HomeMy WebLinkAbout20070295 Ver 1_RAP19000-NWP Issued-2020-05-08-Corrected_20220707U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2012-01298 County: Wake U.S.G.S. Quad: NC -Wake Forest GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: ALF Holding Village LLC Scott Lav Address: 1001 Chestnut Street, suite 101 Philadelphia, PA 19107 Telephone Number: 919-714-7279 E-mail: scotareadercommunities.com Size (acres) 131 Nearest Town Wake Forest Nearest Waterway Smith Creek River Basin Neuse USGS HUC 03020101 Coordinates Latitude: 35.9616 Longitude: -78.5096 Location description: The project site is approximately 131 acres and is identified as future phases 1-4 of the existing Holden Village residential subdivision, bordered to the north by NC Hwy 98 bypass, and to the south by existing Holding Village subdivision. Description of projects area and activity: This permit verification allows for 779 linear feet of stream channel impacts (581 LF permanent loss from fill, 74 LF permanent/no loss for rip rap installation, and 124 LF temporary from construction access), 0.12 acre of temporary wetland impacts, and 0.07 acre of permanent open water impacts for the construction of future phases of the Holding Village residential subdivision. Mitigation is required for this proposal. Applicable Law(s): © Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: NWP 29. Residential Developments SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed Conditions, your application signed and dated 3/3/2020, and the enclosed plans Holding Village North Lake dated 3/2/2020. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management Morehead City, NC, at (252) 808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact James Lastinger at 919-554-4884 ext 32or James.C.Lastin2er(aeusace.armv.mil. Digitally signed by LASTINGER.JAMES.C.1363642400 Corps Regulatory Official: t/ Date: 2020.04.08 14:17:32-04'00' Date: 4/8/2020 Expiration Date of Verification: 03/18/2022 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cmapex/f?p=136:4:0 Copy fumished: Agent: McAdams Company Jennifer Burdette Address: 2905 Meridian Parkway Durham, NC 27713 Telephone Number: 919-361-5000 E-mail: burdette(a,mcadamsco.com SAW-2012-01298 SPECIAL CONDITIONS a. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit authorization. b. All recommendations in the attached letter from the North Carolina State Historic Preservation Office dated March 19, 2020, are hereby incorporated as special conditions of this permit. North Carolina Department of Natural and Cultural Resources State Historic Preservation Office Ramona M. Bartos, Administrator Governor Roy Cooper Office of Archives and History Secretary Susi H. Hamilton Deputy Secretary Kevin Cherry March 19, 2020 James Lastinger US Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 James.C.Lastinger@usace.army.mil Re: Holding Village North Lake Residential Subdivision, NC 98 Bypass, Wake Forest, Wake County, ER 19-5131 This letter supplements our comments provided to the applicant for the above -referenced project in a letter dated February 12, 2020. One cemetery (31WA1987) is in the project area. Cemeteries are protected under North Carolina General Statutes (NCGS) Chapter 14-148 and 149. They are afforded consideration under NCGS Chapter 65. Unmarked burials are afforded consideration under the provisions of NCGS Chapter 70 Article 3, the Unmarked Human Burial and Human Skeletal Remains Protection Act. Due to the age of the cemetery, it has high potential for containing unmarked graves. A ground penetrating radar (GPR) survey has been completed to delineate the boundaries of the cemetery by identifying subsurface anomalies that may represent unmarked graves. Upon completion of the survey, stakes were placed 20 feet from the closest potential graves. We recommend that this delineated area be avoided during any construction related activities. The applicant intends to dedicate 7,480 square feet of land to the cemetery as a buffer for the potential burials, erect new fencing, and dedicate 766 square feet of land to the cemetery. However, two anomalies that were identified as potential graves cannot be avoided. We recommend that these anomalies be investigated archaeologically and if they are identified as human burials, we recommend they be treated in accordance with NCGS Chapter 70. We recommend that permitted construction activities associated with the proposed project be allowed to proceed with the following conditions: • The proposed protection procedures for cemetery 31WA1987 be implemented • A 30-foot protective zone around the two subject GPR anomalies, within which mechanized ground disturbance is prohibited, be marked with high -visibility fencing and maintained until the recommended archaeological work, inclusive of our review of all resulting reports, is complete Location: 109 East Jones Street, Raleigh NC 27601 Mailing Address: 4617 Mail Service Center, Raleigh NC 27699-4617 Telephone/Fax: (919) 807-6570/807-6599 The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106 codified at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have questions concerning the above comment, contact Renee Gledhill -Earley, environmental review coordinator, at 919-814-6579 or environmental.review@a,ncdcr.gov. In all future communication concerning this project, please cite the above referenced tracking number. Sincerely, artos, P eputy etate Historic Preservation Officer Action ID Number: SAW-2012-01298 County: Wake Permittee: ALF Holding Village LLC, Scott Lay Project Name: Holding Village subdivision Date Verification Issued: 4/8/2020 Project Manager: James Lastinger Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: James Lastinger Raleigh Regulatory Office U.S Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 or James.C.Lastinger@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date Compensatory Mitigation Responsibility Transfer Form Permittee: ALF Holding Village LLC, Scott Lay Action ID: SAW-2012-01298 Project Name: Holding Village subdivision County: Wake Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate mitigation Sponsors. Instructions to Sponsor: The Sponsor must verify that the mitigation requirements (credits) shown below are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project Manager, and the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements: Permitted Impacts Requiring Mitigation* 8-digit HUC and Basin: 03020201, Neuse River Basin Stream Impacts (linear feet) Wetland Impacts (acres) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 207 *If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8-digit HUC and Basin: 03020201, Neuse River Basin Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 414 Mitigation Site Debited: NCDMS (List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS acceptance letter identifies a specific site, also list the specific site to be debited). Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor Name: Name of Sponsor's Authorized Representative: Signature of Sponsor's Authorized Representative Date of Signature Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE Project Manager (address below) is provided with a signed copy of this form. • If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the USACE, the Sponsor must obtain case -by -case approval from the USACE Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance and a new version of this form must be completed and included in the USACE administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions: A letter from NCDMS, confirming they are willing and able to accept the applicant's compensatory mitigation responsibility, dated 12/10/2019 was included with the preconstruction notification. This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1) the Permittee, 2) the USACE Project Manager at the address below, and 3) the Wilmington District Mitigation Office, Attn: Todd Tugwell, 11405 Falls of Neuse Road, Wake Forest, NC 27587 (email: todd.tugwell@usace.army.mil). Questions regarding this form or any of the permit conditions may be directed to the USACE Project Manager below. USACE Project Manager: USACE Field Office: Email: James Lastinger Raleigh Regulatory Office US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 James.C.Lastinger@usace.army.mil Digitally signed by LASTINGER.JAMES.C.1363642400 Date: 2020.04.08 14:20:48 -04'00' 4/8/2020 USACE Project Manager Signature Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at http://ribits.usace.army.mil ww,mc.am5co.corn VNI1OUVJ 1-1IIION DIVAA GVOU 13dVHD dIHSCIN31):Id SdVlAllDVd1All U3ddnaaNV lAJVRIIS DIV1 HilION 39V111A 9N1a1OH PLAN INFORMATION 8 cc w Ll IMPACT AREA 1 PERMANENT STREAM IMPACT AREA - S15 (ROAD WIDENING) +/- 20 LF (122 SF) -\\ .,, ,..„,,,- .--, - ._ -11 \ \ \.\\' PERMANENT STREAM IMPACT AREA - S1 (FILL) +/- 127 LF (438 SF) TEMPORARY GRADING FOR ROADWAY CONSTRUCTION PARCEL DEVELOPMENT GRADING ZONE 2 NEUSE STREAM BUFFER (MEASURED 50' FROM TOP OF BANK, EACH SIDE) ZONE 1 NEUSE STREAM BUFFER (MEASURED 30' FROM TOP OF BANK, EACH SIDE) j LEGEND STREAM S2 (UT TO SPRING BRANCH) ZONE 2 BUFFER IMPACT-8 AREA (1,691-SF) ZONE 2 BUFFER IMPACT-B2 AREA (8,006 SF) ROAD CROSSING //2 PROPOSED 96" CMP CULVERT TEMPORARY STREAM IMPACT AREA - S5 +/- 28 LF (82 SF) PERMANENT STREAM IMPACT- CULVERT PERMANENT STREAM IMPACT- RIPRAP TEMPORARY STREAM IMPACT ZONE 1 NEUSE BUFFER IMPACT ZONE 2 NEUSE BUFFER IMPACT PERMANENT STREAM IMPACT AREA - S2 (CULVERT) +/- 227 LF (1,089 SF) TEMPORARY STREAM IMPACT AREA - S4 +/- 6 LF (24 SF) J ROAD CROSSING #1 .PROPOSED 48" CMP CULVERT Y PERMANENT STREAM IMPACT -' AREA - S3 (RIPRAP) +/- 18 LF (73 SF) ■ W .{ram• / 4 i� 1 — ZONE 1 BUFFER IMPACT-B1 AREA (403 SF) STREAM 57 EXISTING WETLAND TEMPORARY STREAM IMPACT AREA - S8 +/- 5 LF (19 SF) PERMANENT STREAM IMPACT AREA - S7 (RIPRAP) +/- 28 LF (165 SF) PERMANENT STREAM IMPACT AREA - S6 (CULVERT) +/- 126 LF (851 SF) ZONE 1 BUFFER IMPACT-B2 AREA (10,845 SF) GRAPHIC SCALE 25 50 100 PERMANENT STREAM IMPACT- OFFSITE ROAD WIDENING PERMANENT STREAM IMPACT- FILL 1OF10 Pro,ecr,\ RAP \aAP-1900 0aProduction\ Engineering , Construction Drawings , Current Drawl e.,ImpacrUap=\RAPl9009- , arr,dwp 11,1,/101925113PM Torres Mara 1 inch = 50 ft. MCADAMS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361.2269 license number, C-0293, 0-187 www.mceeamsco.enm HOLDING VILLAGE NORTH LAKE IMPACT MAPS FRIENDSHIP CHAPEL ROAD WAKE FOREST, NORTH CAROLINA IMPACT AREA 1 PROJECT NO. RAP-19000 FILENAME RAP19000-IMP CHECKED BY JCM DRAWN BY MCT SCALE 1" = 50' DATE 11.19.2019 IMPACT AREA 1A - CULVERT CROSS SECTION FINISHED CL GRADE 320 310 \ EXISTING \ \ \ 4' CMP CIRCULAR CULVERT CIRCULAR CCULVERT CMP GRADE i' \ ',.. �, __-----� / --- 300 III I1I 1 11 \----- , 1 I 1I INV IN=302.16 INV OUT=296.52 I I I I IJ / I II 1 CULVERT 0.8' IMBEDDED IN STREAM BED I I INV INV IN=295.57 OUT=293.90 CULVERT IMBEDDED 1' IN STREAM BED 290 10+00 TYPICAL CROSS SECTION W/ RIPRAP NOT TO SCALE 11+00 1A OF 10 x.\Proieees\R<P\RAP-1s0o0\Od-Pmeormon\Engineering \Construction Drawings \ Current Draw g•\Impact Mapa3010l9000.1mpar[s.dwg,00/19/20199:51:25 PM, Torres, Marra 12+00 MCADAMS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number, C-0293, C-187 www.mcadamsco.enm HOLDING VILLAGE NORTH LAKE IMPACT MAPS FRIENDSHIP CHAPEL ROAD WAKE FOREST, NORTH CAROLINA IMPACT AREA 1A PROJECT NO. RAP-19000 FILENAME RAP19000-IMP CHECKED BY JCM DRAWN BY MCT SCALE 1:40 DOR, 1:4 VERT DATE 11.19.2019 IMPACT AREA 2 ZONE 2 NEUSE STREAM BUFFER (MEASURED 50' FROM TOP OF BANK, EACH SIDE) ZONE 1 NEUSE STREAM / - A C�j /BUFFER (MEASURED 30' FROM 1 / F TOP OF BANK, EACH SIDE) / /- / /+ / LEGEND PERMANENT STREAM IMPACT - CULVERT 111 PERMANENT STREAM IMPACT - RIPRAP TEMPORARY STREAM IMPACT ZONE 1 NEUSE BUFFER IMPACT ZONE 2 NEUSE BUFFER IMPACT 2 OF 10 Projects\RAP \RAP-19p000aProdur Engineering \ Construction Drawings \ Current Drawl e.\ImPactMaps \RAP19poo-9mparr,.dag,00/1„101925133PM, Torres, Maria ZONE 1 BUFFER IMPACT—B3 AREA (446 SF) ZONE 2 BUFFER IMPACT—B3 AREA (262 SF) GRAPHIC SCALE 20 40 1 inch = 40 ft. MCADAMS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.meadamseo.enm HOLDING VILLAGE NORTH LAKE IMPACT MAPS FRIENDSHIP CHAPEL ROAD WAKE FOREST, NORTH CAROLINA IMPACT AREA 2 PROJECT NO. RAP-19000 FILENAME RAP19000-IMP CHECKED BY JCM DRAWN BY MCT SCALE 1" = 40' DATE 11,19.2019 IMPACT AREA 3 PROJECT PROPERTY \ \ \ PERMANENT STREAM IMPACT AREA - S10 (CULVERT) +/- 81 LF (442 SF) ZONE 2 NEUSE STREAM z 6-6 -/- TEMPORARY STEAM / IMPACT AREA - S12 / +/- 10 LF (37 SE) 7 I �1 BUFFER (MEASURED 50' FROM 3>0 TOP OF BANK, EACH SIDE) / - 1 / / / 7 c8 / / O6 / /; STREAM S1 UT TO SMITH CREEK / _ /� /' EXISTING E / 1 2 WETLAND E A // / i E E / / ° E E /E / r LEGEND c c E/ E TEMPORARY WETLAND IMPACT AREA - W1 / +/- 0.009 AC. (394-SF) E E /E PERMANENT STREAM IMPACT - CULVERT PERMANENT STREAM IMPACT- RIPRAP TEMPORARY STREAM IMPACT ZONE 1 NEUSE BUFFER IMPACT ZONE 2 NEUSE BUFFER IMPACT TEMPORARY WETLAND IMPACT 30F10 Pro,ecrs\RAP \RAP-19p000aProdu n\E"ginaaring\constructionDra,,ngs\c"rrenroraaxi gs IrripactMapa\RAP19poo-1mparta.2a0,12/1,/101925141PM,Torres,Marla 7/,'/ TEMPORARY STREAM IMPACT AREA - S9 +/- 24 LF (133 SF) ROAD CROSSING #3 PROPOSED 64" CMP CULVERT ZONE 2 BUFFER IMPACT-B4 m� AREA (6,181-SF) ZONE 1 BUFFER IMPACT-B4 AREA (8,226-SF) PERMANENT STREAM IMPACT AREA - S11 (RIPRAP) +/- 28 LF (132 SF) ZONE 1 NEUSE STREAM BUFFER (MEASURED 30' FROM TOP OF BANK, EACH SIDE) GRAPHIC SCALE 20 40 1 inch = 40 ft. MCADAMS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number, C-0293, C-187 www.mcadamsco.enm HOLDING VILLAGE NORTH LAKE IMPACT MAPS FRIENDSHIP CHAPEL ROAD WAKE FOREST, NORTH CAROLINA IMPACT AREA 3 PROJECT NO. RAP-19000 FILENAME RAP19000-IMP CHECKED BY JCM DRAWN BY MCT SCALE 1" = 40' DATE 11.19.2019 IMPACT AREA 3A - CULVERT CROSS SECTION 330 FINISHED CL GRADE \ \ / / / 320 \ // \ \ \ \ \ �\ \ \ / / // j / / EXISTING GRADE / 310 5' CIRCULAR CMP CULVERT \ \ / / / / . 1 1 I II / / /. 1 II / II f INV IN=306.36 INV OUT=304.62 CULVERT IN IMBEDDED STREAM 1' BED 10+00 TYPICAL CROSS SECTION W/ RIPRAP NOT TO SCALE 11+00 3A OF 10 x.\Proieers\ RAP \RAP-19000\oserodurmon\Engineering \Construction Drawings \ Current Drawl g•\impact Maps \RAP1900wmpacts.awg,12/vk0192.51:43 PM, Torres, Maria 12+00 MCADAMS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.enm HOLDING VILLAGE NORTH LAKE IMPACT MAPS FRIENDSHIP CHAPEL ROAD WAKE FOREST, NORTH CAROLINA IMPACT AREA 3A PROJECT NO. RAP-19000 FILENAME RAP19000-IMP CHECKED BY JCM DRAWN BY MCT SCALE 1:40 HOR; 1:4 VERT DATE 11.19.2019 IMPACT AREA 4 ZONE 1 NEUSE STREAM BUFFER (MEASURED 30' FROM TOP OF BANK, EACH SIDE) \ \` ZONE 2 NEUSE STREAM BUFFER (MEASURED 50' FROM TOR OF BANK, EACH SIDE) ' ZONE 2 BUFFER IMPACT—B5 AREA (402—SF)\ ZONE 1 BUFFER IMPACT—B5 AREA (603—SF) PROJECT PROPERTY' LEGEND PERMANENT STREAM IMPACT - CULVERT PERMANENT STREAM IMPACT- RIPRAP �_ TEMPORARY STREAM IMPACT F� ZONE 1 NEUSE BUFFER IMPACT ZONE 2 NEUSE BUFFER IMPACT 40F 10 Pro,ects\RAP \RAP-19p000aProductio Engineering \ Construction Dra,,ngs\CurrentDraaxi e.\Impact Maps \RAP190098mparr,.dag,90/1„1019251:51PM, Torres, Maria /Pe., �JE 02 GRAPHIC SCALE 20 40 1 inch = 40 ft. 02 9- 300 298 MCADAMS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number, C-0293, C-187 www.mcaeamsco.enm HOLDING VILLAGE NORTH LAKE IMPACT MAPS FRIENDSHIP CHAPEL ROAD WAKE FOREST, NORTH CAROLINA IMPACT AREA 4 PROJECT NO. RAP-19000 FILENAME RAP19000-IMP CHECKED BY JCM DRAWN BY MCT SCALE 1" = 40' DATE 11.19.2019 IMPACT AREA 5 a P. LEGEND %//Z ZONE 2 BUFFER IMPACT-B9 AREA (433-SF) ZONE 1 BUFFER IMPACT -BP AREA (636-SF) TOTAL ZONE 2 BUFFER IMPACT-B8 (SEWER EASEMENT) AREA (7,966-SF) TOTAL ZONE 2 BUFFER IMPACT-B7 (PROPOSED GREENWAY) AREA (5,130-SF) ZONE 1 NEUSE STREAM BUFFER (MEASURED 30' FROM TOP OF BANK, EACH SIDE) PROJECT PROPERTY ZONE 2 BUFFER IMPACT-B6 AREA (391-SF) ZONE 1 BUFFER IMPACT-B6 AREA (605-SF) PERMANENT STREAM IMPACT - CULVERT PERMANENT STREAM IMPACT- RIPRAP TEMPORARY STREAM IMPACT ZONE 5 NEUSE BUFFER IMPACT ZONE 2 NEUSE BUFFER IMPACT HOLDING LAKE ZONE 2 NEUSE BUFFER IMPACT (SANITARY SEWER EASEMENT) ZONE 2 NEUSE BUFFER IMPACT (PROPOSED GREENWAY TRAIL) 50F10 Prolecr,,RAP ,aAP-19p000aProductio Engineering , Construction Drawings \ Current Drawl gs IrripactMapa\RAP10000-0parta.deg,10/19/1019251,59PM,Torres,Marla ZONE 2 NEUSE STREAM BUFFER (MEASURED 50' FROM TOP OF BANK, EACH SIDE) GRAPHIC SCALE 25 50 1 inch = 50 ft. 100 \'92 MCADAMS The John R. McAdams Company, Inc, 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number, C-0293, C-187 www.mcadamaco.enm HOLDING VILLAGE NORTH LAKE IMPACT MAPS FRIENDSHIP CHAPEL ROAD WAKE FOREST, NORTH CAROLINA IMPACT AREA 5 PROJECT NO. RAP-19000 FILENAME RAP19000-IMP CHECKED BY JCM DRAWN BY MCT SCALE 1" = 50' DATE 11.19.2019 IMPACT AREA 6 n500—YR FLOO PLAIN 238 2 22 2� FLOODWAY 290 234 299 I , 8 ZONE 2 BUFFER IMPACT—B10 AREA (5,004—SF) \\ 100—YR FLOODPLAIN \ \ ss \ N ZONE 2 NEUSE STREAM \\ V` 1 BUFFER (MEASURED 50' FROM TOP OF BANK, EACH SIDE) '2 V A �V \Cr N N ` ZONE 1 NEUSE STREAM ,�� �� BUFFER (MEASURED 30' FROM TOP OF BANK, EACH SIDE) �� A �\ '�`.//V \` / ��� \. \ y •v I / \ / 1 v, . ,#•\ ‘' PERMANENTLY MAINTAINED \ _. , 30' SEWER EASEMENT , 1 282 LEGEND %/// PERMANENT STREAM IMPACT- CULVERT PERMANENT STREAM IMPACT- RIPRAP TEMPORARY STREAM IMPACT ZONE 1 NEUSE BUFFER IMPACT ZONE 2 NEUSE BUFFER IMPACT 6 OF 10 Proleer,\ RAP, RAP-1900 04-ProductionEngineering \ Construction Drawings , Current Drawl e.,I2PacrUap=\RAP1900018,8s.dwp 11,1„1019252:07PM Torres Mara v • PROJECT PROPERTY '. _ GRAPHIC SCALE 20 40 1 inch = 40 ft. MCADAMS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.enm HOLDING VILLAGE NORTH LAKE IMPACT MAPS FRIENDSHIP CHAPEL ROAD WAKE FOREST, NORTH CAROLINA IMPACT AREA 6 PROJECT NO. RAP-19000 FILENAME RAP19000-IMP CHECKED BY JCM DRAWN BY MCT SCALE 1" = 40' DATE 11.19.2019 IMPACT AREA 7 z --/ ZONE 2 NEUSE STREAM BUFFER (MEASURED 50' FROM - - TOP OF BANK, EACH SIDE) - --- -- �s_ ZONE 1 NEUSE STREAM BUFFER (MEASURED 30' FROM TOP OF BANK, EACH SIDE) ZONE 1 BUFFER IMPACT-B11 AREA (1,809-5F) // TEMPCRARY STREAM �///IMPACT AREA 513 ,/ '+/- 30 LF (60 SF) j / LEGEND PERMANENT STREAM IMPACT- CULVERT PERMANENT STREAM IMPACT- RIPRAP TEMPORARY STREAM IMPACT ZONE 1 NEUSE BUFFER IMPACT ZONE 2 NEUSE BUFFER IMPACT TEMPORARY WETLAND IMPACT 17 2,2 ZONE 2 BUFFER IMPACT-B11 AREA (3,462-SF) / - 2'6 / •Ls/ // / TEMPORARY WETLAND IMPACT AREA - W2 +/- 0.003 AC. (140-5F) / /r /\/ 7 OF 10 Prol ,9RAP\0AP1200004-Production\En3 n09constructionDra ngs \ Current Drawl gz Irripact MapsRAP1302 P , p.3/2/20204,2:13P0.Torres,Maria /,, / 6 6.4 rap`P'' s2-- 296 GRAPHIC SCALE 20 40 1 inch = 40 ft. 1 A MCADAMS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC Z)713 phone 919. 361. 5000 fax 919. 361. 2269 license number, C-0293, C-187 www.mceeamsco.enm HOLDING VILLAGE NORTH LAKE IMPACT MAPS FRIENDSHIP CHAPEL ROAD WAKE FOREST, NORTH CAROLINA IMPACT AREA 7 PROJECT NO. RAP-19000 FILENAME RAP19000-IMP CHECKED BY JCM DRAWN BY MCT SCALE 1" = 40' DATE 03.02.2020 IMPACT AREA 8 ZONE 1 NEUSE STREAM UJ BUFFER (MEASURED 30' FROM TOP OF BANK, EACH SIDE) ,I ' 6\ / V LEGEND PERMANENT STREAM IMPACT - CULVERT PERMANENT STREAM IMPACT- RIPRAP �_ TEMPORARY STREAM IMPACT F//� ZONE 1 NEUSE BUFFER IMPACT ZONE 2 NEUSE BUFFER IMPACT 8 OF 10 Prolecrs\RAP \RAP-19p000aProductio Engineering \ Construction Drawings Current Drawl gs IrripactMaps\0AP19poo-0mparr,.dwg,00/19/2019252:1,PM,Torres,Marla ZONE 2 NEUSE STREAM BUFFER (MEASURED 50' FROM TOP OF BANK, EACH SIDE) / / / i //9 i j / i l ti?9 ZONE 1 BUFFER IMPACT—B12 AREA (523—SF) // /2 / /��� / � ZONE 2 BUFFER IMPACT—B12 AREA (413—SE) / /Pa GRAPHIC SCALE 20 40 1 inch = 40 ft. MCADAMS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number, C-0293, C-187 www.mcadamsco.enm HOLDING VILLAGE NORTH LAKE IMPACT MAPS FRIENDSHIP CHAPEL ROAD WAKE FOREST, NORTH CAROLINA IMPACT AREA 8 PROJECT NO. RAP-19000 FILENAME RAP19000-IMP CHECKED BY JCM DRAWN BY MCT SCALE 1" = 40' DATE 11.19.2019 IMPACT AREA 9 LEGEND PERMANENT STREAM IMPACT - CULVERT PERMANENT STREAM IMPACT- RIPRAP TEMPORARY STREAM IMPACT 17774_ ZONE 1 NEUSE BUFFER IMPACT ZONE 2 NEUSE BUFFER IMPACT /1 I I III r1 500—YR FLOODPLAIN ' 0 , 1 9 OF 10 Proleas\RAP ,RAP-19000\oaProductio Engineering \ Construction Drawings \ Current Drawl gs IrripactMapa\RAP19poo-0mparta.dwg,10/1„2019252:36PM,Torres,Marla ZONE 2 NEUSE STREAM BUFFER (MEASURED 50' FROM TOP OF BANK, EACH SIDE) s W W 1 ZONE 1 NEUSE STREAM BUFFER (MEASURED 30' FROM TOP OF BANK, EACH SIDE) \ \ 100—YR FL000PLAIN \\ ONE 1 BUFFER IMPACT—B13 AREA (609—SF) ZONE 2 BUFFER IMPACT—B13 AREA (616—SF) GRAPHIC SCALE 20 40 1 inch = 40 ft. MCADAMS The John R. McAdams Company, Inc, 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number, C-0293, C-187 www.mcadam,co.enm HOLDING VILLAGE NORTH LAKE IMPACT MAPS FRIENDSHIP CHAPEL ROAD WAKE FOREST, NORTH CAROLINA IMPACT AREA 9 PROJECT NO. RAP-19000 FILENAME RAP19000-IMP CHECKED BY JCM DRAWN BY MCT SCALE 1" = 40' DATE 11.19.2019 IMPACT AREA 10 LEGEND \\ /'k \� v/ /� , ��/�� L� \ \ / \� I N , 10 TEMPORARY SPILLWAY TO BE LINED WITH NCDOT CLASS 'B' RIPRAP PROJECT PROPERTY PERMANENT OPEN-01 WATER IMPACT AREA (2,985—SF) (0.07 AC.) 20 PERMANENT STREAM IMPACT- OPEN WATER TEMPORARY STREAM IMPACT ZONE 1 NEUSE BUFFER IMPACT ZONE 2 NEUSE BUFFER IMPACT 10 OF 10 x\Prolexr,\R,P\RAP-19p000aProductio Engineering \ Construction Dra,,ngs\CurrentDrauw e.\Impact Maps 3RAP19poo-omparta.dwp.11/1„1019252:44PM, Torres, Marra 7 7 / 2'6 / A /9 TEMPORARYAREA STREAM IMPACT514 / /.o '>i ^24) % : , / ZONE 1 BUFFER IMPACT—B14 AREA (7,511—SF) ZONE 2 BUFFER IMPACT—B14 AREA (676—SF) ZONE 1 NEUSE STREAM BUFFER (MEASURED 30' FROM TOP OF BANK, EACH SIDE) ZONE 2 NEUSE STREAM BUFFER (MEASURED 50' FROM TOP OF BANK, EACH SIDE) / / / GRAPHIC SCALE 20 40 1 inch = 40 ft. iL MCADAMS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number, C-0293, C-187 www.meadamseo.enm HOLDING VILLAGE NORTH LAKE IMPACT MAPS FRIENDSHIP CHAPEL ROAD WAKE FOREST, NORTH CAROLINA IMPACT AREA 10 PROJECT NO. RAP-19000 FILENAME RAP19000-IMP CHECKED BY JCM DRAWN BY MCT SCALE 1" = 40' DATE 11,19.2019 Determination of Jurisdiction: A. e There are waters, including wetlands on the above described project area that may be subject to Section 404 of the Clean Water Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. Please note, if work is authorized by either a general or nationwide permit, and you wish to request an appeal of an approved JD, the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work in waters of the United States and prior to any work that could alter the hydrology of waters of the United States. B. D There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. C. ❑ There are waters, including wetlands within the above described project area that are subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. D. ❑ The jurisdictional areas within the above described project area have been identified under a previous action. Please reference jurisdictional determination issued DATE. Action ID: FILE NUMBER. Basis For Determination: See the preliminary jurisdictional determination form dated 04/06/2020. Remarks: None. E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdiction determinations as indicated in B and C above). This correspondence constitutes an approved jurisdiction determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Phillip Shannin, Review Officer 60 Forsyth Street SW, Room 10M15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by Not applicable. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.** Corps Regulatory Official: James Lastinger Date of JD: 04/06/2020 Expiration Date of JD: Not applicable PROCESS AND NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND REQUEST FOR APPEAL Applicant: ALF Holding Village LLC, Scott Lay File Number: SAW-2012-01298 Date: 4/8/2020 Attached is: See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A PROFFERED PERMIT (Standard Permit or Letter of permission) B PERMIT DENIAL C APPROVED JURISDICTIONAL DETERMINATION D PRELIMINARY JURISDICTIONAL DETERMINATION E x SECTION Additional gaig I - The following identifies your rights and options regarding an administrative appeal information may be found at or http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits.aspx of the above decision. Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for fmal authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: • • PROFFERED PERMIT: You may accept or appeal the permit ACCEPT: If you received a Standard Permit, you may sign the permit document and return authorization. If you received a Letter of Permission (LOP), you may accept the LOP and signature on the Standard Permit or acceptance of the LOP means that you accept the permit rights to appeal the permit, including its terms and conditions, and approved jurisdictional permit. APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of you may appeal the declined permit under the Corps of Engineers Administrative Appeal it to the district engineer for fmal your work is authorized. Your in its entirety, and waive all determinations associated with the certain terms and conditions therein, Process by completing Section II of the division engineer within 60 days this form and sending the form to the division engineer. This form must be received by of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers completing Section II of this form and sending the form to the division engineer. This form engineer within 60 days of the date of this notice. Administrative Appeal Process by must be received by the division D: information. • • APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify date of this notice, means that you accept the approved JD in its entirety, and waive all APPEAL: If you disagree with the approved JD, you may appeal the approved JD under Administrative Appeal Process by completing Section II of this form and sending the form approved JD or provide new the Corps within 60 days of the rights to appeal the approved JD. the Corps of Engineers to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your proffered permit in clear concise statements. You may attach objections are addressed in the administrative record.) reasons for appealing the decision or your objections to an initial additional information to this form to clarify where your reasons or ADDITIONAL INFORMATION: The appeal is limited to a record of the appeal conference or meeting, and any supplemental clarify the administrative record. Neither the appellant nor the review of the administrative record, information that the review Corps may add new information the location of information that the Corps memorandum for the officer has determined is needed to or analyses to the record. is already in the administrative However, you may provide additional information to clarify record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the appeal process you may contact: District Engineer, Wilmington Regulatory Division Attn: James Lastinger Raleigh Regulatory Office U.S Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 If you only have questions regarding also contact: Mr. Phillip Shannin, Administrative the appeal process you may Appeal Review Officer South Atlantic Division CESAD-PDO U.S. Army Corps of Engineers, 60 Forsyth Street, Room 10M15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: James Lastinger , 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Phillip Shannin, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 10M15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PJD: 4/8/2020 B. NAME AND ADDRESS OF PERSON REQUESTING PJD: ALF Holding Village LLC, Scott Lay, 1001 Chestnut Street, suite 101, Philadelphia, PA 19107 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington District, Holding Village subdivision, SAW-2012-01298 D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: The project site is approximately 131 acres and is identified as future phases 1-4 of the existing Holden Village residential subdivision, bordered to the north by NC Hwy 98 bypass, and to the south by existing Holding Village subdivision. (USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR AQUATIC RESOURCES AT DIFFERENT SITES) State: NC County: Wake City: Wake Forest Center coordinates of site (lat/long in degree decimal format): Latitude: 35.9616 Longitude: -78.5096 Universal Transverse Mercator: Name of nearest waterbody: Smith Creek E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ▪ Office (Desk) Determination. Date: ® Field Determination. Date(s): July 9, 2019 TABLE OF AQUATIC RESOURCES INREVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY JURISDICTION Site Number Latitude (decimal degrees) Longitude (decimal degrees) Estimated amount of aquatic resources in review area (acreage and linear feet, if applicable Type of aquatic resources (i.e., wetland vs. non -wetland waters) Geographic authority to which the aquatic resource "may be" subject (i.e., Section 404 or Section 10/404) W1 (A) 35.96130000 -78.50610000 0.195163 acre Wetland Section 404 W2 (D) 35.95870000 -78.51310000 0.046675 acre Wetland Section 404 W3 35.96160000 -78.50590000 0.001597 acre Wetland Section 404 W4 (E2) 35.96320000 -78.51360000 0.113246 acre Wetland Section 404 W5 (El) 35.96350000 -78.51420000 0.077847 acre Wetland Section 404 W6 (F) 35.96470000 -78.50880000 0.034393 acre Wetland Section 404 W7 35.96440000 -78.51000000 0.008518 acre Wetland Section 404 W8 35.96460000 -78.50960000 0.009025 acre Wetland Section 404 W9 35.96460000 -78.50940000 0.054505 acre Wetland Section 404 W10 35.96430000 -78.50800000 0.005665 acre Wetland Section 404 W11 35.96390000 -78.50800000 0.055986 acre Wetland Section 404 W12 35.96370000 -78.50760000 0.001531 acre Wetland Section 404 W13 35.96200000 -78.50600000 0.034459 acre Wetland Section 404 S1 35.95890000 -78.51387600 144 feet Non -wetland Section 404 S2 35.96340800 -78.50761500 4009 feet Non -wetland Section 404 S3 35.96066800 -78.50389000 612 feet Non -wetland Section 404 S4 35.96112600 -78.50640100 490 feet Non -wetland Section 404 S5 35.96345400 -78.50739700 294 feet Non -wetland Section 404 S6 35.96357700 -78.50787800 70 feet Non -wetland Section 404 S7 35.96462300 -78.51083500 582 feet Non -wetland Section 404 P1 35.96301800 -78.51268000 1.8 acres Non -wetland Section 404 1. The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2. In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre- construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "may be" waters of the U.S. and/or that there "may be" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items are included in the administrative record and are appropriately cited: ▪ Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: Map: See attached dated July 9, 2019 ▪ Data sheets prepared/submitted by or on behalf of the PJD requestor. Datasheets: ▪ Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. Rationale: ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ▪ U. S. Geological Survey Hydrologic Atlas: ▪ USGS NHD data: ❑ USGS 8 and 12 digit HUC maps: ® U. S. Geological Survey map(s). Cite scale & quad name: ▪ Natural Resources Conservation Service Soil Survey. Citation: ® National wetlands inventory map(s). Cite name- USFWS NWI ❑ State/local wetland inventory map(s): ▪ FEMA/FIRM maps: NC FIRM Maps ❑ 100-year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929) ® Photographs: ® Aerial (Name & Date): undated or ❑ Other (Name & Date): ❑ Previous determination(s). File no. and date of response letter: ❑ Other information (please specify): IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should not be relied upon for later jurisdictional determinations. Digitally signed by LASTI NG ERJAM ES.C.13636 42400 Date: 2020.04.08 14:24:00 -04'00' Signature and date of Regulatory staff member completing PJD 04/06/2020 Signature and date of person requesting PJD (REQUIRED, unless obtaining the signature is impracticable)' 1 Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to fmalizing an action. LEGEND ▪ Project Area — —•• Streams — Wetlands - Pond Parcels 2-ft contours cif 2 2 2 7.---':--------- \t,-) f ite,..,.....„4 1 /1/// i I ' r'- " . -. -- - 't.t . di FIGURE 4. VERIFIED JURISDICTIONAL DETERMINATION MAP HOLDING VILLAGE NORTH LAKE WAKE FOREST, WAKE COUNTY, NC (Verified by James Lastinger, USAGE on July 9, 2019) 0 200 400 Feet 1 inch = 400 feet VERSION: 1