLET & REBUILD PER C.O.G. STD. #435 *OVERFLOW AND ADJUST TOP TO ELEV.: 823.00 STRUCTURE (SEE DETAIL FOR NOTES) L=6' _ I _ L=6' L = 5.74' L = 7.0' L = 3.0' SEE STORM ROUTING INFORMATION REMOVE EX. GRATE / INLET & REBUILD PER C.O.G. STD. #435 3 INSTALL(SEE DETAIL) GUARD � 100 YR., 24-HR. 3" SOD 3" SOD 10 YR., 24HR. 1 Q (100) = 823.35 823.00 - Q (10) = 823.06 = 3" SOD 2 YR., 24-HR. 1 YR., 24-HR. 3" SOD - 0 Q (2) = 822.31 p Q (1) = 822.20 I I c MAX. PONDING _ NORMAL PONDING I { I I- I -I -I I II I) CV 14�� IrmTri I I I -III- I R.C.P. { _ �'rn 2 -6 SOIL MIXTURE_H \ +I III - I (NON -MECHANICAL I/ { = LOOSE COMPACTION-7 1 819.25 _ - { N I - 4" WASHED - I= SAND 3 818.50 I -I _ -_- I�.................. 818.25 817.92 �o.. I I - I . •` II- I I III III II - II- I816.42 (MAX. DEPTH) GRAVEL UNDERDRAIN I II -III-III-I I - IIII-III I III -I I I- 3 _ A "' UNDERDRAIN PIPE 814.25 (+/-) 6" DIA. SCHEDULE 40 PIPE TENCATE MIRAFI 14ON NON -WOVEN FILTER FABRIC FOR INTERNAL WATER STORAGE THERE IS NO SEASONAL HIGH WATER TABLE (i W S) OVERLAP 18" MIN. @ JOINTS PER (S.H.W.T.) WITHIN 2.0 FEET OFTHE BOTTOM OF BIOCELL. *SEE DETAIL* MANUFACTURER'S SPECIFICATIONS (OR APPROVED EQUAL) SEE INCLUDED REPORT (ELEVATION 814.25). STO R M WATE R CONTROL MEASURE GRASS BIOCELL #2 DETAIL CROSS-SECTION THROUGH EMBANKMENT AT OVERFLOW STRUCTURE SCALE: 1" = 2' L=10.44' SEE STORM ROUTING INFORMATION CLEANOUT (SEE PLANS, TYP.) L = 15.0' L = 9.75' CLEANOUT (SEE PLANS, TYP.) - 824.0 100 YR., 24-H R. 823.0 10 YR., 24-HR. _ Q (100) = 823.35 3 Q(10)=823.06 _ 2 YR., 24-HR. 3" SOD 1 YR., 24-HR. 1 3" SOD MAX. PONDING p Q (2) = 822.31 p Q (1) = 822.20 822.0 - - - 0 zo -III-III-IIII - N N NORMAL PONDING 821.0 Li 111111111H 2'-6" SOIL MIXTURE +' 2'-6" SOIL MIXTURE / \�- (NON -MECHANICAL LOOSE COMPACTION) N \�_ LOOSE COMPACTION) -I I 4" WASHED \ o �; SAND ? 2" MIN. .............................................................................'.'.'.'.'.'.'..'.'.'.'.'.'.'.'.'.'.'.'.'.'..'.'.'.'.'.'.' EX.15 R.C.P. STORM SEWER o :I ..vO. .. v°. ..p°. ..v °. ..vO. .. .. .. .. 817.0(+/-) I- IIII 1 11 1 1-1 1 11 I II I I I II I I I I-IIIIII-III-IIIIIIIII-III III -III -III III-III-IIIIII I I -III IIII I i "' UNDERDRAIN PIPES UNDERDRAIN PIPES 814.25 (+/-) 6" DIA. SCHEDULE 40 PERFORATED PIPE GRAVEL UNDERDRAIN 6" DIA. SCHEDULE 40 PERFORATED PIPE @ 0.50% MIN. SLOPE NCDOT #57 WASHED STONE (MIN. 2" @ 0.50% MIN. SLOPE THERE IS NO SEASONAL HIGH WATER TABLE (SEE PLAN VIEW) OVERTOP OF PERFORATED PIPES) (SEE PLAN VIEW) (S.H.W.T.) WITHIN 2.0 FEET OFTHE BOTTOM OF BIOCELL. IN -PLACE OR SEE INCLUDED REPORT (ELEVATION 814.25). COMPACTED FILLSOILS STORMWATER CONTROL MEASURE GRASS BIOCELL #2 DETAIL CROSS-SECTION THROUGH MIDPOINT OF BIOCELL SCALE: 1" = 2' SEE RETAINING WALL DESIGN FOR COORDINATION RETAINING WALL Q (10 YR., 10 MIN) = 4.08 C.F.S. L = 7.5' (+/-) 2' 2' L 2' BIOCELL CLASS "B" RIP RAP #57 WASHED STONE D = 18" D = 6" so - 2 823.14 FOREBAY t 00/6 -� 1 I I I I -III -I I -I I -I III -I I( -III I I I I I IIII-III-III-I I �- FILTER FABRIC SEE RETAINING WALL DESIGN FOR COORDINATION CROSS SECTION RETAINING WALL Q (10 YR., 10 MIN) = 4.08 C.F.S. * 10 YEAR, 10 MIN. INTENSITYLL =17' I , 2' I , 2' I _ 2' DRAINAGE FROM SITE Q(10) = 4.08 C.F.S.* CLASS "B" RIP RAP #57 WASHED STO D = 18" WePTO WIN pm ro FM .�a,�. •. .ems►• i. J• .���.9Ff;4!#L. i. t• .I�at�► •. •. t• .As,�. i. .�st�. r. ► i�a�. i. �. .. .Asl�. •. •. ..��. •. �. .�a�► i� ' II RIP RAP OUTLET & FOREBAY @ INLET TO BIOCELL FOREBAY CALCULATIONS AND DATA:: 1. MIN. L REQUIRED = 8.0 FT. (FROM FIGURE 8.06b OF NCDEQ EROSION CONTROL DESIGN MANUAL). 2. WEIR LENGTH PROVIDED: 26.0' (+/-). H = 0.14 FT. DISPERSED OVER BAFFLE WEIR (O.K.). BIOCELL 6" DIA. SCHEDL PERFORATED (SEE PLAN VII 4 ROWS OF 3 823.0 DIAMETER H( 822.0 900 TYP. ' READED CLEANOUT CAP & PLUG ELEV.: 823.0 TOP OF SOD ELEV.: 821.0 6" SCHEDULE 40 SOLID PVC PIPE i SWEEP 90° ELBOW b•' (IYN.) 6 - INCH P.V.C. COLLECTOR PIPE & CLEANOUT DETAIL N.T.S. FOR USE IN BIOCELLUNDERDRAIN L = 9.0' 3" SOD 3 820.' 2'-6" SOIL MIXTURE E I LOOOM ACTION) =I 4" WASHED SAND - _ _ I 818.25 .................................................. _ 817.92 v ° _ 822.0 821.0 I816.50* III -I I I I III III III -III -I *VARIES FROM ELEVATION 816.67 AT OUTER EDGE TO ELEVATION 816.42 AT END OF UNDERDRAIN AT INLET. TENCATE MIRAFI 140N NON -WOVEN FILTER FABRIC OVERLAP 18" MIN. @ JOINTS PER MANUFACTURER'S SPECIFICATIONS (OR APPROVED EQUAL) ;ASH GUARD I N LET* *CONSTRUCT NEW TOP TO ELEV. 823.00 y y i y y 4 y y y y y W y y ly a BIOCELL OVERFLOW STRUCTURE INLET NOTES: 1. OVERFLOW STRUCTURE TO BE REBUILT PER C.O.G. STD. #435. 2. CONTRACTOR WILL APPLY BRICK & MORTAR FINISHING TECHNIQUES CONSISTENT WITH FINISHED BRICK WORK ON EXPOSED SECTION OF STRUCTURE. BRICKS TO MATCH COLOR OF THE NEW CONSTRUCTION. 3. SUBMIT SHOP DRAWING OF TRASH GUARD TO ENGINEER FOR REVIEW AND APPROVAL PRIOR TO MANUFACTURE AND INSTALLATION. RETAINING WALL L = 11.2' TOP OF BERM: / L=10' I L=8' 820.75 824.0 L=4' INLET *SEE TRASH GUARD DETAIL (SEE DETAIL THREADED CLEANOUT & NOTES) ❑❑a❑❑❑H CAP & PLUG ELEV.: 823.0 ELEV.: 823.0 6" SCHEDULE 40 SOLID PVC PIPE - N WALL OF - OVERFLOW STRUCTURE ( 819.25I 818.50 (EX.) 6" DIA. SCHEDULE 40 COLLECTOR DRAIN (SEE PLAN VIEW) NOTE: UPTURNED ELBOW IS LOCATED OUTSIDE OF DRAINAGE STRUCTURE BECAUSE EX. PIPE INVERT IS IS ABOVE BOTTOM OF BIOCELL a 816.75 6" STANDARD 90" ELBOW UPTURNED ELBOW & EX. STRUCTURE DETAIL N.T.S. FOR USE IN BIOCELL OVERFLOW STRUCTURE TO PROVIDE INTERNAL WATER STORAGE (I.W.S.) (SEE PLAN) 824.0 823.0 822.0 821.0 EX. SIDEWALK 1 TOP OF SOD ELEV.: 821.0 6" DIA. SCHEDULE 40 PERFORATED PIPE & COLLECTOR DRAINS (SEE PLAN VIEW) i I i a �"��� �r r r Suyro,rs Borum, Wade and Associates, P.A. 621 Eugene Court, Suite 100, Greensboro, NC 27401-2711 PO Box 21882 Greensboro, NC 27420-1882 Phone-336-275-0471 Fax: 336-275-3719 Web: www.borum-wade.com N.C. License #: C-0868 ONF10 Q.� ...... R0 I =Q .•OFESS���•�� SEAL, 10771 S t !o tal t9 l T.R.C. APPROVAL SET PROJEGT: V 1 LU < V LU' 1� LU O ` v III o < (y- Q ___► � tv O LL_ v LU lV F•- � z - � LWU O 0 Q Z LU Q) W 2 LU � LtJ O • LU M 01'M ,/DEVELOPER: {ALL • SPRING 4100 14415PRINO DRIVE CREEK-WRO, NORTH GAROLINA 21410 (33(g) 545-5400 DRAWN BY: KLM DATE: OGTOBER 31, 2019 REM510N5: 5HEET TITLE: S.G.M. PLAN BIDGELL #2 (6RA 5). FILE NO: F:\WeI1Spdng\sitep1on_SCA.dwg DKANUNG 5GALE: I'= 20' FLAN SHEET NO. G-5B