Loading...
HomeMy WebLinkAboutSW5220601_Supplement-EZ Form_20220712SUPPLEMENT-EZ COVER PAGE PROJECT INFORMATION 1 Project Name 2 Project Area ac 3 Coastal Wetland Area ac 4 Surface Water Area ac 5 Is this project High or Low Density? 6 Does this project use an off -site SCM? Community Baptist Church 29.66 0 No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided [feet NIA 8 Will the vegetated setback remain ve etated? 9 If BUA Is mposed in the setback, does it meet NCAC 02H.1003 4 C-d ? 10 1 Is streambank stabilization proposed on this project? NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting RWH 18 Green Roof 19 Level Spreader -Filter Strip LS-FS 20 Disconnected Impervious Surface DIS 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED NER CERTI Name and l 29 I Street address: 31 ]Phone 32 Email: Zachary Gardner, PE ,nmey Engineering Assocites; PLLC 150 S. Fayetteville St. Asheboro. NC 27203 336-328-0902 zach@summeyengineedng.com C_artirication Statement I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. lv._ os- 2 3 - 2 0 Z 2 gnatur of Designer DRAINAGE AREAS 1 Is this a hjo q@sn / prnj ect9 NO 2 . if i6. number of dralnams areas/SCMs 0 3 i Does this pro ec[.havice low tlensity areas? Y"s a If S4, number of low ai sily drainage areas 1 Is alVW of this project subject to pravk6s role 5 verslons7 No DRAINAGE AREA INFORMATION Entire Site: 1.0.1 4 5 Type of SCM 1292117 13.2981 of . Total drainage area (sq ft)_1292117 8 i Onsite drainage area (sq ft 7 Offsite drainage area (sq ft) 8 1 Total BUA in project (sq ft 132981 st _10 ii New BUA on subdivided lots (subject to permitting) New BUA not on subdivided lots (subject to ermitlina) s Offsite BUA A fl _ 6_9273 of 30308 of 291 of 17874 at 12 Breakdown of new BUA not on subdivided lots: - Parking s .ft 38308 at 291 at 17874 of Sltlewalk ft Roof (sq ft Roadwa ft Future ft 13 Other, please specify in the comment box below sq ft�. New infiltrating permeable pavement on subdivided Ilots sq f1. 14 New infiltrating permeable pavement not on psubdivided lots (sq ft 15 (Existing BUA that will remain (not subject to ermitlin _(sa p) 76708 at 76708 of T9 Erdstin BUA That is already permitted (sq ft 17 lExIsling BUA that will be removed ft sr _ $1 18 (Percent BUA 10°M 1096 19 IDesion storm (inches) 201pasianvolume of SCM (cu ft) 21 1 Calculation method for des) n volume ADDITIONAL INFORMATION Please use III IS space to provide any addlltonal information about the 22 prainage area(0 LOW DENSITY DMGN REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 02.14.1003 1 Is project below density thresholds set forth in the applicable stormwater rule? Does project maximize dispersed flow and minimize channelization of flow? Has the use of piping been minimized per ,1003(2)(c)? Side elopes of the vegetated tbnveytatices. HIV) Yes Yes — Yes N/A 2 3 4 5 Maximum velocity in the vegetated conveyances during the 10-year storm? 6 Are curb outlet swales proposed? NO 7 Maximum longitudinal slope of curb outlet swale(s) (%) B Bottom width of curb outlet swale(s) (feet) 9 Maximum side slope of curb outlet swale(s) (H:V) 10 _ 1 Minimum length of curb outlet swale(s) (feet) 11 Are treatment swales used instead of curb outlet swales? Is stormwater released at the edge of the setback as dispersed flow? Have stormwater outlets been designed to prevent downslope erosion? Are variations to rule 1003 proposed? Yes _ Yes No 12 13 14 ADDITIONAL INFORMATION 15 1 Please use this space to provide any additional information about this low density project: There are no proposed sweles or plpes as a part of this project. All stormwater will sheet flow off of the proposed project. kN2BUA I Pervious Q Slope Vk- V...w Flow dept